Robert Goad, Shirley Goad, and Ashley Goad v. KHBM Partners III, Ltd., KHBM Partners II, Ltd., and Kendall Home Builders, Inc. ( 2021 )


Menu:
  •                                       In The
    Court of Appeals
    Ninth District of Texas at Beaumont
    __________________
    NO. 09-20-00020-CV
    __________________
    ROBERT GOAD, SHIRLEY GOAD, AND ASHLEY GOAD, Appellants
    V.
    KHBM PARTNERS III, LTD., KHBM PARTNERS II, LTD., AND
    KENDALL HOME BUILDERS, INC., Appellees
    __________________________________________________________________
    On Appeal from the 284th District Court
    Montgomery County, Texas
    Trial Cause No. 17-02-01454-CV
    __________________________________________________________________
    MEMORANDUM OPINION
    Appellants Robert Goad, Shirley Goad, and Ashley Goad (referred to
    collectively as “the Goads”) complain that the trial court erred in granting summary
    judgment to appellees, KHBM Partners III, Ltd., KHBM Partners II, Ltd., and
    Kendell Home Builders, Inc. (referred to collectively as “the Defendants”). We
    affirm the trial court’s judgments.
    1
    BACKGROUND
    In February 2017, the Goads filed suit against KHBM Partners III, Ltd.
    (“KHBM III”) and Indian Forest Homeowners Association, Inc. (“Indian Forest”),1
    alleging causes of action against KHBM III for public and private nuisance,
    negligence, and deviation or diversion of storm runoff and drain water in violation
    of 11.086 of the Texas Water Code. See Tex. Water Code Ann. § 11.086. Robert and
    Shirley Goad own a single-family residence on an improved three-acre tract of land
    in Montgomery County, Texas, and their daughter Ashley occupies a second
    residence located on the property. The Goads alleged that KHBM III operated Caddo
    Village subdivision, which is located to the northwest of the Goads’ property, and
    that KHBM III built and continues to build single-family residences in the
    subdivision along the south side of South Buffalo Circle. According to the Goads,
    KHBM III’s negligent design, elevation, and construction of homes on South
    Buffalo Circle has resulted in an increase of storm runoff onto and through the
    Goads’ property, resulting in severe overland flow erosion, loss of property use, and
    diminution of the Goads’ property value. The Goads alleged that KHBM III elevated
    building pads and lots with red clay fill material which resulted in a deviation of the
    usual flow of storm runoff onto the Goads’ property, and the Goads also alleged that
    1
    Indian Forest Homeowners Association, Inc. is not a party in this appeal.
    2
    KHBM III grated the lots in a manner that caused natural runoff to drain away from
    the drainage ditch along South Buffalo Circle and onto the Goads’ property.
    According to the Goads, KHBM III decreased the storm drainage area by
    removing a significant amount of timber, including timber on the Goads’ property,
    and KHBM III left a considerable amount of construction waste and debris along
    and within the Goads’ northwest property line. The Goads alleged that KHBM III’s
    actions have increased storm runoff and diverted or directed storm drainage onto the
    Goads’ property, causing the Goads to sustain severe damage to their homes,
    belongings, and real property. The Goads also alleged that their sustained losses and
    damages in the amount of $350,000 includes the diminished market value of their
    property because it is prone to flooding. The Goads further alleged that KHBM III’s
    development and construction of homes along South Buffalo Circle has created a
    private and public nuisance, causing incessant problems due to the flooding of the
    Goads’ property and residences since April/May 2015, rendering their home unfit
    for habitation, and substantially interfering with their use and enjoyment of their
    property.
    The record shows that the trial court entered a Discovery Control Plan in June
    2017, which set the Goads’ case for a jury trial in May 2018. In November 2017,
    KHBM III filed its Original Answer, asserting a general denial and indicating that
    3
    KHBM III is also known as Kendell Homes. In February 2018, the trial court entered
    an Amended Discovery Control Plan, setting the deadline for amended pleadings on
    October 12, 2018, and ordering the discovery period to end on November 16, 2018.
    In August 2018, the parties entered into a Rule 11 Agreement, extending the
    deadlines for amending pleadings and designation of experts. In September 2018,
    KHBM III filed a Motion for Leave to Designate Responsible Third-Party
    Montgomery County, Texas, for its responsibility in failing to maintain the drainage
    pipes and ditches in the area in question, and the trial court granted the motion. The
    trial court also granted Indian Forest’s Motions for Leave to Designate Responsible
    Third-Parties A.H. Curry & Son, Inc., a Texas Corporation; Powers Engineering;
    and M.C.C.R., a Texas Partnership. According to Indian Forest, A.H. Curry & Son
    and M.C.C.R. were responsible for the design, installation, construction, and
    development of the subdivision’s drainage system, and Powers Engineering was
    responsible for designing the subdivision’s storm sewer drainage plan.
    In January 2019, the trial court granted Indian Forest’s Traditional Motion for
    Summary Judgment. In January 2019, the trial court entered an Amended Docket
    Control Order setting the trial in June 2019. On October 31, 2019, the Goads filed
    Plaintiff’s Motion For Leave To File Plaintiffs’ First Amended Original Petition due
    to KHBM III’s First Amended Responses to Requests for Disclosure filed on
    4
    October 11, 2019, which identified KHBM II and KHB as other corporate entities
    that should be named as necessary parties to the action. According to the Goads,
    KHBM III disclosed that KHBM II purchased lots 171-178 in the subdivision north
    and uphill from the Goads’ property, construction began on many of the homes in
    Fall 2014, KHBM II provided for the construction of the homes through KHB,
    KHBM II and KHB are proper defendants regarding any alleged construction defects
    relating to the homes, and KHBM II conveyed all the lots to KHBM III between
    March and April 2015. The trial court granted the Goads’ motion, and in November
    2019, the Goads filed Plaintiffs’ First Amended Original Petition, adding KHBM II
    and KHB as defendants and alleging causes of action for public and private nuisance,
    negligence, and deviation or diversion of storm runoff and drain water in violation
    of 11.086 of the Texas Water Code. KHBM II and KHB filed an Original Answer
    and pleaded the affirmative defense of statute of limitations and asserted that Ashley
    lacked standing.
    KHBM III filed a Traditional and No Evidence for Motion of Summary
    Judgment, arguing that all the Goads’ alleged claims involve actions by KHBM II
    and KHB, and that the Goads have no evidence that KHBM III committed any of
    the alleged causes of action because the Goads cannot show that KHBM III was
    involved with the construction, design, grading, or any other wrongful activity that
    5
    the Goads have alleged. According to KHBM III, KHBM II purchased the lots on
    South Buffalo Circle in July 2014, KHB obtained building permits for the lots in
    October 2014, and KHBM III did not conduct any business in 2014. KHBM III’s
    summary judgment evidence includes the Affidavit of Glenn Briggs, the Chief
    Financial Officer of the Defendants, July 2014 Deeds to KHBM II, August 2014
    Building Permits to KHB, and excerpts from Shirley’s oral deposition. KHBM III
    argued that since the Goads failed to show that KHBM III constructed the homes,
    the Goads cannot prove the essential elements of a private nuisance or that KHBM
    III owed the Goads a duty and breached that duty. KHBM III further argued that the
    Goads did not have common law or statutory standing to prove a public nuisance
    because they failed to prove that the general public suffered a harm caused by
    KHBM III or that the Goads suffered a different kind of harm from the general
    public. KHBM III also argued that the Goads cannot prove that it violated section
    11.086 of the Water Code, because section 11.086 requires that any damage that the
    Goads allegedly sustained must be the result of diffused surface water and not flood
    water or water from a defined course of channel. According to KHBM III, the
    evidence conclusively negates elements in each of the Goads’ causes of action. The
    trial court entered an Interlocutory Order granting KHBM III’s Traditional and No
    Evidence Motion for Summary Judgment.
    6
    KHBM II and KHB also filed a Traditional and No Evidence Motion for
    Summary Judgment and asserted that all the Goads’ causes of action, which accrued
    no later than May 2015, are barred by a two-year statute of limitations. According
    to KHBM II and KHB, the Goads originally filed suit against KBMH III in February
    2017 and alleged that their damages began to flow as early as Fall/Winter 2014 or
    before May 1, 2015, which is more than four years before the Goads filed suit against
    KHBM II and KHB. KHBM II and KHB argued that the Goads’ claims for a
    violation of the Water Code, negligence, and nuisance are all barred by limitations
    because they occurred between October 1, 2014, and May 1, 2015. KHBM II and
    KHB further argued that they exclusively established the affirmative defense of
    statute of limitations as to all the Goads’ claims, and the evidence conclusively
    negates one or more essential elements of the Goads’ nuisance and Water Code
    claims. According to KHBM II and KHB, the Goads did not have common-law or
    statutory standing to prove a public nuisance, and the Goads could not prove a
    violation under 11.086 of the Water Code because the alleged damages were the
    result of flood water that overflowed out of a ditch that was constructed and owned
    by Montgomery County. KHBM II and KHB argued that the State of Texas has the
    ownership and non-delegable duty to control flood water and that the Goads cannot
    bring a claim under section 11.086 against any of the Defendants. KHBM II’s and
    7
    KHB’s summary judgment evidence includes Briggs’s affidavit, July 2014 Deeds to
    KHBM II, 2014 Building Permits to KHB, and excerpts from Ashley’s and Robert’s
    oral depositions.
    In their response to KHBM II’s and KHB’s Amended Motion for No Evidence
    and Traditional Summary Judgment, the Goads argued that the motion should be
    denied because the statements in the motion constitute conclusions and are
    nonspecific in challenging the Goads’ claims. The Goads also argued that the
    discovery rule delays accrual of the cause of actions against responsible but
    unknown defendants until the plaintiff knew or in the exercise of reasonable
    diligence should have known of the party committing the wrongful conduct.
    According to the Goads, KHBM III did not disclose that KHBM II and KHB were
    the parties responsible for the development of the lots on South Buffalo Circle until
    October 2019. The Goads contend that KHBM III should have known that KHBM
    II and KHB were responsible parties sooner because David Wickens and Kenneth
    Wickens manage and own all the Defendants. The Goads also argued that the
    deviation or diversion of storm runoff water created by KHBM II and KHB violates
    section 11.086 of the Water Code because it is only surface water flowing from
    Caddo Village onto their property. The Goads maintained that their summary
    judgment evidence, including the affidavits of Shirley and Ronald Saikowski, the
    8
    excerpts of Shirley’s deposition, the Google Earth aerial photograph of Caddo
    Village and the Goads’ property, raises a fact issue on the challenged elements
    because a material fact exists concerning whether KHBM II and KHB are
    responsible for the Goads’ loss.
    The Goads also filed a response to KHBM III’s Amended Motion for No
    Evidence and Traditional Summary Judgment. The Goads argued that in October
    2019, counsel for KHBM III sent an email to the Goads’ counsel disclosing that
    KHBM II and KHB were responsible for the development of the lots and residences
    on South Buffalo Circle. According to the Goads, Briggs is the Chief Financial
    Officer of the Defendants, and in his affidavit, Briggs does not conclusively state
    when the construction of the homes on Lots 171-178 began or when it was
    completed. The Goads argued that their summary judgment evidence, which shows
    that KHBM III owned lots on South Buffalo Circle where the homes were
    constructed, raises a fact issue concerning whether KHBM III is responsible for the
    Goads’ loss.
    KHBM II and KHB filed a reply to the Goads’ response and argued that the
    discovery rule does not apply and that the Goads failed to cite a case showing that a
    plaintiff can evade limitations when they learn of actions and damages, file suit, fail
    to send Request for Disclosures for over two years, and then discover that a search
    9
    of public records shows that two relevant entities are the only entities connected to
    the land during all relevant acts. KHBM II and KHB argued that they were not
    “unknown” defendants because the exercise of any diligence would have discovered
    their existence. KHBM II and KHB further argued that the Goads failed to prove
    that their damages resulted from surface water.
    The trial court granted KHBM III’s Traditional and No Evidence Motion for
    Summary Judgment. The trial court also granted KHBM II’s and KHB’s Traditional
    and No Evidence Motion for Summary Judgment. The Goads appealed.
    ANALYSIS
    In their sole issue, the Goads argue that the trial court erred in granting the
    Defendants’ Traditional and No Evidence Motions for Summary Judgment. We
    review rulings on motions for summary judgment using a de novo standard. See
    Provident Life & Accident Ins. Co. v. Knott, 
    128 S.W.3d 211
    , 215 (Tex. 2003). The
    trial court’s orders granting summary judgment do not specify the basis for the
    ruling; thus, we must affirm the trial court’s judgment if any of the theories advanced
    are meritorious. Western Invs., Inc. v. Urena, 
    162 S.W.3d 547
    , 550 (Tex. 2005).
    In resolving the Goads’ issues, we must consider the ruling on the no-evidence
    part of the Defendants’ hybrid motions for summary judgment before considering
    the ruling on the traditional portion of the Defendants’ motion. See Ford Motor Co.
    10
    v. Ridgway, 
    135 S.W.3d 598
    , 600 (Tex. 2004). In reviewing a no-evidence motion,
    we must view the evidence in the light most favorable to the non-movant. 
    Id. at 601
    .
    The Texas Supreme Court has explained that the trial court must grant a no-evidence
    motion if (1) there is a complete absence of evidence of a vital fact, (2) the court is
    barred by rules of law or of evidence from giving weight to the only evidence offered
    to prove a vital fact, (3) the evidence offered to prove a vital fact is no more than a
    mere scintilla, or (4) the evidence conclusively established the opposite of the vital
    fact. King Ranch, Inc. v. Chapman, 
    118 S.W.3d 742
    , 751 (Tex. 2003). Because a
    trial court’s decision granting a no-evidence motion for summary judgment is
    essentially a pretrial directed verdict, the same legal sufficiency standard is used in
    reviewing rulings made by trial courts on motions for directed verdicts. 
    Id. at 750
    -
    51. “A genuine issue of material fact exists if more than a scintilla of evidence
    establishing the existence of the challenged element is produced.” Ridgway, 135
    S.W.3d at 600. “When the evidence offered to prove a vital fact is so weak as to do
    no more than create a mere surmise or suspicion of its existence, the evidence is no
    more than a scintilla and, in legal effect, is no evidence.” Kindred v. Con/Chem, Inc.,
    
    650 S.W.2d 61
    , 63 (Tex. 1983).
    “If the non-movant fails to meet its burden under the no-evidence motion,
    there is no need to address the challenge to the traditional motion as it necessarily
    11
    fails.” First United Pentecostal Church of Beaumont, d/b/a The Anchor of Beaumont
    v. Parker, 
    514 S.W.3d 214
    , 219 (Tex. 2017). A party moving for traditional
    summary judgment meets its burden by proving that there is no genuine issue of
    material fact and it is entitled to judgment as a matter of law. Tex. R. Civ. P. 166a(c).
    The party asserting an affirmative defense has the burden of pleading and
    proving the defense as a matter of law such that there is no genuine issue of material
    fact. Montgomery v. Kennedy, 
    669 S.W.2d 309
    , 310-11 (Tex. 1984); see also Tex.
    R. Civ. P. 94. A defendant is entitled to summary judgment on the affirmative
    defense of limitations if it conclusively establishes all necessary elements of that
    affirmative defense. Velsicol Chem. Corp. v. Winograd, 
    956 S.W.2d 529
    , 530 (Tex.
    1997); Thomas v. Omar Invs., Inc., 
    129 S.W.3d 290
    , 293 (Tex. App.—Dallas 2004,
    no pet.). Summary judgment will be affirmed only if the record shows that the
    defendant conclusively proved all elements of the affirmative defense as a matter of
    law. Thomas, 
    129 S.W.3d at 293
    .
    APPLICABLE LAW
    To prevail on a negligence claim, a plaintiff must prove three elements: (1)
    legal duty owed by one person to another; (2) breach of that duty, and (3) damages
    proximately caused by the breach. Kroger Co. v. Elwood, 
    197 S.W.3d 793
    , 794 (Tex.
    2006); D. Houston, Inc. v. Love, 
    92 S.W.3d 450
    , 454 (Tex. 2002). “The threshold
    12
    inquiry in a negligence case is whether the defendant owes a legal duty to the
    plaintiff.” Centeq Realty, Inc. v. Siegler, 
    899 S.W.2d 195
    , 197 (Tex. 1995). To
    establish liability in tort, the plaintiff must establish the existence and the violation
    of a duty that the defendant owes the plaintiff. 
    Id.
     Whether a legal duty exists is a
    question of law for the court to decide based on the particular facts surrounding the
    occurrence in question. Alcoa, Inc. v. Behringer, 
    235 S.W.3d 456
    , 459-60 (Tex.
    App.—Dallas 2007, pet. denied).
    To be entitled to summary judgment on a public nuisance claim, the plaintiff
    must prove the existence of a public nuisance, which is “a condition that amounts to
    ‘an unreasonable interference with a right common to the general public.’” Tex.
    Cent. Partners, LLC v. Grimes Cty., 
    580 S.W.3d 824
    , 827 (Tex. App.—Houston
    [14th Dist.] 2019, no pet.) (quoting Jamail v. Stoneledge Condo. Owners Ass’n, 
    970 S.W.2d 673
    , 676 (Tex. App.—Austin 1998, no pet.)). A private person may not
    maintain an action based on public nuisance without showing that a “special injury”
    resulted from the nuisance. Jamail, 970 S.W.2d at 676. The difference between a
    public and private nuisance is that a public nuisance affects the public at large, while
    a private nuisance is a non-trespassory invasion of another’s interest in the private
    use and enjoyment of land. Walker v. Tex. Elec. Serv. Co., 
    499 S.W.2d 20
    , 27 (Tex.
    13
    Civ. App.—Fort Worth 1973, no writ); Kane v. Cameron Int’l Corp., 
    331 S.W.3d 145
    , 147 (Tex. App.—Houston [14th Dist.] 2011, no pet.).
    “A ‘nuisance’ is a condition that substantially interferes with the use and
    enjoyment of land by causing unreasonable discomfort or annoyance to persons of
    ordinary sensibilities attempting to use and enjoy it.” Holubec v. Brandenberger,
    
    111 S.W.3d 32
    , 37 (Tex. 2003). A nuisance arises when a defendant causes (1)
    physical harm to property, such as by the encroachment of a damaging substance or
    by the property’s destruction, (2) physical harm to a person or his property from an
    assault on his senses or by other personal injury, and (3) emotional harm to a person
    from the deprivation of the enjoyment of his property through fear, apprehension, or
    loss of peace of mind. Salazar v. Sanders, 
    440 S.W.3d 863
    , 870 (Tex. App.—El Paso
    2013, pet. denied); Aguilar v. Trujillo, 
    162 S.W.3d 839
    , 850 (Tex. App.—El Paso
    2005, pet. denied). To have an actionable nuisance, a defendant must engage in one
    of three kinds of activity: (1) intentional invasion of another’s interests; (2) negligent
    invasion of another’s interests; or (3) other conduct that is culpable because it is
    abnormal and out of place in its surroundings, and that invades another’s interests.
    Aguilar, 
    162 S.W.3d at 850-51
    . To prevail on a nuisance claim grounded in
    negligence, the plaintiff must allege and prove a legal duty owed to the plaintiff, a
    14
    breach of that duty, and damage proximately resulting from that breach. Crosstex N.
    Tex. Pipeline, L.P. v. Gardiner, 
    505 S.W.3d 580
    , 607 (Tex. 2016).
    To prove statutory liability under section 11.086 of the Texas Water Code, the
    plaintiff must show that a person diverted or impounded the natural flow of “surface
    water” in a manner that damaged the property of another by the overflow of the
    water diverted or impounded. See Tex. Water Code Ann. § 11.086(a). “Surface
    water,” as used in section 11.086, means “diffused surface water, i.e., water ‘which
    is diffused over the ground from falling rains or melting snows, and [it] continues to
    be such until it reaches some bed or channel in which water is accustomed to flow.’”
    See id.; Dietrich v. Goodman, 
    123 S.W.3d 413
    , 419 (Tex. App.—Houston [14th
    Dist.] 2003, no pet.) (citations omitted). The chief characteristic of “surface water”
    is that it does not follow a defined course or channel and does not gather into or form
    a natural body of water. 
    Id.
     (citations omitted). Thus, when rainwater is under control
    by a ditch or pipe, it no longer qualifies as surface water. Id.; Dalon v. City of DeSoto,
    
    852 S.W.2d 530
    , 538 (Tex. App.—Dallas 1992, writ denied).
    KHBM III’s Motion for Summary Judgment
    KHBM III argued that the Goads failed to prove the essential elements of their
    four alleged causes of action. Regarding the Goads’ negligence claim, KHBM III
    argued that the Goads have no evidence that it constructed the homes or was
    15
    responsible for any of the alleged wrongful activity, and without such evidence, the
    Goads have no evidence of duty, breach of duty, or causation. The Goads argued
    that their damages occurred due to KHBM III’s negligent conduct, included grading,
    elevating, designing, and constructing the residences along South Buffalo Circle.
    The Goads further argued that their summary-judgment evidence, which shows that
    KHBM III owned Lots 171-178 on South Buffalo Circle where the homes were
    constructed, raises a fact issue concerning whether KHBM III is responsible for their
    loss. In support of their contention that KHBM III had input in the construction of
    the residences on Lots 171-178, the Goads point out that Briggs’ affidavit does not
    conclusively state when the construction of the homes began or when it was
    completed.
    To prevail on a negligence claim, the Goads must prove that KHBM III owed
    them a legal duty, breached that duty, and that their damages were proximately
    caused by the breach. See Kroger, 197 S.W.3d at 794. After reviewing the Goads’
    summary-judgment evidence, we have found no evidence that KHBM III owed the
    Goads any legal duty because there is no evidence that KHBM III graded or elevated
    Lots 171-178 or designed or constructed the homes on Lots 171-178. Neither
    Shirley’s affidavit nor the affidavit of Ronald Saikowski, a professional engineer,
    shows that KHBM III performed any of the alleged wrongful activity on Lots 171-
    16
    178. Additionally, the printouts from the Montgomery County Appraisal District
    showing that KHBM III bought the homes on Lots 171-178 in 2015, does not raise
    a genuine issue of material fact regarding KHBM’s involvement in any of the alleged
    wrongful activity on Lots 171-178.
    Moreover, the uncontroverted evidence submitted in the form of the affidavit
    of Briggs, indicates that KHB obtained building permits on Lots 171-178 in October
    2014 and began building homes on the lots on behalf of KHBM II, KHBM III bought
    the lots and homes in Spring 2015, and KHBM III was not involved in any of the
    activities or construction defects the Goads allege. In the absence of evidence
    controverting Briggs’ affidavit and creating a fact issue on whether KHBM III
    performed any of the alleged wrongful activity, we conclude that the trial court did
    not err in granting summary judgment in KHDM III’s favor on the Goads’
    negligence claim because the Goads failed to produce more than a scintilla of
    evidence establishing the existence of a legal duty. See Kroger, 197 S.W.3d at 794;
    Kindred, 650 S.W.2d at 63.
    Concerning the Goads’ nuisance claims, the Goads argued that their nuisance
    claims were based on KHBM III’s development and construction of homes along
    South Buffalo Circle. KHBM III argued that the Goads failed to prove a private
    nuisance because there is no evidence that KHBM III owned lots 171 through 178
    17
    when KHB constructed the homes or that KHBM III was involved with the
    construction, design, grading, elevation, development, or any other alleged wrongful
    activity concerning the lots. According to KHBM III, there is no evidence that it
    engaged in any activity that constitutes a public nuisance, performed any of the
    alleged wrongful activities, or caused the Goads to suffer some special harm that is
    different from the general public. To have an actionable nuisance, the Goads had to
    prove that KHBM III engaged in conduct that caused a condition that substantially
    interfered with the Goads’ use and enjoyment of their land. See Gardiner, 505
    S.W.3d at 606. Having already concluded that there is no evidence that KHBM III
    engaged in any of the alleged wrongful conduct, we conclude that the trial court did
    not err in granting summary judgment in KHDM III’s favor on the Goads’ nuisance
    claims. See Kroger, 197 S.W.3d at 794; Kindred, 650 S.W.2d at 63.
    Lastly, regarding the Goads’ claim that KHBM III violated section 11.086 of
    the Texas Water Code, KHBM III argued that the Goads failed to satisfy their burden
    of proof to bring forth any evidence showing that their alleged damages was the
    result of diffused surface water and not flood water or water from a defined course
    or channel. KHBM III further argued that the Goads have no evidence that KHBM
    III constructed or filled in any ditch, swale, gully, or creek. The Goads argued that
    they are not required to prove that “any drop of rain that came upon their property
    18
    as surface water after falling on the roofs and backyards of the South Buffalo Circle
    homes does not constitute flood water.”
    To prove statutory liability under section 11.086 of the Texas Water Code, the
    Goad had to show that KHBM III diverted or impounded the natural flow of surface
    water in a manner that damaged the Goads’ property by the overflow of the water
    diverted or impounded. See Tex. Water Code Ann. § 11.086(a). Based on our review
    of the Goads’ summary-judgment evidence, we have found no evidence that KHBM
    III engaged in any of the alleged activity that the Goads contend diverted or
    impounded the natural flow of surface water. We conclude that the trial court did not
    err in granting summary judgment in KHBM III’s favor on the Goads’ Water Code
    claim. Since we have concluded that the trial court did not err in granting the KHBM
    III’s no-evidence motion for summary judgment on all of the Goads’ claims, we
    need not address the Goads’ arguments regarding the traditional summary-judgment
    grounds. See Tex. R. App. P. 47.1.
    KHBM II’s and KHB’s Motion for Summary Judgment
    KHBM II and KHB argued that all of the Goads’ claims are governed by a
    two-year statute of limitations; the Goad’s causes of action accrued no later than
    February 2015; the Goads’ lawsuit filed in November 2017 against KHBM III
    includes the same facts, damages, and causes of action that the Goads allege against
    19
    KHBM II and KHB; and the Goads’ lawsuit filed in November 2019 is barred by as
    a matter of law on limitations grounds. See Tex. Civ. Prac. & Rem. Code Ann. §
    16.003(a); Schneider Nat’l Carriers, Inc. v. Bates, 
    147 S.W.3d 264
    , 270 (Tex. 2004);
    Graham v. Pirkey, 
    212 S.W.3d 507
    , 512-13 (Tex. App.—Austin 2006, no pet.);
    Sanders v. Constr. Equity, Inc., 
    42 S.W.3d 364
    , 368 (Tex. App.—Beaumont 2001,
    pet. denied). The Goads argued that the discovery rule delays the accrual of the cause
    of action because they did not know that KHBM II and KHB were the responsible
    parties until KHBM III disclosed the appropriate defendants in 2019.
    Defendants moving for summary judgment on the affirmative defense of
    limitations has the burden to conclusively establish the defense. KPMG Peat
    Marwick v. Harrison Cty. Hous. Fin. Corp., 
    988 S.W.2d 746
    , 748 (Tex. 1999); see
    Tex. R. Civ. P. 166a(c). To be entitled to summary judgment, the defendants must
    (1) conclusively prove when the cause of action accrued, and (2) negate the
    discovery rule, if it applies and has been pleaded or otherwise raised, by proving as
    a matter of law that there is no genuine issue of material fact about when the plaintiff
    discovered, or in the exercise of reasonable diligence should have discovered the
    nature of its injury. KPMG Peat Marwick, 988 S.W.2d at 748. Limitations begins to
    run when the cause of action accrues. See Trunkhill Capital, Inc. v. Jansma, 
    905 S.W.2d 464
    , 467 (Tex. App.—Waco 1995, writ denied). The discovery rule is an
    20
    exception to this rule of accrual. Sanders, 
    42 S.W.3d at 368
    . In cases in which the
    discovery rule applies, the cause of action does not accrue, and the limitations period
    does not begin to run until the plaintiff knows, or exercising reasonable diligence,
    should know of the facts giving rise to a cause of action. See HECI Expl. Co. v. Neel,
    
    982 S.W.2d 881
    , 886 (Tex. 1998).
    However, a party must plead the discovery rule before it has applicability. See
    Rhone–Poulenc, Inc. v. Steel, 
    997 S.W.2d 217
    , 223 (Tex. 1999); see also Hall v.
    Stephenson, 
    919 S.W.2d 454
    , 468 (Tex. App.—Fort Worth 1996, writ denied). The
    Goads did not assert the discovery rule in Plaintiffs’ First Amended Original
    Petition. The Goads first raise the discovery rule in their Response to KHBM II’s
    and KHB’s Amended Motion to for No-Evidence and Traditional Summary
    Judgment, in which KHBM II and KHB argued that all of the Goads’ claims were
    barred by limitations. In the reply on Summary Judgment, KHBM II and KHB
    argued that the Goads have a duty to plead the discovery rule and that the Goads
    seek to avoid defeat by “applying the unpled and unproven discovery rule
    exception.”
    The summary-judgment evidence shows that the Goads filed claims against
    KHBM II and KHB in November 2019, more than two years after the Goads filed
    suit against KHBM III in which they alleged the same cause of actions and that their
    21
    damages due to flooding began in April/ May 2015. We conclude that KHBM II and
    KHB established as a matter of law that the Goads’ claims accrued no later than May
    2015. We further conclude that because the Goads first brought suit against KHBM
    II and KHB in November 2019, their claims for negligence, nuisance, and violation
    of the Water Code are barred by the two-year statute of limitations. See Tex. Civ.
    Prac. & Rem. Code Ann. § 16.003(a); Bates, 147 S.W.3d at 270; Graham, 
    212 S.W.3d at 512-13
    ; Sanders, 
    42 S.W.3d at 368
    . Accordingly, since KHBM II and
    KHB established the affirmative defense of limitations by conclusively showing that
    the Goads’ causes of action accrued more than two years before the Goads filed suit
    and that the discovery rule does not apply because the Goads did not properly plead
    the discovery rule, the trial court did not err in granting summary judgment in
    KHBM II’s and KHB’s favor on all the Goads’ claims. See Steel, 997 S.W.2d at 223;
    KPMG Peat Marwick, 988 S.W.2d at 748. We overrule the Goads’ sole issue and
    affirm the trial court’s orders granting summary judgment in favor of the
    Defendants.
    AFFIRMED.
    _________________________
    W. SCOTT GOLEMON
    Chief Justice
    Submitted on April 30, 2021
    Opinion Delivered October 7, 2021
    Before Golemon, C.J., Horton and Johnson, JJ.
    22