  •                                  NO. 12-20-00207-CV
    IN THE COURT OF APPEALS
    TWELFTH COURT OF APPEALS DISTRICT
    TYLER, TEXAS
    MARK BENTON, INDIVIDUALLY                       §      APPEAL FROM THE 159TH
    AND D/B/A MEBCO CONTRACTING,
    APPELLANT
    §      JUDICIAL DISTRICT COURT
    V.
    CONTRACTOR’S SUPPLIES, INC.,                    §      ANGELINA COUNTY, TEXAS
    APPELLEE
    MEMORANDUM OPINION
    Mark Benton, individually and D/B/A MEBCO Contracting appeals the trial court’s order
    granting summary judgment in favor of Contractor’s Supplies, Inc. In what we construe as two
    issues, Benton argues that the trial court erred in granting summary judgment in favor of
    Contractor’s because he argues material issues of fact remain with respect to Contractor’s breach
    of contract claim and Benton’s affirmative defenses. We affirm.
    BACKGROUND
    This case arises from a dispute between a subcontractor and a materials supplier over
    payment for concrete and other materials used in the construction of the Pinnacle Senior Living
    of Lufkin, an assisted living facility located in Lufkin, Texas. The facility is licensed as an
    assisted living community with roughly eighty beds and sixty thousand square feet of indoor
    space.
    Benton is a self-employed contractor who works in the concrete business. He was
    awarded a bid by the general contractor, Regent Construction, to furnish concrete work and
    framing on the Pinnacle project. Benton entered into a detailed subcontractor agreement with
    Regent on August 1, 2017 to complete the concrete and framing work for $890,570.00.
    1
    Benton began work on the project in August 2017. Contractor’s sold premixed concrete,
    construction supplies and other materials to Benton for the Pinnacle project.               During
    construction, a dispute arose between Regent and Benton over problems and delays in the
    concrete work and framing on the project. Subsequently, Regent hired another contractor to
    complete the concrete work and framing and charged Benton for the new subcontractor’s work.
    Benton stopped work on the Pinnacle project in December 2017. Contractor’s provided Benton
    with $389,211.66 worth of construction materials and concrete from August to December.
    Benton paid Contractor’s $5,774.71 at the outset of the work, but thereafter ceased
    paying for the materials. In November and December of 2017, Regent directly paid Contractor’s
    $74,527.64 for the materials. In January 2018, Contractor’s filed statutory liens for materials
    supplied in October ($229,084.14), November ($54,715.00), and December ($3,307.79) in an
    attempt to collect the outstanding balance for the materials. However, the lien for the materials
    supplied in October 2017 was not timely filed. Additionally, the lien filed for the materials
    supplied in November excluded an invoice for $21,801.55. In May of 2018, Regent paid
    Contractor’s $58,023.62 to release the valid liens. Thereafter, Regent advised Contractor’s that
    all the funds for the concrete portion of the Pinnacle project had been expended.
    Contractor’s then filed suit against Benton for breach of contract and unjust enrichment
    to recover the remaining $250,889.69 it was owed for the materials. Benton answered and
    asserted multiple defenses including modification, estoppel/quasi-estoppel, accord and
    satisfaction/novation, and failure to mitigate damages.
    Subsequently, Contractor’s filed a traditional motion for summary judgment and no-
    evidence motion for summary judgment with respect to Benton’s affirmative defenses. The trial
    court granted the motion for summary judgment and signed a final judgment awarding damages
    and attorney’s fees to Contractor’s. This appeal followed.
    SUMMARY JUDGMENT
    In his first issue, Benton argues that the trial court erred in granting summary judgment in
    favor of Contractor’s because Contractor’s did not carry its burden to establish entitlement to
    summary judgment as a matter of law, as it failed to prove the existence of a valid contract.
    2
    In his second issue, Benton argues that the trial court erred in granting summary
    judgment in favor of Contractor’s because the record establishes disputed issues of fact with
    respect to Benton’s affirmative defenses.
    Standard of Review and Applicable Law
    In a traditional motion for summary judgment, if the movant’s motion and summary-
    judgment evidence facially establish its right to judgment as a matter of law, the burden shifts to
    the nonmovant to raise a genuine, material fact issue sufficient to defeat summary judgment.
    M.D. Anderson Hosp. & Tumor Inst. v. Willrich, 
    28 S.W.3d 22
    , 23 (Tex. 2000). In reviewing a
    no-evidence summary judgment, we ascertain whether the nonmovant pointed out summary-
    judgment evidence raising a genuine issue of fact as to the essential elements attacked in the no-
    evidence motion. Johnson v. Brewer & Pritchard, P.C., 
    73 S.W.3d 193
    , 206–08 (Tex. 2002).
    In our de novo review of a trial court’s summary judgment, we consider all the evidence in the
    light most favorable to the nonmovant, crediting evidence favorable to the nonmovant if
    reasonable jurors could, and disregarding contrary evidence unless reasonable jurors could not.
    Mack Trucks, Inc. v. Tamez, 
    206 S.W.3d 572
    , 582 (Tex. 2006). The evidence raises a genuine
    issue of fact if reasonable and fair-minded jurors could differ in their conclusions in light of all
    of the summary-judgment evidence. Goodyear Tire & Rubber Co. v. Mayes, 
    236 S.W.3d 754
    ,
    755 (Tex. 2007). When a trial court’s order granting summary judgment does not specify the
    ground or grounds relied on for the ruling, summary judgment will be affirmed on appeal if any
    of the theories advanced are meritorious. State Farm Fire & Cas. Co. v. S.S., 
    858 S.W.2d 374
    ,
    380 (Tex. 1993).
    In a no evidence summary judgment context, if the non-movant failed to produce more
    than a scintilla of evidence under the standards of Rule 166a(i), then there is no need to analyze
    whether the movant’s summary-judgment proof satisfied the less stringent burden set forth for
    traditional summary judgment under Rule 166a(c). TEX. R. CIV. P. 166a(c) & (d); E. Hill
    Marine, Inc. v. Rinker Boat Co., 
    229 S.W.3d 813
    , 816 (Tex. App.—Fort Worth 2007, pet.
    denied). That is why, typically, when a party files a hybrid summary-judgment motion on both
    no-evidence and traditional grounds, we first review the trial court’s judgment under the no-
    evidence standard of review. Ford Motor Co. v. Ridgway, 
    135 S.W.3d 598
    , 600 (Tex. 2004); All
    Am. Tel., Inc. v. USLD Commc’ns, Inc., 
    291 S.W.3d 518
    , 526 (Tex. App.—Fort Worth 2009,
    pet. denied); E. Hill Marine, 
    229 S.W.3d at 816
    . However, this rule is not absolute. See Dunn
    3
    v. Clairmont Tyler, LP, 
    271 S.W.3d 867
    , 870 (Tex. App.—Tyler 2008, no pet.). Affirmative
    defenses, as opposed to defendant’s denials, are the propositions which a defendant may assert
    and interpose to defeat a prima facie case made by the plaintiff. Hays Consol. Indep. Sch. Dist.
    v. Valero Transmission Co., 
    645 S.W.2d 542
    , 546 (Tex. App.—Austin 1982, writ ref’d n.r.e.).
    They open the way for the defendant to introduce evidence which does not tend to rebut the
    factual propositions asserted in the plaintiff’s case, but seek to establish an independent reason
    why the plaintiff should not recover. 
    Id.
    The elements of a breach of contract claim are (1) the existence of a valid contract
    between plaintiff and defendant, (2) the plaintiff’s performance or tender of performance, (3) the
    defendant’s breach of the contract, and (4) the plaintiff’s damage as a result of the breach. Prime
    Prods., Inc. v. S.S.I. Plastics, Inc., 
    97 S.W.3d 631
    , 636 (Tex. App.—Houston [1st Dist.] 2002,
    pet. denied). The elements of a valid contract are (1) an offer, (2) acceptance, (3) a meeting of
    the minds, (4) each party’s consent to the terms, and (5) execution and delivery of the contract
    with the intent that it be mutual and binding. 
    Id.
    Traditional Summary Judgment
    Contractor’s moved for traditional summary judgment on its breach of contract claim
    against Benton, and moved for no evidence summary judgment on Benton’s affirmative
    defenses. For summary judgment on Contractor’s breach of contract claim to have been properly
    granted, the trial court had to find that Contractor’s established each element of its breach of
    contract claim as a matter of law by competent summary judgment evidence. See Willrich, 28
    S.W.3d at 23. Further, as explained above, Benton’s affirmative defenses are only relevant if
    Contractor’s established its claim for breach of contract.               See Hays Consol. Indep. Sch.
    Dist., 645 S.W.2d at 546. Thus, we will review Contractor’s traditional motion for summary
    judgment first. Cf. Dunn, 
    271 S.W.3d at 870
    .
    Benton argues that Contractor’s did not conclusively establish that it had a contract with
    Benton. He argues that
    The only agreement between the [p]arties, if any, was oral, and the loose terms were based upon a
    general course of dealing between the parties.
    ...
    Defining the specific terms of the contract or contracts—which [Contractor’s] has not done
    conclusively either in its pleadings or through its summary judgment motions—is a fact issue in
    itself which should be resolved by a jury.
    ...
    4
    [Contractor’s] points to “hundreds of receipts and invoices” that were sent to [Benton] as “proving
    the existence of the contract” and tries to overwhelm the record with such evidence. However,
    invoices are not contracts, [Contractor’s] has not alleged that the invoices were an agreement
    themselves or integrated into any agreement.
    Benton points out that, although the invoices contain language stating “NET AMOUNT DUE IN
    30 DAYS,” Contractor’s made no attempt to enforce or collect after thirty days and further, the
    evidence demonstrates that the invoices were sent directly from Contractor’s to Regent
    beginning in September 2017.
    The elements of a contract are the same whether the contract is written or oral.
    Critchfield v. Smith, 
    151 S.W.3d 225
    , 233 (Tex. App.—Tyler 2004, pet. denied). The existence
    of an oral contract may be proved by circumstantial as well as direct evidence. Harris v.
    Balderas, 
    27 S.W.3d 71
    , 77 (Tex. App.—San Antonio 2000, pet. denied). We look to the
    communications between the parties and to the acts and circumstances surrounding those
    communications. 
    Id.
    Benton argues that the acts and circumstances indicate that his communication with
    Shawn Kaemmerling in late 2017 confirmed this was a “direct pay” job under the parties’ course
    of dealing and that Contractor’s had an agreement with Regent that Regent would pay
    Contractor’s directly for materials on the project. Kaemmerling is employed by Contractor’s as
    the plant manager at the Lufkin plant.               Benton testified in his deposition that he had
    conversations with Kaemmerling during the project, and Kaemmerling told Benton that
    Contractor’s had an agreement with Regent for Regent to pay Contractor’s directly for the
    materials used on the Pinnacle project. While Benton acknowledges that Kaemmerling denies
    making this representation, he argues that the documentary evidence supports his testimony.
    Benton points to invoices he sent directly to Regent and the checks issued by Regent to
    Contractor’s, together with the fact that Benton stopped paying Contractor’s after the outset of
    the job and Contractor’s made no demands for payment until 2018. Benton argues that these
    circumstances establish a disputed issue of material fact and therefore, summary judgment in
    favor of Contractor’s was improper.
    In our de novo review of the trial court’s summary judgment, we consider all the
    evidence in the light most favorable to Benton, crediting evidence favorable to him if reasonable
    jurors could, and disregarding contrary evidence unless reasonable jurors could not. Mack
    Trucks, Inc., 206 S.W.3d at 582. The evidence raises a genuine issue of fact if reasonable and
    5
    fair-minded jurors could differ in their conclusions in light of all of the summary-judgment
    evidence. Goodyear Tire, 236 S.W.3d at 755. Contractor’s motion for summary judgment
    stated as follows:
    Regent...was the general contractor on the construction of Pinnacle Senior Living in
    Lufkin, Texas. On August 6, 2017, Regent hired [Benton] as a subcontractor to provide concrete
    services for the construction of Pinnacle Senior Living. On August 23, 2017, [Benton] ordered
    premixed concrete, construction supplies, and other materials from [Contractor’s]. [Contractor’s]
    provided all materials as requested, in a timely and prompt manner. [Contractor’s] provided
    services to [Benton] starting on August 23, 2017 until December 12, 2017. During this time
    period, [Contractor’s] provided $389,211.66 worth of construction materials and concrete to
    [Benton].
    Under the terms of their oral agreement, [Benton] was to pay [Contractor’s] within 30
    days of receiving the concrete and supplies provided. Originally, [Benton] paid the first $5,774.71
    owed to [Contractor’s] under the contract. However, after paying the $5,774.71, [Benton] never
    directly paid [Contractor’s] again for the concrete and supplies for the Pinnacle Senior Living job.
    Rather, Regent issued checks payable to [Contractor’s] in the amounts of $17,439.97 and
    $57,987.67 for concrete suppled in August and September 2017. These checks were given to
    [Benton] who later forwarded them to [Contractor’s].
    (internal citations omitted). In response to this motion, Benton stated as follows:
    Regent Construction Group, LLC (“Regent”) was the general contractor on the
    construction of Pinnacle Senior Living Center (“Project”) in Lufkin, Angelina County, Texas. On
    August 6, 2017, Regent hired [Benton] as a subcontractor to provide concrete services for the
    construction of Pinnacle Senior Living Center. [Benton] ordered premixed concrete, construction
    supplies, and other materials from Plaintiff, Contractor’s Supplies, Inc. [Contractor’s] provided an
    accounting of their invoices for supplies with their petition.
    [Benton] paid the first $5,774.71 owed to [Contractor’s] under the invoices as indicated
    on Ex N. Thereafter, [Contractor’s] and [Benton] modified any agreement for payment of the
    concrete and concrete supplies in that [Contractor’s] would start receiving direct payment from
    Regent’s.
    Further, after the first draw, [Benton] paid for the concrete as indicated on Ex. N,
    however, after that [Contractor’s] made a direct payment agreement with Regent’s according to
    Shawn Kaemmerling, an employee of [Contractor’s]. [Benton] made no further payments, since
    he relied on what Mr. Kaemmerling had told him and believed he was no longer responsible for
    the payment of the concrete and the concrete supplies. Further, [Contractor’s] accounting shows
    three payments by Regent to [Contractor’s] as payment for concrete and supplies.
    (internal citations omitted). We agree with Contractor’s that Benton conceded the existence of a
    valid contract between the parties. Moreover, as previously discussed, the first element of a
    breach of contract claim is the existence of a valid contract. Prime Prods., Inc., 
    97 S.W.3d at 636
    .   It is clear from both parties’ statement of facts in their motions and responses that
    6
    Contractor’s provided materials to Benton for the Pinnacle project and Benton accepted and
    partially paid for the materials.      Benton argues that his alleged communications with
    Kaemmerling, in addition to Regent’s direct payments to Contractor’s and Contractor’s delay in
    collecting from Benton creates a question of material fact with respect to whether the parties had
    a meeting of the minds on the essential terms. We disagree.
    Whether the parties had a meeting of the minds must be resolved utilizing an objective
    standard; we consider the meaning reasonably conveyed by what the parties said and did, and not
    on their subjective state of mind. Parker Drilling Co. v. Romfor Supply Co., 
    316 S.W.3d 68
    , 73
    (Tex. App.—Houston [14th Dist.] 2010, pet. denied). “We view the conduct and circumstances
    surrounding the transaction from a reasonable person’s interpretation at that particular point in
    time.” 
    Id.
     A contract also must be “sufficiently definite to confirm that both parties actually
    intended to be contractually bound.” Fischer v. CTMI, L.L.C., 
    479 S.W.3d 231
    , 237 (Tex.
    2016). “To be enforceable, a contract must address all of its essential and material terms with ‘a
    reasonable degree of certainty and definiteness.’” 
    Id.
     (quoting Pace Corp. v. Jackson, 
    284 S.W.2d 340
    , 345 (Tex. 1955)). Whether a particular contractual term is essential, or material is a
    question of law. Sharifi v. Steen Auto., LLC, 
    370 S.W.3d 126
    , 142 (Tex. App.—Dallas 2012,
    no pet.).
    Benton does not specifically identify which essential term is missing from the oral
    contract, but we assume from the context that he is referring to whether he, Regent, or someone
    else would ultimately be responsible for payment of the supplies provided by Contractor’s.
    Looking to the communications between the parties and the acts and circumstances surrounding
    those communications at the time the parties entered into the oral contract, we determine that a
    meeting of the minds on the essential terms occurred. Cf. Bowles Const. Co. v. Bridwell, No.
    11-02-00079-CV, 
    2002 WL 32344569
    , at *2 (Tex. App.—Eastland Nov. 7, 2002, no pet.) (op.)
    (“The testimony concerning the communications and circumstances existing at the time the oral
    contract was entered supports a finding that the contract related to dirt only.”) (emphasis added).
    Benton’s evidence, including his communications with Kaemmerling, Regent’s payments to
    Contractor’s, and Contractor’s delay in collecting from Benton are all communications, acts, or
    circumstances that arose after the initial contract was formed. As discussed above, Benton
    ordered premixed concrete and other supplies, Contractor’s delivered the supplies, and Benton
    initially paid for the supplies. Viewing the conduct and circumstances of the parties at the time
    7
    Benton ordered the supplies, from a reasonable person’s objective point of view, it is clear that
    Benton agreed to pay for the supplies. See Parker Drilling Co., 
    316 S.W.3d at 73
    . Therefore,
    we overrule his first issue.
    Affirmative Defenses
    In general, a moving plaintiff is not under any obligation to negate a defendant’s pleaded
    affirmative defenses. Tesoro Petroleum Corp. v. Nabors Drilling USA, Inc., 
    106 S.W.3d 118
    ,
    124 (Tex. App.—Houston [1st Dist.] 2002, pet. denied). Rather, an affirmative defense only
    prevents the granting of summary judgment if each element of the affirmative defense is
    supported by summary judgment evidence. Kirby Expl. Co. v. Mitchell Energy Corp., 
    701 S.W.2d 922
    , 926 (Tex. App.—Houston [1st Dist.] 1985, writ ref’d n.r.e.). If the defendant
    moves for summary judgment on his affirmative defense, he bears the burden to conclusively
    prove each element of the affirmative defense to be entitled to summary judgment. See Am.
    Tobacco Co., Inc. v. Grinnell, 
    951 S.W.2d 420
    , 425 (Tex. 1997) (defendant carried burden of
    conclusively proving pre-emption defense in its summary judgment motion). However, when, as
    here, a defendant only seeks to survive summary judgment based on an affirmative defense, he
    must do no more than raise a fact issue as to each element of the defense. See Moore Burger,
    Inc. v. Phillips Petroleum Co., 
    492 S.W.2d 934
    , 937 (Tex. 1972).
    Benton argues that the trial court erred in granting summary judgment in favor of
    Contractor’s because he raised a fact issue as to each element of the affirmative defenses of
    modification, estoppel/quasi-estoppel, accord and satisfaction/novation, and the failure to
    mitigate damages. Benton relies on Kaemmerling’s alleged representations to argue that he
    established a fact issue with respect to his modification, estoppel, and accord and satisfaction
    defenses. Benton relies on Contractor’s failure to timely file statutory liens for the materials it
    supplied to argue it created a fact issue with respect to his failure to mitigate damages defense.
    Modification
    Contract modification is an affirmative defense. Arthur J. Gallagher & Co. v. Dieterich,
    
    270 S.W.3d 695
    , 701 (Tex. App.—Dallas 2008, no pet.). Modification of a contract is some
    change in an original agreement that introduces a new or different element into the details of the
    contract but leaves its general purpose undisturbed. In re F.C. Holdings, Inc., 
    349 S.W.3d 811
    ,
    815 (Tex. App.—Tyler 2011, no pet.).
    8
    Benton argues that “there is evidence of a modification of the agreement to direct pay by
    Regent Construction.” In support of this argument, he cites to his own deposition testimony:
    Benton: And I discussed that with the plant manager, Shawn Kaemmerling, after we
    finally got our first payment. I paid them that first month that I had drawn on. And beyond that I
    think Shawn had called Regent, Shawn or someone else had called Regent, and they had discussed
    being paid directly. And from that point on they started sending checks to Contractor’s Supplies.
    Counsel: All right. So it’s your recollection that after the first check that you received –
    first progress payment and you paid Contractor's Supplies, after that Regency (sic) was paying
    Contractor’s Supplies directly?
    Benton: Correct, according to Shawn Kaemmerling, who is the manager at Contractor’s
    Supplies.
    Counsel: Okay. That’s what he told you?
    Benton: Shawn and I would have lunch nearly every month and discuss this project
    because it was late in payment. And you have time guidelines that fall on the 15th of the month, as
    far as filing a notice of intent to lien or a notice of filing a lien.
    And I started prompting Shawn to make sure that he filed his notices of intent on time, on
    the 13th or 14th of every month. And on the second draw Shawn told me that he had – he had
    received a check from them and we had already discussed that that would be all right with me if
    they paid him direct and I had told him it was.
    And he told me, “I received a check from them. They’re going to pay. It’s not going to
    be a problem.” And so he didn’t seem worried about it.
    ...
    Counsel: Is it your understanding from talking with Shawn Kaemmerling that going
    forward from November on they were supposed to be paid directly by Regent?
    Benton: Shawn told me he had discussed with Regent that they were going to pay them. I
    think that was his words almost verbatim. And he wasn't worried about it. And as far as I was
    concerned, I was done with paying these. They were paying for it, so –
    ...
    Counsel: All right. Did you ever see a written agreement that reflects what you testified
    to; that Regent agreed to pay Contractor’s Supplies directly for the concrete?
    Benton: No, I did not.
    Counsel: Okay.
    Benton: I had Shawn Kaemmerling’s word that he called them and they were paying
    Contractor’s Supplies.
    In short, Benton testified that Kaemmerling told him that Contractor’s contacted Regent
    and Regent had agreed to pay Contractor’s directly. However, Kaemmerling’s statements do not
    reflect an agreement between Benton and Contractor’s to discharge Benton’s obligation to pay
    9
    for the materials he ordered in favor of collecting directly from Regent. Kaemmerling’s alleged
    statements only indicate that Contractor’s successfully attempted to collect some of the money it
    was owed from Regent directly. Nothing in Kaemmerling’s alleged statements, if true, indicate
    an intent on behalf of the evidence in Contractor’s to discharge Benton from his obligation to pay
    for the materials. Thus, viewing the light most favorable to Benton, we must still conclude that
    the trial court correctly found that he failed to produce more than a scintilla of evidence on his
    affirmative defense of modification. See TEX. R. CIV. P. 166a(i); Johnson, 73 S.W.3d at 206–
    08.
    Quasi-Estoppel 1
    Quasi-estoppel is an affirmative defense that precludes a party from asserting, to
    another’s disadvantage, a right inconsistent with a position previously taken.                         Lindley v.
    McKnight, 
    349 S.W.3d 113
    , 131 (Tex. App.—Fort Worth 2011, no pet.). The defense applies
    when it would be unconscionable to allow a person to maintain a position inconsistent with one
    to which he acquiesced or from which he accepted a benefit. 
    Id.
     Thus, quasi-estoppel forbids a
    party from accepting the benefits of a transaction and then subsequently taking an inconsistent
    position to avoid corresponding obligations or effects. 
    Id.
    Benton argues that
    [He] relied on the representation made to him by Shawn Kaemmerling related to receipt of
    payment and the manner that Contractor’s Supplies, Inc. would be paid on the project. These facts,
    at a minimum, provide summary judgment evidence that under Texas Law Contractor’s Supplies
    should be estopped from seeking payment From Mr. Benton instead of Regent.
    ...
    Here, Contractor’s Supplies should be estopped from seeking to recover the remaining balance
    owed from Mr. Benton after previously taking the position that general contractor Regent
    Construction would pay for concrete directly and communicating that position to Mr. Benton.
    [Benton] has presented evidence (1) that Contractor’s Supplies accepted a benefit under a
    transaction—in that it began accepting payments directly from general contractor Regent
    Construction; and (2) also that position was inconsistent with the initial arrangement whereby Mr.
    Benton paid for Contractor’s Supplies’ invoices himself. (3) It is unconscionable for Contractor’s
    Supplies to remain silent on the outstanding amounts for roughly a year and pursue litigation
    against Mr. Benton after representing an agreement for direct payment from Regent Construction,
    particularly when Mr. Benton had already suffered a significant loss for the balance of the Project.
    1
    Benton entitled this section of his brief “estoppel/quasi-estoppel” but only argued quasi estoppel.
    Contractor’s recognizes this fact in its brief and responded to Benton’s quasi-estoppel arguments. In reply, Benton
    countered Contractor’s quasi-estoppel arguments, but did not argue estoppel. Therefore, we only consider quasi-
    estoppel. See TEX. R. APP. P. 38.1 (i) (“The brief must contain a clear and concise argument for the contentions
    made, with appropriate citations to authorities and to the record.”).
    10
    We disagree. Cf. Lopez v. Munoz, Hockema & Reed, L.L.P., 
    22 S.W.3d 857
    , 864 (Tex. 2000)
    (plaintiffs’ initial acceptance of lesser portion of settlement not inconsistent with later assertion
    that they were entitled to more).
    As stated above, Contractor’s sought and recovered payment directly from Regent for
    some of the supplies it provided to Benton. However, none of the facts Benton alleges, even if
    taken as true, would demonstrate that Contractor’s took a position inconsistent with the initial
    contract.   Simply put, Contractor’s attempt to recover directly from Regent, at Benton’s
    suggestion, is not inconsistent with its original contract with Benton. Moreover, the doctrine of
    quasi-estoppel forbids a party from accepting the benefits of a transaction and subsequently
    taking an inconsistent position to avoid corresponding obligations or effects. McKnight, 349
    S.W.3d at 131. Benton has not argued nor does the evidence disclose that Contractor’s accepted
    payments from Regent to avoid a corresponding obligation or effect, therefore the doctrine is
    inapplicable. See id. Additionally, Benton failed to offer authority to support his contention that
    it is unconscionable for Contractor’s to remain silent on the outstanding amounts for roughly a
    year and pursue litigation against Benton after Kaemmerling represented to Benton that there
    was a direct pay arrangement between Contractor’s and Regent. See TEX. R. APP. P. 38.1(i).
    Nor is this Court aware of any authority that would support such a contention. For the above
    reasons, viewing the evidence in the light most favorable to Benton, we conclude that the trial
    court did not err in finding that Benton failed to produce more than a scintilla of evidence on his
    affirmative defense of quasi-estoppel. See TEX. R. CIV. P. 166a(i); Johnson, 73 S.W.3d at 206–
    08.
    Accord and Satisfaction/Novation
    An “accord” is a new contract to discharge an existing obligation. Honeycutt v.
    Billingsley, 
    992 S.W.2d 570
    , 576 (Tex. App.—Houston [1st Dist.] 1999, pet. denied) (citing
    Jenkins v. Henry C. Beck Co., 
    449 S.W.2d 454
    , 455 (Tex. 1969); Bueckner v. Hamel, 
    886 S.W.2d 368
    , 372 (Tex. App.—Houston [1st Dist.] 1994, writ denied)). “Satisfaction” is the
    performance of the new contract. Billingsley, 
    992 S.W.2d at 576
     (citing City of Houston v. First
    City, 
    827 S.W.2d 462
    , 472 (Tex. App.—Houston [1st Dist.] 1992, writ denied)). In the new
    contract: (1) the parties agree to discharge the existing obligation; (2) the parties agree that one
    party will perform and the other will accept something different from what each expected from
    the existing obligation; (3) the parties unmistakably communicate that the different performance
    11
    will discharge the existing obligation; (4) the agreement to discharge the existing obligation is
    plain, definite, certain, clear, full, explicit, and not susceptible of any other interpretation; and (5)
    the parties’ agreement must be accompanied by acts and declarations that the creditor is “bound
    to understand.” Billingsley, 
    992 S.W.2d at 576
     (citing Jenkins, 449 S.W.2d at 455).
    An accord and satisfaction may work a novation. Billingsley, 
    992 S.W.2d at 576
    . In an
    accord and satisfaction, it is generally the performance of the new obligation, and not the
    obligation itself, that is considered a novation. 
    Id.
     (citing DoAll Dallas Co. v. Trinity Nat’l
    Bank, 
    498 S.W.2d 396
    , 400 (Tex. Civ. App.—Texarkana 1973, writ ref’d n.r.e.)). An agreement
    that modifies an existing obligation will result in both an accord and satisfaction and a novation
    if the parties intended to extinguish the existing obligation. Billingsley, 
    992 S.W.2d at 576
    .
    Thus, the common requirement under both novation and accord and satisfaction is that
    the new contract must extinguish or excuse the duty to perform the existing obligation. 
    Id.
    Under either theory, the parties must intend to release the other from a prior obligation and to
    assume a new one. 
    Id.
     Because the same element of both defenses (i.e., whether there was an
    extinguishment of prior obligations) is at issue in this case, we will discuss novation and accord
    and satisfaction together.
    Benton argues that the summary judgment evidence related to his communications with
    Kaemmerling create a genuine issue of material fact as to whether there was an accord and
    satisfaction/novation. According to Benton, “[t]he new arrangement consummated by an oral
    agreement constitutes the modification of an existing agreement that extinguishes the existing
    obligation.” As previously discussed, viewing the evidence in the light most favorable to
    Benton, the alleged statements made by Kaemmerling did not indicate that Contractor’s was
    extinguishing Benton’s obligation to pay for the materials he ordered. If true, Kaemmerling’s
    statements to Benton merely indicated that Contractor’s would try to collect the money it was
    owed directly from Regent, not that Contractor’s would no longer attempt to collect the monies it
    was owed by Benton. Thus, we conclude that the trial court correctly found that Benton failed to
    produce more than a scintilla of evidence on its affirmative defense of accord and
    satisfaction/novation. See TEX. R. CIV. P. 166a(i); Johnson, 73 S.W.3d at 206–08.
    Failure to Mitigate Damages
    The doctrine of mitigation of damages, sometimes referred to as the doctrine of avoidable
    consequences, requires an injured party to use reasonable efforts to avoid or prevent losses. E.L.
    12
    & Assocs. v. Pabon, 
    525 S.W.3d 764
    , 768 (Tex. App.—Houston [14th Dist.] 2017, no pet.)
    (citing Pulaski Bank & Trust Co. v. Tex. Am. Bank/Fort Worth, N.A., 
    759 S.W.2d 723
    , 735
    (Tex. App.—Dallas 1988, writ denied)). In the context of a breach of contract case, the doctrine
    has been stated as follows: “Where a party is entitled to the benefits of a contract and can save
    himself from the damages resulting from its breach at a trifling expense or with reasonable
    exertions, it is his duty to incur such expense and make such exertions.” Pabon, 525 S.W.3d at
    768 (citing Great Am. Ins. Co. v. N. Austin Mun. Util. Dist. No. 1, 
    908 S.W.2d 415
    , 426 (Tex.
    1995) (quoting Walker v. Salt Flat Water Co., 
    96 S.W.2d 231
    , 232 (1936)).
    Benton states that “[d]espite reminders from [him], [Contractor’s] failed to serve lien
    notices on time which apparently prevented further payment from Regent Construction.” Benton
    argues that he created a fact issue with respect to his defense that Contractor’s failed to mitigate
    its damages because he showed that Contractor’s failed to timely serve lien notices related to the
    project.   He further argues that “[Contractor’s] summary judgment briefing...cites just one
    unpublished case for the proposition that Texas law does not recognize the failure to pursue liens
    as a failure to mitigate.” See Kondos Entm’t, Inc. v. Quinney Elec., Inc., No. 04-96-00251-CV,
    
    1999 WL 1261455
     (Tex. App.—San Antonio Dec. 29, 1999, no pet.) (op.).
    In Kondos, Quinney was retained by Kondos Entertainment, Inc. (Kondos) to do
    electrical work for the construction of a night club in San Antonio, Texas.                 Kondos
    Entertainment, Inc. v. Quinney Elec., Inc., 
    948 S.W.2d 820
    , 821 (Tex. App.—San Antonio
    1997), rev’d, 
    988 S.W.2d 212
     (Tex.1999). When it was not paid, Quinney sued Kondos, Jay
    Snyder, a representative of Kondos, and V-Ball, Inc. (V-Ball), the company named on the checks
    Snyder used to pay Quinney’s invoices. 
    Id. at 822
    . Four months after suit was filed, V-Ball
    filed for bankruptcy. 
    Id.
     Quinney filed a proof of claim for $83,991.32 with the bankruptcy
    court which was accepted as a general unsecured claim and paid. 
    Id.
     Quinney pursued its claim
    in state court against Kondos and Snyder, ultimately securing a judgment of $83,991.21 in actual
    damages, $18,839.13 in prejudgment interest, $20,000.00 in attorney’s fees, and $978.00 in court
    costs. 
    Id.
     Post-judgment interest on the foregoing sums was also awarded. 
    Id.
     The court
    further ordered the $83,991.32 awarded to Quinney in the bankruptcy proceedings be credited to
    the amount in the judgment, ultimately resulting in a judgment against Kondos and Snyder in the
    unsatisfied amount of $40,083.58, plus post-judgment interest, which represented primarily the
    prejudgment interest, attorney’s fees, and court costs not included in the amount paid in
    13
    connection with the bankruptcy. 
    Id.
     The Fourth Court of Appeals ultimately held that Quinney
    was collaterally estopped from bringing suit because the specific issues central to Quinney’s
    claims were previously litigated in the bankruptcy proceeding. 
    Id. at 824-25
    . The Texas
    Supreme Court reversed the Fourth Court’s decision and remanded the case to the Fourth Court
    to consider Kondos’ and Snyder’s additional points of error.
    In one of those additional points of error, Kondos and Snyder argued that Quinney failed
    to mitigate damages because Quinney failed to file a materialman’s lien, which would have
    resulted in its claim being secured against V-Ball in bankruptcy and allowing it to recover
    interest and attorney’s fees against V-Ball. Kondos, 
    1999 WL 1261455
    , at *3. The court
    rejected this argument because the attorney’s fees and interest could not have been “avoided,”
    and the lien simply would have enabled Quinney to collect the same amount from a different
    source. 
    Id. at *3
    . The court went on to state that “Kondos and Snyder are really contending that
    Quinney’s filing of the lien might have minimized the ‘loss’ to Kondos and Snyder, not the
    damages to Quinney.” The court held that “[t]he doctrine of mitigation does not apply in that
    manner.” 
    Id. at *4
    .
    Here, Benton argues that the factual scenario in Kondos is distinguishable from this case
    because
    [t]he Kondos scenario is talking about attorney’s fees and interest that are not even damages that
    could have been awarded in the original breach of contract case. That is why the Kondos opinion
    says that such damages would have been “avoided.” There is reason Contractor’s Supplies cannot
    point to any other case for the legal proposition that failing to send a lien notice absolutely cannot
    constitute a failure to mitigate damages—because it is misreading the Kondos case and attempting
    to apply it overly broadly.
    We disagree with Benton’s interpretation of the Kondos court’s holding and reasoning.
    The operative reasoning behind the Kondos holding is that the filing of a lien did nothing to
    avoid Quinney’s damages; the only effect of the lien would allow Quinney to collect his
    damages from another source. 
    Id. at *3
    . The lien might have allowed Quinney to collect the
    damages from a different source and minimized Kondos’ and Snyder’s exposure, but it would
    not have avoided Quinney’s damages, and therefore does not implicate the mitigation of
    damages doctrine. See 
    Id. at *4
    .
    We find the Kondos holding persuasive in our analysis of this issue. Here, Contractor’s
    damages would not have been avoided had it correctly and timely filed its lien. Rather, the lien
    14
    would have allowed Contractor’s to collect its damages from another source, Regent. This
    would have minimized Benton’s exposure but would have done nothing to “avoid” Contractors’
    damages. See 
    Id. at *4
    . Thus, we conclude that the trial court correctly granted Contractor’s no
    evidence summary judgment motion on Benton’s affirmative defense that Contractor’s failed to
    mitigate its damages. See TEX. R. CIV. P. 166a(i); Johnson, 73 S.W.3d at 206–08.
    Conclusion
    Accordingly, for the above reasons, we overrule issue two.
    DISPOSITION
    Having overruled both of Benton’s issues, we affirm the trial court’s judgment.
    GREG NEELEY
    Justice
    Opinion delivered October 6, 2021.
    Panel consisted of Worthen, C.J., Hoyle, J., and Neeley, J.
    15
    COURT OF APPEALS
    TWELFTH COURT OF APPEALS DISTRICT OF TEXAS
    JUDGMENT
    OCTOBER 6, 2021
    NO. 12-20-00207-CV
    MARK BENTON, INDIVIDUALLY AND D/B/A MEBCO CONTRACTING,
    Appellant
    V.
    CONTRACTOR’S SUPPLIES, INC.,
    Appellee
    Appeal from the 159th District Court
    of Angelina County, Texas (Tr.Ct.No. CV-00387-19-07)
    THIS CAUSE came to be heard on the appellate record and briefs filed
    herein, and the same being considered, it is the opinion of this court that there was no error in the
    judgment.
    It is therefore ORDERED, ADJUDGED and DECREED that the judgment of
    the court below be in all things affirmed, all costs of this appeal are assessed against the
    Appellant, MARK BENTON, INDIVIDUALLY AND D/B/A MEBCO CONTRACTING,
    and that this decision be certified to the court below for observance.
    Greg Neeley, Justice.
    Panel consisted of Worthen, C.J., Hoyle, J., and Neeley, J.