siemens-energy-inc-fka-siemens-power-generation-inc-v-national-union ( 2014 )


Menu:
  • Affirmed and Memorandum Opinion filed June 3, 2014.
    In the
    Fourteenth Court of Appeals
    NO. 14-13-00863-CV
    SIEMENS ENERGY, INC. F/K/A SIEMENS POWER GENERATION, INC.,
    Appellant
    V.
    NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH,
    PENNSYLVANIA, FACTORY MUTUAL INSURANCE COMPANY,
    ZURICH AMERICAN INSURANCE COMPANY, ASSOCIATED
    ELECTRIC & GAS INSURANCE SERVICES, LIMITED ARCH
    INSURANCE COMPANY (EUROPE) LTD., AND CERTAIN
    UNDERWRITERS AT LLOYD’S OF LONDON, Appellees
    On Appeal from the 344th District Court
    Chambers County, Texas
    Trial Court Cause No. 27811
    MEMORANDUM OPINION
    In this interlocutory appeal, appellant Siemens Energy, Inc. f/k/a Siemens
    Power Generation, Inc. (“Siemens”) challenges the trial court’s denial of its motion
    to dismiss the breach-of-contract and professional negligence claims brought by
    appellee National Union Fire Insurance Company of Pittsburgh, Pennsylvania, and
    other insurer appellees (collectively, “National Union”) 1 for failure to file an
    adequate certificate of merit pursuant to section 150.002 of the Texas Civil
    Practice and Remedies Code.              Siemens argues that National Union’s expert
    affidavit failed to identify any specific engineering act, error, or omission
    committed by Siemens, and failed to set forth the factual basis for National
    Union’s claims. Siemens further contends the trial court should have dismissed
    National Union’s case with prejudice. Finding no abuse of discretion, we affirm.
    I.       FACTUAL AND PROCEDURAL BACKGROUND
    Siemens designed, manufactured, and sold a natural gas, combined cycle
    generating unit (referred to as “Unit 4”) to NRG Cedar Bayou Development
    Company, LLC, a subsidiary of NRG Energy, Inc. (“NRG”), for its Cedar Bayou
    Electrical Generating Facility in Baytown, Texas. Unit 4 consists of two Siemens
    501 gas turbines, two heat recovery steam generators, and one Siemens KN steam
    turbine (the “Turbine”).
    On May 22, 2008, NRG and Siemens entered into a purchase order
    containing an agreement for Technical Field Assistance (the “TFA”). In the TFA,
    Siemens agreed to provide NRG with technical field assistance to support the
    installation of certain Siemens-supplied equipment, including the Turbine. NRG
    paid Siemens $4.6 million pursuant to the purchase order containing the TFA.
    In its petition, National Union alleged that on or about April 24, 2009, a
    Siemens engineer “supervised, inspected and/or approved the alignment of the
    Turbine . . ., which included the alignment of the coupling between the HP/IP and
    LP rotors of the Turbine.” National Union also alleged that prior to March 11,
    1
    National Union brought the action in subrogation for their insureds.
    2
    2011, “Siemens representative(s) also programmed the Turbine for use in Unit 4.”
    According to National Union, on March 11, 2011, the Turbine “was in start-up
    mode when it failed and tripped off line on loss of vacuum and high vibration after
    reaching approximately 3,570 rpm.” Such failure allegedly “caused damages to . .
    . the Turbine’s rotors and related equipment” and was caused by “misalignment of
    the coupling between the HP/IP and LP rotors of the Turbine,” as well as by “an
    error in the initial programming of the Turbine which prolonged the time during
    which the Turbine was subjected to excessive vibration associated with the
    misalignment.”
    National Union filed suit against Siemens for breach of contract and
    professional negligence, claiming damages in excess of $20 million.                 To its
    original petition, National Union attached an affidavit from Timothy B. Hatch, a
    registered professional engineer and consulting engineer for Engineering Design &
    Testing Corp. A copy of Hatch’s curriculum vitae was attached to his affidavit.
    Siemens filed a motion to dismiss on the basis that National Union’s
    certificate-of-merit affidavit failed to meet the requirements of section 150.002 of
    the Texas Civil Practice and Remedies Code.2 The trial court denied Siemens’
    motion, and Siemens filed this interlocutory appeal.
    Siemens brings three issues on appeal. First, Siemens argues that National
    Union’s claims must be dismissed because their expert failed to identify any
    specific engineering act, error, or omission committed by Siemens.                 Second,
    Siemens asserts that the claims must be dismissed because the affidavit failed to set
    forth the factual basis to support the expert’s conclusions.              Third, Siemens
    2
    See Tex. Civ. Prac. & Rem. Code § 150.002(e) (West 2011). As part of its motion,
    Siemens challenged Hatch’s qualifications under section 150.002. Siemens does not raise this
    issue on appeal.
    3
    contends that National Union’s action should be dismissed with prejudice. We
    conclude that the trial court did not abuse its discretion in concluding National
    Union’s certificate of merit complies with section 150.002’s requirements.
    II.      STANDARD OF REVIEW AND APPLICABLE LAW
    An order denying a motion to dismiss for failure to file a certificate of merit
    in accordance with section 150.002 is immediately appealable. See Tex. Civ. Prac.
    & Rem. Code § 150.002(f) (West 2011). We review a trial court’s order on such a
    motion for an abuse of discretion. Dunham Eng’g, Inc. v. Sherwin-Williams Co.,
    
    404 S.W.3d 785
    , 789 (Tex. App.—Houston [14th Dist.] 2013, no pet.).               In
    reviewing a trial court’s denial of a section 150.002 motion to dismiss, we review
    the record in the light most favorable to the ruling. See Howe-Baker Eng’rs, Ltd. v.
    Enter. Prods. Operating, LLC, No. 01-09-01087-CV, 
    2011 WL 1660715
    , at *5
    (Tex. App.—Houston [1st Dist.] Apr. 29, 2011, no pet.) (mem. op.).
    Merely because a trial court may decide a matter within its discretion in a
    different manner than an appellate court does not demonstrate an abuse of
    discretion. Dunham 
    Eng’g, 404 S.W.3d at 789
    . However, the trial court abuses its
    discretion when it acts in an unreasonable and arbitrary manner, or without
    reference to any guiding rules or principles. 
    Id. A trial
    court also abuses its
    discretion if it fails to analyze or apply the law correctly. 
    Id. As the
    party
    complaining of an abuse of discretion, Siemens has the burden of bringing forth a
    record showing such abuse. See TDIndus., Inc. v. My Three Sons, Ltd., No. 05-13-
    00861-CV, 
    2014 WL 1022453
    , at *4 (Tex. App.—Dallas Feb. 14, 2014, no. pet.
    h.) (mem. op.).
    To the extent we are required to interpret a statute, that aspect of our review
    is performed de novo. See Dunham 
    Eng’g, 404 S.W.3d at 789
    . We look to the
    statute’s plain meaning because we presume that the legislature intends the plain
    4
    meaning of its words. 
    Id. In doing
    so, we read the words in context and construe
    the language according to the rules of grammar and common usage. Id.; see Tex.
    Gov’t Code Ann. § 311.011(a) (West 2013).
    Section 150.002 provides, in relevant part:
    (a) In any action . . . for damages arising out of the provision of
    professional services by a licensed or registered professional, the
    plaintiff shall be required to file with the complaint an affidavit of a
    third-party . . . licensed professional engineer . . . who:
    (1) is competent to testify;
    (2) holds the same professional license or registration as the
    defendant; and
    (3) is knowledgeable in the area of practice of the defendant
    and offers testimony based on the person’s:
    (A) knowledge;
    (B) skill;
    (C) experience;
    (D) education;
    (E) training; and
    (F) practice.
    (b) The affidavit shall set forth specifically for each theory of
    recovery for which damages are sought, the negligence, if any, or
    other action, error, or omission of the licensed or registered
    professional in providing the professional service, including any error
    or omission in providing advice, judgment, opinion, or a similar
    professional skill claimed to exist and the factual basis for each such
    claim. The third-party . . . licensed professional engineer . . . shall be
    licensed or registered in this state and actively engaged in the practice
    of . . . engineering . . . .
    ...
    (e) The plaintiff’s failure to file the affidavit in accordance with this
    section shall result in dismissal of the complaint against the defendant.
    This dismissal may be with prejudice.
    5
    (f) An order granting or denying a motion for dismissal is
    immediately appealable as an interlocutory order.
    Tex. Civ. Prac. & Rem. Code § 150.002.
    The certificate of merit serves the “legislative goal of requiring merely that
    plaintiffs make a threshold showing that their claims have merit.” M-E Eng’rs,
    Inc. v. City of Temple, 
    365 S.W.3d 497
    , 504 (Tex. App—Austin 2012, pet. denied).
    “[A]t the certificate-of-merit stage, before discovery and before other dispositive
    motions are available, the plaintiff is not required to fully ‘marshal his evidence.’”
    Dunham 
    Eng’g, 404 S.W.3d at 795
    (quoting CBM Eng’rs, Inc. v. Tellepsen
    Builders, L.P., 
    403 S.W.3d 339
    , 346 (Tex. App.—Houston [1st Dist.] 2013, pet.
    denied) (op. on reh’g)).
    III.        ANALYSIS
    A. The affidavit sets forth sufficiently specific negligence, or other actions,
    errors, or omissions by Siemens in providing the professional service.
    In its first issue, Siemens argues the “bare, conclusory” allegations in
    Hatch’s affidavit do not satisfy section 150.002(b)’s requirement that the affidavit
    “specifically” identify the professional errors claimed to exist. We disagree with
    this characterization of Hatch’s affidavit.
    1. National Union’s petition
    National Union alleged in its petition that, under the TFA, 3 “Siemens agreed
    to provide NRG with certain professional engineering services in connection with
    the construction, assembly, alignment and/or programming of the Turbine in Unit 4
    at the Facility.” National Union further alleged, pursuant to the TFA, that Siemens
    agreed to provide “inspection and supervision of the Turbine installation for proper
    3
    National Union attached the TFA to its petition.
    6
    assembly, clearances, alignment and cleanliness, and to advise NRG of errors
    and/or omissions with respect to these services.” And that on or about April 24,
    2009, “Siemens’ engineer supervised, inspected, and/or approved the alignment of
    the Turbine.” National Union alleged that “Siemens breached the TFA Contract by
    failing to properly inspect, supervise and/or approve the alignment of the coupling
    between the HP/IP and LP rotors of the Turbine” and by failing to advise NRG of
    such errors or omissions. National Union alleged that Siemens breached its duty to
    exercise professional engineering skill and care by “failing to properly inspect,
    supervise and/or approve the alignment of the coupling between the HP/IP and LP
    rotors of the Turbine” and by failing to advise NRG of such errors or omissions.
    National Union further alleged that prior to March 11, 2011, “Siemens
    representative(s) . . . programmed the Turbine for use in Unit 4.” National Union
    alleged that “Siemens breached the TFA Contract by . . . failing to properly
    program the Turbine” and by failing to advise NRG of such error or omission.
    National Union alleged that Siemens breached its duty to exercise professional
    engineering skill and care by “failing to properly program the Turbine” and by
    failing to advise NRG of such error or omission.
    2. Hatch’s affidavit
    In his affidavit, Hatch stated that his consulting engineer position involves
    “evaluating equipment failures and industrial accidents and performing root cause
    analyses and damage assessments” at energy plants.         Hatch was retained to
    evaluate the cause of damage to a steam turbine generator at the Cedar Bayou
    facility on March 11, 2011. Hatch inspected the Turbine at the Cedar Bayou
    facility on March 22, 2011. He participated in inspections of the Turbine rotor and
    related components at Siemens’ shop in Charlotte, North Carolina, on March 24,
    2011, and April 21, 2011. He attended inspections and testing of the Turbine’s
    7
    foundations at the Cedar Bayou facility on October, 23, 29, and 30, 2011. Hatch
    also “reviewed the design, construction, and installation documents regarding
    Siemens’ design, programming, and installation of the [T]urbine, including
    Siemens’ work under its agreement with NRG to perform Technical Field
    Assistance (‘TFA Agreement’) and the Steam Turbine Assembly Documentation.”
    Based on his understanding of the facts, investigation, education, training,
    and experience, Hatch stated that on March 11, 2011, the Turbine “was in start-up
    mode when it failed and tripped off line on loss of vacuum and high vibration
    when the [T]urbine reached approximately 3,570 rpm.” Hatch indicated that this
    failure damaged the Turbine’s rotors and related equipment. He opined that the
    Turbine’s failure was caused by “misalignment of the coupling between the HP/IP
    and LP rotors of the [T]urbine by Siemens pursuant to its work under the TFA
    Agreement . . . on or about April 24, 2009.” Hatch provided his “professional
    opinion that Siemens was negligent in performing its TFA work for the alignment
    of the [T]urbine” and that Siemens’ “acts, errors and/or omissions . . . fell below
    the standard of care which reasonable and prudent installation . . . personnel would
    and should have exercised under the same or similar circumstances and failed to
    meet the standards set forth in the TFA Agreement.”
    Hatch also opined that the Turbine’s failure was “caused or contributed to by
    an error by Siemens in the initial programming of the [T]urbine which prolonged
    the time during which Unit 4 was subjected to excessive vibration associated with
    the misalignment.” Hatch provided his “professional opinion that Siemens . . . was
    negligent in its initial programming of the [T]urbine” and that Siemens’ error “fell
    below the standard of care which reasonable and prudent . . . programming
    personnel would and should have exercised under the same or similar
    circumstances and failed to meet the standards set forth in the TFA.”
    8
    3. Hatch’s affidavit sufficiently sets forth the misalignment error.
    With regard to Hatch’s statement that the Turbine’s shutdown “was caused
    by misalignment of the coupling between the HP/IP and LP rotors by Siemens
    pursuant to work under its TFA Agreement with NRG,” Siemens first contends
    such conclusion “merely identifies a consequence of an alleged error” but “does
    not actually identify the allegedly erroneous act committed by Siemens.” Siemens
    does not appear to have raised this argument in its motion to dismiss. 4 In any
    event, stating that Siemens misaligned the coupling between Turbine rotors in a
    particular location—between the HP/IP and LP rotors—specifies an alleged error.5
    See, e.g., Sylva Eng’g Corp. v. Kaya, No. 03-12-00334-CV, 
    2013 WL 1748754
    , at
    *4–5 (Tex. App.—Austin Apr. 18, 2013, no pet.) (mem. op.) (alleged failure to
    specify drainage inlets in the “critical area” near the gore in engineering plans
    asserted specific omission); CBM 
    Eng’rs, 403 S.W.3d at 346
    (alleged “structural
    flitch beam design error and omission of lateral bracing” in construction
    documents and specifications asserted specific error and omission). Hatch also
    causally linked Siemens’ alleged error to the Turbine’s failure on March 11, 2011,
    which damaged the Turbine’s rotors and related equipment. See Sylva Eng’g, 
    2013 WL 1748754
    , at *4–5 (omission prevented proper drainage and contributed to
    traffic accident); CBM 
    Eng’rs, 403 S.W.3d at 346
    (error and omission in design
    contributed to “the instability of the Facility”).
    4
    See Coleman v. Klockner & Co. AG, 
    180 S.W.3d 577
    , 587 (Tex. App.—Houston [14th
    Dist.] 2005, no pet.) (“It is an established rule of Texas Procedure that, absent fundamental error,
    an appellate court has no discretion to reverse an otherwise error-free judgment based on a new
    argument raised for the first time on appeal.”).
    5
    The common pertinent meaning of misalignment includes the “wrong” “positioning or
    state of adjustment of parts (as of a mechanical or electronic device) in relation to each other.”
    See Merriam Webster’s Collegiate Dictionary 31, 793 (11th ed. 2003) (“mis-” and “alignment”).
    9
    Next, Siemens complains Hatch’s affidavit is so “conclusory” with regard to
    Siemens’ TFA “work” that the trial court had to “erroneously infer” statutorily-
    required-but-omitted information.
    To the extent Siemens challenges the competence of Hatch’s testimony,
    neither the statute nor the case law imposes any requirement that averments and
    opinions in certificates of merit be competent evidence.        See Durivage v. La
    Alhambra Condo. Ass’n, No. 13-11-00324-CV, 
    2011 WL 6747384
    , at *2–3 (Tex.
    App.—Corpus Christi Dec. 21, 2011, pet. dism’d) (mem. op.) (concluding there
    was no authority “establishing that a certificate of merit must fail if its statements
    are conclusory, or even that it must comply with rules of evidence”); Benchmark
    Eng’g Corp. v. Sam Houston Race Park, 
    316 S.W.3d 41
    , 47 (Tex. App.—Houston
    [14th Dist.] 2010, pet. dism’d by agr.) (while expert must be “competent to testify”
    under section 150.002(a), “the legislature did not include a requirement that
    statements in a certificate of merit must be competent as evidence”).
    Siemens contends that Hatch’s affidavit does not inform the trial court what
    “work” was provided by Siemens under the TFA. However, Texas courts of
    appeals consistently have rejected similar arguments that an expert affidavit was
    “conclusory” or lacked specificity. For example, in CBM Engineers, the defendant
    engineering firm argued that the affidavit was conclusory because “any person
    reading the [certificate] would not know which structural flitch beam to which [the
    expert] was referring, nor where the allegedly omitted lateral bracing should have
    been located, nor how these alleged errors caused ‘instability of the 
    Facility.’” 403 S.W.3d at 345
    –46. The CBM Engineers court concluded the affidavit was not
    conclusory, explaining that “the statute does not require the certificate of merit to
    contain that level of detail” with regard to the alleged design error and omission.
    
    Id. at 346.
    In Dunham Engineering, the defendant engineering firm challenged the
    10
    affidavit for not providing specific facts regarding the “falsity” of the firm’s
    evaluation and 
    recommendation. 404 S.W.3d at 797
    . We rejected that argument
    where the plaintiff’s theory of falsity could be shown by the fact the firm told its
    municipal client that the plaintiff’s products were not an acceptable substitute
    under the bid at issue and the plaintiff’s contention was that its products would
    have been considered “equal” under a proper specification. 
    Id. Here, according
    to Hatch’s affidavit, Siemens’ “work” under its agreement
    to perform technical field assistance for NRG involved installation of the Turbine
    and, pursuant to such “work,” Siemens misaligned the Turbine.             Contrary to
    Siemens’ assertion that Hatch needed to describe “how or in what manner”
    Siemens allegedly misaligned the Turbine while performing its “work” for NRG,
    neither the statute nor the case law requires the certificate of merit to contain “that
    level of detail.” See CBM 
    Eng’rs, 403 S.W.3d at 346
    ; see also Gartrell v. Wren,
    No. 01-11-00586-CV, 
    2011 WL 6147786
    , at *3–4 (Tex. App.—Houston [1st Dist.]
    Dec. 8, 2011, pet. denied) (mem. op.) (rejecting lack-of-specificity argument where
    affidavit identified alleged survey errors concerning acreage, house location, and
    existence of easements but did not describe “how or why the errors occurred”).
    Moreover, motions to dismiss for failure to file an adequate certificate of merit
    may be filed before discovery. Dunham 
    Eng’g, 404 S.W.3d at 795
    . At this stage,
    National Union is not yet required to “marshal its evidence,” and Hatch’s averment
    that Siemens erred in misaligning the Turbine coupling while performing its
    technical field assistance “work” for NRG is not inconsistent with National
    Union’s contentions that Siemens breached the TFA and was professionally
    negligent by failing to properly inspect, approve, supervise, and/or approve the
    Turbine’s alignment, and by failing to advise NRG of such errors or omissions.
    See 
    id. at 795,
    797; CBM 
    Eng’rs, 403 S.W.3d at 346
    (statute does not require
    11
    plaintiff to “provide the full range of information that the defendant is entitled to
    obtain through formal discovery”).
    Siemens also takes issue with Hatch’s description of Siemens’ TFA role as
    “installation” personnel because, according to Siemens, its role “was limited to
    post-alignment inspection and advising NRG of any errors and/or omissions.”6
    However, the statute does not require that engineers undertake contract
    interpretation. See M-E 
    Eng’rs, 365 S.W.3d at 506
    –07 (“We cannot conclude that
    the Legislature intended to require affiants with expertise in such fields as
    engineering or architecture to opine regarding such far-afield subjects as contract
    construction or agency.”). Further, section 150.002 does not foreclose Siemens
    from later filing other motions, such as motions seeking to exclude expert
    testimony or obtain summary judgment, based on the TFA. See Dunham 
    Eng’g, 404 S.W.3d at 795
    ; CBM 
    Eng’rs, 403 S.W.3d at 346
    ; see also Coats v. Farmers
    Ins. Exch., 
    230 S.W.3d 215
    , 217–18 (Tex. App.—Houston [14th Dist.] 2006, no
    pet.) (summary judgment appropriate when controversy can be resolved by proper
    contract construction).
    In addition, Siemens contends that Hatch’s affidavit requires the trial court
    to “fill in the blanks” as to how Siemens’ “‘work’ relates to the provision of
    engineering advice, opinion, or judgment.” However, a certificate of merit is not
    limited to setting forth an alleged “error or omission in providing advice,
    judgment, [or] opinion” as the exclusive ways to meet section 150.002(b). See
    Tex. Civ. Prac. & Rem. Code § 150.002(b). Rather, it is sufficient for the affidavit
    6
    Both parties attempt to support their respective positions by pointing to the TFA.
    However, leaving aside any issue of the appropriateness of looking beyond the “four corners” of
    the certificate of merit, we conclude that the trial court had sufficient information within Hatch’s
    affidavit itself to determine its compliance with section 150.002. See Elness Swenson Graham
    Architects, Inc. v. RLJ II-C Austin Air, LP, No. 03-10-00805-CV, 
    2011 WL 1562891
    , at *5 (Tex.
    App.—Austin Apr. 20, 2011, pet. denied) (mem. op.).
    12
    to set forth the alleged “negligence, if any, or other action, error, or omission . . . in
    providing the professional service, including any error or omission in providing
    advice, judgment, opinion, or a similar professional skill claimed to exist.” See 
    id. The explanatory
    “including” phrase functions to enlarge rather than limit the
    previous phrase. See id.; Tex. Gov’t Code Ann. § 311.005(13) (West 2013) (used
    in statute, “including” is term of enlargement and not of limitation or exclusive
    enumeration, and use of “including” does not create a presumption that
    components not expressed are excluded); Tex. W. Oaks Hosp., LP v. Williams, 
    371 S.W.3d 171
    , 179 (Tex. 2012). According to Hatch, Siemens allegedly provided
    “engineering services” and “Technical Field Assistance” to NRG for “installation”
    of the Turbine at the Cedar Bayou facility. See Benchmark 
    Eng’g, 316 S.W.3d at 49
    (noting that “the trial court is not required to ignore the obvious” with regard to
    what constitutes engineering practice).7            We cannot conclude that Hatch’s
    affidavit, which complains of Siemens’ alleged error with regard to negligent
    installation of the Turbine, specifically its misalignment of the coupling between
    certain rotors, fails to set forth the negligence, or other action, error, or omission of
    Siemens in providing the professional service.8
    7
    Siemens emphasizes that under the TFA it merely provided “advisory and other
    support” services to NRG. We note that if Siemens’ position actually were that National Union’s
    damages did not arise “out of the provision of professional services by a licensed or registered
    professional,” then no certificate-of-merit requirement would even apply to National Union’s
    claims. See Tex. Civ. Prac. & Rem. Code § 150.002(a).
    8
    See, e.g., Tex. Civ. Prac. & Rem. Code § 150.001(3) (referencing Texas Occupation
    Code section 1001.003’s definition of “practice of engineering”); Tex. Occ. Code. Ann. §
    1001.003(c)(9) (West 2012) (“engineering for review of the construction or installation of
    engineered works to monitor compliance with drawings or specifications”); 
    id. § 1001.003(c)(10)
    (“a service, design, analysis, or other work performed for a public or private
    entity in connection with a utility, structure, building, machine, equipment, process, system,
    work, project, or industrial or consumer product or equipment of a mechanical, electrical,
    electronic, chemical, hydraulic, pneumatic, geotechnical, or thermal nature”); 
    id. § 1001.003(c)(12)
    (“any other professional service necessary for the planning, progress, or
    completion of an engineering service”).
    13
    Finally, Siemens contends Hatch’s affidavit does not “identify the applicable
    standard of care allegedly breached by Siemens” 9 nor inform the trial court
    regarding the specifics of Siemens’ alleged negligence in performing its alignment
    “work.”        However, several Texas courts of appeal, including this court, have
    concluded that a certificate of merit need not include an express description of the
    applicable standard of care, how it was allegedly violated, or what specific actions
    should have been taken to comply with the standard of care. See Sylva Eng’g,
    
    2013 WL 1748754
    , at *3–4; Morrison Seifert Murphy, Inc. v. Zion, 
    384 S.W.3d 421
    , 427–28 (Tex. App.—Dallas 2012, no pet.); Gartrell, 
    2011 WL 6147786
    , at
    *4–5; Elness Swenson Graham Architects, Inc. v. RLJ II–C Austin Air, LP, No. 03–
    10–00805–CV, 
    2011 WL 1562891
    , at *4 (Tex. App.—Austin Apr. 20, 2011, pet.
    denied) (mem. op.); Benchmark 
    Eng’g, 316 S.W.3d at 45
    –46.10
    In any event, Hatch’s affidavit states he reviewed “Siemens’ work under its
    agreement with NRG to perform Technical Field Assistance” and concluded in his
    professional opinion that “Siemens was negligent in performing its TFA work for
    the alignment of the [T]urbine.” See Elness Swenson, 
    2011 WL 1562891
    , at *4
    (“[N]egligence is, by definition, conduct that falls below the applicable standard of
    care.        By averring that the licensed or registered professional’s conduct is
    “negligent,” the affiant is necessarily opining that the complained-of conduct did
    not meet the applicable standard of care.”). Moreover, Hatch places Siemens’
    alleged negligence in the context of a particular standard of care—that of
    9
    Although Siemens presents this “lack of standard of care” argument in a separate
    section of its brief, it does not include it as a separate issue within its statement of issues
    presented, and so we address it as a subpart of Siemens’ first issue.
    10
    But see Criterium-Farrell Eng’rs v. Owens, 
    248 S.W.3d 395
    , 400 (Tex. App.—
    Beaumont 2008, no pet.) (holding that “the certificate of merit must necessarily address the
    applicable standard of care and the defendant’s failure to meet the standard”), disagreed with by
    Morrison 
    Seifert, 384 S.W.3d at 427
    –28, and Benchmark 
    Eng’g, 316 S.W.3d at 45
    –46.
    14
    “reasonable and prudent installation . . . personnel . . . under the same or similar
    circumstances,” i.e., while performing contractual technical field assistance for a
    steam turbine. Hatch’s certificate of merit, stating that Siemens’ complained-of
    misalignment was negligent and referencing a standard of care, is sufficient to
    satisfy section 150.002(b). See Sylva Eng’g, 
    2013 WL 1748754
    , at *4 (statement
    that “[t]he acts, errors and/or omissions described above show that [KBR] and
    Sylva Engineering Corporation did not meet the Standard of Care for appropriate
    Civil Engineer roadway and drainage design and engineering, and constitute
    professional design negligence” was sufficient).
    We conclude the trial court did not abuse its discretion in determining that
    Hatch’s reference to Siemens’ alleged Turbine coupling misalignment presents a
    sufficient professional error under section 150.002(b).
    4. Hatch’s affidavit sufficiently sets forth the programming error.
    Next, Siemens argues Hatch’s statement that “[t]he failure was also caused
    or contributed to by an error by Siemens in the initial programming of the
    [T]urbine which prolonged the time in which Unit 4 was exposed to excessive
    vibration” fails to satisfy section 150.002(b)’s requirements.       That is, such
    statement “does not describe what specific error was committed by Siemens, what
    initial programming is, what role Siemens had in or related to the initial
    programming, how initial programming relates to Siemens’ support services under
    the TFA Contract, or whether initial programming is even a professional
    engineering service.”     These lack-of-specificity arguments essentially repeat
    Siemens’ position with regard to its alleged misalignment error.
    First, we again disagree that an error in the initial programming of the
    Turbine “merely identifies a consequence of an alleged error, not the error itself.”
    Stating that Siemens erred in the initial programming of the Turbine specifies an
    15
    alleged error. 11 See, e.g., Sylva Eng’g, 
    2013 WL 1748754
    , at *4; CBM 
    Eng’rs, 403 S.W.3d at 346
    . According to Hatch, the alleged programming error “prolonged the
    time during which Unit 4 was subjected to excessive vibration associated with the
    misalignment.” In other words, the programming error was timing related and
    compounded the misalignment error.                  Hatch causally linked this alleged
    programming error to the Turbine’s March 11, 2011 failure and resulting damages.
    See Sylva Eng’g, 
    2013 WL 1748754
    , at *4; CBM 
    Eng’rs, 403 S.W.3d at 346
    .
    As discussed above, section 150.002(b) does not require an inordinate “level
    of detail” describing “how or why” the error occurred. See CBM 
    Eng’rs, 403 S.W.3d at 346
    ; Gartrell, 
    2011 WL 6147786
    , at *4. Hatch’s affidavit states that
    Siemens’ “work” pursuant to an agreement to provide technical field assistance for
    NRG involved programming of the Turbine, and Siemens erred in the initial
    programming of the Turbine, which prolonged the time during which Unit 4 was
    subjected to excessive vibration associated with the misalignment. At this early
    stage of litigation, this alleged programming error by Siemens is not inconsistent
    with National Union’s theories that Siemens breached the TFA and was
    professionally negligent by failing to properly program the Turbine and by failing
    to advise NRG of such error. See Dunham 
    Eng’g, 404 S.W.3d at 795
    , 797.
    As with Siemens’ argument that Hatch’s affidavit incorrectly described
    Siemens’ TFA role as providing Turbine “installation” and “installation”
    personnel, we similarly cannot sustain its argument that the TFA does not require
    Siemens to actually perform initial “programming” or provide “programming”
    personnel for the Turbine. The statute does not require Hatch to interpret the TFA.
    11
    The common pertinent meaning of an “error” in “programming” includes a “mistake”
    in “the planning, scheduling, or performing” of “a sequence of coded instructions that can be
    inserted into a mechanism.” See Merriam-Webster’s Collegiate Dictionary 425, 992 (11th ed.
    2003). “Initial” describes when the error occurred: “of or relating to the beginning.” See 
    id. at 643.
    16
    See M-E 
    Eng’rs, 365 S.W.3d at 506
    –07. Nor does it foreclose Siemens from later
    filing dispositive motions, including for summary judgment based on its
    interpretation of its scope of work under the TFA. See Dunham 
    Eng’g, 404 S.W.3d at 795
    .
    We also do not agree the trial court “necessarily had to guess” that an initial
    programming error constituted an error in providing a professional engineering
    service.    According to Hatch, Siemens provided “engineering services” and
    “Technical Field Assistance” to NRG at the Cedar Bayou facility, which included
    “programming” of the Turbine. We cannot conclude Hatch’s affidavit, which
    complains of Siemens’ alleged error with regard to negligent initial programming
    of the Turbine, specifically that the error extended the time Unit 4 was subjected to
    excessive vibration associated with the rotor misalignment, fails to set forth the
    negligence, or other action, error, or omission of Siemens in providing the
    professional service.12
    Finally, as with the alleged misalignment error, Hatch’s affidavit states that
    he reviewed “Siemens’ work under its agreement with NRG to perform Technical
    Field Assistance” and concluded in his professional opinion that “Siemens . . . was
    negligent in its initial programming of the [T]urbine,” which error “fell below the
    standard of care which reasonable and prudent . . . programming personnel” would
    and should employ in similar circumstances. Hatch’s certificate of merit, stating
    that Siemens’ complained-of programming conduct was negligent and referencing
    a standard of care, is sufficient to satisfy section 150.002(b). See Sylva Eng’g,
    12
    Properly initially programming a steam turbine so that it can be used within an
    electrical generation unit reasonably falls within the practice of engineering. See Tex. Occ.
    Code. Ann. § 1001.003(c)(10), (12); see also In re Anloc, LLC, 
    487 B.R. 825
    , 838–39 (Bankr.
    S.D. Tex. 2013) (describing section 1001.003’s definition of practice of engineering as “broad”).
    17
    
    2013 WL 1748754
    , at *4. 13
    We conclude that the trial court also did not abuse its discretion in
    determining that Hatch’s reference to Siemens’ alleged Turbine initial
    programming error presents a sufficient professional error under section
    150.002(b). We overrule Siemens’ first issue.
    B. The affidavit sets forth a sufficient factual basis for National Union’s
    claims.
    In its second issue, Siemens argues Hatch’s affidavit fails section
    150.002(b)’s requirement that the expert’s affidavit “set forth specifically for each
    theory of recovery for which damages are sought . . . the factual basis for each such
    claim.” See Tex. Civ. Prac. & Rem. Code § 150.002(b). We cannot agree. 14
    “The certificate of merit must provide a factual basis for the allegations of
    professional errors or omissions.” CBM 
    Eng’rs, 403 S.W.3d at 345
    . The plain
    meaning of “factual basis” “requires an affiant to describe the facts giving rise to
    the claim.” Dunham 
    Eng’g, 404 S.W.3d at 796
    (citing Benchmark 
    Eng’g, 316 S.W.3d at 48
    ). The affiant is not required, however, to “explain the law to the trial
    court” or provide “operative facts other than the professional errors and omissions
    that are the focus of the statute.” 
    Id. Moreover, while
    “factual basis” is not
    defined in the statute, courts, including ours, recognize that the purpose of the
    certificate of merit “is to provide a basis for the trial court to conclude that the
    13
    See supra note 9.
    14
    To the extent that Siemens repeats its lack-of-specificity arguments from its first issue,
    we addressed and rejected them in Sections III.A.3 and III.A.4. Siemens has provided us with,
    and we have located, no authority supporting Siemens’ position that Hatch’s affidavit is
    insufficient because he fails to identify the Siemens’ individual who committed the alleged
    errors, or specifically how or when the errors were committed. Siemens also continues to
    dispute its particular role and scope of work under the TFA, but again, while this may present
    fodder for a later fight on summary judgment, it is not a proper inquiry for this threshold
    certificate-of-merit stage.
    18
    plaintiff’s claims are not frivolous.” 
    Id. at 795–96;
    see CBM 
    Eng’rs, 403 S.W.3d at 345
    ; Durivage, 
    2011 WL 6747384
    , at *3; Elness Swenson, 
    2011 WL 1562891
    ,
    at *4.     We evaluate whether a “factual basis” has been established with this
    “threshold” purpose in mind. See M-E 
    Eng’rs, 365 S.W.3d at 504
    ; Durivage, 
    2011 WL 6747384
    , at *3. We also keep in mind that “[t]he requirement to show a
    ‘factual basis’ is less onerous than that imposed on, for example, health care
    liability plaintiffs” under chapter 74. Dunham 
    Eng’g, 404 S.W.3d at 796
    n.4; see
    Durivage, 
    2011 WL 6747384
    , at *3.
    The “factual basis” requirement of section 150.002(b) is met where the
    expert “identifie[s] the factual basis upon which he based his professional
    opinion,” such as “his review of the structural drawings issued for construction that
    were prepared by a professional structural engineer who worked for [defendant
    engineering firm].”    CBM 
    Eng’rs, 403 S.W.3d at 346
    (reversing trial court’s
    dismissal of plaintiff’s negligence claim). Likewise, affidavit testimony that the
    expert had “walked the subject property and [had] prepared a survey of [his] own
    on the subject property” has been held to provide the required “factual basis” for
    the expert’s statements identifying the defendant land surveyor’s alleged survey
    errors. Gartrell, 
    2011 WL 6147786
    , at *4; see also Dunham 
    Eng’g, 404 S.W.3d at 796
    –97 (rejecting argument that affidavit lacked sufficient “factual basis” where
    expert opined defendant engineering firm and defendant engineer committed
    professional errors based on his review of engineering project plans and
    specifications, and correspondence by the parties); Morrison 
    Seifert, 384 S.W.3d at 428
    –29 (same where expert opined defendant architecture firm committed
    professional errors based on his review of project-related design documents and
    certain testimony).
    19
    Similarly, here, we conclude Hatch’s affidavit identifies a sufficient “factual
    basis” upon which he based his professional opinions that Siemens’ alleged
    misalignment and programming errors were negligent and “failed to meet the
    standards set forth in the TFA.” That is, Hatch testified regarding his review of
    “the design, construction and installation documents regarding Siemens’ design,
    programming and installation of the [T]urbine, including Siemens’ work under its
    agreement with NRG to perform Technical Field Assistance (‘TFA Agreement’)
    and the Steam Turbine Assembly Documentation.” Hatch also provided details of
    his root-cause investigation of the March 11, 2011 Turbine shutdown, including
    multiple dates and locations, and his actions in examining and photographing the
    plant and Turbine, inspecting “the [T]urbine rotor and related components,” and
    attending “additional inspections and testing of the [T]urbine’s foundation.” Hatch
    described the Turbine’s failure during start-up mode—it tripped off line on loss of
    vacuum and high vibration, when it reached about 3,570 rpm. “Based on [his]
    understanding of the facts, investigation, education, training, and experience,”
    Hatch then attributed the cause of the Turbine’s failure and resulting damages to
    Siemens’ April 24, 2009 coupling misalignment error pursuant to its TFA work
    and to Siemens’ error in initial programming of the Turbine, which lengthened
    Unit 4’s exposure to excessive vibration associated with the misalignment.
    Siemens nevertheless asserts that Hatch’s affidavit and National Union’s
    petition are “remarkably divergent.” However, the primary case Siemens relied on
    in the trial court, and continues to rely on here, is distinguishable. In Garza v.
    Carmona, the “crux” of the plaintiffs’ negligence claim was that the defendant
    engineering firm failed to supervise the construction contractor and correct his
    errors, but the affidavit—while arguably detailed in the firm’s own alleged errors
    with regard to a lack of proper contractual documents and omissions in
    20
    construction documents—was “wholly silent on” the firm’s alleged actions as they
    related to the contractor’s work. See 
    390 S.W.3d 391
    , 396 (Tex. App.—Corpus
    Christi 2012, no pet.).
    Here, the “crux” of National Union’s theories of breach of contract and
    negligence is tied to Siemens’ own performance of the TFA whereby it was
    allegedly charged with providing technical field assistance to NRG in connection
    with Siemens’ steam turbine. National Union asserts that Siemens’ failures in
    improperly aligning and programming the Turbine, and in not advising NRG of
    such errors, breached the TFA and constituted professional negligence. According
    to Hatch, Siemens’ misalignment of the coupling of specific rotors within the
    Turbine, which contributed to its failure, constituted negligence.                       Likewise,
    Siemens’ error in the initial programming of the Turbine, which contributed to its
    failure and compounded the misalignment error, constituted negligence. Whether
    Hatch is correct that Siemens’ technical field assistance work under the TFA with
    NRG in fact related to “installation” and “programming” of the Turbine, the
    affidavit further alleges that Siemens’ misalignment and programming errors
    “failed to meet the standards set forth in the TFA.” Unlike in Garza, there is no
    disconnect between Siemens’ errors as alleged in Hatch’s affidavit and in National
    Union’s petition.15
    15
    Siemens’ other cases are distinguishable in that they involved multiple defendants.
    Because the affidavits at issue did not clearly indicate that one particular defendant was involved
    in a particular professional error, the trial courts abused their discretion in denying the motion to
    dismiss. See Sylva Eng’g, 
    2013 WL 1748754
    , at *5 (although petition asserted that KBR’s
    and/or Sylva’s roadway design improperly contained flat pavement slopes, “[t]he affidavit does
    not indicate that Sylva was involved in designing the slope of the road, but rather states that
    Sylva was a subcontractor that KBR employed for the engineering of the drainage inlets
    discussed above”); Robert Navarro & Assocs. Eng’g, Inc. v. Flowers Baking Co. of El Paso,
    LLC, 
    389 S.W.3d 475
    , 482 (Tex. App.—El Paso 2012, no pet.) (“One cannot ascertain the
    nuanced distinctions based upon Spencer’s affidavit. We thus agree with Appellants that the
    statutory language does not allow for collective assertions of negligence.”). Here, Hatch’s
    21
    Finally, Hatch’s assertions provide a sufficient “factual basis” for both
    National Union’s negligence and breach-of-contract claims. See Tex. Civ. Prac. &
    Rem. Code § 150.002(b). Although Siemens contests its role and the scope of its
    work under the TFA, there is no dispute that Hatch’s affidavit describes the
    existence of an agreement with NRG for Siemens to perform technical field
    assistance and identifies the TFA at issue. Hatch further states that he reviewed the
    TFA, and opined that Siemens’ misalignment and programming errors constituted
    negligence and did not meet the standards set forth in the TFA. Cf. Durivage,
    
    2011 WL 6747384
    , at *4 (affidavit did not provide “factual basis” for plaintiff’s
    contract claim “because it does not state any facts regarding the existence or breach
    of any contract”). 16
    We conclude that Hatch’s affidavit describes the facts giving rise to National
    Union’s breach-of-contract and negligence claims and thus provided the trial court
    a basis to conclude that such claims are not frivolous. See Dunham 
    Eng’g, 404 S.W.3d at 797
    . Therefore, the trial court did not abuse its discretion by refusing to
    dismiss National Union’s claims. See 
    id. We overrule
    Siemens’ second issue.
    affidavit references sole defendant Siemens in connection with both the misalignment error and
    the initial programming error.
    16
    Even where the expert does not describe the contract at issue and its alleged breach, or
    “couches” certain errors “in terms of negligence,” courts have concluded that affidavits
    contained a sufficient “factual basis” for breach-of-contract claims. See, e.g., Packard Eng’g
    Assocs. v. Sally Grp., L.L.C., 
    398 S.W.3d 389
    , 394 (Tex. App.—Beaumont 2013, no pet.)
    (rejecting “the notion that the portions of Brown’s affidavit that characterize Packard’s acts and
    omissions as negligent may not also serve to provide a factual basis for appellees’ breach of
    contract claim”); M-E 
    Eng’rs, 365 S.W.3d at 505
    –06 (rejecting defendant engineering firm’s
    argument that affidavit lacked a “factual basis” for plaintiff’s breach-of-contract and breach-of-
    warranty theories because “Long did not describe the contracts or warranties at issue or specify
    any particular provisions thereof that Tochihara or M-E allegedly breached”).
    22
    IV.   CONCLUSION
    Accordingly, we affirm the trial court’s denial of Siemens’ motion to
    dismiss. 17
    /s/              Marc W. Brown
    Justice
    Panel consists of Justices Boyce, Christopher, and Brown.
    17
    Because we conclude that Siemens has failed to demonstrate any abuse of discretion by
    the trial court in denying Siemens’ motion to dismiss, we need not address its third issue. See
    Tex. R. App. P. 47.1.