knife-river-corporation-south-v-esmeralda-hinojosa-individually-as ( 2014 )


Menu:
  • Opinion issued March 13, 2014
    In The
    Court of Appeals
    For The
    First District of Texas
    ————————————
    NO. 01-12-00862-CV
    ———————————
    KNIFE RIVER CORPORATION-SOUTH, Appellant
    V.
    ESMERALDA HINOJOSA, INDIVIDUALLY AND AS REPRESENTATIVE
    OF THE ESTATE OF ANDRES HINOJOSA, DECEASED, AND AS NEXT
    FRIEND ON BEHALF OF MELISSA HINOJOSA, VANESSA HINOJOSA,
    ANDREA HINOJOSA, AND ANDRES HINOJOSA, JR, Appellee
    On Appeal from the 335th District Court
    Washington County, Texas
    Trial Court Case No. 34659
    OPINION
    In this wrongful death and survivor suit, Knife River Corporation-South
    appeals a judgment rendered against it in favor of Esmeralda Hinojosa,
    Individually and as Representative of the Estate Of Andres Hinojosa, Deceased,
    and as Next Friend on Behalf of Melissa Hinojosa, Vanessa Hinojosa, Andrea
    Hinojosa, and Andres Hinojosa, Jr. Knife River raises three issues on appeal,
    which include its assertion that the trial court erred by denying its directed verdict
    on the plaintiff’s negligent-undertaking claim.
    We reverse and render.
    Background Summary
    On August 30, 2010, Andres Hinojosa was driving his tractor-trailer, loaded
    with gravel, on Highway 105 in Washington County, when his vehicle overturned.
    Hinojosa told emergency personnel at the scene that the accident was precipitated
    by his driving onto the paved shoulder of the road to avoid a head on collision with
    a vehicle that had crossed over into his lane. Hinojosa was taken to the hospital,
    where he died from his injuries.
    A reconstruction of the accident showed that Hinojosa had been in control of
    his vehicle until he had reached a location in the highway where there is a concrete
    box culvert running under the road. At that location, the improved shoulder of the
    road narrows from 10 feet to 6.3 feet. On the roadway above the culvert, where the
    pavement of the shoulder ends, the ground sloped dramatically at a 45 degree
    angle, creating a drop off. The drop off was 1.8 feet to the left of, and 1.7 feet
    2
    above, the culvert headwall. Tall vegetation grew along the shoulder’s edge,
    camouflaging the precipitous slope.
    Reconstruction of the accident also revealed that, as he drove along the
    paved shoulder, Hinojosa’s right front tire had fallen into the drop off. This caused
    the rear of his vehicle to fall to the right and the front of the vehicle to turn to the
    left. When the tires regained the pavement, Hinojosa’s vehicle was turning sharply
    to the left, resulting in a rollover of the tractor-trailer.
    The Texas Department of Transportation (“TxDOT”) had, at some point
    before the accident, placed an “object marker” on the side of the road to mark the
    headwall of the culvert. An object marker is a yellow and black striped sign
    intended to warn a motorist that there is a hazard to the right of the sign and to
    indicate to the motorist that he should drive to the left of the sign to avoid the
    hazard. The state trooper who investigated Hinojosa’s accident would later testify
    that the drop off, into which Hinojosa’s right front tire fell, was to the left of the
    object marker. Thus, a driver could stay to the left of the object marker and
    nonetheless drive off the drop off.
    The section of Highway 105 where Hinojosa’s accident occurred had last
    been repaved in 2005. In 2004, TxDOT had hired Knife River Corporation-South
    (“Knife River”) to resurface a 4.5 mile section of Highway 105. The location on
    3
    Highway 105 where Hinojosa’s accident would later occur was within this 4.5 mile
    section.
    Knife River and TxDOT signed a contract regarding the resurfacing project.
    Incorporated into the contract were TxDOT’s final project plans.          The plans
    indicated that the project was “for the construction of asphalt concrete pavement
    overlay consisting of one course surface treatments and pavement markings [and]
    markers.”
    The plans also provided the following: “No edge drop offs exceeding 3:1
    shall be left exposed to traffic.    Backfilling these areas shall be considered
    incidental to the various forms of work.” Backfilling referred to the part of the
    road construction project occurring after the new layer of asphalt had been laid, in
    which material—in this case recycled, ground asphalt—was placed along the
    newly paved edges of the road to create a gradual slope, or transition. The three-
    to-one ratio related to the slope of the road. For every three feet of horizontal
    distance, the drop in the slope of the road would be no more than one foot of
    vertical distance. This was to ensure a gentle slope from the traveled portion of the
    roadway to the unimproved portion of the shoulder.
    On the front page of the project plans, three stand-alone phrases were listed
    in the center of the bottom of the page. These phrases were “No Exceptions,” “No
    Railroads,” and “No Equations.”
    4
    The project plans also expressly incorporated specifications adopted by
    TxDOT.      These specifications were contained in the publication “Standard
    Specifications for Construction and Maintenance of Highways, Streets and
    Bridges,” published by TxDOT. Section 4.3 of the specifications indicated that a
    contractor, such as Knife River, should give written notice to the TxDOT engineer
    managing the project when the contractor encountered differing or latent
    conditions not addressed by the project plans. After receiving written notice, the
    TxDOT engineer would then investigate and determine whether cost adjustments
    should be made for the project.
    Knife River began the resurfacing project on April 14, 2005. On May 3,
    2005, Joe Sustaita, Knife River’s asphalt plant manager, made a notation in the
    project’s work diary. The notation read, in part: “There are some safety issues on
    the box culvert sections which really need to be fixed. The shoulder drops right off
    the edge along these box culverts. The [S]tate needs to get a change order to
    extend the boxes further or put up guard rail on these sections.”
    Raymond Vasquez, the Knife River employee in charge of the work site,
    made a notation in the work diary the following day, May 4, 2005. The notation
    pertains to the section of the highway where Hinojosa would have his accident five
    years later. Vasquez wrote, “We had to put [vertical panels] on the shoulder where
    it was deep and also where the shoulder is narrow and has a straight drop off and is
    5
    very dangerous[.] I told the [TxDOT inspector] about getting a change order and
    fix the problem on the shoulder by extending [the] box culverts.” Vasquez would
    later testify that he had verbally informed the on-site TxDOT inspector about the
    drop off existing in the area of the culvert. Vasquez also testified that he had not
    sent written notice to the TxDOT engineer regarding the drop off.
    When Knife River finished the resurfacing project in August 2005, the drop
    off remained. A TxDOT engineer inspected Knife River’s work by driving the 4.5
    mile stretch that had been resurfaced. The engineer approved and accepted the
    work performed by Knife River. Hinojosa’s fatal accident occurred five years
    later.
    Hinojosa’s wife, Esmeralda, filed suit against Knife River, in her individual
    capacity, as representative of the Estate of Andres Hinojosa, and as next friend of
    the couple’s four children.       Mrs. Hinojosa, hereinafter “Appellee,” asserted
    survivor, wrongful death, and negligence claims. Knife River timely designated
    TxDOT as a responsible third party pursuant to section 33.004 of the Civil Practice
    and Remedies Code. 1
    At the time of trial, Appellee’s second amended petition was the live
    pleading. In the petition, Appellee alleged, “On entering a contract which it should
    have recognized as necessary to the protection of the public, Knife River [] had a
    1
    See TEX. CIV. PRAC. & REM. CODE ANN. § 33.004 (Vernon Supp. 2013).
    6
    duty to exercise reasonable care in the performance of that contract.” She claimed
    that Knife River’s negligence included its failure to send written notice to TxDOT
    “clearly identifying the sheer edge drop off and conveying the degree of danger the
    defect presented. . . .” Appellee asserted that Knife River should have sent written
    notice “identifying the need to extend the shoulder over the culvert and eliminate
    the danger or need to place a guardrail at the area of the sheer drop off in order to
    isolate traffic from the danger.” Appellee claimed that Knife River should have
    requested a “change order,” that is, permission from TxDOT to change the scope
    of the work that had been agreed upon to address the danger presented by the drop
    off.
    Appellee proceeded to trial before a jury, asserting a theory of negligent
    undertaking against Knife River based on section 324A of the Restatement
    (Second) of Torts. Appellee claimed that Knife River had undertaken certain
    duties in the construction contract for the benefit of a third person, Andres
    Hinojosa. Appellee claimed that, based on the construction contract, Knife River
    (1) had undertaken a duty not to leave a drop off with a greater than three-to-one
    ratio and (2) had undertaken a duty to send written notification to TxDOT
    regarding the drop off. Appellee asserted that Knife River had not used reasonable
    care in performing these undertaken duties.
    7
    Among Appellee’s trial exhibits was the construction contract between
    TxDOT and Knife River.        The contract indicated that Knife River had been
    retained to lay a new layer of asphalt over the existing pavement and then to
    backfill along the road edges to achieve a 3:1 gradient. There is no dispute that a
    3:1 gradient could not have been achieved at the drop off merely by backfilling the
    road’s edge. Rather, the evidence at trial showed that the drop off could only be
    eliminated, and a 3:1 gradient achieved, by extending the concrete box culvert and
    then backfilling over it. The work required to extend the culvert was not within the
    scope of the work defined in the contract. Knife River had not been hired to
    extend the box culvert and was not permitted under the contract to do so. To
    complete the work necessary to extend the box culvert and back fill the drop off
    would have required Knife River to obtain a change order from TxDOT. The
    issuance of any change order would have first required the analysis and approval of
    a TxDOT engineer.
    The evidence also showed that there were other alternatives to address the
    hazard created by the drop off. As with the culvert extension, these alternatives
    were also not part of the contract. At trial, guard rails were discussed as a means
    to isolate a hazard, such as a drop off, from traffic. Painting cross-hatching
    markings on the road shoulder was also discussed as a means to warn motorists of
    a hazard and to direct motorists away from it. Here, the testimony indicated that it
    8
    would have been favorable to have cross hatching painted on the road to warn
    motorists of the narrowing shoulder and to direct motorists away from the drop off.
    However, the evidence was clear that the contract did not require or permit Knife
    River to paint cross-hatching on the road, to construct guard rails, or to perform
    work beyond laying new asphalt and backfilling the road edges.
    At the close of evidence, Knife River moved for a directed verdict on
    Appellee’s negligent-undertaking claim.      Among its arguments, Knife River
    asserted that it had no duty to rectify or to warn of the drop off. The trial court
    denied Knife River’s motion.
    The case was sent to the jury. The charge asked the jury whether the
    negligence, if any, of TxDOT or Knife River had caused the death of Hinojosa.
    With respect to Knife River’s negligence, the trial court’s jury instruction tracked
    the essential elements of an undertaking claim as defined in section 324A of the
    Restatement (Second) of Torts. The jury found that TxDOT’s and Knife River’s
    negligence had caused Hinojosa’s death. The jury apportioned responsibility as
    follows: five percent to Knife River and ninety-five percent to TxDOT. The jury
    answered “no” with respect to whether Hinojosa’s death resulted from gross
    negligence. The jury awarded Appellee damages totaling $4,850,895.33.
    Following trial, Appellee filed a motion to disregard the jury’s findings with
    respect to TxDOT’s negligence. Appellee asserted that there was no evidence to
    9
    support the jury’s finding that TxDOT’s negligence had proximately caused
    Hinojosa’s death and, concomitantly, to support the jury’s allocation of ninety-five
    percent responsibility to TxDOT.
    The trial court granted Appellee’s motion, setting aside the jury’s findings
    with respect to TxDOT. As a result, the trial court rendered judgment against
    Knife River in favor of Appellee with Knife River being ordered to pay 100
    percent of the damages found by the jury, plus court costs and interest.
    This appeal followed.    In three issues, Knife River challenges the trial
    court’s judgment, asserting (1) the trial court erred by denying Knife River’s
    motion for directed verdict; (2) the trial court erred by granting Appellee’s motion
    to disregard the jury’s findings; and (3) Knife River is entitled to a new trial based
    on Appellee’s failure to adequately plead its negligent-undertaking claim and
    based on the trial court’s improper exclusion of certain evidence and defenses.
    Directed Verdict
    In its first issue, Knife River claims that the trial court erred by denying
    Knife River’s motion for directed verdict. Knife River asserts that no evidence
    was presented at trial to establish the duty element of Appellee’s negligent-
    undertaking claim asserted under section 324A of the Restatement (Second) of
    Torts.
    10
    A.    Standard of Review
    When reviewing the grant of a directed verdict, we follow the usual standard
    for assessing the legal sufficiency of the evidence. See B & W Supply, Inc. v.
    Beckman, 
    305 S.W.3d 10
    , 21 (Tex. App.—Houston [1st Dist.] 2009, pet. denied)
    (citing City of Keller v. Wilson, 
    168 S.W.3d 802
    , 821–28 (Tex. 2005)). We
    determine whether there is any evidence of probative value to raise a material fact
    issue on the question presented. 
    Id. (citing Bostrom
    Seating, Inc. v. Crane Carrier
    Co., 
    140 S.W.3d 681
    , 684 (Tex. 2004)). We will credit the favorable evidence if
    reasonable jurors could and disregard the contrary evidence unless reasonable
    jurors could not. 
    Id. (citing City
    of 
    Keller, 168 S.W.3d at 827
    ). A directed verdict
    in favor of the defendant is proper when “a plaintiff fails to present evidence
    raising a fact issue essential to the plaintiff’s right of recovery.” See Krobar
    Drilling, L.L.C. v. Ormiston, No. 01-10-01016-CV, 
    2012 WL 1564160
    , at *2 (Tex.
    App.—Houston [1st Dist.] May 3, 2012, no pet.) (citing Prudential Ins. Co. of Am.
    v. Fin. Review Servs., Inc., 
    29 S.W.3d 74
    , 77 (Tex. 2000)). Stated differently, a
    directed verdict is warranted when the evidence is such that no other verdict can be
    rendered and the moving party is entitled, as a matter of law, to judgment. B & W
    
    Supply, 305 S.W.3d at 21
    (citing Byrd v. Delasancha, 
    195 S.W.3d 834
    , 836 (Tex.
    App.—Dallas 2006, no pet.)).
    11
    B.    Negligent Undertaking
    1.    Legal principles
    To sustain her negligence claim, Appellee was required to establish that
    Knife River violated a legal duty owed to Hinojosa.        See Torrington Co. v.
    Stutzman, 
    46 S.W.3d 829
    , 837 (Tex. 2000). Texas law generally imposes no duty
    to take action to prevent harm to others absent certain special relationships or
    circumstances. See SmithKline Beecham Corp. v. Doe, 
    903 S.W.2d 347
    , 353 (Tex.
    1995); see also RESTATEMENT (SECOND)      OF   TORTS § 314 (1965) (“The fact that
    [an] actor realizes or should realize that action on his part is necessary for
    another’s aid or protection does not of itself impose upon him a duty to take such
    action.”). For example, one who voluntarily undertakes an affirmative course of
    action for the benefit of another has a duty to exercise reasonable care that the
    other’s person or property will not be injured thereby.     See Fort Bend Cnty.
    Drainage Dist. v. Sbrusch, 
    818 S.W.2d 392
    , 395–96 (Tex. 1991) (citing Colonial
    Sav. Ass’n v. Taylor, 
    544 S.W.2d 116
    , 119 (Tex. 1976)).
    Appellee claimed that Knife River owed a duty of care to her husband under
    a negligent-undertaking theory, as defined in Restatement (Second) of Torts
    section 324A. That section reads as follows:
    Section 324A. Liability To Third Person For Negligent Performance Of
    Undertaking
    12
    One who undertakes, gratuitously or for consideration, to
    render services to another which he should recognize as
    necessary for the protection of a third person or his things, is
    subject to liability to the third person for physical harm
    resulting from his failure to exercise reasonable care to
    [perform] 2 his undertaking, if
    (a)    his failure to exercise reasonable care increases the risk
    of such harm, or
    (b)    he has undertaken to perform a duty owed by the other to
    the third person, or
    (c)    the harm is suffered because of reliance of the other or
    the third person upon the undertaking.
    RESTATEMENT (SECOND)        OF   TORTS § 324A (1965); see Torres v. Dilley Youth
    Athletic Ass’n, No. 04–11–00439–CV, 
    2012 WL 3205856
    , at *2 (Tex. App.—San
    Antonio Aug. 8, 2012, pet. denied) (mem. op.) (recognizing that Texas courts have
    adopted section 324A); see also Poynor v. BMW of N. Am., LLC, No. 05–10–
    00724–CV, 
    2013 WL 3498695
    , at *5 (Tex. App.—Dallas Feb. 21, 2013, no pet.)
    (analyzing Section 324A negligent-undertaking claim); Lowe’s Home Ctrs., Inc. v.
    GSW Mktg., Inc., 
    293 S.W.3d 283
    , 291 (Tex. App.—Houston [14th Dist.] 2009,
    pet. denied) (same).
    2
    In the Restatement (Second), the word “protect” appears rather than the word
    “perform.” Other courts have noted that “[t]he reporter for this edition of the
    Restatement . . . has verified that the word ‘protect’ which appears at this point is a
    typographical error and should read ‘perform.’” Hill v. U.S. Fid. & Guar. Co.,
    
    428 F.2d 112
    , 115 n.5 (5th Cir. 1970); see also Ironwood Springs Christian
    Ranch, Inc. v. Emmaus, 
    801 N.W.2d 193
    , 199 n.1 (Minn. Ct. App. 2011); Artiglio
    v. Corning Inc., 
    957 P.2d 1313
    , 1317 n.4 (Cal. 1998); Smith v. Allendale Mut. Ins.
    Co., 
    303 N.W.2d 702
    , 706 n.4 (Mich. 1981); Miller v. Bristol–Myers Co., 
    485 N.W.2d 31
    , 38 n.7 (Wis. 1992).
    13
    As with a simple negligence claim, a negligent-undertaking claim requires
    proof that the defendant owed the plaintiff a legal duty and violated it. See
    
    Torrington, 46 S.W.3d at 837
    . “Any such determination involves the balancing of
    a variety of factors, ‘including the risk, foreseeability, and likelihood of injury, and
    the consequences of placing the burden on the defendant.’”             Allen Keller v.
    Foreman, 
    343 S.W.3d 420
    , 425 (Tex. 2011) (quoting Del Lago Partners, Inc. v.
    Smith, 
    307 S.W.3d 762
    , 767 (Tex. 2010)). The critical inquiry concerning the duty
    element of a negligent-undertaking theory is whether a defendant acted in a way
    that requires the imposition of a duty where one otherwise would not exist. Nall v.
    Plunkett, 
    404 S.W.3d 552
    , 555 (Tex. 2013) (citing 
    Torrington, 46 S.W.3d at 838
    –
    39). Appellee asserts that Knife River “acted in a way that requires the imposition
    of a duty” because, as defined in Section 324A subpart (a), Knife River increased a
    risk of harm to Hinojosa and, as stated in subpart (b), it undertook to perform a
    duty owed by the other to the third person. See RESTATEMENT (SECOND) OF TORTS
    § 324A. Appellee claims that Knife River owed her husband a duty of care to
    rectify the drop off and to provide written notice to TxDOT regarding the defect.
    2.     Increased risk of harm
    A defendant may be liable to a plaintiff when, as defined in Section 324A
    subpart (a), a defendant’s failure to exercise reasonable care in rendering the
    service it has undertaken increases the risk of harm to the plaintiff. See Poynor,
    14
    
    2013 WL 3498695
    , at *5–6 (analyzing whether evidence showed that defendant
    had increased risk of harm to plaintiffs). The Restatement provides an illustration
    to guide the interpretation of this concept:
    A operates a grocery store. An electric light hanging over one of the
    aisles of the store becomes defective, and A calls B Electric Company
    to repair it. B Company sends a workman, who repairs the light, but
    leaves the fixture so insecurely attached that it falls upon and injures
    C, a customer in the store who is walking down the aisle. B Company
    is subject to liability to C.
    RESTATEMENT (SECOND) OF TORTS § 324A cmt. c, illus. 1.
    The record shows that TxDOT hired Knife River to lay a two-to-three inch
    layer of asphalt over the existing asphalt on the road. Appellee asserts that Knife
    River increased the risk of harm to Hinojosa when it added the new asphalt to the
    highway, which raised the road’s height and deepened the drop off by two or three
    inches.
    The decision to apply the new layer over the existing layer was made by
    TxDOT, as planned and designed by its engineers. At trial, TxDOT’s district
    director of construction, Patrick Williams, explained that the “no exceptions”
    notation on the front of the construction contract meant that TxDOT required that
    no portion of the 4.5 mile road section would be excepted from being overlaid with
    new asphalt. Knife River had no authority or discretion not to overlay any portion
    of the road or to alter the contract with respect to the overlay.
    15
    Appellee did not allege or show that the claimed increase in the risk of harm
    to Hinojosa associated with the raised road height was caused by a faulty,
    substandard, or incomplete rendition of the overlay work by Knife River. Rather,
    Appellee intimates that the risk of harm was increased by raising the road height
    and by the corresponding deepening of the drop off. In other words, the risk was
    increased by the fact of the overlay itself.     However, it was TxDOT which
    undertook to design, engineer, approve, and require the overlay. Thus, any alleged
    increase in harm was attributable to TxDOT, not to Knife River. Nothing showed
    that the alleged increase in the risk of harm resulted from Knife River’s failure to
    use reasonable care in the rendition of the overlay services it had undertaken. And,
    as discussed, infra, the evidence showed that rectifying the drop off and providing
    written notice of the defect was outside the scope of Knife River’s undertaking.
    Moreover, it was undisputed that the steep drop off—estimated to be 1.5 feet
    deep—existed before Knife River began the overlay project. And it is not in
    dispute that, before the overlay, the drop off was a danger to motorists. Raymond
    Vasquez testified that he had verbally informed the onsite TxDOT project
    inspector about the dangerousness of the existing drop off.
    Although she asserts that the evidence showed that Knife River’s services
    increased the risk to motorists, Appellee presented no evidence to support this
    assertion. In her brief, Appellee points to the testimony of Knife River’s asphalt
    16
    manager, Joe Sustaita, in which he indicated that a two to three inch drop was a
    safety concern. But, when read in context, Sustaita’s testimony referred to the fact
    that, before Knife River put a new layer of asphalt on the highway, there was a
    preexisting two to three inch drop along portions of the old pavement edge that
    needed to be addressed. Sustaita was not referring to the post-construction two to
    three inch height increase along the drop off, which, in its preexisting condition,
    was already approximately one-and-one-half-feet deep. In other words, Sustaita
    was not testifying about the effect of the height increase caused by Knife River’s
    placing a new layer of asphalt on the road.
    The only evidence specifically addressing this issue showed that the raised
    height of the road did not increase the risk of harm to Hinojosa. Appellee asked
    Knife River’s corporate representative whether the additional asphalt layer had
    made the condition more dangerous. The corporate representative indicated that
    the danger was unchanged by the additional layer of asphalt. Brad Partee, the
    TxDOT engineer, who designed the project, was also asked whether the additional
    asphalt increased the risk to the public:
    Q. In your professional opinion as an engineer, your professional judgment,
    would adding a layer of asphalt to this existing roadway make it dangerous?
    [Partee:] No, sir.
    Q. Would it increase any risk at all to the motoring public?
    A. No, sir.
    17
    Given the record, we conclude that Knife River did not owe Hinojosa a duty
    to address the drop off pursuant to subpart (a) of Section 324A. The evidence
    showed that the drop off existed in a dangerous condition before Knife River began
    work and no evidence showed that Knife River’s failure to act with reasonable care
    increased that danger.
    3.    Undertaking duty owed to third person
    Appellee also claims that Knife River is liable under subpart (b) of Section
    324A, which provides that a defendant may be liable when it has undertaken to
    perform a duty owed by another to a third person. See RESTATEMENT (SECOND) OF
    TORTS § 324A(b). Appellee alleged that Knife River undertook TxDOT’s duty
    owed to the motoring public to make the roadway safe when Knife River agreed to
    backfill the road edges to a 3:1 gradient. However, section 324A imposes a duty to
    perform without negligence only the task that the actor has undertaken to
    accomplish. See Lowe’s Home 
    Ctrs., 293 S.W.3d at 291
    ; see also 
    Sbrusch, 818 S.W.2d at 397
    .
    We ask: Did Knife River undertake to make the 1.7 foot drop off comply
    with the 3:1 slope requirement? Appellee says “yes” and cites the project plan,
    which states as follows: “No edge drop offs exceeding 3:1 shall be left exposed to
    traffic. Backfilling these areas shall be considered incidental to the various forms
    of work.” Appellee points out that the project plans state, “No Exceptions.” It also
    18
    points out that Knife River agreed do “all the work necessary for the highway
    improvement as shown and described in the plans and in accordance with the
    referenced specifications and special provisions which are a part of this contract.”
    Appellee asserts that, without any exceptions, Knife River had a duty under the
    contract to make all drop offs compliant with the 3:1 slope requirement, regardless
    of whether compliance was possible within the scope of the work permitted under
    the contract.
    The Supreme Court of Texas has stated that the critical inquiry concerning
    the duty element of a negligent-undertaking theory is whether a defendant acted in
    a way that requires the imposition of a duty where one otherwise would not exist.
    
    Nall, 404 S.W.3d at 555
    . Here, by entering into the construction contract with
    TxDOT to resurface the road and to backfill drop offs incidental to that work,
    Knife River did not act in a way that requires an imposition of a duty to rectify the
    1.7 foot drop off involved in this case.
    By agreeing to backfill edge drops incidental to the resurfacing work, Knife
    River contracted to backfill the edge drops associated with that work and to ensure
    that those edge drops met the 3:1 slope requirement. The evidence shows that
    backfilling the preexisting drop off, into which Hinojosa’s tire fell, was not
    contemplated by Knife River or by TxDOT when they entered into the
    construction contract. Simply backfilling the drop off was not feasible because, as
    19
    a number of witnesses testified, the backfill material would block the culvert.
    Instead, backfilling the drop off required extending the box culvert, an act that was
    outside the scope of the construction contract, and would necessitate TxDOT’s
    engineering judgment and its approval. The only evidence at trial specifically
    addressing the meaning of the contract’s “no exceptions” phrase indicated that the
    phrase referred to TxDOT’s requirement that no part of the road be excluded from
    being overlaid with new asphalt.
    In addition, the project plans did not mention the several box culverts found
    within the section of the highway covered by the project or address whether the
    edge drops existing above these culverts could be made compliant with a 3:1 slope.
    The evidence did show that the edge drop involved in this case was steeper, more
    dramatic, more dangerous, and more concealed than the edge drops at the other
    culvert locations. However, it was not in dispute that TxDOT knew that a 3:1
    gradient could not be achieved at any of the box culvert locations. TxDOT made
    the decision before the project began that no additional work would be done at any
    of the culverts lying within the 4.5 mile section of road included in the project.
    At trial, representatives from Knife River and TxDOT made clear that
    neither party to the contract intended to impose a duty on Knife River to rectify the
    drop off.    Rather, TxDOT viewed this simply as an “overlay contract,” as
    explained by Patrick Williams, TxDOT’s director of construction for the district,
    20
    who ultimately approved and accepted Knife River’s work. He described the
    contract as an “overlay,” and testified as follows: “It’s preventive maintenance.
    It’s just to improve the ride or add a little strength to the pavement structure itself
    and all and give it a little bit more surface life. It doesn’t address safety issues.”
    When asked why he was not critical of Knife River’s work, even though it had not
    achieved a 3:1 slope at the drop off, Williams gave the following testimony:
    A. Because again, it wasn’t part of the contract and there’s—had
    extensive work to be done to get rid of that drop-off.
    Q. . . . And what would be some of the extensive work that would
    have to be done?
    A. Well, the culvert would have to be widened, but before you did
    that you’d have to go in there and do an environmental study first and
    get all the environmental clearance before that was done.
    Q. And there was nothing . . . about Knife River’s project here at this
    location that required them to widen the culvert, agreed?
    A. Agreed.
    In short, the additional work required to achieve a 3:1 gradient at the drop
    off was outside the scope of the contract and was not contemplated by the parties.
    It would be illogical to conclude, then, that Knife River’s agreement to backfill
    edge drops incidental to its overlay work constituted an undertaking by Knife
    River to backfill the preexisting one-and-one-half foot drop off to a 3:1 gradient.
    We also note that courts in other jurisdictions have recognized that for
    liability to be imposed under section 324A(b), a party “must completely assume a
    21
    duty owed by [another] to [the third person].” Hutcherson v. Progressive Corp.,
    
    984 F.2d 1152
    , 1156 (11th Cir. 1993); see also Ironwood Springs Christian Ranch,
    Inc. v. Walk to Emmaus, 
    801 N.W.2d 193
    , 202 (Minn. Ct. App. 2011) (stating that,
    “to impose liability under section 324A(b), one who undertakes a duty owed by
    another to a third person must completely assume the duty”); Plank v. Union Elec.
    Co., 
    899 S.W.2d 129
    , 131 (Mo. Ct. App. 1995) (concluding that “one must intend
    to completely subsume or supplant the duty of the other party in order to incur
    liability for nonperformance of that duty”); Obenauer v. Liberty Mut. Ins. Co., 
    908 F.2d 316
    , 317 (8th Cir. 1990) (concluding that an insurer providing safety services
    to a manufacturer was not liable under Section 324A to the user of a manufactured
    product because the insurer did not “replace” the manufacturer’s duty to design a
    safe product); Furek v. Univ. of Del., 
    594 A.2d 506
    , 515–16 (Del. 1991)
    (recognizing that Section 324A(b) applies “only when one undertakes to supplant
    the duty of another owed to a third person”); Davis v. Liberty Mut. Ins. Co., 
    525 F.2d 1204
    , 1207–08 (5th Cir. 1976) (requiring that party with original duty
    completely “delegate[ ]” the duty to the undertaking party for the undertaking party
    to be liable under subsection (b)). Here, the evidence showed that TxDOT was
    responsible for the maintenance and safety of Texas roads, including the highway
    where the accident occurred. Even though Knife River contracted to provide
    backfill services incidental to the overlay work, no evidence showed that TxDOT
    22
    relinquished its duty to maintain the road’s safety when it entered into the overlay
    contract with Knife River. TxDOT retained that duty.
    Appellee also relies on section 4.3 of the TxDOT specifications incorporated
    into the project plans. That provision required Knife River to give written notice to
    TxDOT when Knife River encountered differing or latent conditions not addressed
    by the project plans. Appellee points to that provision and to Knife River’s
    conduct of obtaining a change order from TxDOT for additional backfill material
    as conduct giving rise to a duty to rectify the 1.7 foot drop off. Appellee also
    asserts that section 4.3 gave rise to a duty for Knife River to send TxDOT written
    notice when it discovered the drop off.
    Section 4.3 of the specifications provides:
    4.3.   Differing Site Conditions. During the progress of the work,
    differing subsurface or latent physical conditions may be
    encountered at the site. The two types of differing site
    conditions are defined as:
    • those that differ materially from those indicated in the
    Contract and
    • unknown physical conditions of an unusual nature
    differing materially from those ordinarily encountered
    and generally recognized as inherent in the work
    provided for in the Contract.
    Notify the [TxDOT] Engineer in writing when differing site
    conditions are encountered. The Engineer will notify the
    Contractor when the Department discovers differing site
    conditions. Unless directed otherwise, suspend work on the
    affected items and leave the site undisturbed. The Engineer
    23
    will investigate the conditions and determine whether differing
    site conditions exist. If the differing site conditions cause an
    increase or decrease in the cost or number of working days
    specified for the performance of the Contract, the Engineer will
    make adjustments, excluding the loss of anticipated profits, in
    accordance with the Contract. Additional compensation will be
    made only if the required written notice has been provided.
    Nothing in section 4.3 indicates that the purpose of providing written notice
    to TxDOT was to address safety issues. Nor does it indicate that the provision was
    for the benefit or protection of third parties. Rather, from its language, the notice
    provision is designed to address compensation issues and to provide a means by
    which a TxDOT contractor may obtain additional compensation for work
    undertaken to complete a project. Section 4.3 did not give rise to a duty for Knife
    River to send written notice to TxDOT.        The notice requirement arose from
    contractual duties owed between the parties regarding payment.          It does not
    contemplate a duty that TxDOT owed to a third party.             See RESTATEMENT
    (SECOND)   OF   TORTS § 324A(b) (imposing undertaking liability when a party has
    undertaken to perform a duty owed by another to a third person).
    Consistent with section 4.3, Knife River did, as Appellee points out, seek a
    change order for additional backfill material.        Knife River had originally
    underestimated the amount and cost of the backfill material needed incidental to
    the overlay work. Knife River obtained the change order so that it would be paid
    for the backfill material it needed for the project. However, this conduct did not
    24
    give rise to a duty for Knife River to obtain a change order to extend the box
    culvert. Backfilling the edge drops incidental to the overlay work with backfill
    material was within the scope of the construction contract. Extending the culverts
    was not part of the agreement. Thus, neither section 4.3 requiring written notice
    nor Knife River’s act of obtaining a change order for additional backfill material
    constitute undertakings giving rise to a duty to obtain a change order to rectify the
    1.7 foot drop off.
    In short, to the extent that it undertook to backfill edge drops incidental to its
    overlay work, making safe the preexisting steep drop off above the culvert, into
    which Hinojosa’s tire fell, was outside the scope of that undertaking. No evidence
    was presented to show otherwise. Because Restatement section 324A imposes a
    duty to perform without negligence only the task that the actor has undertaken to
    accomplish, Knife River owed no duty—as a matter of law—to rectify the drop off
    or to provide written notice regarding the defect. See Lowe’s Home 
    Ctrs., 293 S.W.3d at 291
    ; see also 
    Sbrusch, 818 S.W.2d at 397
    .
    We conclude that Knife River was entitled to a directed verdict on
    Appellee’s negligent-undertaking claim. We hold that the trial court erred when it
    denied Knife River’s motion for directed verdict.
    25
    We sustain Knife River’s first issue.3
    Conclusion
    We reverse the judgment of the trial court and render a take-nothing
    judgment against Appellee.
    Laura Carter Higley
    Justice
    Panel consists of Justices Keyes, Higley, and Massengale.
    3
    Because of the disposition of this issue, we need not reach Knife River’s second
    and third issues.
    26