Barron, Stark & Swift Consulting Engineers, LP and Barron-Bennett Architecture, LP v. First Baptist Church, Vidor, Texas , 551 S.W.3d 320 ( 2018 )


Menu:
  •                                       In The
    Court of Appeals
    Ninth District of Texas at Beaumont
    _________________
    NO. 09-17-00470-CV
    _________________
    BARRON, STARK & SWIFT CONSULTING ENGINEERS, LP AND
    BARRON-BENNETT ARCHITECTURE, LP, Appellants
    V.
    FIRST BAPTIST CHURCH, VIDOR, TEXAS, Appellee
    ________________________________________________________________________
    On Appeal from the 128th District Court
    Orange County, Texas
    Trial Cause No. A160310-C
    ________________________________________________________________________
    OPINION
    This is an interlocutory appeal of the trial court’s denial of Barron, Stark &
    Swift Consulting Engineers, LP and Barron-Bennett Architecture, LP’s (Appellants)
    motion to dismiss the complaint of First Baptist Church, Vidor (FBCV) pursuant to
    Civil Practice and Remedies Code section 150.002. See Tex. Civ. Prac. & Rem.
    Code Ann. § 150.002 (West 2011).
    1
    Background
    On November 20, 2011, FBCV contracted with G.L. Barron Company, Inc.
    (“G.L. Barron”) to oversee a multimillion dollar construction and renovation project
    following a bidding process that began in June 2011. One of the priorities of the
    project was to make sure the buildings’ roofs did not leak and would efficiently and
    properly shed water. The proposal G.L. Barron provided included a team of
    engineers, architects, and other companies to contribute to the design and work for
    the project. G.L. Barron hired Barron-Bennett Architecture, LP (BBA) to oversee
    and approve the architectural design of the project, which was performed under the
    license of Architect Bennett. The engineering services of Barron, Stark & Swift
    Consulting Engineers, LP (BSSCE) were performed under the license of Civil
    Engineer Stark.
    Beginning in June of 2013, FBCV had problems with water intrusion and
    leaks in various rooms throughout the church campus. Despite notifying G.L.
    Barron, the leaks were never repaired to the satisfaction of FBCV, and the church
    ultimately had problems with mold.1
    1
    The church alleged that the types of mold found require remediation;
    however, it is unclear from the record whether remediation has taken place.
    2
    The substantial completion date of the project was October 17, 2014. On
    October 14, 2016, FBCV filed its original petition against multiple defendants,
    including Appellants. In that petition, FBCV asserted claims against the defendants
    for breach of contract, violations of the DTPA, breach of express warranties, breach
    of implied warranties, negligence, and fraud. With its original petition, FBCV did
    not provide the certificates of merit required by section 150.002 of the Texas Civil
    Practice and Remedies Code. See 
    id. Accordingly, on
    November 14, 2016,
    Appellants filed their motion to dismiss pursuant to section 150.002. See 
    id. § 150.002(e).
    Later that same day, FBCV filed its first amended petition accompanied
    by a certificate of merit from Charles R. Norman, a licensed professional engineer,
    but did not include a certificate of merit from an architect. On June 13, 2017, FBCV
    filed its second amended petition, which included certificates of merit from Charles
    R. Norman and Walter Anthony Eeds, a licensed professional architect.
    The crux of Appellants’ argument is the certificates of merit were untimely,
    because FBCV did not file them contemporaneously with its first-filed petition.
    Moreover, FBCV did not allege in its first-filed petition that it was unable to provide
    certificates of merit because it was filed within ten days of the statute of limitations
    expiring and because of that, FBCV was unable to obtain a certificate of merit that
    3
    would have entitled it to an extension of thirty days to file a certificate of merit. See
    
    id. § 150.002(c).
    In this interlocutory appeal, Appellants complain in one issue that the trial
    court abused its discretion by denying their motion to dismiss under Chapter 150 of
    the Texas Civil Practice and Remedies Code based on FBCV’s failure to comply
    with the certificate of merit requirements. See 
    id. § 150.002(e),
    (f).
    Standard of Review
    A party may pursue an interlocutory appeal of an order denying or granting a
    motion to dismiss for failure to file a certificate of merit. 
    Id. § 150.002(f);
    Carter &
    Burgess, Inc. v. Sardari, 
    355 S.W.3d 804
    , 808 (Tex. App.—Houston [1st Dist.]
    2011, no pet.). “We review a trial court’s ruling on a motion to dismiss a case for
    failure to comply with section 150.002 for an abuse of discretion.” Capital One v.
    Carter & Burgess, Inc., 
    344 S.W.3d 477
    , 479 (Tex. App.—Fort Worth 2011, no
    pet.); see also TDIndustries, Inc. v. Rivera, 
    339 S.W.3d 749
    , 752 (Tex. App.—
    Houston [1st Dist.] 2011, no pet.). If a trial court acts arbitrarily or unreasonably,
    without reference to any guiding rules and principles, it constitutes an abuse of
    discretion. Downer v. Aquamarine Operators, Inc., 
    701 S.W.2d 238
    , 241–42 (Tex.
    1985). To the extent our review necessitates interpretation of a statute, that portion
    of our review will be conducted de novo. See Jaster v. Comet II Const., Inc., 438
    
    4 S.W.3d 556
    , 562 (Tex. 2014); 
    Sardari, 355 S.W.3d at 809
    ; 
    TDIndustries, 339 S.W.3d at 752
    .
    Analysis
    Civil Practice and Remedies Code section 150.002 governs the filing of a
    certificate of merit in suits against licensed or registered professional architects,
    engineers, or land surveyors. See Tex. Civ. Prac. & Rem. Code Ann. § 150.002. In
    an action for damages arising out of the provision of professional services by a
    licensed or registered professional, the plaintiff is required to file with the complaint
    an affidavit of a third-party licensed architect, licensed professional engineer,
    registered landscape architect, or registered professional land surveyor who is
    competent to testify, holds the same professional license or registration as the
    defendant, and is knowledgeable in the area of practice of the defendant. 
    Id. § 150.002(a).
    Further, the affidavit provided must set forth the negligence, if any, or
    other action, error, or omission of the licensed or registered professional in providing
    the professional service. 
    Id. § 150.002(b).
    Courts have consistently interpreted this language as requiring plaintiffs to
    file a certificate of merit with a “first-filed petition” as to the defendants in which a
    section 150.002 claim applies. See TIC N. Cent. Dallas 3, L.L.C. v. Envirobusiness,
    Inc., 
    463 S.W.3d 71
    , 77 (Tex. App.—Dallas 2014, pet. denied); JJW Dev., L.L.C. v.
    5
    Strand Sys. Eng’g, Inc., 
    378 S.W.3d 571
    , 576 (Tex. App.—Dallas 2012, pet. denied);
    Sharp Eng’g v. Luis, 
    321 S.W.3d 748
    , 752 (Tex. App.—Houston [14th Dist.] 2010,
    no pet.); see also 
    Jaster, 438 S.W.3d at 563
    (noting “action” refers to the lawsuit,
    not claims asserted within the lawsuit).
    In the present case, the parties do not dispute that this is a claim “arising out
    of the provision of professional services” of licensed engineers and architects. See
    Tex. Civ. Prac. & Rem. Code Ann. § 150.002(a). Accordingly, section 150.002
    applies to FBCV’s claims against Appellants in this matter. See 
    id. There is
    also no
    dispute that FBCV failed to file certificates of merit with its original petition in this
    case.
    Subsection (c) contains an exception to the contemporaneous filing
    requirement of subsection (a), which states
    [t]he contemporaneous filing requirement of Subsection (a) shall not
    apply to any case in which the period of limitation will expire within
    10 days of the date of filing and, because of such time constraints, the
    plaintiff has alleged that an affidavit of a third-party licensed architect,
    licensed professional engineer, registered landscape architect, or
    registered professional land surveyor could not be prepared. In such
    cases, the plaintiff shall have 30 days after the filing of the complaint
    to supplement the pleadings with the affidavit. The trial court may, on
    motion, after hearing and for good cause, extend such time as it shall
    determine justice requires.
    
    Id. § 150.002(c).
    6
    In Nangia v. Taylor, we examined whether the allegation of a plaintiff’s
    inability to obtain the certificate of merit under subsection (c) must be made
    contemporaneously with the filing of the initial petition. 
    338 S.W.3d 768
    , 771–72
    (Tex. App.—Beaumont 2011, no pet.). We explained in Nangia that in order for the
    exception to apply, “[t]he pleadings must set out the two explanatory matters: (1)
    limitations would have barred the claim within ten days of the filing of the initial
    pleading against the professional, and (2) time constraints therefore precluded the
    presentment of the affidavit with the initial filing.” 
    Id. (citing Tex.
    Civ. Prac. & Rem.
    Code Ann. § 150.002(c)). We noted that “if the plaintiff does not contemporaneously
    file the certificate of merit with its initial petition against the professional, the
    affidavit is timely only if, within thirty days of that initial filing, the plaintiff satisfies
    the statutory exception.” 
    Id. In Nangia,
    we ultimately concluded the plaintiff met the
    filing requirements of section 150.002, because the explanation and the certificate
    of merit were filed within thirty days of the plaintiff filing his claim. Id.; see also
    Epco Holdings, Inc. v. Chicago Bridge and Iron Co., 
    352 S.W.3d 265
    , 269 (Tex.
    App.—Houston [14th Dist.] 2011, pet. dism’d) (holding 150.002(c) did not require
    a plaintiff’s allegation to be made in the first-filed petition and that appellants
    complied with the statute by filing a certificate of merit and making the subsection
    7
    (c) allegation in an amended petition within thirty days of filing their original
    petition).
    Following our decision in Nangia, however, the Texas Supreme Court
    examined subsection (c) and in particular the provision which states “[t]he trial court
    may, on motion, after hearing and for good cause, extend such time as it shall
    determine justice requires.” Crosstex Energy Services, L.P. v. Pro Plus, Inc., 
    430 S.W.3d 384
    , 390 (Tex. 2014) (quoting Tex. Civ. Prac. & Rem. Code Ann. §
    150.002(c)). In Crosstex, the question was whether the “good cause” extension
    applied only if the plaintiff filed suit during the final ten days of the limitations
    period. See 
    id. In its
    analysis, the Court looked at the “good cause” language in the
    context of the other language in subsection (c). 
    Id. The Court
    noted “[t]he first
    sentence of subsection (c) provides an exception to the contemporaneous filing
    requirement, made available when a plaintiff both files within ten days of the end of
    the limitations period and alleges that the late filing prevented the preparation of a
    certificate of merit.” 
    Id. (emphasis in
    original) (citing Tex. Civ. Prac. & Rem. Code
    § 150.002(c)). In holding the “good cause” exception in subsection (c) did not stand
    alone, the Court explained “rather [it] is contingent upon a plaintiff: (1) filing within
    ten days of the expiration of the limitations period; and (2) alleging that such time
    constraints prevented the preparation of an affidavit. A plaintiff satisfying these
    8
    requirements ‘shall’ receive an extension of thirty days[.]” 
    Id. at 391.
    Once a plaintiff
    meets these requirements and is given the initial thirty-day extension, “upon motion,
    a trial court may, for good cause, extend this thirty-day period as justice requires.”
    
    Id. In light
    of Crosstex, we read subsection (c) to mean that in order for the exception
    of the contemporaneous filing requirement to apply, a plaintiff must file its
    complaint within ten days of the limitations period expiring and allege the time
    constraints prevented the preparation of affidavits. See 
    id. at 390–91.
    These are
    prerequisites to receiving the thirty-day extension. See 
    id. Our sister
    court of appeals in Dallas has also examined subsection (c) since
    Crosstex and reached the same conclusion. In DHM Design v. Morzak, No. 5-15-
    00103-CV, 
    2015 WL 3823942
    , at *3–4 (Tex. App.—Dallas June 19, 2015, pet.
    denied) (mem. op.), the Dallas court concluded the plaintiff was not entitled to the
    initial thirty-day extension, preventing the trial court from considering whether a
    “good cause” extension could be granted because the plaintiff did not allege in her
    first amended petition that as a result of the approaching expiration of the limitations
    period, she was unable to obtain the required affidavit. The court specifically held
    that the exception to the contemporaneous filing was dependent on both filing within
    ten days of limitations expiring and alleging she could not obtain an affidavit in
    compliance with the statute. 
    Id. Later, the
    Dallas Court of Appeals, in another case
    9
    concerning section 150.002(c), concluded that appellant did not satisfy the statute’s
    requirements because appellant did not state in its original petition that the
    limitations period would expire within ten days of filing and the resulting time
    constraints prevented the preparation of an affidavit. Emerald Waco Inv., Ltd. v.
    Petree, No. 05-15-00863-CV, 
    2016 WL 4010056
    , at *5 (Tex. App.—Dallas July 25,
    2016, no pet.) (mem. op.). The Court further noted the courts in Crosstex and DHM
    interpreted section 150.002(c) as imposing two requirements for a plaintiff to receive
    the thirty-day extension for filing a certificate of merit, which are that the plaintiff
    file within ten days of limitations expiring and allege the late filing prevented the
    preparation of a certificate. 
    Id. at *4.
    If a plaintiff fails to file a certificate of merit in accordance with section
    150.002, it “shall result in dismissal of the complaint against the defendant” unless
    the plaintiff qualifies for an extension in subsection (c). Tex. Civ. Prac. & Rem. Code
    Ann. § 150.002(e). Because FBCV failed to meet the prerequisites for obtaining an
    extension under subsection (c) by filing within ten days of the statute of limitations
    expiring and alleging that the resulting time constraints prevented it from obtaining
    a certificate of merit, it was not exempted from contemporaneously filing the
    certificate of merit as mandated by subsection (a). See 
    id. § 150.002(a);
    Crosstex,
    
    10 430 S.W.3d at 391
    ; DHM, 
    2015 WL 3823942
    , at *3–4; Emerald Waco, 
    2016 WL 4010056
    , at *5.
    The trial court “shall” dismiss a complaint where a plaintiff fails to comply
    with the statute. Tex. Civ. Prac. & Rem. Code § 150.002(e). A dismissal pursuant to
    subsection (e) “may be with prejudice.” 
    Id. Accordingly, the
    trial court has the
    discretion to determine if that dismissal will be with or without prejudice. Id.; see
    also CTL/Thompson Texas, LLC v. Starwood Homeowner’s Ass’n, Inc., 
    390 S.W.3d 299
    , 301 (Tex. 2013) (noting 150.002(e) provides no guidance on how the trial court
    should exercise its discretion in determining to dismiss an action with prejudice or
    without); TIC N. Cent. Dallas 3, 
    L.L.C., 463 S.W.3d at 76
    (explaining that
    150.002(e) expressly does not require a dismissal with prejudice). Moreover, if a
    trial court chooses to dismiss a complaint without prejudice, and a plaintiff files a
    new action which includes the appropriate certificates of merit with the first-filed
    petition in that action, the plaintiff has complied with the statute. TIC N. Cent. Dallas
    3, 
    L.L.C., 463 S.W.3d at 77
    .
    Accordingly, Appellants are entitled to dismissal of FBCV’s complaint, but it
    is within the trial court’s discretion as to whether the dismissal will be with or
    without prejudice. Appellants also assert in this appeal that the certificate of merit
    of Charles R. Norman filed on November 14, 2016, could not apply to BBA since
    11
    Norman is not an architect (even if it was timely filed), and Norman’s certificate of
    merit was deficient as to Stark. Because our determination that the certificates were
    not timely filed is dispositive, we do not consider Appellants’ other arguments that
    FBCV did not satisfy the requirements of section 150.002. See Emerald Waco, 
    2016 WL 4010056
    , at *3 n.2; see also Tex. R. App. P. 47.1.
    Conclusion
    We conclude that FBCV failed to establish it was entitled to the thirty-day
    statutory extension to file certificates of merit because it did not allege in its first-
    filed petition alleging claims against Appellants that filing suit within ten days of the
    statute of limitations expiring prevented it from obtaining certificates of merit.
    Therefore, the trial court abused its discretion in denying Appellants’ motion to
    dismiss. Accordingly, we reverse the trial court’s order denying Appellants’ motion
    to dismiss pursuant to section 150.002 and remand to the trial court to determine
    whether such dismissal shall be with or without prejudice.
    REVERSED AND REMANDED.
    ________________________________
    CHARLES KREGER
    Justice
    Submitted on April 26, 2018
    Opinion Delivered May 17, 2018
    Before McKeithen, C.J., Kreger, and Johnson, JJ.