    MEMORANDUM OPINION1
    ----------
    I. INTRODUCTION
    Appellant Thos. S. Byrne, Ltd. appeals from a take-nothing judgment
    entered in accordance with a jury verdict finding that Appellee Seal Craft
    Corporation did not breach its subcontract with Byrne and that Appellee The
    Gray Insurance Company did not fail to comply with a performance bond issued
    1
    See Tex. R. App. P. 47.4.
    in connection with Seal Craft‟s subcontract. In five issues, Byrne argues that the
    trial court erred by denying its motion for judgment notwithstanding the verdict
    (JNOV) and motion to disregard a jury finding and, alternatively, that the
    evidence is factually insufficient to support the jury‟s liability findings. We will
    affirm.
    II. BACKGROUND
    Byrne is a general contractor located in Fort Worth that specializes in large
    commercial construction projects. Seal Craft, based in Shreveport, Louisiana,
    designs   and   manufactures     specialty   window    products   for   commercial
    applications.
    On December 1, 2004, Kimco Montgomery Plaza, LP entered into a
    general contract with Byrne to selectively demolish and renovate the exterior
    “skin,” including the windows, of the Montgomery Ward building (Montgomery
    Plaza), an eight-story, steel-reinforced concrete structure built in 1929 measuring
    about a block-and-a-half wide and between two and two-and-a-half blocks long.
    Byrne also entered into a “STANDARD SUBCONTRACT AGREEMENT” with
    Seal Craft dated November 17, 2004, whereby Seal Craft agreed to fabricate and
    install new windows in the building.2 Under the subcontract, Seal Craft was
    responsible for manufacturing and installing 1,430 windows for 585 openings
    (each opening typically contained three windows and a Fulton ventilator
    2
    The building‟s preexisting windows had been removed by another
    contractor. Byrne was responsible for finishing the concrete openings before
    Seal Craft installed the new windows.
    2
    positioned in the middle window).3 Seal Craft warranted that “all Subcontract
    Work shall be performed in a good and workmanlike manner and shall be free
    from any and all defects due to faulty workmanship and/or materials and shall
    comply with all requirements of the Contract Documents.”          Byrne obtained a
    performance bond that identified Seal Craft as the principal and Gray as the
    surety.
    Seal Craft prepared shop drawings based on criteria established by the
    project architect, Hodges and Associates, P.L.L.C., and produced a product
    submittal that contained detailed information about the windows, both of which
    Byrne and Hodges approved.        Seal Craft later manufactured and installed a
    mock-up window. Architectural Testing, Inc. (ATI) tested the mock-up in late
    November and early December 2004. The initial testing revealed several glazing
    leaks that Seal Craft attributed to either uncured sealant or to an issue involving
    the assembly of the Fulton ventilator.4       Seal Craft repaired the leaks, and
    subsequent testing revealed no water leakage.          At this point, according to
    3
    Many of the window openings measured approximately sixteen-feet wide
    and between six- and eleven-feet tall. Charles Still, a fenestration specialist hired
    by Seal Craft, described the fixed light aluminum windows as “huge” and
    explained that they contained over 5,000 lights of glass and enough sealant to
    measure twenty-nine miles long.
    4
    Byrne describes a glazing leak as “a leak occurring at the glass pane and
    the frame where a seal may be damaged/broken.” Ray VanNess, Seal Craft‟s
    president and sole owner, explained to Byrne that glazing leaks could occur
    when installing the windows due to their size and the difficulty associated with
    moving and installing them. Seal Craft assured Byrne that it would repair the
    glazing leaks as they manifested themselves, and Byrne confirmed that Seal
    Craft did so throughout the window installation process.
    3
    VanNess,    he    had   “effectively   communicated    to   the   architect   and   to
    [Byrne] . . . what [he] was intending to provide and install,” and the approval of
    the mock-up gave him “the confidence to start spending bunches of money
    manufacturing these windows and starting to get them installed,” which Seal
    Craft proceeded to do in January 2005. Byrne simultaneously maintained a field
    installation record for purposes of quality control.
    In May 2005, after Seal Craft had installed about 40% of the windows, ATI
    performed an on-site water test of three windows. ATI reported that the first
    window had no leaks and that the second and third windows had a glazing leak
    around the area of the lock near the Fulton ventilator.5 Seal Craft backfilled
    sealant around the glazing joints, and neither the second nor the third window
    leaked after it was retested.
    ATI conducted a follow-up test of several windows in July 2005 because of
    a concern that the moisture detected after the first test in May 2005 had
    penetrated through the window system. The tests instead revealed a few glazing
    leaks, which Seal Craft repaired.
    In August 2005, ATI conducted another window test, but unlike the
    previous tests, it took place in a controlled laboratory environment. The window
    passed.
    5
    ATI observed some moisture seeping under the windowsill during the
    testing of the first window, but it could not determine whether the moisture was
    caused by Seal Craft‟s window installation or by problems with the masonry
    opening.
    4
    Seal Craft continued installing windows during the summer 2005 tests—in
    fact, it was instructed to hurry up—and completed installing the remaining
    windows and demobilized from the job site in November 2005.
    Between November 2005 and January 2006, Seal Craft submitted an
    application for payment and various closeout documents to Byrne, including a
    one-year     limited   products   warranty       and   remedy    that   commenced   on
    December 15, 2005, and Gray‟s consent for final payment to Seal Craft. Byrne
    paid Seal Craft the remaining amount owed under the subcontract, less a
    retainage in the amount of approximately $133,000.                 Hodges executed a
    certificate of substantial completion dated February 1, 2006, for the project the
    subject of the December 1, 2004 contract between Byrne and Kimco. That same
    day also marked the beginning of Byrne‟s one-year warranty to Kimco for the
    work performed on the project, excluding those items included on the punch lists
    attached to the certificate of substantial completion.          The punch lists did not
    include any window leaks.
    Sometime soon after January 2006, Byrne noticed moisture inside the
    building after a subcontractor cleaned the exterior using a “fire hose technique.”
    Byrne notified Seal Craft, who offered to return to the site and begin
    troubleshooting the window systems for potential leaks, but Byrne advised Seal
    Craft to postpone doing so until it received a report from Curtain Wall Designs &
    Consulting, Inc. (CDC), a firm Byrne hired to investigate the moisture infiltration
    issue.
    5
    CDC initially reported that “[v]ery few leaks [were] being reported on the
    window frames themselves.”       And although it noted some deficiencies, CDC
    concluded that “[n]o one specific source of the leaks [could] be determined at
    [that] time.”
    CDC later reported that there were several defects in the window
    installation and recommended two remedial options: (1) removing, modifying,
    and reinstalling all of the windows (CDC‟s preferred option) or (2) wet sealing all
    of the windows.6 Seal Craft, with Byrne‟s approval, chose to implement CDC‟s
    second option.7 Seal Craft took five months and spent approximately $60,000 to
    wet seal each window. Byrne spot-tested 4% of the windows and discovered
    several glazing leaks, which Seal Craft repaired. During the process, Seal Craft
    clarified for Byrne that it was performing warranty work. Both Byrne and Seal
    Craft left the job site in August 2006.8 In May 2007, Byrne paid Seal Craft the
    remainder of its retainage, $40,250.50, and Byrne received the final payment
    under its contract with Kimco.
    6
    VanNess opined that performing option number one would have cost
    approximately $1.5 million and taken over two years to complete. Regarding the
    second option, CDC noted in one of its reports that “[w]et sealing the windows
    appear[ed] to be successful based on the testing done to date.”
    7
    VanNess described the process as follows: “We got on the boom lift and
    went to the exterior of the entire building, every single window, and applied an
    additional caulk seal . . . all the way around.”
    8
    Byrne claimed to have incurred $113,790—$93,052 attributable to Seal
    Craft and the remainder to Ray Noteboom Paint Co., the subcontractor
    responsible for installing a Thorocoat Exterior Coating System on the building—
    during the “inspection and testing process that occurred from March until August
    [2006].” It debited the $93,052 from Seal Craft‟s retainage.
    6
    Over a year after Byrne and Seal Craft left the job site, in October 2007,
    Byrne entered into a general contract with OMP Development, LLC, the new
    owner of Montgomery Plaza, to build out 240 condominiums in the building‟s east
    and west towers and a parking garage. Other than its delivery of five additional
    windows at Byrne‟s request,9 Seal Craft did not contract with Byrne to perform
    any work related to Byrne‟s 2007 contract with OMP to finish out the interior of
    Montgomery Plaza. With the exception of the ground level, where retail was
    operating, the remainder of Montgomery Plaza (where Seal Craft had installed
    the windows) had sat empty for over a year—between August 2006 and October
    2007.
    In early 2008, about six months after Byrne had contracted with OMP,
    Byrne employees discovered approximately eighty leaks at windows while
    walking through Montgomery Plaza during and after rain events. By letter dated
    April 8, 2008, Byrne (1) notified Seal Craft about the leaks, (2) required that Seal
    Craft honor its warranty by performing the first option that CDC had
    recommended two years earlier (removal and reinstallation of all windows), and
    (3) demanded that Seal Craft complete CDC‟s first option by September 30,
    2008, about five-and-a-half months later. Thereafter, VanNess met with Byrne to
    review its reports and to explain his proposed solution for fixing the leaks, and
    VanNess hired ATI to perform testing on some windows. ATI‟s tests revealed
    several window leaks and other leaks associated with cracks in the concrete wall.
    9
    This set of windows does not form any part of the underlying lawsuit.
    7
    Seal Craft offered to address the window leaks one by one, but it refused to
    perform CDC‟s first option, concluding that it was unreasonable.10
    In a July 14, 2008 email, Seal Craft sought guidance from Byrne about
    how to proceed, but about a week later, Byrne notified Gray that Seal Craft had
    “breached its subcontract agreement” and demanded that Gray perform and
    complete CDC‟s 2006 first option by September 30, 2008, about sixty days later.
    Gray inspected the site and denied Byrne‟s claim on August 18, 2008.
    In late September 2008, Seal Craft‟s attorney notified Byrne that the “vast
    majority of the present existing leaks [were] glazing leaks” and that “Byrne‟s
    unrealistic demand to remove all windows and repair internal sill seals [would]
    not address or resolve the glazing leak issue.” Seal Craft‟s attorney notified
    Byrne at a later date that Seal Craft was prepared to fix the glazing leaks.
    Meanwhile, on September 30, 2008, Byrne received a proposal from DGB
    Glass, Inc. to perform remedial work on Montgomery Plaza‟s windows. Byrne
    entered into a subcontract with DGB on October 9, 2008. DGB performed the
    subcontract work at a cost of $50,500; it did not remove and reinstall all of the
    windows.11
    On or about October 23, 2008, Byrne sued Seal Craft for breach of the
    2004 subcontract agreement and Gray for breach of the performance bond. A
    10
    Seal Craft had also previously scaled back its operations and was only
    manufacturing—and no longer installing—windows.
    11
    Byrne contends that there are additional windows that leak.
    8
    jury answered “No” to Byrne‟s breach of contract claim against Seal Craft and
    “No” to Byrne‟s breach of the performance bond claim against and Gray but
    answered “Yes” to a question asking whether Byrne had made an excessive pre-
    suit demand upon Seal Craft.12 Byrne filed a motion to disregard jury answers
    and for judgment notwithstanding the verdict, which the trial court denied. Byrne
    also filed a motion for new trial, which was overruled by operation of law. The
    trial court entered a take-nothing judgment in favor of Seal Craft and Gray.
    Byrne appeals.
    III. MOTION TO DISREGARD AND MOTION TO ENTER JNOV—
    JURY QUESTION NUMBERS 1, 4, AND 6 AND DAMAGES
    All but one of Byrne‟s issues stem from the trial court‟s ruling denying
    Byrne‟s motion to disregard and motion for JNOV. Specifically, in its first and
    second issues, Byrne argues that the trial court erred by denying its motion to
    disregard the jury‟s “No” answers to question numbers 1 and 4 and motion for
    JNOV that Byrne recover judgment against both Seal Craft and Gray. In its third
    issue, Byrne argues that the trial court should have rendered a JNOV in its favor
    for damages because it conclusively proved the amount of damages relevant to
    Seal Craft‟s contractual obligation and Gray‟s bond obligation. Finally, in its fifth
    12
    Jury question number 1 asked, “Did Seal Craft fail to comply with the
    November 17, 2004 subcontract with Byrne?” Jury question number 4 asked,
    “Did Gray fail to comply with its Performance Bond?” Jury question number 6
    asked, “Did Byrne make an excessive pre-suit demand on Seal Craft to remove
    and reinstall the exterior windows at Montgomery Plaza.”
    9
    issue, Byrne argues that the trial court erred by refusing to disregard the jury‟s
    “Yes” answer to question number 6.
    A.    Standard of Review
    A trial court may disregard a jury verdict and render judgment
    notwithstanding the verdict if no evidence supports the jury finding on an issue
    necessary to liability or if a directed verdict would have been proper. See Tex. R.
    Civ. P. 301; Tiller v. McLure, 
    121 S.W.3d 709
    , 713 (Tex. 2003); Fort Bend Cnty.
    Drainage Dist. v. Sbrusch, 
    818 S.W.2d 392
    , 394 (Tex. 1991). A directed verdict
    is proper only under limited circumstances: (1) when the evidence conclusively
    establishes the right of the movant to judgment or negates the right of the
    opponent or (2) when the evidence is insufficient to raise a material fact issue.
    Prudential Ins. Co. of Am. v. Fin. Review Servs., Inc., 
    29 S.W.3d 74
    , 77 (Tex.
    2000); Playoff Corp. v. Blackwell, 
    300 S.W.3d 451
    , 454 (Tex. App.—Fort Worth
    2009, pet. denied) (op. on reh‟g).
    To determine whether the trial court erred by denying a JNOV, we view the
    evidence in the light most favorable to the verdict under the well-settled
    standards that govern legal sufficiency review.      See Ingram v. Deere, 
    288 S.W.3d 886
    , 893 (Tex. 2009); Wal-Mart Stores, Inc. v. Miller, 
    102 S.W.3d 706
    ,
    709 (Tex. 2003). We must credit evidence favoring the jury verdict if reasonable
    jurors could and disregard contrary evidence unless reasonable jurors could not.
    See Tanner v. Nationwide Mut. Fire Ins. Co., 
    289 S.W.3d 828
    , 830 (Tex. 2009);
    Cent. Ready Mix Concrete Co. v. Islas, 
    228 S.W.3d 649
    , 651 (Tex. 2007). If a
    10
    party is attacking an adverse finding on an issue on which the party had the
    burden of proof, and there is no evidence to support the finding, we then review
    all the evidence to determine whether the contrary proposition is established as a
    matter of law. Dow Chem. Co. v. Francis, 
    46 S.W.3d 237
    , 241 (Tex. 2001);
    Sterner v. Marathon Oil Co., 
    767 S.W.2d 686
    , 690 (Tex. 1989).
    B.     Jury Question Number 1—Seal Craft’s Contractual Liability
    Byrne points out that it alleged two separate legal theories against Seal
    Craft to support its claim for breach of the subcontract: (1) breach of article 7.02
    and (2) breach of article 6.02.    Article 7.02 contains Seal Craft‟s warranty to
    perform the subcontract work in a good and workmanlike manner.13             Byrne
    asserts no contention within its sufficiency argument implicating article 7.02 of
    the subcontract; it has consequently abandoned that legal theory of recovery.
    Byrne instead relies solely upon article 6.02(a), contained within the part of
    the subcontract titled “Indemnification,” which states as follows:
    (a)  THE SUBCONTRACTOR AGREES TO DEFEND,
    INDEMNIFY AND HOLD HARMLESS THE CONTRACTOR, THE
    OWNER, AND ALL OF THEIR AGENTS AND EMPLOYEES (THE
    INDEMNIFIED PARTIES) FROM AND AGAINST ALL CLAIMS,
    DAMAGES, LOSSES AND EXPENSES, INCLUDING BUT NOT
    LIMITED TO (i) ATTORNEYS‟ FEES, (ii) BODILY INJURY,
    SICKNESS, DISEASE OR DEATH TO ANY PERSON OR
    EMPLOYEE, OR (iii) ANY INJURY TO PROPERTY, ARISING OUT
    OF,   RELATED      TO,   OR   CONNECTED    WITH,   THE
    PERFORMANCE, OR FAILURE IN PERFORMANCE, OF THE
    13
    Article 7.02 provides that Seal Craft “warrants to [Kimco] and [Byrne] that
    all Subcontract Work shall be performed in a good and workmanlike manner and
    shall be free from any and all defects due to faulty workmanship and/or materials
    and shall comply with all requirements of the Contract Documents.”
    11
    SUBCONTRACT WORK UNDER THIS AGREEMENT, EVEN IF
    SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS CAUSED IN
    WHOLE OR IN PART BY A NEGLIGENT ACT OR OMISSION BY
    AN INDEMNIFIED PARTY. THE EXPRESSED INTENTION OF
    THE PARTIES IS THAT THE SUBCONTRACTOR‟S INDEMNITY
    HEREIN WILL SURVIVE THE TERMINATION OF THIS
    AGREEMENT AND WILL INDEMNIFY AND PROTECT THE
    INDEMNIFIED PARTIES FROM THE CONSEQUENCES OF THEIR
    OWN NEGLIGENCE.
    Byrne argues that there is no evidence to support the jury‟s finding that Seal
    Craft did not fail to comply with its indemnity obligation because Appellees
    “presented no evidence at trial regarding Seal Craft‟s indemnity obligation (or
    breach thereof) under paragraph 6.02 of the Subcontract. None of the three
    witnesses presented by Defendants were asked about (or testified about) Seal
    Craft‟s indemnity obligation under ¶ 6.02(a) of the Subcontract.”        Byrne then
    argues, as it must to prevail, that not only is there no evidence to support the
    jury‟s “No” answer, but that it conclusively established each element of its
    “breach of contract/indemnity agreement cause of action” against Seal Craft.
    The first prong of Byrne‟s argument is unpersuasive; we therefore need not reach
    the second prong.     See Dow Chem. 
    Co., 46 S.W.3d at 241
    (reasoning that
    appellate court reviews all the evidence to determine whether the contrary
    proposition is established as a matter of law only if there is no evidence to
    support the challenged finding).
    Byrne had the burden to prove that Seal Craft breached its indemnity
    obligation, and our initial task of reviewing the record for evidence that supports
    the jury‟s finding that Seal Craft did not fail to comply with that obligation is not
    12
    limited to evidence involving Seal Craft‟s specific questioning of one or more of
    its witnesses about the indemnity obligation. As we explain, the jury could have
    based its finding that Seal Craft did not fail to comply with its obligation to
    indemnify Byrne for all losses and expenses arising out of, related to, or
    connected with Seal Craft‟s performance under the subcontract on evidence that
    when Byrne demanded in April 2008 that Seal Craft honor its warranty and
    perform CDC‟s first option, Seal Craft no longer bore any contractual obligation,
    including that of indemnity, to Byrne.14
    The evidence demonstrates that in November 2004, Byrne and Seal Craft
    entered into the subcontract for Seal Craft to manufacture and install the
    windows at Montgomery Plaza.         Seal Craft began installing the windows in
    January 2005 and completed installing them in November of the same year.
    Testing during the installation process revealed several leaks, but Seal Craft
    repaired them. Charles Still, Seal Craft‟s fenestration specialist, testified that
    Seal Craft‟s windows were built and installed according to the plans approved by
    both Byrne and Hodges, the architect.
    Seal Craft demobilized from the job site in November 2005 and submitted
    an application for payment and closeout documents to Byrne, including a one-
    year warranty that commenced on December 15, 2005. VanNess testified that
    the application for payment showed “that we‟re complete, and the only thing that
    14
    We therefore need not address Seal Craft‟s alternative argument that the
    subcontract does not permit inter-party indemnity.
    13
    we‟re owed is a retainage.” He also confirmed that Byrne never rejected the one-
    year warranty. Byrne paid Seal Craft the remainder of its subcontract balance
    but withheld the retainage.
    As for Byrne‟s contract with Kimco, which was incorporated into the terms
    of Byrne‟s subcontract with Seal Craft, Hodges executed a certificate of
    substantial completion dated February 1, 2006.         When asked about the
    significance of an owner or architect certifying that a project is substantially
    complete, Still explained, “[I]t means that just a small remaining punch list may
    be needing attention, but the architect and owner realize that the basic
    construction is there, and they approve it, and they sign off on it.” Byrne‟s one-
    year warranty to Kimco for the work performed under their general contract,
    excluding those items included on the punch lists attached to the certificate of
    substantial completion, which did not include any window leaks, began on
    February 1, 2006. VanNess testified that he did not receive a punch list from
    Byrne.
    In late January or early February 2006, Byrne noticed moisture in
    Montgomery Plaza and hired CDC to investigate. In line with CDC‟s second
    remedial option, Seal Craft wet-sealed every window at Montgomery Plaza over
    the course of five months. Seal Craft unambiguously notified Byrne that it was
    performing warranty work. Byrne spot-tested a percentage of the windows and
    discovered several glazing leaks, which Seal Craft repaired, and Byrne and Seal
    Craft left the job site in August 2006. According to VanNess, Montgomery Plaza
    14
    was weathertight when Seal Craft and Byrne left in August 2006.                Indeed,
    VanNess testified that at a closeout meeting held on August 16, 2006, “[w]e all
    congratulated ourselves for doing what was necessary to dry the building in.”
    Seal Craft issued another warranty, this one a three-year warranty, effective as of
    August 11, 2006, but Byrne‟s project manager Scott Salyer explained that Byrne
    never accepted that warranty and that it was provided by Seal Craft to Kimco and
    Hodges.
    The one-year warranty that Seal Craft issued to Byrne expired on
    December 14, 2006, and Byrne‟s one-year warranty under its general contract
    with Kimco expired on January 31, 2007. In May 2007, Byrne paid Seal Craft the
    remainder of its retainage and Byrne received the final payment under its
    contract with Kimco.
    For over a year, between August 2006 and October 2007, Montgomery
    Plaza sat empty. It was not until sometime around October 2007, when Byrne
    secured a contract with OMP, that Byrne returned to the site to begin work under
    that different contract. In fact, Salyer agreed that upon completion of Byrne‟s
    contract with Kimco, Byrne had no idea whether it would be awarded the contract
    to finish out the interior of Montgomery Plaza. He also testified,
    Q.    So in this contract [Byrne‟s contract with OMP], it‟s a
    different owner from -- from the exterior contract, correct?
    A.    That is correct.
    Q.    There‟s a different architect from the exterior contract?
    A.    That is correct
    15
    Q.     There is a different contract from the exterior contract?
    A.     That is correct.
    Q.    There are different plans, and there are different
    specifications?
    A.     Yes, sir, there are different contract documents.
    Byrne contends that Seal Craft could not have completed its obligations
    under the subcontract because Seal Craft‟s work was required to be “free from
    any and all defects due to faulty workmanship and/or materials,” and the
    evidence is undisputed that Byrne found leaks in the windows after it began
    working on the OMP contract.           Byrne also directs us to the part of the
    subcontract which provides that Seal Craft‟s acceptance of final payment “SHALL
    IN NO WAY RELIEVE THE SUBCONTRACTOR OF LIABILITY FOR THE
    OBLIGATIONS        FOR     REPLACING       FAULTY      OR    DEFECTIVE          WORK
    APPEARING AFTER FINAL PAYMENT.” Byrne‟s argument disregards evidence
    favorable to the jury‟s verdict.
    As alluded to above, the majority of the window assemblies installed by
    Seal Craft were rather large, and it took between three and four men to install
    them. VanNess suspected that twisting and torqueing that occurred during the
    transportation and installation of the large windows “played a big role in
    damaging [the] internal glazing seals.”        However, VanNess warned Byrne
    “several times” at meetings that they could expect to have some glazing leaks
    16
    and that he would address them when they manifested themselves, which he did
    every time.
    Still opined that there was nothing unusual about the fact that some of the
    windows experienced glazing leaks. He described the issue as “common” and
    recalled that in his experience, “[m]ost of the complaints that we received after
    windows were built, and shipped, and installed [involved] glazing leaks. The
    fragile nature of the frames to the glass can often break.” Still testified that the
    existence of glazing leaks does not mean that the windows were defectively
    designed, and he ultimately concluded that Seal Craft fully performed its scope of
    work under the subcontract and that all such work met the standards of
    performance set out in the subcontract.
    The jury also heard evidence that after Seal Craft had installed the
    windows, a subcontractor hired by Byrne cleaned the exterior of Montgomery
    Plaza using a “fire hose technique.”       Byrne disputed that the subcontractor
    pressure-washed the building but acknowledged that the hose “was similar to a
    small fire hose, but it was greater than a garden hose.” VanNess testified that he
    “would have had a real problem” if the windows were washed with a fire hose
    because “[t]hat‟s just too much pressure to put against a window, it might
    damage it.” The jury could have reasonably inferred from this evidence that the
    leaks of which Byrne later complained were not caused by Seal Craft‟s
    manufacture and installation of the windows.
    17
    Therefore, in light of this evidence, and contrary to Byrne‟s argument, the
    mere existence of glazing leaks in 2008 did not, in and of itself, foreclose the jury
    from concluding that Seal Craft had completed its obligations under the
    subcontract long before Byrne demanded performance in April 2008.
    Byrne also argues that Seal Craft, through VanNess, “continued to
    recognize its ongoing duty under the Subcontract to provide a non-defective
    „weather-tight‟ product.” It points to the following testimony in which VanNess
    explained his desire to repair the glazing leaks discovered by Byrne in 2008: “I
    felt like I owed -- I still felt a duty to provide a dry building for [Byrne]. I wanted to.
    It was a job I‟m very proud of. I wanted to see it all the way through to the end,
    and I wanted to address the individual leaks.” But as Seal Craft points out, this is
    evidence, if anything, of a personal obligation that VanNess felt he owed to
    Byrne, not a legal obligation.
    Byrne alternatively contends that Seal Craft extended its initial one-year
    warranty to a three-year warranty and that it had a continuing obligation to Byrne
    in that respect, but as mentioned already, Salyer confirmed that Seal Craft issued
    the three-year warranty for the benefit of Kimco and Hodges, not Byrne.
    Accordingly, the evidence viewed in the light most favorable to the verdict
    shows that Seal Craft no longer had a contractual duty to indemnify Byrne when
    Byrne demanded in April 2008 that Seal Craft perform CDC‟s first option; Seal
    Craft had fulfilled and completed its contractual obligation to manufacture and
    install the windows at Montgomery Plaza over two years earlier, and the one-
    18
    year warranty that Byrne issued to Kimco had expired over a year earlier.
    Because this evidence supports the jury‟s finding that Seal Craft did not fail to
    comply with the November 17, 2004 subcontract with Byrne, the trial court did not
    err by denying Byrne‟s motion to disregard jury question number 1 and motion for
    JNOV that Byrne recover judgment against Seal Craft. We overrule Byrne‟s
    second issue.
    C.    Jury Question Number 4—Gray’s Performance Bond Liability
    In its first issue, Byrne directs us to a part of the performance bond which
    provides that “in the event of a breach of the Subcontract on the part of the
    Principal [Seal Craft] (as determined in the sole discretion of the Contractor
    [Byrne]), the Surety [Gray] will” complete the subcontract work or reimburse
    Byrne for the work that Byrne performed to complete the subcontract. [Emphasis
    added.] Byrne argues that there is no evidence to support the jury‟s finding that
    Gray did not fail to comply with its performance bond and that the evidence
    conclusively established that Gray breached the performance bond because,
    relying on the above language from the performance bond, Byrne determined, in
    its sole discretion, that Seal Craft breached the subcontract and Gray denied
    Byrne‟s claim under the bond. Like the previous issue, the evidence supports the
    jury‟s “No” answer.
    The liability of the surety and the intent of the parties are generally
    determined by the language of the bond. Geters v. Eagle Ins. Co., 
    834 S.W.2d 49
    , 50 (Tex. 1992). Surety agreements are strictly construed, and sureties are
    19
    bound only by the precise terms of the contract they have secured. Vastine v.
    Bank of Dallas, 
    808 S.W.2d 463
    , 464 (Tex. 1991); New Amsterdam Cas. Co. v.
    Bettes, 
    407 S.W.2d 307
    , 315 (Tex. Civ. App.—Dallas 1966, writ ref‟d n.r.e.).
    The third full paragraph of the performance bond provides that it is “null
    and void” if Seal Craft
    (i) shall faithfully perform the Subcontract in every particular and
    without fraud, defalcation or delay; and (ii) shall satisfy all claims and
    demands related to the performance of the Subcontract, and
    (iii) shall fully indemnify and save harmless Contractor from all cost
    and damage which Contractor may suffer by reason of Principal‟s
    failure to faithfully perform the Subcontract in every particular and
    (iv) shall fully reimburse and repay the Contractor all costs and
    expenses which the Contractor may incur in making good any such
    default, and (v) shall pay all costs, expenses and attorney‟s fees
    which Contractor may incur in the defense of any suits arising out of
    the performance of the Subcontract or in the prosecution or defense
    of any suits arising out of the breach or default of Principal or Surety
    under the Subcontract or under this bond.
    The evidence demonstrates that Seal Craft manufactured and installed
    1,430 windows for 585 openings at Montgomery Plaza between January and
    November 2005; that Seal Craft performed five months‟ of warranty work in 2006;
    that both Byrne and Seal Craft demobilized from the job site in August 2006; that
    Byrne debited the costs that it claimed to have incurred during the warranty
    period—$93,052—from Seal Craft‟s retainage; that Byrne‟s warranty to Kimco
    expired in February 2007; and that Byrne did not incur any costs or fees during
    this time relating to any suits involving Seal Craft‟s work under the subcontract or
    Gray‟s performance bond obligation. This evidence and the evidence detailed
    above that Seal Craft had fulfilled and completed its obligations under the
    20
    November 17, 2004 subcontract before Byrne demanded that Seal Craft perform
    CDC‟s first option show that Gray‟s obligation under the performance bond was
    null and void by February 2007, and certainly by the time that Byrne made
    demand in July 2008 that Gray perform CDC‟s first option. Indeed, when Gray
    notified Byrne in August 2008 that it was denying Byrne‟s claim against the
    performance bond, Gray stated,
    The bond was given in connection with a subcontract for a
    project which Byrne undertook for Kimco Montgomery Plaza, L.P.
    That project has been closed out and complete for two years. Byrne
    was paid in full. The warranty under the original bonded subcontract
    has expired. The “warranty” claim which you now make is on a
    separate project for a different owner, a project on which Seal Craft
    has no subcontract and Gray has given no bond. It appears to Gray
    that you are trying to force Seal Craft to subsidize Byrne‟s current
    project.
    Byrne argues that any conclusion that the bond was null and void before
    Byrne demanded that Gray perform CDC‟s first option ignores and renders
    meaningless the performance bond‟s “sole discretion” language. Byrne‟s wrong.
    Gray‟s obligations under the performance bond were not perpetual; the bond is
    expressly null and void when the conditions set forth therein are met.          The
    relevant inquiry therefore is not whether Byrne determined, in its sole discretion,
    that Seal Craft breached the subcontract but when Byrne determined, in its sole
    discretion, that Seal Craft breached the subcontract. Byrne points to its July 22,
    2008 letter to Gray and says that there is no dispute that it determined, in its sole
    discretion, that Seal Craft was in breach of the subcontract.         By that time,
    however, Seal Craft had fulfilled and completed its obligations under the
    21
    subcontract, and Gray‟s obligations under the performance bond were null and
    void.    Thus, our analysis does not render the “sole discretion” language
    meaningless; under the evidence detailed above, the language is simply
    inapposite.
    The evidence viewed in the light most favorable to the verdict supports the
    jury‟s finding that Gray did not fail to comply with its performance bond.
    Accordingly, we hold that the trial court did not err by denying Byrne‟s motion to
    disregard jury question number 4 and motion for JNOV that Byrne recover
    judgment against Gray. We overrule Byrne‟s first issue.
    D.    Damages
    Byrne argues in its third issue that the trial court should have rendered a
    JNOV in its favor for damages because the evidence conclusively established
    the amount of Seal Craft‟s indemnity obligation and Gray‟s bond obligation. Jury
    question number 5, the damages question, was conditioned on “Yes” findings to
    jury question numbers 1 or 4. Having determined that the trial court did not err
    by denying Byrne‟s motion to disregard the jury‟s “No” answers to question
    numbers 1 and 4 and motion for JNOV that Byrne recover judgment against both
    Seal Craft and Gray, we hold that the trial court did not err by denying Byrne‟s
    motion for JNOV as to damages. We overrule Byrne‟s third issue.
    E.    Jury Question Number 6—Excessive Pre-suit Demand
    In its fifth issue, Byrne argues that the trial court erred by refusing to
    disregard the jury‟s “Yes” answer to question number 6, which asked whether
    22
    Byrne had made an excessive pre-suit demand on Seal Craft to remove and
    reinstall the exterior windows at Montgomery Plaza.
    Generally, a creditor who makes an excessive claim upon a debtor is not
    entitled to attorneys‟ fees for subsequent litigation required to recover the debt.
    Findlay v. Cave, 
    611 S.W.2d 57
    , 58 (Tex. 1981). A demand is not excessive
    simply because it is greater than the amount a jury later determines is actually
    due. Pratt v. Trinity Projects, Inc., 
    26 S.W.3d 767
    , 769 (Tex. App.—Beaumont
    2000, pet. denied). The dispositive question is whether the claimant acted
    unreasonably or in bad faith. 
    Id. Byrne‟s sole
    argument is that the jury‟s finding was immaterial because the
    excessive-demand doctrine “only applies when a party is seeking to recover
    attorney‟s fees under Chapter 38 of the Texas Civil Practice & Remedies Code,”
    and the indemnification clause in article 6.02 of the subcontract provided an
    express and independent basis upon which Byrne could recover its attorneys‟
    fees from Seal Craft.     Like Byrne‟s damages issue, jury question number 7,
    which asked about the amount of Byrne‟s reasonable and necessary attorneys‟
    fees, was conditioned on a “Yes” answer to question numbers 1 or 4. Having
    overruled Byrne‟s arguments challenging the jury‟s “No” answers to question
    numbers 1 and 4, there is no basis to support an award of attorneys‟ fees to
    Byrne, and we need not decide whether the excessive-demand doctrine is limited
    to an award of attorneys‟ fees under chapter 38. See Tex. R. App. P. 47.1. We
    overrule Byrne‟s fifth issue.
    23
    IV. FACTUAL SUFFICIENCY
    In its fourth issue, Byrne argues that the evidence is factually insufficient to
    support the jury‟s “No” answers to question numbers 1 and 4.
    When reviewing an assertion that the evidence is factually insufficient to
    support a finding, we set aside the finding only if, after considering and weighing
    all of the evidence in the record pertinent to that finding, we determine that the
    credible evidence supporting the finding is so weak, or so contrary to the
    overwhelming weight of all the evidence, that the answer should be set aside and
    a new trial ordered. Pool v. Ford Motor Co., 
    715 S.W.2d 629
    , 635 (Tex. 1986)
    (op. on reh‟g); Cain v. Bain, 
    709 S.W.2d 175
    , 176 (Tex. 1986); Garza v. Alviar,
    
    395 S.W.2d 821
    , 823 (Tex. 1965).
    Byrne submitted evidence that it entered into a subcontract with Seal Craft
    to install windows at Montgomery Plaza, that it performed its obligations under
    the subcontract, and that it incurred “losses and expenses” related to Seal Craft‟s
    manufacture and installation of the windows and attorneys‟ fees prosecuting its
    claims. However, as set out in detail above, there is also evidence that when
    Byrne demanded in April 2008 that Seal Craft honor its warranty and perform
    CDC‟s first option, Seal Craft no longer bore any contractual obligation to Byrne
    and that Gray‟s obligation under the performance bond was null and void when
    Byrne demanded in July 2008 that Gray perform CDC‟s first option. The jury was
    the sole judge of the credibility of the witnesses and the weight to be given to
    their testimony. See Golden Eagle Archery, Inc. v. Jackson, 
    116 S.W.3d 757
    ,
    24
    761 (Tex. 2003). Accordingly, considering all of the evidence, we hold that the
    jury‟s “No” answers to question numbers 1 and 4 are not contrary to the great
    weight and preponderance of the evidence.15 See Dow Chem. 
    Co., 46 S.W.3d at 242
    (reasoning that when the party with the burden of proof appeals from a
    failure to find, the party must show that the failure to find is against the great
    weight and preponderance of the evidence). We overrule Byrne‟s fourth issue.
    V. CONCLUSION
    Having overruled each of Byrne‟s issues, we affirm the trial court‟s
    judgment.
    BILL MEIER
    JUSTICE
    PANEL: GARDNER, MEIER, and GABRIEL, JJ.
    DELIVERED: August 22, 2013
    15
    See Gonzalez v. McAllen Med. Ctr., Inc., 
    195 S.W.3d 680
    , 681 (Tex.
    2006) (“[N]either the appellate rules nor this Court require detailed recitations of
    the evidence when a factual sufficiency complaint is overruled.”).
    25