City of Allen and Coalition of Cities v. Public Utility Commission of Texas Oncor Electric Delivery Company And Centerpoint Energy, Inc. ( 2005 )


Menu:
  •       TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-04-00282-CV
    City of Allen and Coalition of Cities, Appellant
    v.
    Public Utility Commission of Texas,;Oncor Electric Delivery Company;
    and Centerpoint Energy, Inc., Appellees
    FROM THE DISTRICT COURT OF TRAVIS COUNTY, 250TH JUDICIAL DISTRICT
    NO. GV3-02966, HONORABLE MARGARET COOPER, JUDGE PRESIDING
    OPINION
    In this appeal, we must decide whether the Public Utility Commission has jurisdiction
    under the Public Utilities Regulatory Act (PURA) to review certain ordinances that a city claims to
    have enacted based on its police power. The City of Allen and a coalition of cities1 appeal from a
    district court judgment partially dismissing the Cities’ appeal and partially affirming the
    Commission’s summary decision that invalidated four municipal ordinances because of their conflict
    with Oncor Electric Delivery Company’s2 tariffs, PURA, and the Commission’s rules. For the
    reasons discussed below, we affirm the district court’s order.
    1
    The coalition members are the cities of Addision, Austin, Bedford, Colleyville, Denton,
    El Paso, Farmers Branch, Grapevine, Hurst, Keller, Missouri City, North Richland Hills, Pasadena,
    Tyler, Westlake, West University Place, and Wharton. We will refer to the coalition and Allen
    collectively as “Cities.”
    2
    Oncor Electric Delivery Company is now known as TXU Electric Delivery Company.
    Oncor and Centerpoint Energy, Inc. will be referred to collectively as the “Utilities.”
    BACKGROUND
    In 1999, the legislature began dismantling Texas’s electric utility regulation.3 The
    legislature revised PURA to allow determination of retail electric rates by competition. See City of
    Corpus Christi v. Public Util. Comm’n, 
    51 S.W.3d 231
    , 235 (Tex. 2001). Oncor is a transmission
    and distribution company created as part of TXU Electric Company’s unbundling4 during the
    electricity deregulation process. Because electric transmission and distribution has not phased into
    the competitive market, the Commission continues to govern Oncor, including analysis and approval
    of Oncor’s tariff. See Tex. Util. Code Ann. § 39.201 (West Supp. 2004-05); 16 Tex. Admin. Code
    § 25.214(c) (2004) (Public Util. Comm’n, Terms and Conditions of Retail Delivery Service Provided
    by Investor Owned Transmission and Distribution Utilities). Oncor is certificated to distribute
    electric service in Allen, Texas.
    Allen is a home rule city under the Texas Constitution’s home rule amendment. Tex.
    Const. art. XI, § 5 (amended 1912). The home rule amendment altered the longstanding practice of
    having special charters individually granted and amended by the legislature for the State’s larger
    cities. City of San Antonio v. City of Boerne, 
    111 S.W.3d 22
    , 26 & n.5 (Tex. 2003). Cities adopting
    3
    The legislature found that the production and sale of electricity was not a monopoly
    warranting regulation of rates, operations, and services and that the public interest in competitive
    electric markets required that, except for transmission and distribution services and for the recovery
    of stranded costs, electric services and their prices should be determined by customer choices and
    the normal forces of competition. The legislature enacted [PURA] to protect the public interest
    during the transition and establishment of a fully competitive electric power industry. Tex. Util.
    Code § 39.001(a) (West Supp. 2004-05).
    4
    “Unbundling” required each electric utility to separate its business activities from one
    another into the following units: (1) a power generation company, (2) a retail electric provider, and
    (3) a transmission and distribution utility. Tex. Util. Code § 39.051(b) (West Supp. 2004-05).
    2
    a home rule charter have the full power of self government and look to the legislature only for
    limitations on their power. 
    Id. Beginning in
    2000, Allen enacted “zoning development standards”
    in its land development code that required utilities to: (1) place certain electric distribution5 lines
    underground, (2) screen electric meters and other electric distribution facilities from view, and (3)
    substitute metal or concrete distribution line poles for wooden poles—all at the utility’s expense.6
    After enacting these ordinances, Allen denied two of Oncor’s construction permits for failure to
    comply with the electrical undergrounding specifications.
    Oncor challenged the ordinances in an appeal to the Commission. The Commission’s
    preliminary order stated that the Commission had jurisdiction to consider Oncor’s appeal, and that
    Allen exceeded its authority when it passed the ordinances in question. The Commission referred
    the matter to the State Office of Administrative Hearings (SOAH),7 to analyze the applicability of
    an analogous decision concerning the Commission’s jurisdiction to review municipal ordinances that
    required undergrounding utility lines and screening facilities. See Tex. Pub. Util. Comm’n,
    Application of Texas Utilities Electric Company to Obtain a CCN for the Trophy Club-Coppell-
    Euless 138 kV Transmission Line; Appeals of Brazos Electric Power Cooperative, Inc., Tri-County
    Electric Cooperative, Inc. and Texas Utilities Electric Company of an Ordinance of the Town of
    5
    A “distribution” line is a power line operated below 60,000 volts, when measured
    phase-to-phase. See 16 Tex. Admin. Code § 25.5 (31) (2004) (Public Util. Comm’n, Definitions).
    6
    Developers are responsible for the cost of extending utility services with underground
    installation to new subdivisions. See Allen, Tex., Land Development Code, art. VII, §§ 7.03.5.5,
    7.07.3e, 8.10.4e (2002). No developer was associated with Oncor’s projects.
    7
    The coalition of cities and Centerpoint Energy, Inc. intervened in the case while it was
    before the State Office of Administrative Hearings.
    3
    Westlake, Texas; Appeals of Texas Utilities Electric Company and Brazos Electric Power
    Cooperative, Inc. of an Ordinance of the Town of Trophy Club, Texas, Docket Nos. 6117, 6170-72;
    1986 Tex. P.U.C. LEXIS 292, at *5.
    While the case was before SOAH, the Commission’s staff moved for summary
    decision, arguing that there were not any issues of material fact to be resolved at the evidentiary
    hearing.    In her proposal for decision, the administrative law judge recommended that the
    Commission issue a summary decision for Oncor and invalidate the ordinances as a matter of law,
    because the ordinances violated PURA and impaired the public interest by requiring that Oncor
    install non-standard facilities at its own expense.
    After the administrative law judge released the proposal for decision—but before the
    Commission issued its order—Allen repealed the portions of the ordinances that required
    undergrounding lines and wooden pole replacement.8 Applying exceptions to the mootness
    doctrine,9 the Commission invalidated the sections of Allen’s ordinances that required
    undergrounding, wooden pole replacement, and screening of facilities, to the extent that they
    imposed the expense of installing non-standard electric distribution facilities on Oncor, in violation
    of its tariff, PURA, and Commission rules.
    8
    The portions of the ordinances requiring screening of utility facilities were not repealed.
    9
    The Commission found two types of mootness exceptions applicable: the “capable of
    repetition, yet evading review” and “public interest” exceptions. First, it noted that Allen could
    repeat its actions and evade a ruling by reenacting ordinances like the ones at issue, waiting for the
    proposal for decision—and if it is unfavorable to them—repealing the ordinances before the
    Commission issues its order. Second, the Commission determined that addressing the ordinances’
    invalidity served the public interest by preventing other cities from adopting similar ordinances, and
    precluding negative impacts to the electric utilities’ transmission system and market competition.
    4
    On administrative appeal, the district court ruled that it lacked jurisdiction to consider
    the Cities’ moot challenge to the Commission order invalidating the undergrounding and pole
    replacement provisions of the ordinances. The court partially dismissed the Cities’ appeal and ruled
    that the remainder of the Cities’ challenges lacked merit.10
    In a single point of error, the Cities challenge the Commission’s appellate jurisdiction
    over the ordinances in Allen’s land development code. They contend that Allen’s ordinances were
    not promulgated to regulate Oncor, but to protect the health, safety, and welfare of Allen’s citizens,
    that is, as an exercise of police power. The Cities ask this Court to “vacate the Commission order
    and reverse the district court’s order as to its finding of Commission jurisdiction.”
    ANALYSIS
    Motion to Dismiss
    The Utilities and the Commission moved to dismiss this appeal, asserting that we
    cannot reach the question of the Commission’s jurisdiction over the undergrounding and pole
    10
    The district court’s final judgment, in relevant part, states:
    The Court finds that the Court has no jurisdiction to consider the Cities’
    challenges to the Commission’s order invalidating parts of the ordinances of the
    City of Allen that were repealed by City of Allen Ordinance No. 2137-1-03
    because Cities’ appeal to this Court is moot and no exception to the mootness
    doctrine applies, and that the remainder of Cities’ challenges are without merit.
    Accordingly it is ORDERED, ADJUDGED, and DECREED that the Cities’
    appeal is dismissed as to those portions of the Commission’s Order in Docket
    No. 25429 concerning the ordinances repealed by City of Allen ordinance No.
    2137-1-03, and in all other respects renders judgment that the Commission’s
    order in Docket No. 25429 is affirmed, and that plaintiffs take nothing.
    5
    replacement provisions in the ordinances without addressing the district court’s refusal to rule on
    them, and that the Cities waived this point of error due to inadequate briefing.
    However, the question of jurisdiction is fundamental and can be raised at any time
    in the trial of a case or on appeal. Public Util. Comm’n v. J.M. Huber Corp., 
    650 S.W.2d 951
    , 955
    (Tex. App.—Austin 1983, writ ref’d n.r.e.). Administrative agencies may exercise only those
    powers the law confers upon them in clear and express statutory language and those reasonably
    necessary to fulfill a function or perform a duty that the legislature has expressly placed with the
    agency. In re Entergy Corp., 
    142 S.W.3d 316
    , 322 (Tex. 2004).
    We liberally construe the points of error in order to obtain a just, fair and equitable
    adjudication of the rights of the litigants. Holley v. Watts, 
    629 S.W.2d 694
    , 696 (Tex. 1982). We
    look not only at the wording of the points of error, but also at the argument under each point to best
    determine the intent of the party. 
    Id. Read fairly,
    the Cities’ brief complains about the district
    court’s failure to vacate11 the Commission’s order—after the court determined that the Cities’
    challenges to the repealed provisions were moot—because it allowed the Commission’s ruling,
    11
    We note that the district court lacked power to vacate the Commission’s order. The Cities’
    brief acknowledges that section 2001.174 of the government code applied to their suit for judicial
    review. Tex. Gov’t Code Ann. § 2001.174 (West 2000). That section authorizes the reviewing court
    to reverse or remand—but not vacate—an agency decision if the agency’s findings, inferences,
    conclusions, or decisions exceeded its statutory authority. See Public Util. Comm’n v. City Pub.
    Serv. Bd., 
    109 S.W.3d 130
    , 137-38 (Tex. App.—Austin 2003, no pet.) (district court erred in
    vacating void Commission order); BFI Waste Sys., Inc. v. Martinez Envtl. Group, 
    93 S.W.3d 570
    ,
    581 (Tex. App.—Austin 2002, pet. denied) (district court lacked authority to vacate Commission’s
    order; appellate court construed judgment as reversal of Commission’s order); see also Tex. Gov’t
    Code Ann. § 2001.174(2)(B) (West 2000) (court reviewing a state agency’s decision in a contested
    case may either affirm, reverse, or remand case to agency for further proceedings). Thus, the Cities’
    complaint that the district court “failed to vacate” the Commission’s order is erroneous, because the
    district court lacked such authority.
    6
    which invalidated parts of the ordinances, to stand. The Cities also ask that “the district court’s order
    be reversed as to its finding of Commission jurisdiction” over the screening portions of the
    ordinances. The district court’s judgment did not alter the effect of the Commission’s order and the
    Cities have not waived the issue of whether the Commission lacked jurisdiction to review Allen’s
    four ordinances. Accordingly, we deny the motion to dismiss.
    Scope and Standard of Review
    The district court affirmed the Commission’s order concerning the non-repealed
    screening requirements (“. . . in all other respects [the court] renders judgment that the Commission’s
    order in Docket No. 25429 is affirmed, and that plaintiffs take nothing”). The court did not rule on
    whether the Commission had appellate jurisdiction over the repealed provisions in Allen’s
    ordinances; it dismissed that part of the Cities’ appeal as moot (“Accordingly it is ORDERED,
    ADJUDGED, and DECREED that the Cities’ appeal is dismissed as to those portions of the
    Commission’s Order in Docket No. 25429 concerning the ordinances repealed by City of Allen
    ordinance No. 2137-1-03 . . . .”). The court’s refusal to rule on the repealed provisions of the
    ordinances (undergrounding and pole replacement) does not constitute a finding that the Commission
    lacked jurisdiction to review these provisions. Accordingly, we will address the issue of the
    Commission’s appellate jurisdiction over the repealed and non-repealed portions of the municipal
    ordinances. The Commission’s appellate jurisdiction over Allen’s ordinances is a question of law
    that we review de novo. See Public Util. Comm’n v. City Pub. Serv. Bd., 
    109 S.W.3d 130
    , 135 (Tex.
    App.—Austin 2003, no pet.).
    7
    Allen’s Ordinances
    Oncor sought construction permits for two new projects designed to meet peak energy
    demands during the summer of 2002. The proposed projects called for installation of an overhead
    distribution line located within Oncor-owned easements, Allen’s rights-of-way, and state rights-of-
    way. Oncor’s projects were not associated with any particular development project. Allen denied
    Oncor’s permits, based on the undergrounding requirements in its land development code.
    The Cities appeal the Commission’s jurisdiction to review four ordinances in Allen’s
    land development code. The first ordinance, passed June 15, 2000, stated:
    1.   All utilities, including, but not limited to, electrical, gas, and telephone shall be
    placed underground, except that electrical transmission and main feeder lines
    (12.5 or more Kilovolts) may be located overhead.
    2.   Utility meters and other utility apparatus, including, but not limited to
    transformers, shall be located to the rear of the structure unless adequately
    screened from view of public streets and adjoining properties. Adequately
    screened from view shall include screening, as well as the utilization of
    landscaping and other site elements.
    3.   All required screening shall meet clearances required by affected utility
    companies. Wall-mounted equipment, including meters (such as banks of
    electric meters on the rear or side wall of multi-tenant buildings), shall be
    screened from public streets by one of the following methods.
    a.    Landscaping, including trees or evergreen shrubbery.
    b.    Masonry walls in conjunction with landscaping.
    c.    Wall-mounted screening devices, such as cabinets or partitions which are
    architecturally compatible with the facade.
    Allen, Tex., Land Development Code, art. VII, §§ 7.03.5, 7.07.3, 8.10.3c (2000).
    8
    The second ordinance, passed May 3, 2001, left the screening provisions unchanged,
    but expanded the scope of the utilities included in the undergrounding provision, and added a new
    subsection that required the utility to pay for the undergrounding:
    1.   All utilities, existing and proposed, adjacent to and within new development,
    including, but not limited to, electrical, gas, television and
    telephone/telecommunication shall be placed underground, except that electrical
    transmission [(]59 or more Kilovolts) may be located overhead, providing that
    this requirement does not conflict with existing utility service regulations.
    2.   New development shall assume responsibility for all expense related to the
    underground placement of utilities. . . .
    
    Id. §§ 7.03.5,
    7.07.3, 8.10.3c (2001).
    The third ordinance, passed September 6, 2001, made only one change, limiting the
    undergrounding provision to new utility installations:
    1.   All new utilities, including, but not limited to, electrical, gas, television and
    telephone/telecommunication shall be placed underground, except that electrical
    transmission 59 or more Kilovolts may be located overhead, providing that this
    requirement does not conflict with existing utility service regulations.
    
    Id. §§ 7.03.5,
    7.07.3, 8.10.3c (2001).
    The fourth ordinance, passed January 17, 2002, left the screening provisions mostly
    unchanged, but added several new sections, including one requiring replacement of wooden poles
    with metal or concrete poles at the utility’s (service provider’s) expense:
    1.   All new residential utility installations, including, but not limited to, electrical,
    gas, television and telephone/telecommunication shall be placed underground.
    9
    2.   All new non-residential utility installations, including but not limited to,
    electrical, gas, television and telephone/telecommunication shall be placed
    underground where service is provided adjacent to public street or right-of-way.
    Where electrical service is provided from an alley or rear easement not located
    adjacent to a public street, primary electrical service may be provided overhead
    along the property line. Primary and secondary service routed on the site shall
    be placed underground.
    3.   All new construction within the public street rights-of-way shall be located
    underground. Where a street is scheduled for reconstruction, new development
    may be required to provide an escrow of the difference between overhead and
    underground service.
    4.   Nothing herein shall prevent temporary service during construction from being
    located overhead.
    5.   New development shall assume responsibility for all expense related to the
    underground placement of utilities.
    6.   Any upgrade or reinforcement of facilities with existing overhead service by the
    service provider shall require replacement of wooden poles with metal or
    concrete poles at the expense of the service provider. An “upgrade” for
    purposes of this section, shall mean any change that requires the installation, re-
    installation or addition of a new pole. In-line poles necessary for service drops
    will be reviewed by the City Engineer, and may be approved on a case-by-case
    basis.
    7.   Any upgrade or reinforcement of facilities with underground service by the
    service provider shall be placed underground at the expense of the service
    provider.
    8.   Utility meters and other utility apparatus, including, but not limited to
    transformers and switch boxes, shall be located to the rear of the structure unless
    adequately screened from view from public streets and adjoining properties and
    shall be suitable for access required for service and maintenance. Adequately
    screened from view shall include screening walls, as well as the utilization of
    landscaping and other site elements.
    9.   All required screening shall meet clearances required by affected utility
    companies and shall be suitable for access required for service and maintenance.
    Wall-mounted equipment, including meters (such as banks of electric meters on
    10
    the rear or side wall of multi-tenant buildings), shall be screened from public
    streets by one of the following methods.
    a.    Landscaping, including trees or evergreen shrubbery.
    b.    Masonry walls in conjunction with landscaping.
    c.    Wall-mounted screening devices, such as cabinets or partitions which are
    architecturally compatible with the facade.
    10. Electrical transmission [(]59 or more Kilovolts) may be located overhead.
    
    Id. §§ 7.03.5,
    7.07.3, 8.10.4 (2002).
    Allen’s Ordinances as Exercises of Authority over Rights-of-Way or Utility Regulation
    The Cities contend that Allen’s zoning development standards were not promulgated
    to regulate Oncor, but to protect the health, safety, and welfare of Allen’s citizens, that is, as an
    exercise of police power. They defend Allen’s ordinances as conditions on Oncor’s use of city streets
    and rights-of-way:
    A home rule municipality has the following powers: (1) To prohibit the use of any
    street . . . of the city by any telegraph, telephone, electric light . . . gas company, or
    any other character of public utility without first obtaining the consent of the
    governing authorities expressed by ordinance and upon paying such compensation
    as may be prescribed and upon such condition as may be provided by any such
    ordinance.
    Tex. Rev. Civ. Stat. Ann. art. 1175, § 1 (West Supp. 2004-05).
    The Cities acknowledge that an electric utility has the right to “construct, maintain,
    and operate lines over, under, across, on, or along a state highway, a county road, a municipal street
    or alley, or other public property in a municipality,” but emphasize that the utility may exercise that
    11
    authority “with the consent of and subject to the direction of the governing body of the
    municipality.” See Tex. Util. Code Ann. §§ 181.042-.043 (West 1998). Thus, the Cities argue that
    municipalities may designate the location of utility facilities that are to be placed in its rights-of-
    way12 and the screening of those facilities, so long as these ordinances are not unreasonable or
    arbitrary, and do not violate the constitution and laws of the state. See Dykes v. City of Houston, 
    406 S.W.2d 176
    , 181 (Tex. 1966). Additionally, the Cities claim that Allen’s zoning ordinances enjoy
    a presumption of validity; courts cannot interfere unless it appears that:
    the ordinance represents a clear abuse of municipal discretion, and the
    “extraordinary” burden rests on one attacking the ordinance to show that no
    conclusive, or even controversial or issuable fact or condition existed which would
    authorize the governing board of the municipality to exercise the discretion confided
    to it in the passage of that part of the zoning ordinance under attack.
    City of Bellaire v. Lampkin, 
    317 S.W.2d 43
    , 45 (Tex. 1958).
    Nevertheless, the Utilities and the Commission assert that the Cities rely on
    authorities that pre-dated PURA, and that the ordinances were an exercise of Allen’s original
    jurisdiction over Oncor’s rates, operations and services:
    To provide fair, just, and reasonable rates and adequate and efficient services, the
    governing body of a municipality has exclusive original jurisdiction over the rates,
    operations, and services of an electric utility in areas in the municipality, subject to
    the limitations imposed by this title [PURA].
    12
    At oral argument, the Cities acknowledged that the application of these ordinances is not
    limited to Allen’s rights-of-way. Thus, Allen’s ordinances do not merely condition the use of, or
    control access to, its streets and rights-of-way.
    12
    Tex. Util. Code Ann. § 33.001(West 1998). The Utilities and the Commission also assert that
    Allen’s regulatory authority cannot exceed that of the Commission, and Allen may not regulate in
    a manner different from the Commission. See Tex. Util. Code Ann. § 33.004(b) (West 1998).
    Because Allen denies that its zoning development standards were an exercise of its
    “exclusive original jurisdiction over the rates, operations, [or] services of an electric utility,” it
    disputes the applicability of the statute authorizing the Commission’s appellate jurisdiction. Tex.
    Util. Code Ann. § 32.001(b) (West 1998) (“The commission has exclusive appellate jurisdiction to
    review an order or ordinance of a municipality exercising exclusive original jurisdiction under this
    subtitle.”)
    To determine whether Allen exercised its exclusive original jurisdiction over Oncor’s
    “rates, operations, and services” by promulgating these ordinances, we examine the definitions of
    these terms.
    The Ordinances Regulate Oncor’s “Rates” as Defined by Oncor’s Tariff
    A utility’s rates are set forth in its tariff, which contains all charges stated separately
    by type of service, the rules and regulations of the utility, and any contracts that affect rates, charges,
    terms or conditions of service. See 16 Tex. Admin. Code § 25.5 (131) (2004) (Public Util. Comm’n,
    Definitions). Oncor was required to adopt a tariff and obtain the Commission’s approval of it. See
    
    id. § 25.241
    (West 2002); Tex. Util. Code Ann. § 39.201 (West Supp. 2004-05). The tariff had to
    include terms from a Commission-approved, pro forma tariff. See 
    id. § 25.214
    (c)-(d) (West 2002).
    13
    Allen’s ordinances conflict with the provisions in Oncor’s tariff that require customer
    payment for installation of non-standard electrical distribution facilities:13
    Company is responsible for the construction, extension, upgrade, or alteration of
    Delivery System Facilities necessary to connect Retail Customer’s Point of Delivery
    to Company’s Delivery System in conjunction with Section 5.7 FACILITIES
    EXTENSION POLICY and the terms and conditions contained herein. Company
    makes extension of Delivery System Facilities to Retail Customer’s electrical
    installation so as to minimize the cost of such extension. Extension is normally made
    at no cost to Retail Customer except in those instances where the cost of the
    requested extension of Company’s facilities is in excess of the standard allowances
    stated herein, or where the installation of non-standard facilities is requested. In
    these instances, a contribution in aid of construction (“CIAC”) is required from
    Retail Customer for all extensions where the estimated cost of the extension is in
    excess of the standard allowances.
    Oncor’s Tariff for Retail Delivery Services § 6.1.2.2.1 (emphasis added).
    The tariff defines “standard distribution facilities” as those necessary to transport
    electric power:
    Company’s standard distribution facilities consist of the Delivery System facilities
    necessary to transport electric power and energy from a single, single-phase or three
    phase distribution source to Retail Customer at one Point of Delivery, with one
    standard Company Meter, at one of Company’s available standard voltages.
    
    Id. § 6.1.2.2.1.1
    (emphasis added). Conversely, “non-standard facilities” are those exceeding what
    is normally required for service:
    13
    “Facilities” means all of the plant and equipment of a public utility, and includes tangible
    and intangible property, without limitation, owned, operated, leased, licensed, used, controlled, or
    supplied for, by, or in connection with the business of the public utility. Tex. Util. Code Ann.
    § 11.003(10) (West Supp. 2004-05).
    14
    Non-standard facilities include but are not limited to a two-way feed, automatic and
    manual transfer switches, service through more than one point of delivery, redundant
    facilities, facilities in excess of those normally required for service, or facilities
    necessary to provide service at a non-standard voltage. If Retail Customer desires
    Delivery Service utilizing non-standard facilities, as described above, and not
    covered elsewhere in these Service Regulations, then Company may construct such
    facilities pursuant to Section 5.7.5, NON-STANDARD FACILITIES and Section
    6.1.2.2.6, NON-STANDARD FACILITY EXTENSIONS.
    
    Id. § 6.1.2.2.2
    (emphasis added).
    Undergrounding distribution lines, replacing wooden poles with metal or concrete
    poles, and screening facilities with landscaping, walls, or cabinets does not “minimize the cost of
    facility extension” as required by Oncor’s tariff. An Oncor electrical engineer, John C. Soward,
    testified that installation of an underground feeder circuit in Allen’s project is twice as expensive as
    overhead construction—a difference of about $1.1 million.14 He further testified that the cost of
    using metal or concrete poles is about three times that of an equivalent feeder with wooden poles.15
    He also stated that screening facilities by use of landscaping, masonry walls, or mounted cabinets
    introduces another set of unplanned costs.
    14
    Soward arrived at this figure by estimating the costs for one mile of total overhead circuit
    and the cost for one mile of functionally equivalent underground circuit. He then calculated a cost
    differential factor by dividing the underground circuit cost by the overhead circuit cost. He applied
    this factor to the overhead components of Allen’s project and divided the total amount by the original
    cost.
    15
    Soward arrived at this figure by calculating the cost of one mile of standard overhead
    feeder on wooden poles. He then calculated the difference between a concrete or steel pole and a
    wooden pole. After that, he multiplied the cost difference per pole by the number of poles in the
    mile of line, and added that product to the base cost, yielding the cost for a line with concrete or steel
    poles. He identified the cost differential factor as the cost of an overhead line with concrete or steel
    poles, divided by the cost of the standard overhead line with wooden poles.
    15
    Furthermore, the ordinances’ specifications are unnecessary “to transport electric
    power” as referenced in the tariff. Nothing in the Commission’s rules concerning electrical service
    reliability and continuity requires underground installation of distribution lines. See 16 Tex. Admin.
    Code § 25.52 (2004) (Public Util. Comm’n, Reliability and Continuity of Service).
    In fact, one concern of the Utilities and the Commission about undergrounding
    distribution lines is the adverse affect it may have on continuity of electrical service. Soward
    testified that special equipment is required to locate underground lines, and that buried lines lengthen
    repair time. He also remarked that underground systems must be built with greater precision, to
    avoid damage or contact with other underground utilities, and greater redundancy, to achieve
    acceptable levels of reliability performance and to compensate for greater fault location and repair
    times. Soward stated that repair times are only prolonged by hiding facilities from view.
    Because electrical service may be delivered by overhead lines at minimum cost, while
    underground systems require specialized equipment, greater redundancy, and higher expense,
    underground facilities are “in excess of those normally required for service” as specified by the tariff
    and thus, are “non-standard.” Similarly, utility construction that includes metal or concrete poles
    and facility-concealing landscaping, walls, or cabinets exceeds what is “necessary to transport
    electric power” and does not “minimize the cost of extension.” Such installations are also “non-
    standard.”
    Design considerations sometimes require the use of non-standard facilities. Soward
    testified that underground feeders are used in congested areas where overhead lines would not be
    technically or economically feasible—such as downtown Dallas and Fort Worth—and in locations
    16
    adjacent to large substations. He also stated that Oncor uses concrete and steel poles when the
    stresses on wooden poles would be excessive, for example, around sharp street curves or for
    abnormally lengthy line spans. He observed that parts of Allen’s project already have underground
    lines or concrete and steel poles as a result of such electrical design considerations.
    But if Allen requests non-standard facilities—for reasons unrelated to design
    necessity16—the tariff requires that Allen is responsible for the increased cost:
    If Retail Customer desires Delivery System service which involves non-standard
    facilities as described in Section 6.1.2.2.1.2 of this Tariff, in addition to the cost in
    excess of the standard allowance in described in Section 6.1.2.2.5.3 for construction
    of standard facilities, if any, Retail Customer pays Company prior to Company’s
    construction of non-standard facilities the total estimated cost of all non-standard
    facilities to meet Retail Customer’s request. Company may terminate the provision
    of any Delivery Service utilizing non-standard facilities at the end of the contract
    term, or in the absence of a contract term, on reasonable notice to Retail Customer’s
    Competitive Retailer.
    Oncor’s Tariff for Retail Delivery Services § 6.1.2.2.6. The Commission’s pro forma tariff, section
    5.75, echoes this principle:
    If the entity requesting Construction Service desires Delivery Service utilizing non-
    standard Delivery System facilities . . . Company shall construct such facilities
    unless, in the reasonable judgment of Company, such construction would impair
    Company’s facilities or facilities with which Company is interconnected, impair the
    16
    “Aesthetically less obtrusive” and “increased property values” were two of three “pros”
    that John Baumgartner, Allen’s city engineer, offered to support the use of underground utility
    facilities. His presentation to the Allen city council about the “pros and cons” of underground utility
    facilities also listed “protection from wind and ice-related weather” as a third benefit. The five
    “cons” that Baumgartner identified were: “significantly more expensive to install,” “more difficult
    to repair,” “insufficient room in the rights-of-way to locate all providers easily,” “subject to damage
    from other construction,” and “difficult to locate horizontally and vertically.”
    17
    proper operation of such facilities, impair service to retail customers, or there are
    other appropriate concerns that the entity requesting service is unable or unwilling
    to correct. The entity requesting Construction Service shall pay to Company the
    estimated cost of all non-standard facilities, offset by any applicable allowance.
    See 16 Tex. Admin. Code § 25.214(d). Similar provisions appear in Centerpoint Energy, Inc.’s
    tariff.
    Overhead distribution facilities are Oncor’s standard extension of service to a
    customer, according to one Oncor senior electrical engineer, Rudy D. Garza, because overhead
    facilities provide service at the lowest reasonable cost, in accordance with Oncor’s tariff, section
    6.1.2.2.1. Garza testified that placing facilities underground is considered non-standard installation
    for which an up-front contribution in aid of construction is required, per section 6.1.2.2.6. He
    observed that
    it is important to provide for equitable treatment among all customers throughout
    Oncor’s service area. By defining overhead service as standard, Oncor prevents a
    customer in one area of the system with overhead facilities, from helping to pay for
    the underground installation in other areas of the system. The goal is to require those
    who cause the Company to incur unnecessary costs to pay for those costs, rather than
    pass them on to the entire customer base in the future. Basic cost causation
    principles call for this methodology so that subsidization between customer classes
    is minimized.
    To recoup the additional expense imposed by Allen’s ordinances, Oncor would have
    to shift the extra cost to its customers in the next rate case. Meanwhile, Oncor would bear all costs
    that were not contemplated when its tariff rates were set. When the new rate takes effect, all
    customers in Oncor’s service area will have to pay the price of compliance with the ordinances, but
    only Allen’s citizens will realize any benefit for the extra charge.
    18
    Although the Cities propose that Oncor collect the ordinances’ extra costs through
    rate increases restricted to Allen’s residents (“geographic ratemaking”), the ordinances still regulate
    electric utility rates by altering the terms of Oncor’s tariff.17 Moreover, the Texas Supreme Court
    recognized “the contemporary reality that the assets of an integrated utility simultaneously serve all
    its customers rendering the allocation of cost on a territorial basis an inappropriate method of rate-
    setting in the context of present-day technology.” City of Corpus Christi v. Public Util. Comm’n,
    
    572 S.W.2d 290
    , 296 (Tex. 1978). Because Allen’s ordinances obliterate the portion of the tariff that
    held Allen financially responsible for the non-standard distribution facilities that were installed at
    its request, Allen is regulating Oncor’s tariff rates, and the Commission has jurisdiction to review
    the ordinances.
    The Ordinances Regulate Oncor’s “Rates,” “Operations” and “Services” as Defined by PURA
    The Commission has appellate jurisdiction over Allen’s ordinances because they
    regulate Oncor’s rates, operations, and services, as those terms are defined by PURA. According
    to PURA, a “rate”
    includes a compensation, tariff, charge, fare, toll, rental, or classification that is
    directly or indirectly demanded, observed, charged, or collected by an electric utility
    for a service, product, or commodity described in the definition of electric utility in
    17
    Rudy Garza testified that geographic ratemaking is disfavored because it can increase rates
    and stifle competition. He explained that use of systemwide rates benefits competition by
    standardizing the rates for a service area, thereby minimizing the barriers to market entry for new
    retail electric providers. Matthew A. Troxle, a senior retail market analyst in the Commission’s
    electric division, agreed that increased rates harm competition by reducing or eliminating the
    potential electric competitors’ margin to undercut the regulated price-to-beat rate. See Tex. Util.
    Code Ann. § 39.202(a) (West Supp. 2004-05).
    19
    this section and a rule, practice, or contract affecting the compensation, tariff, charge,
    fare, toll, rental, or classification that must be approved by a regulatory authority.
    Tex. Util. Code Ann. § 31.002(15) (West Supp. 2004-05).
    Allen’s ordinances regulate the compensation that Oncor would typically collect from
    Allen for non-standard facilities by reducing Oncor’s receivable amount to zero. Oncor would
    otherwise receive prepayment of the “total estimated cost of all non-standard facilities.” The
    ordinances also regulate rates because they change the terms of Oncor’s tariff—mandating non-
    standard distribution facilities, free of charge to Allen—without the Commission’s approval.
    PURA also defines “service,” which
    has its broadest and most inclusive meaning. The term includes any act performed,
    anything supplied, and any facilities used or supplied by a public utility in the
    performance of the utility's duties under this title to its patrons, employees, other
    public utilities, an electric cooperative, and the public. The term also includes the
    interchange of facilities between two or more public utilities. The term does not
    include the printing, distribution, or sale of advertising in a telephone directory.
    
    Id. § 11.003(19)
    (West Supp. 2004-05). By directing line placement, pole type, and screening of
    electric facilities (such as meters), Allen’s ordinances regulate Oncor’s work performance and
    materials. Thus, Allen’s ordinances regulate Oncor’s service to its customers.
    While PURA does not define “operations,” it has been observed that “[t]he
    jurisdiction of the commission extends not only to rates . . .but to every aspect of an electric utility’s
    operation.” Robert A. Webb, The 1975 Texas Public Utility Regulatory Act: Revolution or
    Reaffirmation?, 13 Hous. L. Rev. 1, 14 (1975). Ordinances such as Allen’s—which direct the
    location of electric facility installation, specify the devices used for utility pole upgrades, and carve
    20
    payment exemptions out of the tariff—control Oncor’s work and constitute exercises of municipal
    jurisdiction over a utility’s operations. By PURA’s definition, the Commission has appellate
    jurisdiction to review these types of municipal ordinances.
    Allen’s Ordinances Conflict with PURA’s Comprehensive Regulatory Scheme
    Another basis for the Commission’s jurisdiction is that the ordinances’ utility
    regulations conflict with PURA’s comprehensive regulatory scheme. Prior to PURA’s enactment
    in 1975, each individual city could regulate the utilities within its boundaries. PURA altered that
    piecemeal oversight by providing a comprehensive regulatory system for utilities. Tex. Util. Code
    § 11.002(a) (West Supp. 2004-05) (“The purpose of this title [PURA] is to establish a
    comprehensive and adequate regulatory system for public utilities to assure rates, operations, and
    services that are just and reasonable to the consumers and to the utilities.”). Empowering the
    Commission with jurisdiction to review certain municipal orders furthers the goal of regulatory
    uniformity. Dan Pleitz, et al., Municipalities and the Public Utility Regulatory Act, 28 Baylor L.
    Rev. 977, 978 (1976).
    A recent ruling from the Texas Supreme Court illustrates PURA’s broad scope. See
    In re 
    Entergy, 142 S.W.3d at 323
    . In re Entergy concerned a dispute over settlement proceeds from
    a utility merger. 
    Id. at 319.
    Two corporate utilities agreed that savings realized from their merger
    would be incorporated into three post-merger rate proceedings before the Commission, to benefit
    their customers. 
    Id. The agreement
    was placed in a Commission order. 
    Id. With the
    advent of
    deregulation, and while the second rate case was pending, the Commission staff and the corporations
    entered into a settlement that postponed retail competition in their service area. 
    Id. at 320.
    A group
    21
    of ratepayers sued the corporations for breach of contract in district court. 
    Id. The corporations
    moved to dismiss, asserting that the district court lacked jurisdiction over the suit because of the
    Commission’s exclusive jurisdiction under PURA. 
    Id. at 321-22.
    The ratepayers responded that
    they were not directly challenging a Commission order and that the Commission lacked jurisdiction
    to settle a dispute over a private contract. 
    Id. at 323.
    Finding that the Commission had exclusive
    jurisdiction, the court stated:
    [T]he statutory definition of PURA as “comprehensive” demonstrates the
    Legislature’s belief that PURA would comprehend all or virtually all pertinent
    considerations involving electric utilities operating in Texas. That is, PURA is
    intended to serve as a “pervasive regulatory scheme” of the kind contemplated in
    David McDavid Nissan.
    
    Id. (citing Subaru
    v. David McDavid Nissan, Inc. 
    84 S.W.3d 212
    , 221 (Tex. 2002)).
    The Cities argue that the Commission’s authority did not allow it to impair Allen’s
    home rule and police power authority by voiding Allen’s zoning development standards. The Cities
    generally cite this Court’s decision in Sexton v. Mount Olivet Cemetery Association to support the
    proposition that the Commission may not assert a new and additional power, regardless of whether
    the new power is viewed as being expedient for administrative purposes. See Sexton, 
    720 S.W.2d 129
    , 137-38 (Tex. App.—Austin 1986, writ ref’d n.r.e.).
    But the Commission’s appellate review of ordinances that regulate an electric utility’s
    rates, operations, and services, is not a “new” or “additional” power—it is an enumerated power in
    section 32.001(b) of the utility code. See Tex. Util. Code Ann. § 32.001(b) (West 1998).
    22
    Significantly, the Cities omit the language immediately preceding their cited excerpt, which states
    that an agency generally has all power necessary to fulfill its specifically delegated duties:
    It is axiomatic that such agencies are creatures of statute and have no inherent
    authority. They may, therefore, exercise only those specific powers conferred upon
    them by law in clear and express language, and no additional authority will be
    implied by judicial construction. However, with respect to a power specifically
    granted the agency, the full extent of that power must be ascertained with due regard
    for the rule that the Legislature generally intends that an agency should have by
    implication such authority as may be necessary to carry out the specific power
    delegated, in order that the statutory purpose might be achieved. Moreover, the
    Legislature impliedly intends, as a general rule, that an agency should have whatever
    power is necessary to fulfill a function or perform a duty placed expressly in the
    agency by the Legislature. The Legislature does not intend that agency functions be
    an exercise in futility.
    
    Sexton, 720 S.W.2d at 137
    . Allen’s power to legislate for its own benefit is limited by the
    Commission’s regulatory authority under PURA, which is itself an exercise of police power in the
    interest of all Texas citizens. See City of Corpus 
    Christi, 51 S.W.3d at 241
    & n.33 (“The United
    States Supreme Court has said that ‘the regulation of utilities is one of the most important of the
    functions traditionally associated with the police power of the States.’”) (quoting Arkansas Elec.
    Coop. Corp. v. Arkansas Pub. Serv. Comm’n, 
    461 U.S. 375
    , 377 (1983); Munn v. Illinois, 94
    U.S.113, 125 (1877)).
    One commentator has concluded that there is no power in the municipality to
    supervise and regulate utilities where the purpose of the state law creating the commission is to
    establish a complete and uniform system throughout the state for the supervision and regulation of
    public utility rates and service. See 12 Eugene McQuillin, Municipal Corporations § 34.146 (3d ed.
    1995). A municipality may, under its police power, prescribe reasonable regulations as a protection
    23
    to the health, life, and safety of its inhabitants, even as applied to public service corporations, but
    these regulations are incident to the state’s sovereign police power, and must be so restricted. 
    Id. (emphasis added).
    Under the guise of a police regulation the municipality cannot undertake to
    prescribe service, rates, or charges containing inequalities, unjust discriminations, undue preference
    or advantages, contrary to the state law and free from state investigation or regulation by the state
    commission. 
    Id. Allen’s ordinances
    cannot be reconciled with PURA’s comprehensive regulatory
    function.
    Other states have found their utility commission’s jurisdiction broad enough to
    address the reasonableness and equity issues that arise when a municipality makes a policy decision
    to require underground relocation of utilities. See, e.g., Homer Elec. Ass’n, Inc. v. City of Kenai, 
    816 P.2d 182
    , 187 (Alaska 1991) (commission had jurisdiction to decide reasonableness of conditions
    imposed on utilities’ permit to use municipal rights-of-way; commission previously found it was
    unreasonable for city to direct unreimbursed relocations of utilities laid in municipal rights-of-way);
    City of Anaheim v. Pacific Bell Tel. Co., 
    14 Cal. Rptr. 3d 725
    , 729-30 (Cal. Ct. App. 4th Dist. 2004),
    pet. denied, 2004 Cal. LEXIS 9685 (Cal. Oct. 13, 2004) (commission had exclusive jurisdiction to
    decide whether city’s undergrounding ordinance interfered with commission’s utility regulation, and
    to address the equitable statewide issue about the order in which communities throughout California
    should have their overhead facilities moved underground); Glen View Dev. Co. v. Public Serv. Elec.
    & Gas Co., 
    271 A.2d 903
    , 904 (N.J. 1970) (commission had jurisdiction to decide who pays for cost
    of undergrounding utilities when an ordinance mandates such relocation; state statutes requiring
    municipal consent for use of its streets by utilities did not authorize local government to legislate
    upon subject of who should be responsible for payment).
    24
    Courts that have ruled in favor of the municipalities had distinct legal grounds for
    upholding the ordinances. For example, a Minnesota court affirmed a municipal ordinance
    mandating underground utility lines based on a Minnesota statute that specifically authorized cities
    to direct utility line placement. See Northern States Power Co. v. City of Oakdale, 
    588 N.W.2d 534
    ,
    538-39 (Minn. Ct. App. 1998). No such statute exists in Texas to support Allen’s ordinances. In
    Colorado, a court found that a municipal ordinance’s conflict with a utility’s tariff would not prevent
    a city from requiring the utilities to place lines underground, since the tariff did not rise to the level
    of a statute. See U. S. W. Communications, Inc. v. Longmont, 
    948 P.2d 509
    , 517 (Colo. 1997). In
    this case, Allen’s ordinances conflict with PURA, as well as Oncor’s tariff. See, e.g., Tex. Util.
    Code Ann. § 33.004(b) (West 1998).
    Although these out-of-state cases parallel certain concerns in this appeal, the
    Commission’s decision in Trophy Club bears the strongest resemblance to the present jurisdictional
    question. See 1986 Tex. P.U.C. LEXIS 292, at *21, *64, *67.
    Commission had Appellate Jurisdiction over Similar Ordinances in Trophy Club
    In Trophy Club, the Commission found it had jurisdiction over ordinances similar to
    the four at issue. See 
    id. The Texas
    Utilities Electric Company sought Commission approval to
    rebuild, aboveground, a distribution feeder line that ran through the towns of Trophy Club and
    Westlake. 
    Id. at *14.
    Trophy Club wanted the utility line placed underground, but declined to pay
    for the cost difference between underground and overhead construction, based on this ordinance:
    After the effective date of this ordinance, no electric or communication utility,
    whether privately or publicly owned, shall install or reconstruct, or cause to be
    installed or reconstructed, any overhead electric or communication transmission or
    25
    distribution facility within the corporate limits of the Town of Trophy Club unless
    a showing is made before the Town Council and a finding made by the Town Council
    that undergrounding such facility would not be feasible or would be inconsistent with
    sound environmental planning.
    
    Id. at *20-21,
    28. However, Texas Utilities’ tariff specified that
    [u]nderground service is provided to a Customer who meets Company requirements
    set out herein and pays to Company an amount based on the cost difference between
    overhead and underground service as estimated by Company.
    
    Id. at *27-28.
    On administrative appeal, Trophy Club argued that the Commission lacked
    jurisdiction because the ordinance was enacted in accordance with the municipality’s police power,
    while the Texas Utilities Electric Company and Brazos Electric Power Cooperative, Inc. asserted that
    PURA authorized the Commission’s appellate review. 
    Id. at *19-20.
    Agreeing with the electricity providers, the hearing examiner asked to the
    Commission to consider
    how very unlikely it is that the Legislature would create this agency to administer a
    “comprehensive regulatory system” over “utility rates, operations, and services,”
    PURA section 2, but deny it the authority to review municipal ordinances such as
    these, which drastically affect such operations and services. The examiner cannot
    believe that the Legislature intended substantive municipal regulation of utility
    services and operations to be unfettered by Commission appellate review.
    
    Id. at *24.
    He invited the Commission to reflect upon the consequences, if municipalities had the
    authority to issue ordinances such as these:
    If utilities were not notified of the ordinances or for some other reason failed to
    appeal to the Commission, the “comprehensive regulatory system” of PURA Section
    2 would be transformed into a patchwork of conflicting state and municipal
    26
    regulations and requirements. Utilities’ ability to construct facilities and to provide
    continuous and adequate service would depend upon the judgment of local officials
    rather than that of the Commission. That result is not what the Legislature intended
    when it vested jurisdiction over public utilities in this agency.
    
    Id. at *33.
    The examiner also cited the Commission’s 1981 order in Magic Valley Electric
    Cooperative, which rejected the theory that ordinances passed pursuant to a city’s police powers are
    beyond the Commission’s appellate jurisdiction. 
    Id. at *21
    (citing Petition of Magic Valley Electric
    Cooperative, Inc. and Central Power and Light Company for Review of an Ordinance Passed by
    City of Brownsville, Docket Nos. 2864, 2882; 1981 Tex. P.U.C. LEXIS 332, at *17) (invalidating
    a Brownsville ordinance that conflicted with a Commission rule and PURA by requiring public
    utilities to file maps with the city, at least seven days before beginning construction, showing the
    location of proposed utility facilities)). The examiner concluded that the Commission had
    jurisdiction, under PURA, to consider the appeal of Trophy Club’s ordinance.
    The Commission adopted the examiner’s report, finding that the Trophy Club
    ordinance affected the operations and services rendered by electric companies within municipal
    limits, regardless of whether the ordinance was enacted pursuant to the town’s police powers. Thus,
    the Commission had jurisdiction to hear an appeal of the Trophy Club ordinance. 
    Id. at *21
    , *67-68.
    As in Trophy Club, the Commission had appellate jurisdiction in this case based on
    the ordinances’ conflict between municipal and state utility regulations. The Cities have not shown
    that Oncor may comply with its tariff, PURA, and Commission rules without simultaneously
    violating the ordinances in Allen’s land development code.
    27
    CONCLUSION
    The Cities’ sole point of error challenges the Commission’s jurisdiction to review
    ordinances in Allen’s land development code that Allen claims to have enacted based on its police
    power. We find that the Commission had appellate jurisdiction to review Allen’s ordinances under
    section 32.001(b). See Tex. Util. Code Ann. § 32.001(b) (West 1998). Requiring Oncor to place
    utility distribution lines underground, replace wooden poles with metal or concrete poles, and screen
    utility facilities—without charging Allen—constitutes municipal regulation of Oncor’s “rates,”
    “operations,” and “services,” within the definitions of the Public Utilities Regulatory Act.
    Accordingly, we affirm the district court’s judgment.
    Jan P. Patterson, Justice
    Before Chief Justice Law, Justices Patterson and Puryear
    Affirmed
    Filed: March 17, 2005