guadalupe-blanco-river-authority-v-texas-attorney-general-san-antonio ( 2015 )


Menu:
  •       TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-14-00393-CV
    Guadalupe-Blanco River Authority, Appellant
    v.
    Texas Attorney General; San Antonio Water System; Texas Commission on
    Environmental Quality; Cibolo Creek Municipal Authority; The Aransas Project;
    New Braunfels Utilities; San Antonio River Authority; KOC Land, LP;
    O’Connor Brothers River Ranch, LLC; Ballinamona-Gafney, LP; Ballinamona, LP;
    Braman Ranches, LLC; Wexford Cattle Co., LLP; Martin O’Connor Ranch Ltd.; and
    Martin O’Connor Cattle Company, Inc., Appellees
    FROM THE DISTRICT COURT OF TRAVIS COUNTY, 261ST JUDICIAL DISTRICT
    NO. D-1-GN-14-001198, HONORABLE STEPHEN YELENOSKY, JUDGE PRESIDING
    MEMORANDUM OPINION
    The Guadalupe-Blanco River Authority (the “Authority”) filed a suit under what is
    commonly referred to as the Expedited Declaratory Judgment Act (the “Act”). See Tex. Gov’t Code
    §§ 1205.001-.152 (containing provisions of Act); see also 
    id. § 1205.042
    (stating that copy of
    petition “shall be served on the attorney general” before trial). In its suit, the Authority sought “to
    clear the way for a much-needed water project in the Lower Guadalupe River Basin” and to obtain
    the revenue needed for that project. According to the Authority, the project will add off-channel
    storage and increase the amount of water than can be supplied annually through its canal system and
    sold to its customers. Moreover, the Authority suggests that the project will cost $100 million and
    will provide 100,000 acre-feet of water per year.
    In its petition, the Authority alleged that the San Antonio Water System (the
    “System”) improperly filed an application with the Texas Commission on Environmental Quality
    (the “Commission”) that would significantly diminish the amount of water available for the project
    by allowing the System to reuse effluent that it had previously used and discharged.1 Moreover, the
    Authority urged that the System’s proposed water use would not comply with the governing
    provisions of the Edwards Aquifer Authority Act. See Act of May 30, 1993, 73d Leg., R.S., ch. 626,
    §§ 1.01-4.03, 1993 Tex. Gen. Laws 2350, 2350-72 (containing provisions of Edwards Aquifer
    Authority Act, including definition for “reuse”). Accordingly, the Authority alleged that the System’s
    application “creates a cloud over” the revenue pledge made by the Authority to secure bonds to pay
    for its project because there will be less water available to sell to its customers. See Tex. Gov’t Code
    § 1205.001(2) (defining “[p]ublic security” as “including a bond”). For these reasons, the Authority
    filed the underlying suit in order to guarantee that its water supply and revenue will remain adequate
    for the project.
    In response to the Authority’s petition, the System, the Commission, and various
    other interested parties2 filed pleas to the jurisdiction contending that the district court did not have
    1
    In its application, the System sought to “convey and reuse return flows derived from privately
    owned groundwater as authorized by section 11.042(b) of the Texas Water Code. [The System]
    intends to reuse 50,000 acre feet of its . . . authorized return flows.”
    2
    The following entities also filed pleas to the jurisdiction and are appellees in this case:
    Cibolo Creek Municipal Authority; The Aransas Project; New Braunfels Utilities; San Antonio River
    Authority; KOC Land, LP; O’Connor Brothers River Ranch, LLC; Ballinamona-Gafney, LP;
    Ballinamona, LP; Braman Ranches, LLC; Wexford Cattle Co., LLP; Martin O’Connor Ranch Ltd.;
    and Martin O’Connor Cattle Company, Inc. Although the attorney general was named as a party,
    see Tex. Gov’t Code § 1205.042, the attorney general neither supported nor attacked the relief sought
    by the Authority. Similarly, on appeal, the attorney general has chosen not to file a brief in this matter.
    2
    jurisdiction over the Authority’s suit because its claims are not ripe, because the claims do not fall
    within the Act, because the Commission has exclusive or primary jurisdiction over the controversy,
    and because the claims are barred by sovereign immunity.
    After considering the various pleas and responses, the district court determined
    “that each and all of the Pleas to the Jurisdiction should be granted in all things” and dismissed
    the case “in its entirety.” See 
    id. § 1205.065
    (requiring trial courts to determine “each legal or factual
    question in the declaratory judgment action” and render final judgment “with the least possible
    delay”). Shortly after the district court made its ruling, the Authority filed this expedited appeal.
    See 
    id. § 1205.068
    (authorizing appeals of trial court rulings and providing that appeals are
    governed by rules for accelerated appeals); see also Tex. Civ. Prac. & Rem. Code §§ 51.014(a)(8)
    (governing appeals from rulings granting or denying plea to jurisdiction “by a governmental unit”),
    101.001(3) (defining governmental unit). We will affirm the district court’s judgment dismissing
    the Authority’s suit.
    STANDARD OF REVIEW
    Appellate courts perform a de novo review of a trial court’s ruling on a plea to the
    jurisdiction. See Westbrook v. Penley, 
    231 S.W.3d 389
    , 394 (Tex. 2007); see also Harris Cnty. v.
    Sykes, 
    136 S.W.3d 635
    , 638 (Tex. 2004) (explaining that “[a] plea to the jurisdiction is a dilatory
    plea that seeks dismissal of a case for lack of subject matter jurisdiction”). When performing this
    review, courts look to the plaintiff’s petition to determine “whether the facts pled affirmatively
    demonstrate that jurisdiction exists.” State v. Holland, 
    221 S.W.3d 639
    , 642 (Tex. 2007). “If the
    pleadings are insufficient to establish jurisdiction but do not affirmatively demonstrate an incurable
    3
    defect, the plaintiff should be afforded the opportunity to replead.” 
    Id. at 643.
    However, if “the
    pleadings affirmatively negate the existence of jurisdiction, then a plea to the jurisdiction may be
    granted without allowing the plaintiffs an opportunity to amend.” Texas Dep’t of Parks & Wildlife
    v. Miranda, 
    133 S.W.3d 217
    , 227 (Tex. 2004). When, as here, “an action is grounded in statute,
    subject matter jurisdiction must be shown under the applicable statute.” Arnold v. Price, 
    365 S.W.3d 455
    , 459 (Tex. App.—Fort Worth 2011, no pet.).
    Resolution of the issues presented in this appeal involves the construction and
    interpretation of the Act, which is a legal question that is reviewed de novo. See Texas Lottery
    Comm’n v. First State Bank of DeQueen, 
    325 S.W.3d 628
    , 635 (Tex. 2010). When performing
    this analysis, our primary objective is to give effect to the legislature’s intent. State v. Shumake,
    
    199 S.W.3d 279
    , 284 (Tex. 2006). In ascertaining that intent, we look first and foremost to the
    statutory text, see 
    id., and we
    rely on the plain meaning of the text unless a different meaning is
    provided by the legislature or unless enforcing the plain language would lead to absurd results,
    see Entergy Gulf States, Inc. v. Summers, 
    282 S.W.3d 433
    , 437 (Tex. 2009).
    DISCUSSION
    As set out above, the Authority filed this suit under color of the Act, and the System,
    the Commission, and the other parties all filed pleas to the jurisdiction alleging, among other things,
    that the suit must be dismissed because the suit exceeds the scope of the Act. The System’s intention
    to reuse effluent as well as the effect that reuse will have on the water supply available for use by
    the Authority and on the economic viability of the project formed the basis for the relief sought
    from the district court, and they frame this appeal as well. On appeal, the Authority attacks the
    4
    jurisdictional grounds that were urged in the various pleas to the jurisdiction and that formed the
    basis for the district court’s ruling.
    When arguing on appeal that the district court erred by granting the pleas, the
    Authority urges that its suit and requested declarations fall within the scope of the Act.3 Generally
    speaking, the Authority notes that the Act was designed “to provide a method of adjudicating the
    validity of public securities in an efficient and quick manner,” see Friends of Canyon Lake, Inc. v.
    Guadalupe-Blanco River Auth., 
    96 S.W.3d 519
    , 528 (Tex. App.—Austin 2002, pet. denied),
    highlights that suits under the Act are proceedings “in rem,” see Tex. Gov’t Code § 1205.023(1);
    see also Alejos v. State, 
    433 S.W.3d 112
    , 117 (Tex. App.—Austin 2014, no pet.) (discussing how
    phrase “in rem” would typically concern “adjudication of the legal status of the securities themselves
    and not merely the personal rights of specific parties before the court”), and urges that the language
    of the Act is broadly written, see Determan v. City of Irving, 
    609 S.W.2d 565
    , 568 (Tex. Civ.
    App.—Dallas 1980, no writ) (discussing predecessor to Act and concluding that consideration of
    effect of amendment to city’s charter “was necessarily involved in determining what authority the
    City of Irving has to issue and deliver its bonds”).
    More specifically, the Authority insists that in its petition, it explained that the project
    was necessary to provide an adequate water supply and to assure its municipal and industrial
    3
    On appeal, the Authority contends that the relief that it sought is not dissimilar from those
    considered in a prior set of cases from this Court. See Bexar Metro. Water Dist. v. City of San Antonio,
    
    228 S.W.3d 887
    (Tex. App.—Austin 2007, no pet.); Bexar Metro. Water Dist. v. City of Bulverde,
    
    234 S.W.3d 126
    (Tex. App.—Austin 2007, no pet.); Bexar Metro. Water Dist. v. City of Bulverde,
    
    156 S.W.3d 79
    (Tex. App.—Austin 2004, pet. denied). However, none of those cases involved suits
    under the Act.
    5
    customers of its ability to enter into long-term-water-commitment contracts.4 Also, the Authority
    points to allegations made in its petition regarding the alleged impact that the System’s application
    will have on the Authority’s project. In particular, the Authority urges that if the System’s application
    is granted, the amount of water available for the project “would amount to only roughly half” of
    the water needed to cover the cost of the bonds but that the full amount of water needed would
    be available if the System is not permitted to reuse discharged water by later reclaiming it. Stated
    differently, the Authority contends that if the System is allowed to proceed with its planned use, then
    the bond authorization by the Authority would be invalid “because the $100 million expenditure
    cannot result in the required total” water supply necessary to cover the cost of constructing the project.
    Building on the potential impact of the System’s intention to reuse effluent, the
    Authority contends that its “prospective customers and the bond market need judicial resolution of”
    its authority to issue the public securities to pay for the project and assurance that the bond resolution
    is legal and valid, that the water-supply contracts from which it will derive revenue can be legally
    executed and will be valid, that the Authority can impose its planned rate, and that its proposed
    expenditures relating to the bonds are legal and valid. In addition, the Authority notes that through
    the bond resolution it has pledged its revenues from its water contracts and its right to “divert, use,
    and sell state water” and that it has asked the district court to determine whether those pledges are
    proper. See Ex parte City of Irving, 
    343 S.W.3d 850
    , 854-58 (Tex. App.—Dallas 2011, pet. granted,
    4
    Specifically, the Authority alleged that its “municipal and industrial customers need [the
    Authority] to commit to supply defined amounts of water on a firm basis under long-term contracts”
    and that “purchasers of Bonds want assurance that the amounts of water committed by contract to
    be supplied on a firm basis will continue to be firm throughout that term.” According to the Authority,
    a water supply is “firm” if it is “reliable each and every day throughout a drought at least as severe
    as the most-severe drought of record in the region.”
    6
    judgm’t vacated w.r.m.) (considering under Act whether city’s proposal to pledge tax revenues for 10
    years fell under exception to biennial appropriation requirement and whether city could pledge State’s
    portion of mixed beverage taxes).
    Regarding the declarations sought from the district court, the Authority requested
    the following:
    (1) that each public security authorization relating to the Lower Basin Project Bonds
    is legal and valid, see TEX. GOV’T CODE § 1205.021(2), including without limitation
    the determination to construct “off-channel reservoir storage . . . to provide a
    total firm water supply of not less than 100,000 acre-feet per year utilizing the
    GBRA-Dow Lower Basin Run-of River Water Rights”;
    (2) that all treated wastewater derived from water withdrawn from the Edwards
    Aquifer, if discharged or otherwise allowed to flow into a watercourse, lake, or other
    body of state-owned water: (i) may not be reused pursuant to Section 11.042(b) of
    the Water Code or otherwise; and, therefore, (ii) is and shall remain state-owned
    water and part of the run-of-river flow of that watercourse to which state-issued water
    rights are entitled in the order of their respective priority dates[; and]
    (3) that all treated wastewater derived from water withdrawn from the Edwards
    Aquifer, if lawfully reused (i.e., before it is discharged or otherwise allowed to flow
    into a watercourse, lake, or other body of state-owned water), must be so used within
    the boundaries of the [Edwards Aquifer Authority][.]
    In addition, the Authority sought “a decree, pursuant to” the Act “that the declaratory judgment
    herein prayed for shall, as to all matters adjudicated, be forever binding and conclusive” to the
    parties to the suit as well as “all Interested parties, irrespective of whether such parties filed an
    answer or otherwise appeared.”
    Although the Authority contends that the Act is broadly worded and that the relief
    that it requested is available under the Act, we believe that the Authority’s reliance on the Act is
    7
    misplaced. The Act was promulgated “to provide issuers of public securities . . . a method of quickly
    and efficiently adjudicating the validity of public securities and acts affecting those public securities.”
    Hotze v. City of Houston, 
    339 S.W.3d 809
    , 814 (Tex. App.—Austin 2011, no pet.); see also
    Buckholts Indep. Sch. Dist. v. Glaser, 
    632 S.W.2d 146
    , 149 (Tex. 1982) (explaining that purpose of
    promulgating Act was to prevent “one disgruntled taxpayer” from stopping “the entire bond issue
    by simply filing suit”). The Act “allows an issuer to bring a special, expedited declaratory judgment
    action to validate proposed public securities or to resolve any disputes relating to public securities.”
    
    Hotze, 339 S.W.3d at 814
    (citing Tex. Gov’t Code § 1205.021). In general, a suit under the Act is
    “binding on all persons who own property or reside within the boundaries of the issuer.” 
    Id. (citing Tex.
    Gov’t Code § 1205.023).
    Moreover, the Act only allows issuers to seek declarations regarding a limited set
    of topics. In particular, under the Act, an “issuer may bring an action . . . to obtain a declaratory
    judgment” regarding the following:
    (1) the authority of the issuer to issue the public securities;
    (2) the legality and validity of each public security authorization relating to the public
    securities, including if appropriate:
    (A) the election at which the public securities were authorized;
    (B) the organization or boundaries of the issuer;
    (C) the imposition of an assessment, a tax, or a tax lien;
    (D) the execution or proposed execution of a contract;
    8
    (E) the imposition of a rate, fee, charge, or toll or the enforcement of
    a remedy relating to the imposition of that rate, fee, charge, or toll;
    and
    (F) the pledge or encumbrance of a tax, revenue, receipts, or property
    to secure the public securities;
    (3) the legality and validity of each expenditure or proposed expenditure of money
    relating to the public securities; and
    (4) the legality and validity of the public securities.
    See Tex. Gov’t Code § 1205.021; see also 
    id. § 1205.001(1)
    (specifying that “‘[i]ssuer’ means an
    agency, authority, board, body politic, commission, department, district, instrumentality, municipality
    or other political subdivision, or public corporation of this state”), (2) (providing that “‘[p]ublic
    security’ means an interest-bearing obligation, including a bond”), (3) (defining “[p]ublic security
    authorization” as “an action or proceeding taken, made, or proposed to be taken or made in
    connection with or affecting a public security”).
    In its brief, the Authority attempts to characterize its claims and requested
    declarations as falling within these permissible categories, but the relief sought and the language of
    the declarations in dispute reveal that this appeal does not concern whether the Authority has the
    authority to issue the public securities, whether the securities were properly authorized, whether
    the procedures for issuing the securities were complied with, or whether the securities and the
    related proposed expenditures are legal and valid. See 
    id. § 1205.021.
    In other words, the requested
    declarations in this case do not seek judicial approval regarding the legality and validity of the
    Authority’s bonds or the procedures that were used when issuing the bonds.
    9
    On the contrary, the declarations sought by the Authority are based on the continued
    availability of water returned to the Guadalupe River by the System and seek to guarantee that the
    project has a supply of water that the Authority considers adequate. The Authority seeks to achieve
    those assurances by pursuing a judicial determination regarding whether the System’s desire to
    reuse discharged water and its requested permit are inconsistent with the Edwards Aquifer Authority
    Act. Moreover, the Authority is asking that this determination be made before the Commission
    has had an opportunity to fully consider and rule on the Authority’s request in an administrative
    proceeding. Unquestionably, the Authority would like the security and certainty sought through
    those declarations, but we are not persuaded that the claims and requests concerning the availability
    of water for the project and any potential impact that might occur from issuing the System its
    requested permit can fairly be construed as bearing on the “legality and validity” of the bonds at issue
    as those terms are used in the Act. See id.; see also Black’s Law Dictionary 618, 1075 (6th ed.
    abridged 1991) (defining “valid” as having “legal strength or force” and having been “executed with
    proper formalities, incapable of being rightfully overthrown or set aside” and “legal” as “conforming
    to the law; according to the law; required or permitted by law; not forbidden or discountenanced
    by law; good and effectual in law”); see also Ex parte City of Corpus Christi, 
    427 S.W.3d 400
    , 406
    (Tex. App.—Corpus Christi 2013, pet. denied) (considering under Act whether city’s proposed road-
    construction project complied with language of bond proposition approved by voters); Leonard v.
    Cornyn, 
    47 S.W.3d 524
    , 528 (Tex. App.—Austin 1999, pet. denied) (explaining that predecessor to
    Act was “designed to provide an orderly, efficient system for assuring that the bonds have been
    issued with the requisite authority and in compliance with what the law requires”).
    10
    In much the same way that unexpected or unforeseen changes in the weather might
    impact the ability of the Authority to meet the requirements of its bonds, the actions proposed by the
    System through its permit application might affect the amount of water available to the Authority,
    but they do not bear upon the procedural requirements that must be met for the bonds to be legal and
    valid or the Authority’s ability to issue the bonds. This remains true even though the availability of
    the desired water was specifically mentioned in the bond resolution.5 Although a trial court might
    be able to consider the validity and legality of a pledge of water rights as part of a bond authorization,
    we are not persuaded that the trial court could properly address under the Act whether those rights
    will secure a particular amount of water or whether the decision to pledge those rights is a wise one.
    Those types of declarations would not seem to fall within the limited scope of the Act.6
    5
    We do note that although the Authority contends on appeal that the bond resolution was
    premised on water availability, the language of the resolution seems to speak more in terms of
    guaranteeing that the Authority will charge a rate to its customers that will ensure that there is
    enough money to pay off the bonds. Accordingly, by its terms, that pledge could seemingly be
    satisfied regardless of whether the desired amount of water is present because the Authority could
    raise its rates to ensure that there were sufficient funds to cover the bonds. See Act of May 21, 1975,
    64th Leg., R.S., ch. 433, § 1, sec. 9, 1975 Tex. Gen. Laws, 1149,1153-54 (empowering Authority
    to establish and set rates sufficient to produce revenue to cover its obligations). The issue of whether
    the Authority has the legal ability to pledge revenue to satisfy the bond is not before us in this appeal.
    6
    In addition to the three declarations discussed above, the Authority’s petition also contains
    a request for the following five declarations:
    (1) that [the Authority] is authorized to issue the Lower Basin Project Bonds; and that
    the Lower Basin Project Bonds, when issued and executed pursuant to the procedural
    requirements by law and the authorizing proceedings of [the Authority], including
    approval by the Attorney General of Texas, constitute lawful and valid obligations
    and contracts of [the Authority], enforceable according their respective terms, and
    that all provisions for the payment of, and pledges, liens, and security provided for
    such debt and the interest thereon constitute valid and binding obligations and
    contracts of [the Authority] under the laws of the State of Texas and that the Lower
    Basin Project Bonds have been confirmed and approved by this Court;
    11
    This more limited construction of the reach of the Act is consistent with other
    provisions in the Act as well. For example, section 1205.151 of the Act describes the effect of
    a judgment obtained under the Act and sets out the types of judgments that may be issued by a
    trial court. Specifically, the section states that it applies to final judgments under the Act that hold
    the following:
    (1) the issuer had or has the authority on the terms set out in the issuer’s petition to:
    (A) issue the public securities; or
    (B) take each public security authorization; and
    (2) that the proposed expenditures of money relating to the Lower Basin Project
    Bonds are legal and valid;
    (3) that the Lower Basin Project Bonds themselves are legal and valid;
    (4) that, upon final approval by the Attorney General of Texas, the proceedings
    described herein made in connection with the issuance of the Lower Basin Project
    Bonds are valid and authorized by applicable laws; and
    (5) that [the Authority] may, in the future, make changes and amendments to the
    Lower Basin Project Bonds, as may be necessary or appropriate, so long as the
    changes are approved by the Attorney General of Texas.
    Arguably, the language of these requests would seem to fall more squarely within the bounds of the
    Act provided that the bases for the requests do not exceed the permissible scope. However, these
    additional requests do not form the basis of this appeal, and the Authority has not specifically asked
    this Court to address these declarations or remand these declarations in the event that the other
    requests are deemed to exceed the scope of the Act. On the contrary, in its conclusion, the Authority
    only asks this Court to reverse the trial court’s judgment and remand the proceeding to allow the
    district court to construe the Edwards Aquifer Authority Act in the manner that it suggested to ensure
    that there is a sufficient amount of water available to finance the project through the bonds.
    Accordingly, we need not express any comment on whether these other declarations could have
    properly been considered by the district court.
    12
    (2) each public security authorization and expenditure of money relating to the
    public securities was legal.
    Tex. Gov’t Code § 1205.151(a). By the terms of section 1205.151, the authorized judgments
    concern whether the requirements for issuing public securities and for disbursing or using money
    pertaining to the securities were complied with and do not address the effect that the activities of
    another party might have on the ability of the issuer to fulfill those obligations. Id.7
    Moreover, section 1205.151 also contains a rather unusual provision binding the
    parties named in the suit and those described by the Act as well as precluding future claims that
    could have been but were not presented. Specifically, the section states that “[t]he judgment, as to
    each adjudicated matter and matter that could have been raised, is binding and conclusive against”
    the comptroller, the attorney general, the issuer, and any party named and served or described by the
    Act. 
    Id. § 1205.151(b);
    see also 
    id. § 1205.151(c)
    (stating that judgment is permanent injunction
    against future filing contesting validity of securities, security authorizations, expenditures of money
    related to securities, provisions made for payment of securities, and “any adjudicated matter and any
    7
    When arguing that the district court had jurisdiction over its claims, the Authority points
    to subsection 1205.024(8) of the Act. See Tex. Gov’t Code § 1205.024(8). That section sets out the
    required contents for a petition filed under the Act, and the subsection states that the petition must
    set out “any other pertinent matter.” 
    Id. In light
    of this language, the Authority urges that the Act
    contemplates claims like those that it made in this case, which might not appear at first blush to fall
    under a more typical “legality and validity” inquiry. However, given that the section’s scope is
    limited to the contents of the petition, does not expressly authorize claims beyond those mentioned
    in section 1205.021, 
    id. § 1205.021,
    and lists only items for inclusion that are relevant to the legality
    and validity of a public security, 
    id. § 1205.024(1)-(7)
    (requiring petition to set out issuer’s authority
    to issue securities, purpose of security at issue, results of required elections, copy of security
    authorization, amount of security, interest rate for security, and authority relating to creation of issuer
    or to boundary change if relevant), we are not persuaded that the language relied on by the Authority
    expands the scope of the Act in the manner suggested.
    13
    matter that could have been raised in the action”). If the Authority is correct that claims beyond
    those more typically concerned with the legality and validity of public securities may be addressed
    under the Act, then claims not presented when a more typical suit under the Act was filed would be
    precluded from subsequent litigation even though they involved parties and subject matters that did
    not pertain to the legality and validity of the securities under review. We do not believe that the
    legislature could have intended that result and instead believe that the legislature only intended to
    foreclose future challenges that could have been presented in the suit regarding the authority of the
    entity to issue securities and the legality or validity of the actual securities.
    Furthermore, we believe that our limited construction is supported by section 1205.061
    of the Act. Section 1205.061 allows an issuer to request the trial court to “enjoin the commencement
    . . . of any proceeding” that is related to a suit filed under the Act. See 
    id. § 1205.061.
    In particular,
    the provision states that a trial court may enjoin a proceeding “that contests the validity of” the
    following:
    (1) any organizational proceeding or boundary change of the issuer;
    (2) public securities that are described in the petition for declaratory judgment action;
    (3) a public security authorization relating to the public securities;
    (4) an action or expenditure of money relating to the public securities, a proposed
    action or expenditure, or both;
    (5) a tax, assessment, toll, fee, rate, or other charge authorized to be imposed or made
    for the payment of the public securities or interest on the public securities; or
    (6) a pledge of any revenue, receipt, or property, or an encumbrance on a tax,
    assessment, toll, fee, rate, or other charge, to secure that payment.
    14
    
    Id. § 1205.061(a).
    As set out above, when discussing the types of proceedings that may be enjoined,
    the legislature chose to provide a circumscribed list similar to the set of declarations that may be
    pursued under the Act. 
    Id. In addition
    to concluding that the terms of the Act as a whole support our limited
    construction, we also believe that our determination that the Act is not designed to address the issues
    presented by the Authority is supported by the possibility that the requested relief and declarations
    would not guarantee the Authority the amount of water that it believes it needs to cover the costs of
    the project. As mentioned above, the amount of water that the Authority is able to use and sell is
    dependent on some factors that are beyond the control of any entity withdrawing water from the river
    as well as the decision by other entities to continue discharging their groundwater-based effluent into
    the river. Although we do not attempt to outline the full impact of the desired declarations here, we
    do note that it seems logical to assume that the System could bypass the effect of the requested
    declarations by not releasing its effluent back into the river system. If that were the case, the Authority
    would be confronted with the same reduction in supply that it is purportedly confronting and
    attempting to ameliorate now.
    In light of the preceding, including the plain language of the governing statutory
    provisions, and after reviewing the petition, including the claims and declarations at issue as well
    as the relief sought, we cannot conclude that the district court erred when it determined that the
    Authority’s suit exceeded the scope of the Act. Accordingly, we conclude that the district court
    properly granted the pleas and dismissed the suit on that ground. Having determined that the district
    court properly dismissed the suit on that basis, we need not address the remaining jurisdictional
    15
    arguments presented to the district court. Moreover, because the Authority’s pleadings affirmatively
    negated the existence of jurisdiction in this case, the Authority is not entitled to an opportunity to
    amend its pleadings.
    CONCLUSION
    Having determined that the district court did not err by dismissing the Authority’s
    suit, we affirm the judgment of the district court.
    __________________________________________
    David Puryear, Justice
    Before Justices Puryear, Pemberton, and Field
    Affirmed
    Filed: February 26, 2015
    16