NGL Water Solutions Eagle Ford, LLC v. Railroad Commission of Texas and Blue Water Disposal ( 2019 )


Menu:
  •       TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-17-00808-CV
    NGL Water Solutions Eagle Ford, LLC, Appellant
    v.
    Railroad Commission of Texas and Blue Water Disposal, Appellees
    FROM THE DISTRICT COURT OF TRAVIS COUNTY, 261ST JUDICIAL DISTRICT
    NO. D-1-GN-17-001119, HONORABLE ORLINDA NARANJO, JUDGE PRESIDING
    MEMORANDUM OPINION
    The trial court affirmed the Railroad Commission’s granting of Blue Water Disposal’s
    permit application for a commercial saltwater disposal injection well. See Tex. Water Code § 27.031
    (requiring permit from Railroad Commission to drill and operate injection well to dispose of oil and
    gas waste). The trial court also denied NGL Water Solutions Eagle Ford, LLC’s alternative claims
    for declaratory relief. Raising two issues, NGL argues that the Railroad Commission erred when it
    denied NGL “party status” to protest Blue Water Disposal’s permit and when it subsequently
    approved and issued the permit administratively. For the following reasons, we affirm the portion
    of the trial court’s order affirming the challenged order and dismiss NGL’s claims for
    declaratory relief.
    Background
    Statutory and Regulatory Framework
    To give context to the parties’ dispute, we begin with a brief overview of the
    Injection Well Act, which governs the permitting process for underground injection wells in this
    State. See generally Tex. Water Code §§ 27.001–.157; Railroad Comm’n v. Texas Citizens for a
    Safe Future & Clean Water, 
    336 S.W.3d 619
    , 626–27 (Tex. 2011) (discussing Injection Well Act).
    Under the Injection Well Act, the Railroad Commission has jurisdiction over injection wells used
    “to dispose of oil and gas waste,” see Tex. Water Code §§ 27.031, .051(b), and the Texas
    Commission on Environmental Quality (TCEQ) has jurisdiction over injection wells used for other
    purposes, see Tex. Water Code §§ 27.011, .051(a).
    The Railroad Commission may grant an application and issue a permit for an injection
    well within its jurisdiction if it finds, among other factors, that “the use or installation of the injection
    well is in the public interest” and that “the applicant has made a satisfactory showing of financial
    responsibility if required by Section 27.073.” 
    Id. § 27.051(b)(1),
    (4); see 
    id. § 27.073(a)
    (stating that
    person to whom injection well permit is issued “may be required” by Railroad Commission “to
    maintain a performance bond or other form of financial security” to ensure that abandoned injection
    well is properly plugged); see also Texas 
    Citizens, 336 S.W.3d at 628
    –32 (interpreting and
    discussing “public interest” in section 27.051(b) of Injection Well Act). Unlike the TCEQ, see Tex.
    Water Code § 27.051(d) (providing factors for TCEQ to consider in making “public interest”
    determination), the Railroad Commission does not have statutory factors that it must consider in a
    “public interest” determination.
    2
    Pursuant to the Injection Well Act, the Railroad Commission adopted Statewide Rule
    9 to address injection wells within its jurisdiction. See 
    id. § 27.034(a)
    (requiring Railroad
    Commission to adopt rules and procedures for performance of duties under chapter, including
    adopting “rules for notice and procedure of public hearings”); 16 Tex. Admin. Code § 3.9 (Railroad
    Comm’n, Disposal Wells).1 The rule defines “affected person” for purposes of Statewide Rule 9 to
    mean “a person who has suffered or will suffer actual injury or economic damage other than as a
    member of the general public or as a competitor, and includes surface owners of property on which
    the well is located and commission-designated operators of wells located within one-half mile of the
    proposed disposal well.” 16 Tex. Admin. Code § 3.9(5)(E)(ii); see Tex. Water Code § 27.034(a)
    (requiring Railroad Commission to “define ‘affected person’ by rule”). A hearing is required if “a
    protest from an affected person or local government is made to the commission . . . or if the
    commission or its delegate determines that a hearing is in the public interest.” 16 Tex. Admin. Code
    § 3.9(5)(E)(i). Without a protest from an “affected person,” the Railroad Commission’s “delegate
    may administratively approve the application.” 
    Id. § 3.9(5)(F).2
    Administrative Proceedings
    In April 2016, Blue Water applied for a permit from the Railroad Commission to
    operate a commercial injection well. The Railroad Commission notified Blue Water in May 2016
    1
    Citations to Title 16 of the Administrative Code are to rules adopted by the
    Railroad Commission.
    2
    Although not relevant here, if the Railroad Commission’s delegate denies
    administrative approval, “the applicant shall have a right to a hearing upon request.” 16 Tex. Admin.
    Code § 3.9(5)(F).
    3
    that it had determined that Blue Water’s application was administratively complete but that it was
    unable to approve the application administratively because it had received a protest from NGL to
    the application. In response, Blue Water requested a hearing, and the hearing occurred on
    August 10, 2016, before a technical examiner and an administrative law judge (collectively
    “examiners”). Blue Water’s evidence and argument focused principally on NGL’s status as a
    competitor, arguing that NGL was not an “affected person” entitled to protest the application and,
    thus, that NGL did not have standing. As support for its position, Blue Water introduced evidence
    that NGL was a competitor. See 
    id. § 3.9(5)(E)(ii)
    (defining “affected person” to mean “person who
    has suffered or will suffer actual injury or economic damage other than as a member of the general
    public or as a competitor”). Evidence showed that NGL operated disposal wells, including one that
    would compete with Blue Water’s proposed well, but that NGL did not operate a well that was
    within one-half mile of the location of Blue Water’s proposed well. See 
    id. (defining “affected
    person” to include “commission-designated operators of wells located within one-half mile of the
    proposed disposal well”).
    NGL did not dispute that it would be a competitor of Blue Water’s proposed well.
    Its evidence focused on its positions that the permit application was not in the “public interest”
    because there was no present industry need for additional disposal capacity in the area of the
    proposed well and that Blue Water had failed to show financial responsibility. See Tex. Water Code
    § 27.051(b)(1), (4). NGL introduced evidence that it had existing injection wells with excess
    capacity, including some that were currently idle, to support its position that it was not in the public
    4
    interest to grant the permit application. NGL also presented evidence that Blue Water had not
    provided financial security.
    The examiners’ proposal for decision (PFD) recommended that the Railroad
    Commission conclude that NGL was not an “affected person” as defined by Statewide Rule 9 and
    remand the permit application for further administrative review and consideration. The examiners
    found that NGL “did not present sufficient evidence to demonstrate that it is a person who has
    suffered or will suffer actual injury or economic damage other than that of the general public or as
    a competitor.” The conclusions of law included that NGL was not an “affected person” as that term
    is defined in Statewide Rule 9 and that it was not entitled to party status to protest Blue Water’s
    permit application. In its order dated December 6, 2016, the Railroad Commission adopted the
    examiners’ findings of fact and conclusions of law and remanded the permit application for
    further administrative review and consideration. NGL filed a motion for rehearing, and the
    Railroad Commission denied the motion in February 2017. Following the remand of Blue Water’s
    application for administrative review, the Railroad Commission approved and issued the permit on
    March 9, 2017.
    Litigation Commenced
    Shortly after the Railroad Commission issued Blue Water’s permit, NGL filed suit
    seeking judicial review of the December 2016 order remanding the permit application for
    administrative review and the Railroad Commission’s subsequent approval and issuance of Blue
    Water’s permit. As support for the trial court’s jurisdiction to consider its claims seeking judicial
    review, NGL cited the Administrative Procedure Act (APA) and the Texas Natural Resources Code.
    5
    See Tex. Gov’t Code § 2001.176 (addressing petitions initiating judicial review); Tex. Nat. Res.
    Code § 85.241 (authorizing “interested person” to file suits for judicial review of Commission orders
    “relating to oil or gas and the waste of oil or gas”). In the alternative to its claims for judicial review,
    NGL sought declaratory judgments that: “(i) the [Railroad] Commission’s refusal to recognize
    NGL’s status as a party to the contested case over Blue Water’s permit application and consequent
    remand of the application from the Hearings Division to the Technical Processing department was
    error and violated NGL’s rights, and (ii) Blue Water’s permit was unlawfully issued.” See Tex. Civ.
    Prac. & Rem. Code §§ 37.001–.011 (UDJA). NGL asserted that the December 2016 order violated
    its rights to due process and equal protection of the laws.
    The parties filed briefing on the merits, and the Railroad Commission filed a partial
    plea to the jurisdiction asserting that the trial court lacked jurisdiction over NGL’s claims for
    declaratory relief and its APA claim challenging Blue Water’s permit. Following a hearing, the trial
    court affirmed the Railroad Commission’s order and denied NGL’s claims for declaratory relief.
    This appeal followed.
    Analysis
    Jurisdiction
    We begin with threshold issues raised by the Railroad Commission that challenge the
    trial court’s jurisdiction to consider NGL’s claims. Although the Railroad Commission did not file
    a notice of appeal, see Tex. R. App. P. 25.1(c) (stating that appellate court may not grant party who
    does not file notice of appeal “more favorable relief than did the trial court except for just cause”),
    we address its issues because they challenge the trial court’s subject matter jurisdiction, see Oncor
    6
    Elec. Delivery Co. v. Chaparral Energy, LLC, 
    546 S.W.3d 133
    , 138 (Tex. 2018) (explaining
    that challenge to court’s subject matter jurisdiction cannot be waived); Rusk State Hosp. v. Black,
    
    392 S.W.3d 88
    , 103 (Tex. 2012) (Lehrmann, J., dissenting) (“Subject matter jurisdiction cannot be
    waived or conferred by agreement, can be raised at any time, and must be considered by a court
    sua sponte.”).
    Suit for Judicial Review
    In its first issue, the Railroad Commission argues that the trial court did not have
    jurisdiction to consider NGL’s claims that sought judicial review of the December 2016 order and
    its subsequent grant and issuance of the Blue Water’s permit because NGL was not a “party” to the
    proceeding that resulted in the Railroad Commission granting the permit. As support for its position,
    the Railroad Commission cites section 105.001(a) of the Texas Utilities Code, which states: “Any
    party to a proceeding before the railroad commission is entitled to judicial review under the
    substantial evidence rule.” See Tex. Util. Code § 105.001(a); Texas 
    Citizens, 336 S.W.3d at 624
    (citing and stating that “Utilities Code generally requires a court to review a decision of the
    [Railroad] Commission under a substantial evidence standard”). According to the Railroad
    Commission, NGL’s claims are barred by sovereign immunity because it was not a “party.” See
    Coastal Habitat All. v. Public Util. Comm’n of Tex., 
    294 S.W.3d 276
    , 281–82 (Tex. App.—Austin
    2009, no pet.) (interpreting similar language to section 105.001 that is found in section 15.001 of
    Texas Utilities Code to preclude putative party who was denied intervention in Public Utility
    Commission proceeding from bringing suit for judicial review). Sovereign immunity generally
    deprives courts of subject matter jurisdiction over suits against agencies of the State, like the
    7
    Railroad Commission. See State v. Shumake, 
    199 S.W.3d 279
    , 283 (Tex. 2006); Texas Dep’t of
    Parks & Wildlife v. Miranda, 
    133 S.W.3d 217
    , 224 (Tex. 2004). Further, “[i]t is well recognized
    under Texas law that there is no right to judicial review of an administrative order unless a statute
    provides a right or unless the order adversely affects a vested property right or otherwise violates a
    constitutional right.” Continental Cas. Ins. v. Functional Restoration Assocs., 
    19 S.W.3d 393
    , 397
    (Tex. 2000).
    NGL counters that the trial court had jurisdiction under section 2001.171 of the APA
    to consider its claims seeking judicial review because the Injection Well Act “neither specifically
    authorizes nor prohibits judicial review of the decision.”         See Texas Dep’t of Protective
    & Regulatory Servs. v. Mega Child Care, Inc., 
    145 S.W.3d 170
    , 173 (Tex. 2004) (holding that
    section 2001.171 of APA provides independent right to judicial review of decision in contested case
    “when the agency’s enabling statute neither specifically authorizes nor prohibits judicial review of
    the decision”); see also Tex. Gov’t Code § 2001.171 (“A person who has exhausted all
    administrative remedies available within a state agency and who is aggrieved by a final decision in
    a contested case is entitled to judicial review under this chapter.”). The parties agree that the
    Injection Well Act does not address the right to judicial review. See generally Tex. Water Code
    §§ 27.001–.157. NGL also relies on section 85.241 of the Texas Natural Resources Code to support
    8
    the trial court’s jurisdiction, see Tex. Nat. Res. Code § 85.241,3 and argues that section 105.001 of
    the Texas Utilities Code does not apply.
    Even if we assume that section 105.001 of the Texas Utilities Code limits the right
    to judicial review to parties to proceedings before the Railroad Commission, we conclude that NGL
    was a party to the proceeding that resulted in the December 2016 order. See Tex. Util. Code
    § 105.001(a). NGL participated in the contested-case hearing, offering argument and evidence, was
    assessed hearing transcript costs, and filed a motion for rehearing, which the Railroad Commission
    denied. See 16 Tex. Admin. Code §§ 1.2(21) (Definitions) (defining “party” to mean “person named
    or admitted as . . . protestant . . . in a contested case before the [Railroad] Commission”),
    (26) (defining “protestant” to mean “person opposing an application or permit submitted to the
    [Railroad] Commission”), 1.111(b) (Reporters and Transcripts) (stating that “costs of the original
    transcripts shall be assessed to all parties equally unless otherwise directed by the examiner or
    required by law”), 1.128 (Motions for Rehearing) (addressing motions for rehearing and providing
    deadlines for parties to file motions for rehearing after decision or order signed);4 see also Tex. Gov’t
    3
    Section 85.241 of the Texas Natural Resources Code provides:
    Any interested person who is affected by the conservation laws of this state or orders
    of the commission relating to oil or gas and the waste of oil or gas, and who is
    dissatisfied with any of these laws or orders, may file suit against the commission or
    its members in a court of competent jurisdiction in Travis County to test the validity
    of the law or order.
    Tex. Nat. Res. Code § 85.241; see H.G. Sledge, Inc. v. Prospective Inv. & Trading Co., 
    36 S.W.3d 597
    ,
    601–02 (Tex. App.—Austin 2000, pet. denied) (discussing section 85.241 of Texas Natural
    Resources Code).
    4
    In August 2017, the Railroad Commission amended Chapter 1, renumbering many of its
    sections without modifying their substance in any material respect for purposes of this appeal. See
    9
    Code § 2001.003(4) (defining “party” to mean “person or state agency named or admitted as
    a party”).
    We also observe that the December 2016 order was subsumed in the Railroad
    Commission’s subsequent decision to grant Blue Water’s permit application. See Walter West, P.E.
    v. Texas Comm’n on Envtl. Quality, 
    260 S.W.3d 256
    , 263–64 (Tex. App.—Austin 2008, pet. denied)
    (concluding TCEQ’s denial of requests for contested case hearings and ALJ’s order remanding
    application to executive director were interim orders that were subsumed in final decision to approve
    permit application and “subject to judicial review on appeal therefrom” (citing City of Corpus Christi
    v. Public Util. Comm’n of Tex., 
    572 S.W.2d 290
    , 299–300 (Tex. 1978) (op. on reh’g))); see also City
    of Corpus 
    Christi, 572 S.W.2d at 299
    –300 (explaining that review of agency’s interim orders occurs
    upon appeal from final decision).
    In this procedural context, even if section 105.001 of the Texas Utilities Code limits
    the right to judicial review to parties, we conclude that the trial court had jurisdiction over NGL’s
    claims seeking judicial review of the December 2016 order. See, e.g., Texas 
    Citizens, 336 S.W.3d at 622
    –23 (considering claims brought in suit for judicial review of Railroad Commission’s
    approval of application for injection well permit following contested-case hearing); Rosenthal
    v. Railroad Comm’n, No. 03-09-00015-CV, 2009 Tex. App. LEXIS 6522, at *1 (Tex. App.—Austin
    Aug. 20, 2009, pet. denied) (mem. op.) (same); H.G. Sledge, Inc. v. Prospective Inv. & Trading Co.,
    
    36 S.W.3d 597
    , 599, 601–02 (Tex. App.—Austin 2000, pet. denied) (concluding that trial court
    properly exercised jurisdiction to consider whether appellant was “affected person” entitled to notice
    42 Tex. Reg. 4131 (Aug. 21, 2017). We cite the sections of the current version of Chapter 1.
    10
    and that substantial evidence supported Railroad Commission’s decision that appellant was not
    “affected person”). Thus, we overrule the Railroad Commission’s first issue.
    Claims for Declaratory Relief
    In its second issue, the Railroad Commission argues that the trial court lacked
    jurisdiction over NGL’s claims for declaratory relief because the UDJA does not waive the Railroad
    Commission’s sovereign immunity from claims challenging its orders and NGL has failed to identify
    any other statute that would waive sovereign immunity for these claims. During oral argument,
    counsel for NGL affirmatively represented to this Court that it was abandoning its claims for
    declaratory relief. Based on NGL’s affirmative representation abandoning the UDJA claims, we
    dismiss those claims. See, e.g., Wojcik v. Wesolick, 
    97 S.W.3d 335
    , 336-37 (Tex. App.—Houston
    [14th Dist.] 2003, no pet.) (concluding that appellee had abandoned ground that asserted to trial court
    by affirmatively “stating in its brief that it ‘does not contend at this time [ground asserted to trial
    court]’”); Hall v. Tomball Nursing Ctr., Inc., 
    926 S.W.2d 617
    , 619 (Tex. App.—Houston [14th
    Dist.] 1996, no writ) (concluding that appellate court did not need to address ground where counsel
    affirmatively “conceded” during oral argument that “judgment could not stand if it were based on
    this ground”).
    NGL’s Claims Seeking Judicial Review
    Having determined that the trial court had jurisdiction to consider NGL’s claims
    seeking judicial review of the December 2016 order, we turn to NGL’s issues that challenge the
    11
    order and the Railroad Commission’s subsequent approval and issuance of Blue Water’s permit. We
    begin with the applicable standard of review.
    Standard of Review
    Our review of NGL’s claims seeking judicial review of the Railroad Commission’s
    order is governed by section 2001.174 of the APA. See Tex. Gov’t Code § 2001.174; Texas
    
    Citizens, 336 S.W.3d at 624
    ; Slay v. Texas Comm’n on Envtl. Quality, 
    351 S.W.3d 532
    , 548–49
    (Tex. App.—Austin 2011, pet. denied) (describing standard of review under section 2001.174 of
    APA). Under this standard, “a court may not substitute its judgment for the judgment of the state
    agency on the weight of the evidence or questions committed to agency discretion.” Tex. Gov’t
    Code § 2001.174; see Firemen’s & Policemen’s Civil Serv. Comm’n v. Brinkmeyer, 
    662 S.W.2d 953
    ,
    956 (Tex. 1984) (“The reviewing court is concerned only with the reasonableness of the
    administrative order, not its correctness.”). But we must reverse or remand the case to the state
    agency for further proceedings:
    if substantial rights of the appellant have been prejudiced because the administrative
    findings, inferences, conclusions, or decisions are:
    (A)     in violation of a constitutional or statutory provision;
    (B)     in excess of the agency’s statutory authority;
    (C)     made through unlawful procedure;
    (D)     affected by other error of law;
    (E)     not reasonably supported by substantial evidence considering the reliable and
    probative evidence in the record as a whole; or
    12
    (F)    arbitrary or capricious or characterized by abuse of discretion or clearly
    unwarranted exercise of discretion.
    Tex. Gov’t Code § 2001.174(2).
    With respect to subsection (E) of section 2001.174(2), “‘substantial evidence’ does
    not mean a large or considerable amount of evidence, but such relevant evidence as a reasonable
    mind might accept as adequate to support a conclusion of law.” 
    Slay, 351 S.W.3d at 549
    .
    “Substantial-evidence analysis entails two component inquiries: (1) whether the agency made
    findings of underlying facts that logically support the ultimate facts and legal conclusions
    establishing the legal authority for the agency’s decision or action and, in turn, (2) whether the
    findings of underlying fact are reasonably supported by evidence.” AEP Tex. Commer. & Indus.
    Retail, Ltd. P’ship v. Public Util. Comm’n of Tex., 
    436 S.W.3d 890
    , 905 (Tex. App.—Austin 2014,
    no pet.).
    We presume that the agency’s decision is supported by substantial evidence, and the
    burden is on the appellant to demonstrate otherwise. Froemming v. Texas State Bd. of Dental
    Exam’rs, 
    380 S.W.3d 787
    , 791 (Tex. App.—Austin 2012, no pet.) (citing Texas Health Facilities
    Comm’n v. Charter Med.-Dall., Inc., 
    665 S.W.2d 446
    , 452 (Tex. 1984)). The evidence in the record
    may preponderate against the agency’s decision but still provide a reasonable basis for the agency’s
    decision and thereby meet the substantial evidence standard. Texas Gen. Land Office v. Crystal
    Clear Water Supply Corp., 
    449 S.W.3d 130
    , 135 (Tex. App.—Austin 2014, pet. denied) (citing
    Charter Med.-Dall., 
    Inc., 665 S.W.2d at 452
    ). “The question of whether an agency’s decision is
    13
    supported by substantial evidence is a question of law, and we owe no deference to the district
    court’s decision.” 
    Id. (citing Brinkmeyer,
    662 S.W.2d at 956).
    To the extent NGL’s issues address statutory and rule construction, we review these
    questions de novo. See Texas Mun. Power Agency v. Public Util. Comm’n of Tex., 
    253 S.W.3d 184
    ,
    192 (Tex. 2007); Rodriguez v. Service Lloyds Ins., 
    997 S.W.2d 248
    , 254 (Tex. 1999). Our primary
    concern is the express language of the statute or rule. See Galbraith Eng’g Consultants, Inc.
    v. Pochucha, 
    290 S.W.3d 863
    , 867 (Tex. 2009); 
    Rodriguez, 997 S.W.2d at 254
    (explaining that
    administrative rules, which have same force as statutes, are construed in same manner). “We thus
    construe the text according to its plain and common meaning unless a contrary intention is apparent
    from the context or unless such a construction leads to absurd results.” Presidio Indep. Sch. Dist.
    v. Scott, 
    309 S.W.3d 927
    , 930 (Tex. 2010) (citing City of Rockwall v. Hughes, 
    246 S.W.3d 621
    ,
    625–26 (Tex. 2008)); see Texas 
    Citizens, 336 S.W.3d at 628
    (explaining that courts “generally avoid
    construing individual provisions of a statute in isolation from the statute as a whole”); 
    Rodriguez, 997 S.W.2d at 254
    (explaining that, “[u]nless the rule is ambiguous, we follow the rule’s clear
    language”). Further, we “generally uphold an agency’s interpretation of a statute it is charged by the
    Legislature with enforcing, ‘so long as the construction is reasonable and does not contradict the
    plain language of the statute.’” Texas 
    Citizens, 336 S.W.3d at 625
    (quoting First Am. Title Ins.
    v. Combs, 
    258 S.W.3d 627
    , 632 (Tex. 2008)).
    December 2016 Order
    In its first issue, NGL argues that the Railroad Commission erred , both substantively
    and procedurally, in denying NGL “party status” to protest Blue Water’s permit application. NGL
    14
    asserts that the Railroad Commission violated NGL’s due process and equal protection rights, acted
    arbitrarily and capriciously, and exceeded its authority in interpreting Statewide Rule 9 to deny NGL
    standing. See Tex. Gov’t Code § 2001.174(2)(A), (B), (F); University of Tex. Med. Sch. at Hous.
    v. Than, 
    901 S.W.2d 926
    , 930 (Tex. 1995) (explaining that “[d]ue process at a minimum requires
    notice and an opportunity to be heard at a meaningful time and in a meaningful manner”); In re
    Nestle USA, Inc., 
    387 S.W.3d 610
    , 624 (Tex. 2012) (orig. proceeding) (explaining that equal
    protection clause “keeps governmental decisionmakers from treating differently persons who are in
    all relevant respects alike”); Price v. Texas Alcoholic Beverage Comm’n, No. 01-12-01164-CV,
    2014 Tex. App. LEXIS 7495, at *11 (Tex. App.—Houston [1st Dist.] July 10, 2014, pet. denied)
    (mem. op.) (listing elements of equal protection claim).
    According to NGL, once the contested-case hearing was called on Blue Water’s
    permit application, Statewide Rule 9(5)(E) no longer had any bearing on the proceeding or provided
    any legal basis for excluding NGL, as a party to the proceeding, from being heard or from ignoring
    the evidence that it offered at the hearing. See 16 Tex. Admin. Code § 1.109(b) (Hearing
    Procedures); see also Tex. Gov’t Code §§ 2001.051, .060. NGL further argues that the Railroad
    Commission’s “error in pretending no hearing ever occurred and excising record evidence was
    not harmless.”
    In its order, the Railroad Commission adopted the examiners’ PFD, which included
    the following conclusions of law:
    1.        NGL Water Solutions Eagle Ford, LLC is not an “affected person,” as that
    term is defined in 16 Tex. Admin. Code § 3.9.
    15
    2.      NGL Water Solutions Eagle Ford, LLC is not entitled to party status to
    protest Blue Water Disposal’s application for a commercial permit to dispose
    of oil or gas waste by injection . . . .
    Because it had concluded that NGL was not an affected person and no other person had
    protested the application, the Railroad Commission remanded Blue Water’s permit application to
    technical permitting staff for further administrative review and consideration. See 16 Tex. Admin.
    Code § 3.9(5)(F).
    The findings of fact supporting the Railroad Commission’s conclusion that NGL was
    not an affected person included:
    3.      NGL Water Solutions Eagle Ford, LLC is not a Commission-designated
    operator of a well within one-half mile of the proposed disposal well location.
    4.      NGL Water Solutions Eagle Ford, LLC is not a surface owner of property on
    which the proposed well is located.
    5.      NGL Water Solutions Eagle Ford, LLC did not present evidence sufficient to
    demonstrate that it is a person who has suffered or will suffer actual injury or
    economic damage other than that of the general public or as a competitor.
    See 
    id. § 3.9(5)(E)(ii)
    (emphasis added). NGL concedes that it was not an operator within one-half
    mile of the proposed location or a surface owner, limiting its challenge to the third finding.5 See id.;
    5
    To the extent that NGL argues that its equal protection rights were violated because it was
    treated differently than a well operator within one-half mile of the proposed location would have
    been, NGL has not shown that it was “similarly situated” to an operator within one-half mile or that
    it was treated differently without a reasonable basis. See Price v. Texas Alcoholic Beverage
    Comm’n, No. 01-12-01164-CV, 2014 Tex. App. LEXIS 7495, at *11 (Tex. App.—Houston
    [1st Dist.] July 10, 2014, pet. denied) (mem. op.) (“To assert an equal protection claim, the plaintiff
    must establish that: (1) he or she was treated differently than other similarly situated parties; and
    (2) he or she was treated differently without a reasonable basis.”).
    16
    Madden v. State Bd. For Educator Certification, No. 03-11-00584-CV, 2014 Tex. App. LEXIS 5444,
    at *11 n.4 (Tex. App.—Austin May 22, 2014, pet. denied) (mem. op.) (accepting agency’s
    unchallenged findings as established on appeal). As to the challenged finding, Blue Water presented
    evidence that NGL operates commercial disposal wells, and NGL’s evidence focused on its own
    facilities that had additional disposal capacity to support its position that it was not in the “public
    interest” to grant the permit application. It presented evidence that it had facilities that were idle and
    a disposal well that could be reconfigured to accept more waste in the area of the proposed well.
    Based on our review of the record, we conclude that the Railroad Commission’s
    remand of the permit application for administrative review and consideration complied with the plain
    language of Statewide Rule 9 and the Injection Well Act and did not violate NGL’s rights to due
    process or equal protection. See 
    Scott, 309 S.W.3d at 930
    ; 
    Rodriguez, 997 S.W.2d at 254
    ; 
    Than, 901 S.W.2d at 930
    ; Price, 2014 Tex. App. LEXIS 7495, at *11. The Injection Well Act requires the
    Railroad Commission to adopt rules and procedures for the performance of its duties, including
    “provisions for giving notice to local governments and affected persons” as to pending applications
    for injection wells within its jurisdiction and to define “‘affected person’ by rule.” See Tex. Water
    Code § 27.034(a). Statewide Rule 9 sets out the requirements for applications for injection wells
    within the Railroad Commission’s jurisdiction and provides procedures for notice and public
    hearings. See 16 Tex. Admin. Code § 3.9.
    In particular, subsection (5) of Statewide Rule 9 addresses required notices and the
    opportunity for hearings, and subsections (5)(E) and (F) address protests, the lack of a protest, and
    the definition of “affected person”:
    17
    (E)     Protested applications: (i) If a protest from an affected person or local
    government is made to the commission within 15 days of receipt of the
    application or of publication, whichever is later, or if the commission or its
    delegate determines that a hearing is in the public interest, then a hearing will
    be held on the application after the commission provides notice of hearing to
    all affected persons, local governments, or other persons, who express an
    interest, in writing, in the application. (ii) For purposes of this section,
    “affected person” means a person who has suffered or will suffer actual injury
    or economic damage other than as a member of the general public or as a
    competitor, and includes surface owners of property on which the well is
    located and commission-designated operators of wells located within one-half
    mile of the proposed disposal well.
    (F)     If no protest from an affected person is received by the commission, the
    commission’s delegate may administratively approve the application. If the
    commission’s delegate denies administrative approval, the applicant shall
    have a right to a hearing upon request. After hearing, the examiner shall
    recommend a final action by the commission.
    See 
    id. § 3.9(5).
    As defined in the rule, “affected persons” are not absolutely limited to certain
    classes of persons, but the definition contains an express exclusion—the person must suffer actual
    injury or economic damage other than as a member of the general public or as a competitor. As the
    examiners explained in the PFD, Statewide Rule 9 “excludes persons protesting an application,
    solely as a competitor to an applicant. That is not to say that a competitor is forbidden from
    protesting an application, but that a competitor must identify a harm specific to it separate and apart
    from injury or damage that it has (or, would) experience as an entity engaged in the same service in
    the same market, if challenged on its status as an ‘affected person.’”
    At the outset of the hearing, Blue Water challenged NGL’s standing to protest the
    application on the ground that it was not an “affected person” and offered evidence that NGL was
    protesting the application solely as a competitor. Rather than presenting evidence of injury or
    18
    economic damage other than that of a competitor, NGL challenged the merits of the application on
    the ground that the proposed well would not be in the “public interest” by offering evidence of
    excess disposal capacity.6 See Tex. Water Code § 27.051(b)(1) (requiring finding that “use or
    installation of injection well is in the public interest”). As noted by the examiners, however, its
    evidence did not identify harm or economic damage other than as a competitor.7 In this context,
    6
    In its briefing to this Court, NGL continues to cite and rely on evidence that it offered
    during the hearing that showed “an average unused monthly capacity at NGL’s four nearby
    disposal facilities of 1.6 million barrels, approximately 56% of those facilities’ total permitted
    capacities,” to support its stated position that “the local market is substantially oversaturated with
    disposal capacity.”
    7
    In the adopted PFD (emphasis in original), the examiners detailed the parties’ evidence and
    then explained the reasoning as to the affected person determination as follows:
    At the hearing, [Blue Water] challenged NGL’s standing to protest the Application,
    and stated that NGL is not an “affected person” entitled to party status as a protestant.
    In its direct case, [Blue Water] successfully established that: 1) NGL does not operate
    a well within one-half mile of the proposed well location; and 2) NGL does not own
    the surface estate of the proposed well location. NGL does not dispute either of those
    facts.
    It was therefore incumbent upon NGL to establish that it is a person who has suffered
    or will suffer actual injury or economic damage other than that of the general public
    or as a competitor. However, the Examiners conclude that NGL did not demonstrate
    that it is an “affected person,” as defined in [Statewide Rule] 9.
    ...
    [R]ather than identifying actual injury or economic damage specific to it separate and
    apart than that as a competitor, NGL challenged the merits of the Application on the
    grounds that the proposed well is not in the “public interest,” as required by the
    Texas Water Code. NGL opines that additional disposal capacity is not needed in the
    area, without identifying harm or injury that the proposed well would cause to it if
    permitted. In a sense, NGL placed the cart before the horse.
    19
    Statewide Rule 9 expressly allowed the Railroad Commission to take the action that it did after it
    determined that NGL was not an affected person. Because there was no protest from an affected
    person, the rule expressly authorized Blue Water’s application to be approved administratively. See
    16 Tex. Admin. Code § 3.9(5)(F).
    NGL argues that, even if Statewide Rule 9 limits protests to “affected persons,” NGL
    met this requirement because its harm arises from the Railroad Commission’s “imposition of
    differing regulatory burdens on some permit applicants but not others.” As support for its position
    that it was an “affected person,” NGL cites Good Shepherd Medical Center, Inc. v. State,
    
    306 S.W.3d 825
    , 836 n.7 (Tex. App.—Austin 2010, no pet.). In that case, however, the dispute
    concerned the appellant’s standing to bring constitutional challenges to statutes, see 
    id. at 828,
    and
    NGL has not challenged the validity of a statute or brought a rule challenge under the APA, see Tex.
    Gov’t Code § 2001.038. Thus, we do not find the analysis in that case helpful to our analysis here.
    NGL also cites the Railroad Commission’s final order that denied the application of
    Karnes County Properties, LLC for a commercial injection well and a subsequent decision following
    the analysis in that case as support for its position that it was an “affected person,” arguing that it
    “raised an administratively cognizable harm that is distinct from purely economic injury.” See Texas
    Railroad Comm’n, Application of Supreme Vacuum Services, LLC Pursuant to Statewide Rule 9 for
    the SWD Lease, Well No. 1, Eagleville (Eagle Ford-2) Field, Karnes County, Texas, Oil and Gas
    Docket No. XX-XXXXXXX (May 20, 2014) (proposal for decision); Texas Railroad Comm’n,
    Application of Karnes County Properties, LLC for Commercial Disposal Authority Pursuant to
    Statewide Rule 9 for the KC SWD Lease, Well No. 1 Eagleville (Eagle Ford-2) Field, Karnes
    20
    County, Texas, Oil and Gas Docket No. XX-XXXXXXX (May 7, 2013) (final order denying application).
    In the final order in Karnes County, the Railroad Commission found that the application was not in
    the “public interest” based in part on its finding that the applicant “did not establish that there is an
    industry need for the facility in this area at this time.”         According to NGL, the Railroad
    Commission’s “inclusion of that ‘industry need’ assessment confers on NGL (and others within the
    10-mile area of review) a legally cognizable interest that, as a matter of law, differs from the purely
    competitive injury excluded under the rule.” In that case, however, the Railroad Commission did
    not conduct an “affected person” inquiry because the standing of a purported protestant had not
    been challenged.
    When the standing of a purported protestant has been challenged at the outset of a
    hearing, the Railroad Commission previously had applied the same analysis as it did in this case.
    See Texas Railroad Comm’n, Application of High Roller Wells, LLC Pursuant to Statewide Rule
    9 for a Permit to Dispose of Oil and Gas Waste by Injection, for the Highway 285 SWD Lease,
    Wells No. 1 & 2, Sandbar (Bone Spring) Field, Reeves County, Texas, Oil and Gas Docket
    Nos. XX-XXXXXXX & XX-XXXXXXX (Jan. 21, 2016) (examiner’s decision). In High Roller, a hearing
    on the merits of the application was held; the hearing examiner determined that the two persons
    appearing in protest were not affected persons and denied them standing; and, based on these
    determinations, found that the subject application was no longer protested and that it could be
    administratively approved. Similar to the evidence presented by NGL, one of the persons appearing
    in protest would have been a competitor of the proposed well and offered testimony to demonstrate
    a lack of industry need for additional wells. The hearing examiner concluded that this evidence “did
    21
    demonstrate that the proposed wells would cut into [the person]’s market-share” and that the person
    had “failed to articulate specifically what actual injury or economic damage it would incur other than
    that would be incurred as a competitor.” Applying the High Roller analysis here, the same is true
    of NGL’s evidence offered to show that the proposed well was not in the public interest.8 See Texas
    
    Citizens, 336 S.W.3d at 625
    (generally upholding agency’s interpretation of statute that it is charged
    with enforcing so long as construction is reasonable and does not contradict plain language
    of statute).
    Based on our review of the record, we conclude that there was substantial evidence
    to support the challenged finding that NGL did not present evidence sufficient to demonstrate that
    it would suffer actual injury or economic damage other than that of the general public or as a
    competitor. See 16 Tex. Admin. Code 3.9(5)(E)(ii); Charter Med.-Dall., 
    Inc., 665 S.W.2d at 452
    ;
    Crystal Clear Water Supply 
    Corp., 449 S.W.3d at 135
    ; 
    Slay, 351 S.W.3d at 549
    . Thus, we conclude
    that the Railroad Commission’s underlying findings support its conclusion that NGL was not an
    8
    To the extent that NGL complains that the Railroad Commission improperly excised and
    ignored its evidence, the administrative record reflects that the Railroad Commission considered
    NGL’s evidence in determining that it was not an “affected person” and, based on that determination,
    remanded the application for administrative review. See Texas Comm’n on Envtl. Quality v.
    City of Aledo, No. 03-13-00113-CV, 2015 Tex. App. LEXIS 6940, at *16 (Tex. App.—Austin
    July 8, 2015, no pet) (mem. op.) (observing that, despite ALJ’s refusal to admit documentary
    evidence into record, there was no indication in record that ALJ refused to consider evidence offered
    to support “affected persons” status). Further, although NGL argues in its reply brief that the
    Commission ignored and removed NGL’s evidence that proved “overwhelmingly the glut of existing
    disposal capacity in the area of Blue Water’s proposed well,” NGL’s counsel during oral argument
    confirmed that the administrative record contains all of the evidence that NGL offered at the hearing.
    22
    “affected person” for purposes of Statewide Rule 9. See AEP Tex. Commer. & Indus. 
    Retail, 436 S.W.3d at 905
    .
    NGL further argues that, regardless of whether it was an affected person entitled to
    protest the application, it was an abuse of discretion for the Railroad Commission not to afford NGL
    party status as an intervenor. See Railroad Comm’n v. Ennis Transp. Co., 
    695 S.W.2d 706
    , 710
    (Tex. App.—Austin 1985, writ ref’d n.r.e.) (explaining that generally “the allowance or denial of
    petitions for intervention in administrative proceedings rests in the discretion of the agency” and that
    “[o]rdinarily, reviewing courts do not overturn agency orders concerning the propriety of
    intervention”). NGL sought to intervene when it filed its motion for rehearing. See 16 Tex. Admin.
    Code § 1.37(a) (relevant here, authorizing “person who has a justiciable or administratively
    cognizable interest ...[to] file a petition for leave to intervene no later than five days prior to the
    hearing date”). Given our conclusion that substantial evidence supports the Railroad Commission’s
    determination that NGL was not an “affected person” as defined in Statewide Rule 9, we cannot
    conclude that the Railroad Commission abused its discretion by denying NGL’s request to intervene
    at the motion for rehearing stage. See Ennis Transp. 
    Co., 695 S.W.2d at 710
    . We overrule NGL’s
    first issue.
    Blue Water’s Permit
    In its second issue, NGL argues that granting Blue Water’s permit constituted a
    distinct set of substantive and procedural errors. NGL argues that: (1) there are no findings that the
    proposed well was in the public interest or that Blue Water was financially responsible; and (2) even
    if findings are deemed made, they were not supported by substantial evidence. See Tex. Water Code
    23
    § 27.051(b)(1), (4). NGL complains that the Commission failed to publish findings of fact, to
    properly consider industry need, and to require financial security.
    Statewide Rule 9, however, expressly authorized the Railroad Commission to
    “administratively approve the application” because no affected person protested the application. See
    16 Tex. Admin. Code § 3.9(5)(F). Once it was determined that NGL was not an “affected person”
    entitled to protest the permit application, NGL did not have standing to challenge the merits of the
    Railroad Commission’s subsequent decision to grant and issue the permit. See id.; see also
    Continental Cas. 
    Ins., 19 S.W.3d at 397
    (recognizing that “there is no right to judicial review of an
    administrative order unless a statute provides a right or unless the order adversely affects a vested
    property right or otherwise violates a constitutional right”); Texas Ass’n of Bus. v. Texas Air Control
    Bd., 
    852 S.W.2d 440
    , 446 (Tex. 1993) (stating general test for standing); Bacon v. Texas Historical
    Comm’n, 
    411 S.W.3d 161
    , 174–75, 179 (Tex. App.—Austin 2013, no pet.) (discussing general test
    for standing and fundamental distinction between “standing” before administrative agency and
    constitutional standing required to invoke court’s subject matter jurisdiction); see also Sierra Club
    v. Texas Comm’n on Envtl. Quality, No. 03-14-00130-CV, 2016 Tex. App. LEXIS 3244, at *2–3,
    9–12 (Tex. App.—Austin Mar. 31, 2016, no pet.) (mem. op.) (concluding that appellants did not
    have standing to challenge merits of permit application to TCEQ when they did not demonstrate that
    they were “affected persons”).
    Consistent with this analysis, the Railroad Commission’s December 2016 order
    concluded that NGL did not have “party status to protest” the application and remanded the permit
    application for administrative review and consideration. See 16 Tex. Admin. Code § 1.201 (Time
    24
    Periods for Processing Applications and Issuing Permits Administratively) (establishing when
    application is complete); see also Citizens Against Landfill Location v. Texas Comm’n on Envtl.
    Quality, 
    169 S.W.3d 258
    , 272 (Tex. App.—Austin 2005, pet. denied) (discussing significance of
    determination that application is administratively complete). The trial court affirmed the Railroad
    Commission’s order. In this context, we conclude that we do not have jurisdiction to address NGL’s
    complaints that are directed to the merits of the Railroad Commission’s subsequent administrative
    approval and issuance of Blue Water’s permit. See 
    Bacon, 411 S.W.3d at 174
    (addressing
    constitutional requirement of standing that “particular plaintiff has a sufficient personal stake in the
    controversy”); Continental Cas. 
    Ins., 19 S.W.3d at 397
    .
    Conclusion
    For these reasons, we affirm the portion of the trial court’s order affirming the
    Railroad Commission’s challenged order and dismiss NGL’s claims for declaratory relief.
    __________________________________________
    Melissa Goodwin, Justice
    Before Justices Goodwin, Baker, and Triana
    Affirmed in Part; Dismissed in Part
    Filed: November 27, 2019
    25
    

Document Info

Docket Number: 03-17-00808-CV

Filed Date: 11/27/2019

Precedential Status: Precedential

Modified Date: 11/27/2019

Authorities (24)

Wojcik v. Wesolick , 2003 Tex. App. LEXIS 302 ( 2003 )

Railroad Commission v. Texas Citizens for a Safe Future & ... , 54 Tex. Sup. Ct. J. 642 ( 2011 )

Texas Department of Protective & Regulatory Services v. ... , 47 Tex. Sup. Ct. J. 1116 ( 2004 )

GOOD SHEPHERD MEDICAL CENTER, INC. v. State , 2010 Tex. App. LEXIS 1184 ( 2010 )

Firemen's & Policemen's Civil Service Commission v. ... , 27 Tex. Sup. Ct. J. 146 ( 1984 )

H.G. Sledge, Inc. v. Prospective Investment & Trading Co. , 2000 Tex. App. LEXIS 7557 ( 2000 )

Texas Ass'n of Business v. Texas Air Control Board , 852 S.W.2d 440 ( 1993 )

Slay v. TEX. COM'N ON ENVIRONMENTAL QUALITY , 351 S.W.3d 532 ( 2011 )

Texas Department of Parks & Wildlife v. Miranda , 47 Tex. Sup. Ct. J. 386 ( 2004 )

Texas Health Facilities Commission v. Charter Medical-... , 27 Tex. Sup. Ct. J. 234 ( 1984 )

Railroad Commission v. Ennis Transportation Co. , 1985 Tex. App. LEXIS 12056 ( 1985 )

Hall v. Tomball Nursing Center, Inc. , 926 S.W.2d 617 ( 1996 )

Walter West, P.E. v. Texas Commission on Environmental ... , 260 S.W.3d 256 ( 2008 )

University of Texas Medical School at Houston v. Than , 38 Tex. Sup. Ct. J. 910 ( 1995 )

City of Rockwall v. Hughes , 51 Tex. Sup. Ct. J. 349 ( 2008 )

State v. Shumake , 49 Tex. Sup. Ct. J. 769 ( 2006 )

Texas Municipal Power Agency v. Public Utility Commission ... , 51 Tex. Sup. Ct. J. 216 ( 2007 )

Coastal Habitat Alliance v. Public Utility Commission , 2009 Tex. App. LEXIS 5325 ( 2009 )

Rodriguez v. Service Lloyds Insurance Co. , 997 S.W.2d 248 ( 1999 )

Continental Casualty Insurance Co. v. Functional ... , 19 S.W.3d 393 ( 2000 )

View All Authorities »