CRAIG GENERAL CONTRACTORS, INC., )
) No. 08-01-00135-CV
Appellant, )
) Appeal from the
v. )
) 160th District Court
ARLINGTON INDEPENDENT SCHOOL )
DISTRICT, ) of Dallas County, Texas
)
Appellee. ) (TC# DV-98-02716-H)
)
O P I N I O N
Appellant Craig General Contractors, Inc. appeals from the jury=s verdict for Appellee Arlington Independent School District (AAISD@). Appellant brings five issues:
(1) The trial court erred in submitting a broad-form question to the jury that included a breach of warranty issue;
(2) the trial court erred in submitting a question on breach of indemnity provision;
(3) the trial court erred in submitting a question on failure to perform in a good and workmanlike manner;
(4) the jury=s refusal to find AISD negligent is against the great weight and preponderance of the evidence; and
(5) the jury=s findings on damages is contrary to conclusive evidence and/or against the great weight and preponderance of the evidence.
We affirm.
SUMMARY OF THE EVIDENCE
On July 9, 1997, Appellant and other subcontractors were at Sam Houston High School, a part of AISD, to install and test out a new fire pump. That morning, a fire marshal was present when the test began and low voltage readings that did not meet the standard were obtained. The fire marshal instructed the parties to stop the installation until they discovered the problem causing the low readings. The voltage readings were intermittent, and the contractors continued with the test. As the contractors started the pump around the lunch hour, the power failed, and a fire occurred at the school from explosions in the electrical connections, or the switchgear.
AISD brought suit against Appellant for breach of contract, breach of warranties, negligent misrepresentation, negligence, and fraud in the inducement. The jury answered in favor of AISD on the questions of breach of contract and negligence and awarded AISD $291,770 in actual damages. Including the attorney=s fees, the trial court entered judgment for $429,270, $78,099.43 for
pre-judgment interest, and post-judgment interest at $79.94 per day. The judgment did not specify on which alternate theory of recovery the award of damages was based.
DISCUSSION
When a party tries a case on alternative theories of recovery, and the jury returns favorable findings on two or more theories, the party has a right to a judgment on the theory providing the greatest or most favorable relief. Boyce Iron Works, Inc. v. Southwestern Bell Tel. Co., 747 S.W.2d 785, 787 (Tex. 1988). The jury awarded AISD the same amount, $291,770, for each of the theories of recovery. The judgment does not state which theory of recovery the award of damages was based, but under either the theory of breach of contract or of negligence, the same amount would be recovered. In the first three issues, Appellant challenges only the submission of the breach of the contract question to the jury and does not address the submission of the question of negligence. Furthermore, Appellant, in the fourth issue, complains of the sufficiency of the evidence of the negligence claim but not the breach of contract claim. Since the judgment could have been based on either of the alternate theories for recovery, the trial court=s judgment cannot be reversed by challenging only one of the theories of the recovery. We see no need to address the first four issues. See, e.g., Ponton v. Munro, 818 S.W.2d 865, 866-67 (Tex.App.--Corpus Christi 1991, no writ).
In the fifth issue, Appellant argues the measure of the actual damages was improper. In Texas, the scope of recoverable damages associated with damage to property depends upon whether the injury is temporary or permanent in nature. Z.A.O., Inc. v. Yarbrough Drive Ctr. Joint Venture, 50 S.W.3d 531, 545-46 (Tex.App.--El Paso 2001, no pet.); Lone Star Dev. Corp. v. Reilly, 656 S.W.2d 521, 525 (Tex.App.‑‑Dallas 1983, writ ref=d n.r.e.). If an injury to property is temporary in nature, the proper measure of damages is the reasonable cost of the repairs necessary to restore the property to its condition immediately prior to the injury plus the loss occasioned by being deprived of the use of the property. Lone Star Dev. Corp., 656 S.W.2d at 525-26. A>Stated differently, the proper measure of damages for a temporary injury to real property is the amount necessary to place the owner of the property in the same position he occupied prior to the injury.=@ Id. at 526, quoting Kraft v. Langford, 565 S.W.2d 223, 227 (Tex. 1978).
Appellant does not dispute that AISD spent $291,770 to repair the damages from the fire. Since the correct measure of damages is the amount spent to put AISD in the place it was before the injury to the property, the jury properly awarded $291,770 in damages, or the amount spent to repair the building and the switchgear. We overrule the fifth issue.
The judgment of the trial court is affirmed.
August 29, 2002
DAVID WELLINGTON CHEW, Justice
Before Panel No. 1
Larsen, McClure, and Chew, JJ.
(Do Not Publish)
Document Info
Docket Number: 08-01-00135-CV
Filed Date: 8/29/2002
Precedential Status: Precedential
Modified Date: 9/9/2015