Enbridge Pipelines (East Texas) L.P. v. Avinger Timber, Llc , 55 Tex. Sup. Ct. J. 1387 ( 2012 )


Menu:
  •                 IN THE SUPREME COURT OF TEXAS
    444444444444
    NO . 10-0950
    444444444444
    ENBRIDGE PIPELINES (EAST TEXAS) L.P., PETITIONER,
    v.
    AVINGER TIMBER, LLC, RESPONDENT
    4444444444444444444444444444444444444444444444444444
    ON PETITION FOR REVIEW FROM THE
    COURT OF APPEALS FOR THE SIXTH DISTRICT OF TEXAS
    4444444444444444444444444444444444444444444444444444
    Argued February 27, 2012
    JUSTICE JOHNSON , joined by JUSTICE GREEN and JUSTICE WILLETT , dissenting.
    The Court, focusing on a report by Avinger’s appraisal expert David Bolton that was not
    introduced into evidence at trial, concludes “[i]t is apparent that Bolton was not valuing the 23.79
    acres improved by the pipeline infrastructure that Avinger lost, but rather the gas processing facility
    that Enbridge Pipelines gained,” and his testimony “impermissibly focused on the benefit to
    Enbridge Pipelines in avoiding the cost of removing the plant.” ___ S.W.3d at ___. I disagree that
    Bolton’s testimony supports the Court’s statement. I also disagree that the trial court abused its
    discretion by admitting the portion of Bolton’s testimony related to Enbridge’s contractual obligation
    to remove its plant. Bolton testified that the Uniform Standards of Professional Appraisal Practice
    (USPAP) and Texas law required him to consider the effect of the lease provision requiring Enbridge
    to remove its plant within six months after the lease expired, and he did. However, in his trial
    testimony, which is the issue here, he did not assign any value to that obligation. Rather, he valued
    only Avinger’s land without Enbridge’s plant on it, and clearly based his opinion of market value
    on accepted income and comparable sales methodologies. I respectfully dissent.
    I. Background
    Beginning in 1973, predecessors in interest of Enbridge Pipelines (East Texas) L.P.
    (Enbridge) leased 23.79 acres of East Texas land (the property or the leased property) from the
    predecessors in interest of Avinger Timber, LLC (Avinger). In 2001 Enbridge Processing, an
    affiliate of Enbridge, acquired the lessee’s interest in the Avinger lease, which had been renewed in
    1998 and expired on April 2, 2004. During the 31 years the lease was in effect, a “mid-stream” gas
    processing plant was built on the property and environmentally permitted for processing operations,
    and infrastructure supporting operation of the plant was put in place. There is no dispute that (1) the
    Avinger lease expired on April 2, 2004; (2) the date of taking was April 7, 2004; (3) millions of
    cubic feet of raw natural gas flowed through fifteen or sixteen pipelines into Enbridge’s plant for
    processing on a daily basis; (4) high voltage electrical lines had been built through surrounding raw
    timberland to supply electricity to the plant; (5) environmental permits were in place for operation
    of the gas processing plant; (6) the property is in one of the most prolific gas-producing counties in
    Texas and the field was predicted to produce until at least “the end of the century;” and (7) Enbridge
    was contractually required to remove its plant no later than six months from the date the lease term
    expired.
    2
    II. Standards
    A landowner whose property is taken by condemnation is entitled to compensation in the
    amount of its market value, which is the value to a willing buyer under no compunction to buy and
    to a willing seller under no compunction to sell. City of Harlingen v. Estate of Sharboneau, 
    48 S.W.3d 177
    , 182 (Tex. 2001).1 But the amount of compensation is determined by what is taken from
    the landowner, not what the property’s special value might be to the taker. See City of Dallas v.
    Rash, 
    375 S.W.2d 502
    , 505 (Tex. Civ. App.—Dallas 1964, writ ref’d n.r.e.) (citing United States v.
    Milner, 
    317 U.S. 369
    (1943)). Bolton testified, and the parties do not dispute, that appraisers must
    consider every factor affecting a property’s value when they appraise condemned property to
    determine its market value. That stands to reason because fact finders are to consider all factors that
    affect the property’s value to willing buyers and sellers when they determine the market value of
    property taken through condemnation proceedings. City of Ft. Worth v. Corbin, 
    504 S.W.2d 828
    ,
    830 (Tex. 1974). Furthermore, Bolton testified that the USPAP requires appraisers to consider the
    effect on a property’s value of lease or contractual agreements to which the property is subject and
    that Texas law requires appraisers to abide by those standards in making appraisals. See TEX . OCC.
    CODE §§ 1103.002, .005, .154, .201, .405.
    1
    The jury charge defined market value as follows:
    The term “MARKET VALUE” means the price which the property would bring when it is offered for
    sale by one who desires to sell, but is not obliged to sell, and is bought by one who desires to buy, but
    is under no necessity of buying it, taking into consideration all of the uses to which it is reasonably
    adaptable and for which it either is or in all reasonable probability will become available within the
    reasonable future.
    3
    III. The Testimony
    A. Donald Niemiec
    Donald Niemiec was one of Avinger’s witnesses. Before he retired, Niemiec worked in the
    mid-stream gas processing business for many years in several capacities for several companies,
    including managing multiple gas processing plants. He had been involved in valuing and selling
    mid-stream processing plants and was familiar with the factors affecting the value of such plants in
    the marketplace. After retiring, Niemiec continued working as a consultant in the industry and
    served on several industry committees related to the gas processing business. He testified that the
    property was special because of the infrastructure in place to support a gas processing plant, its
    location in a long-lasting and highly-productive gas field, and its established history of processing
    gas in that area. He characterized it as “unique” because of the lease provision requiring Enbridge
    to remove its plant after the lease terminated. He opined that many companies in the processing
    business would be interested in the property as it was on April 7, 2004 because of the cost savings
    inherent in the existing infrastructure and the opportunity for whoever owned it to capture the gas
    processing business in the area.
    Niemiec had examined records produced by Enbridge and testified (without contradiction
    by Enbridge) that a plant on the property would process approximately 80 million cubic feet of gas
    per day, produce projected earnings from the liquids portion of that processing before interest, taxes,
    depreciation, and amortization (EBITDA) of $16,500,000 per year, and have additional income from
    other fees a plant operator would typically charge its customers. Industry standards for valuing
    processing plants ranged from 10 to 14 times EBITDA, so $16,500,000 in annual EBITDA would
    4
    yield a value of $165 to $231 million for the property with a plant on it. Niemiec estimated the
    property, absent Enbridge’s plant, would be worth $18 to $22 million to a buyer who could build a
    new plant on it for $50 to $52 million, secure the projected $16,500,000 EBITDA, and own an asset
    valued at $165 to $231 million that was producing annual EBITDA of approximately 22% to 23%
    on invested capital. His valuation was based only on the property’s projected ability to produce an
    income stream:
    Q: What do you think you and a group of investors in 2004, if you had known the site
    was leased and that the lease was expiring, would have been willing to pay for the
    23.79 acres involved in this lawsuit?
    A: Having worked with a number of investors like Warburg Pincus and JP Morgan
    and various things, they have pools of money looking for investments. And what I
    said in my report, knowing what I know about the site and the lease, that we would
    be willing to put up a minimum of $18 million for the site knowing that this lease is
    expiring and knowing, as a knowing buyer, what I know about would have to be done
    to move this plant per the lease.
    Q: And did you say earlier that the range you thought was reasonable, from looking
    at it from that point of view, was 18 to 22 million?
    A: Yes.
    Q: Okay. Let’s assume that you had to pay the highest price, 22 million for the land.
    And how much would it cost to build a new plant on this site that’s already permitted
    and everything, got all the stuff going on?
    A: Well, it would be less than the $50 million . . . it would be less than the $52
    million than [sic] I had before, so . . . .
    Q: What number, 51 million?
    A: 50.
    Q: One-and-a-half. So you would have 72 million in it, right?
    5
    A: Yes.
    Q: If you bought it for the cheapest, 18 million, you’d have - 18 plus 50 would be 68
    million, and have a new plant sitting on this site; is that right?
    A: Yes, 68 million.
    Q: Would that tend to be a valuable proposition for any buyer?
    A: Yes. It cost you - it’d cost you 68 million, and you’ve got a value in the plant of
    165 to 231 [million]. So that would be a valued proposition that somebody would
    want to do . . . .
    Q: Okay. I’m told by my lawyer that I didn’t make it clear that the 18 to 22 million
    is for the land only.
    A: Yes.
    Q: Not talking about you buying the old plant. And so if you bought the land only
    and the old plant went away, so you built you a brand new plant, you would still have
    between 68 and $72 million total in the property, depending on the range you paid
    for the land, 18 to 22, right?
    A: Yes.
    Q: Explain to this jury - maybe you have, but one more time, why would it make
    economic sense for anybody in the gas processing business to pay between 18 and
    $22 million to buy this site if - let me back up.
    If a tornado came along on April 6th at 11 o’clock at night and wiped this plant out,
    what kind of money would you be willing to pay, UP Fuels, people in the industry,
    for this site, even if the plant is gone?
    A: The - I’d still pay the 18 to $22 million.
    Q: Why?
    A: The way I think about it - and we can use the tornado, but that’s a way to just kind
    of lift it up and take it out of there so that we have the land at that time vacant. But
    the pipeline is coming in; the pipeline is going out; the air permits; the electrical
    power that’s there; the customers are all still there. So I would simply put a plant in
    6
    there. I would have to spend the money to do that, the $50 million, but the earnings
    off of these plants is enough to justify that.
    Q: Did you explain all of this to David Bolton?
    A: I did.
    ....
    Q: Would anybody knowledgeable in this business, in the gas processing business,
    anybody understand that it’s a heck of a bargain to buy this tract in . . . Avinger,
    Texas . . . to capture this kind of value and this kind of annual income? Even if it is
    in Marion County?
    A: They would--they would understand that, and they would see the value in that.
    The above passage, among others, makes it clear that Niemiec based his opinion of value on
    the property without Enbridge’s plant on it, and that his opinion did not take into account any value
    for Enbridge’s plant, Enbridge’s cost to remove the plant, or the property’s special value to Enbridge.
    B. David Bolton
    The Court says that in his appraisal report Bolton “concluded that a prudent and
    knowledgeable investor, considering Enbridge Pipeline’s cost savings, would pay between
    $21,750,000 and $28,500,000 for Avinger’s interest” and that “[t]he only interest that should have
    been appraised was Avinger’s interest in the land. However, . . . this was not the interest that was
    valued in Bolton’s report.” ___S.W. 3d at ___. But Bolton’s report was not introduced into
    evidence at trial. The valuation testimony the jury heard from Bolton was that the market value of
    the property was $20,955,000 if the Enbridge plant did not exist or had been “swept away by a
    tornado.” That value did not include any amount attributable to the plant, Enbridge’s obligation to
    remove it, or cost savings to Enbridge if it did not have to remove it. Bolton specifically testified
    7
    that he appraised the tract and formed his opinion of its market value based on “typical market
    participants,” and not on its special value to Enbridge as the taker, or its value to Avinger as the
    seller:
    Q: Now, is the - in the definition [of market value], it asked about the price of a seller
    willing to sell and a buyer willing to buy. Is it the value to Avinger Timber or the
    value to Enbridge Pipeline Company that you’re trying to appraise?
    A: No. We’re appraising the value of the property.
    Q: And is it the value to that mythical seller in the definition whose name is not given
    and the mythical buyer?
    A: It’s to typical market participants.
    Q: Do you know why, in the definition of appraisal, that it doesn’t set forth the
    particular value to the owner or the particular value to a specific person?
    A: Well a value to a particular person or a particular entity may have something
    special over and above or less than typical market participants. So that may be a
    value to that person, but it wouldn’t be a value in exchange.
    Just as Niemiec did, Bolton explained that the site was valuable because of its physical
    location in a highly productive gas field, the existing pipeline infrastructure that included fifteen or
    sixteen pipelines through which gas arrived at the site for processing, the existing electrical supply
    to the property, and the fact that the site was already permitted for operation of a gas processing
    plant. His opinion was that the property would be an attractive investment for gas processing
    businesses because it would allow a buyer to begin processing gas at least a year sooner than if the
    buyer purchased a new site, obtained permits for it, and constructed a new plant. Further, a buyer
    of the property would not have to contend with the creation of a pipeline infrastructure for a new
    8
    processing site or start competing for customers. His testimony of $20,955,000 value was based on
    two separate income analyses and a comparable sales analysis.
    Niemiec and a consultant named Jeff Spearman2 provided Bolton with cost estimates for
    Enbridge to remove its plant and relocate it to another site. The minimum estimated cost for
    Enbridge to do that was $29 million which included building a temporary plant on the property to
    process a reduced amount of the gas received at the property while Enbridge located, acquired, and
    permitted a new site, then moved its existing plant. The temporary plant scenario was discounted
    by Niemiec as a poor choice at best because it would reduce Enbridge’s processing revenue
    significantly and disrupt operations of the producers supplying gas. Bolton understood from
    Niemiec that under the best and most viable scenario for Enbridge, if it did not buy the property or
    execute a new lease with Avinger at market rates, it would incur a minimum $38 million cost. That
    cost included Enbridge leaving the existing plant where it was and continuing to process gas at a
    normal rate while it built another plant close by and then selling the existing plant for salvage.
    Leaving its plant in place and building a new one would allow Enbridge to continue capturing the
    full amount of revenue from the gas processing business while it transitioned to a new plant—a time
    estimated to be at least 12 months and likely 18 to 24 months—and would avoid disrupting the
    business of its gas suppliers and incurring their ill will as well as losing some or all of the revenue
    for processing gas. This latter scenario apparently was the most probable from Enbridge’s point of
    view, also. Avinger presented the testimony of Kyle Hart, who worked in management at Enbridge’s
    2
    Spearman worked for a consulting company that specialized in mid-stream gas processing.
    9
    plant. Hart testified that it would have cost Enbridge an estimated $20 million to move the plant and
    that cost made moving it prohibitive.
    The only value testimony Bolton gave relating to cost savings to Enbridge was that the value
    of the property to Enbridge would have been much greater than the $20,955,000 he concluded was
    its market value absent the plant. In giving that testimony Bolton did not refer to the higher appraisal
    numbers in his report, even though at one point he was specifically asked about the property’s value
    to Enbridge as opposed to its value to a third party buyer. His opinion was that it would be greater
    to Enbridge because of Enbridge’s cost savings:
    Q: If you had been asked in this case -- if this were not a condemnation case, but you
    were asked to do an appraisal of what the value of this property was to the tenant,
    would it have been more or less than your opinion of the value to a willing buyer?
    A: No. It would have been more.
    Q: And explain to the jury why you say that.
    A: Well, their cost savings would be something like $38 million if -- considering the
    lease and considering their position to construct a new land [sic] less the salvage.
    And I believe Mr. Niemiec’s numbers are $38 million. I think that would represent
    that scenario.
    Q: Focusing you on other buyers -- not Enbridge, focusing you on other buyers, are
    the Enbridge costs to relocate the plant or the tenant costs to relocate the plant
    relevant to those other buyers?
    A: Sure.
    Q: Why? Can you explain that to the jury?
    A: Sure. Because anyone looking to buy this is -- and the lease was terminating, and
    they - and if the tenant had to move, then they’re faced with relocating at a net cost
    of at least $38 million. Well, if a prospective buyer can come in because of the
    location . . . of the pipelines and because of the amount of actual business that goes
    10
    through that site, would -- any dollar amount that they can buy that for substantially
    less is going to be a factor they consider, I think.
    C. Discussion
    The Court takes issue with Bolton’s consideration of Enbridge’s contractual obligation (and
    right) to remove its plant under the lease agreement. But Bolton’s uncontradicted testimony was that
    the USPAP requires appraisers to “analyze the effect on value, if any, of the terms and conditions
    of [any] lease.” In his opinion the lease provision giving Enbridge six months to move its plant was
    a factor affecting the value of the property that not only could be taken into consideration, but had
    to be taken into consideration under the USPAP and Texas law because it would affect the value to
    a hypothetical willing buyer. As reflected by the testimony quoted above, Bolton’s opinion was that
    a willing buyer would factor Enbridge’s relocation costs and the potential for purchasing Enbridge’s
    plant into the property’s value. Because such a buyer would consider that factor, he was bound to
    consider it in appraising the property’s value. But he never testified to a value for that factor. His
    testimony was clear that his opinion of the property’s market value without Enbridge’s plant on it
    was $20,955,000, and that value was based on accepted methods of appraising properties by using
    sales comparisons and the property’s projected ability to produce income—not its value to Enbridge
    because of the cost savings Enbridge could obtain by purchasing the property, nor the value of the
    Enbridge plant. On the other hand, as a licensed appraiser he could not ignore the fact that for up
    to six months after the lease expired on April 2, 2004, a purchaser’s use of the property was subject
    to the presence of the plant, Enbridge’s right and obligation to remove the plant, and the effects of
    those on the property’s market value. In his testimony Bolton detailed his investigations and the
    11
    bases for his calculations and opinion. Donnie Sherwood, an appraiser hired by Enbridge, testified
    clearly that he had no basis to criticize Bolton’s methodology or his conclusions.
    The Court does not criticize Bolton’s methodology or the information underlying his opinion.
    Nor does the Court point to any portion of Bolton’s testimony showing that his opinion of the
    property’s market value included any amount for “the gas processing facility that Enbridge Pipelines
    gained.” Manifestly, any potential buyer of the property would assess all aspects of it before
    investing: it was rural East Texas timber land except for its being the site of a longstanding gas
    processing operation with particular attributes and advantages. Under the USPAP and Texas law,
    Bolton could not ignore the effect of Enbridge’s lease rights and obligations on the property’s market
    value. The property was burdened by those; they affected the ability of any potential purchaser to
    use the property as well as provided an opportunity for decreasing the costs necessary to purchase
    and make the property profitable by possibly purchasing Enbridge’s plant for less than the cost of
    building a new one. Bolton would have been blinking reality, as well as violating his professional
    obligations, if he disregarded the effect of the lease terms. Certainly the potential cost savings to a
    buyer could fail to come to full fruition if, after the buyer purchased the property, Enbridge
    dismantled and moved its plant instead of selling it to the buyer for a price lower than the cost to
    build a new plant. But that is the nature of business risk: potential cost and profit drive the price of
    any business property.
    Even though Bolton considered the lease and its terms, there was no evidence he put any
    amount into his $20,955,000 valuation of the property because of the costs to Enbridge to remove
    the plant. His report might have included value in its figures based on Enbridge’s obligation to move
    12
    its plant and cost savings if it did not do so, but those figures were not referred to or used at trial by
    Bolton or Avinger. Despite the Court’s characterization of his testimony otherwise, he never
    wavered from the position that his testimony to the jury about the property’s value was based on its
    market value as a tract without Enbridge’s plant on it, not its value with Enbridge’s plant on it, the
    property’s special value to Enbridge, or Enbridge’s cost savings if it purchased the property and did
    not have to move its plant.
    IV. Conclusion
    For the reasons expressed above and those expressed by the court of appeals, I agree with the
    court of appeals that Bolton’s opinions did not violate the value-to-the-taker rule and that his
    valuation opinions were not speculative. 
    326 S.W.3d 390
    , 406-08, 411. His opinions were based
    on two different income analyses that he properly supported and a comparable sales methodology
    that he fully explained. Moreover, as explained by the court of appeals, his opinions did not violate
    the project-enhancement rule. 
    Id. at 408-10.
    I agree with the Court that the trial court did not abuse its discretion by excluding Albert
    Allen’s testimony because he improperly valued the land as vacant rural residential property.
    I would affirm the judgment of the court of appeals.
    ________________________________________
    Phil Johnson
    13
    Justice
    OPINION DELIVERED: August 31, 2012
    14
    

Document Info

Docket Number: 10-0950

Citation Numbers: 386 S.W.3d 256, 55 Tex. Sup. Ct. J. 1387, 178 Oil & Gas Rep. 475, 2012 Tex. LEXIS 745, 2012 WL 3800234

Judges: Lehrmann, Jefferson, Hecht, Wainwright, Medina, Guzman, Johnson, Green, Willett

Filed Date: 8/31/2012

Precedential Status: Precedential

Modified Date: 10/19/2024