Rene and Marialis Lopez v. Metro Lumber Industries, Inc. ( 2014 )


Menu:
  • AFFIRMED; Opinion Filed June 18, 2014.
    S
    Court of Appeals
    In The
    Fifth District of Texas at Dallas
    No. 05-13-01048-CV
    RENE LOPEZ AND MARIALIS LOPEZ, Appellants
    V.
    METRO LUMBER INDUSTRIES, INC., D/B/A DALLAS CEDAR
    COMPANY, Appellee
    On Appeal from the 68th Judicial District Court
    Dallas County, Texas
    Trial Court Cause No. DC-12-08376-C
    MEMORANDUM OPINION
    Before Justices Moseley, O’Neill, and FitzGerald
    Opinion by Justice Moseley
    Appellants Rene and Marialis Lopez contracted with Metro Lumber Wholesale, Co., Inc.,
    d/b/a Dallas Cedar Co., 1 to build a swimming pool. Afterward, they complained the pool leaked
    and that Metro did not fix the leaks. They sued Metro alleging fraud, breach of contract,
    negligence, breach of implied warranty, and breach of express warranty. The trial court granted
    Metro’s no-evidence motion for summary judgment as to all of appellants’ claims. Appellants
    appeal, arguing the trial court erred by granting the no-evidence motion for summary judgment
    as to their breach of contract and negligence claims.
    The background of the case and the evidence adduced at trial are well known to the
    1
    Appellee identified itself as Metro Lumber Wholesale Co, Inc., d/b/a Dallas Cedar Company in the body
    of its pleading and the summary judgment reflects this name. The parties do not complain about the variance
    between appellee’s name in the body and the caption of the pleadings. We refer to appellee as Metro.
    parties; thus, we do not recite them here in detail. Because all dispositive issues are settled in
    law, we issue this memorandum opinion. TEX. R. APP. P. 47.2(a), 47.4. We affirm the trial
    court’s judgment.
    Appellants do not appeal the trial court’s judgment as to the fraud, breach of implied
    warranty, or breach of express warranty claims. We therefore affirm as to those claims.
    We review the trial court’s summary judgment as to the breach of contract and
    negligence claims de novo. Provident Life & Accident Ins. Co. v. Knott, 
    128 S.W.3d 211
    , 215
    (Tex. 2003). We apply the well-established standards for reviewing no-evidence summary
    judgments. See TEX. R. CIV. P. 166a(i); Timpte Indus., Inc. v. Gish, 
    286 S.W.3d 306
    , 310–11
    (Tex. 2009).
    Metro’s no-evidence motion for summary judgment challenged the evidence as to the
    following elements of appellants’ breach of contract claim: (1) Metro breached the contract, and
    (2) appellants were damaged as a result of the breach. In response, appellants filed the affidavit
    of Rene Lopez. 2 It states appellants contracted with Metro to build a pool in their backyard.
    Appellants would not have entered into the contract without Metro’s promises and warranties.
    During construction, cracks began to form in the shell of the pool. Metro attempted to fix those
    cracks and continued construction. When the pool was completed, more cracks appeared, and
    Metro again attempted to repair the pool. The cracks reappeared several times. Rene’s affidavit
    also states the pool has never been capable of holding water as promised, and that appellants
    have to add water to the pool beyond what would be lost by evaporation.
    Metro argues there is no evidence it breached the contract to build a pool for appellants.
    2
    Attached to the affidavit was a copy of the contract and a letter from an engineer regarding an inspection
    performed on the pool. Metro objected to portions of Lopez’s affidavit as conclusory and to the engineer’s letter as
    hearsay. The trial court sustained the objections and appellants do not challenge this ruling on appeal. Therefore,
    we do not consider as evidence the engineer’s letter and the challenged portions of Lopez’s affidavit.
    –2–
    Rene’s affidavit does not assert that Metro failed to build the pool. And nothing in the affidavit
    identifies a contractual obligation Metro failed to perform, other than an express warranty that
    “for the period of time the pool is owned by the buyer . . . the pool will remain capable of
    retaining water.” However, appellants do not challenge on appeal the summary judgment on
    their breach of express and implied warranty claims.
    There is a distinction between breach of contract and breach of warranty. A breach of
    warranty claim “must involve something more than a mere promise to perform under the
    contract.” Staton Holdings, Inc. v. Tatum L.L.C., No. 05-12-01408-CV, 
    2014 WL 2583668
    , at
    *2 (Tex. App.—Dallas June 10, 2014, no pet. h.) (mem. op.). Here, the only “something more”
    present is the express term regarding the condition of the pool; namely, that the pool would
    remain capable of retaining water. And whether Metro breached that express warranty is not at
    issue here because appellants do not complain about the express warranty claim on appeal.
    We conclude appellants failed to present evidence raising a genuine issue of material fact
    as to the breach element of their breach of contract claim. Therefore, the trial court did not err
    by granting the no-evidence motion for summary judgment on that claim.
    Metro’s no-evidence motion for summary judgment also challenged all the elements of
    appellants’ negligence claim, i.e. that: (1) Metro owed a legal duty to appellants; (2) the breach
    of that duty; and (3) damages to appellants proximately caused by that breach. See Nabors
    Drilling, U.S.A. Inc. v. Escoto, 
    288 S.W.3d 401
    , 404 (Tex. 2009). Rene’s affidavit does not
    indicate how Metro failed to exercise reasonable care in performing any duty it had. We
    conclude appellants failed to raise a genuine issue of material fact as to the challenged element of
    breach of duty. Therefore, the trial court did not err by granting the no-evidence motion for
    summary judgment on that claim.
    Because appellants failed to raise a genuine issue of material fact as to each challenged
    –3–
    element of their breach of contract and negligence claims against Metro, we overrule their sole
    issue on appeal. We therefore affirm the trial court’s judgment.
    131048F.P05
    /Jim Moseley
    JIM MOSELEY
    JUSTICE
    –4–
    S
    Court of Appeals
    Fifth District of Texas at Dallas
    JUDGMENT
    RENE LOPEZ AND MARIALIS LOPEZ,                        On Appeal from the 68th Judicial District
    Appellants                                            Court, Dallas County, Texas
    Trial Court Cause No. DC-12-08376-C.
    No. 05-13-01048-CV         V.                         Opinion delivered by Justice Moseley.
    Justices O’Neill and FitzGerald
    METRO LUMBER INDUSTRIES, INC.,                        participating.
    D/B/A DALLAS CEDAR COMPANY,
    Appellee
    In accordance with this Court’s opinion of this date, the summary judgment of the trial
    court is AFFIRMED.
    It is ORDERED that appellee METRO LUMBER INDUSTRIES, INC., D/B/A
    DALLAS CEDAR COMPANY recover its costs of this appeal from appellants RENE LOPEZ
    AND MARIALIS LOPEZ.
    Judgment entered this 18th day of June, 2014.
    /Jim Moseley/
    JIM MOSELEY
    JUSTICE
    –5–