Brazos River Authority and the State of Texas v. City of Houston And Sylvester Turner, in His Official Capacity as Mayor of the City of Houston ( 2021 )


Menu:
  •        TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-20-00076-CV
    Brazos River Authority and The State of Texas, Appellants
    v.
    City of Houston; and Sylvester Turner, in his Official Capacity as
    Mayor of The City of Houston, Appellees
    FROM THE 261ST DISTRICT COURT OF TRAVIS COUNTY
    NO. D-1-GN-19-004189, THE HONORABLE KARIN CRUMP, JUDGE PRESIDING
    OPINION
    This is a dispute over the right to construct and operate a reservoir on
    Allens Creek. For over two decades, the City of Houston and the Brazos River Authority have
    jointly held a water-appropriation permit authorizing them to construct the reservoir and to use
    some of the water impounded there. In 2019, the Legislature instructed Houston to transfer its
    entire interest in the proposed reservoir, including its permit rights, to the Authority. See Act of
    May 16, 2019, 86th Leg., R.S., ch. 380, § 1, 
    2019 Tex. Gen. Laws 688
    , 688 (H.B. 2846). On
    cross-motions for summary judgment, the district court granted declaratory relief that H.B. 2846
    is “unconstitutional, void, and unenforceable.” We will affirm.
    BACKGROUND
    To provide context to the parties’ dispute, we begin with an overview of the
    relevant statutory framework, found in Chapter 11 of the Water Code. Under Chapter 11, the
    waters of Texas rivers, streams, and lakes are declared “the property of the state,” see Tex. Water
    Code § 11.021(a), and “held in trust for the public,” see id. § 11.0235(a). The right to use state
    water may be acquired by appropriation in the manner and for the purposes the chapter
    prescribes. See id. §§ 11.022, .023. No one may appropriate state water or “begin construction
    of any work designed for the storage, taking, or diversion of water” without a permit from the
    Texas Commission on Environmental Quality.          See id. § 11.121.     In processing a permit
    application, the Commission must comply with various procedural requirements, including
    providing notice to senior water rights holders and the opportunity for a hearing.         See id.
    §§ 11.132, .133. The Commission may grant the application only after concluding, among other
    things, that the proposed appropriation “is intended for a beneficial use.”               See id.
    § 11.134(b)(3)(A). The permit may authorize an appropriation for a certain time or of permanent
    duration. See id. §§ 11.135–.138.
    A permanent water right is conditioned on ongoing “beneficial use” of the
    appropriated water as set out in the permit. See id. § 11.135(a) (“The applicant’s right to take
    and use water is limited to the extent and purposes stated in the permit.”). The appropriative
    right is limited “not only to the amount specifically appropriated” in the permit, “but also to the
    amount which is being or can be beneficially used for the purposes specified in the appropriation,
    and all water not so used is considered not appropriated.” See id. § 11.025. Similarly, no
    appropriative right is “perfected” until the water has been “beneficially used” for a purpose
    specified in the permit. See id. § 11.026. And because “[n]o person is granted the right to waste
    2
    water by not using it,” Lower Colo. River Auth. v. Texas Dep’t of Water Res., 
    689 S.W.2d 873
    ,
    882 (Tex. 1984), an appropriative right is subject to forfeiture or cancelation for nonuse, see
    Tex. Water Code §§ 11.030, .146, .171–.177, .183–.186. “But such rights continue to exist in
    perpetuity to the extent beneficial use does.”       Ware v. Texas Comm’n on Env’t Quality,
    No. 03-14-00416-CV, 
    2017 WL 875307
    , at *1 (Tex. App.—Austin Mar. 3, 2017, no pet.) (mem.
    op.). With this statutory framework in mind, we turn to the history of the case.
    The site of the proposed reservoir is an approximately 9,500-acre tract located in
    Austin County near the confluence of Allens Creek and the Brazos River. In 1974, the Texas
    Water Commission (a predecessor of the Commission) granted Houston Power and Lighting
    Company’s application for a permit to build a reservoir on the site. Water Appropriation Permit
    2925 authorized HP&L to construct the reservoir and to use a certain amount of the water
    impounded there. The reservoir was never built, and the Commission canceled the permit at
    HP&L’s request. HP&L retained ownership of the site subject to an option to purchase held by
    the Authority.
    In 1999, the Legislature intervened to encourage development of a reservoir on
    the site. The Legislature designated the site “as a site of unique value for the construction of a
    dam and reservoir on Allens Creek” and found “that construction and development of the
    Allens Creek Reservoir project” would be “in the public interest and would constitute
    a beneficial use of the water.”     Act of May 22, 1999, 76th Leg., R.S., ch. 1291, § 1.01,
    
    1999 Tex. Gen. Laws 4426
    , 4426 (S.B. 1593). To that end, S.B. 1593 granted the Texas Water
    Development Board (Board) “the right to construct a dam and reservoir on Allens Creek” and to
    “divert and use from the reservoir an amount of water specified” in a permit to be issued by the
    3
    Commission. 
    Id.
     § 1.02(a). Instead of having the Board apply for a new permit, S.B. 1593
    instructed the Commission to
    reissue without notice or hearing Water Appropriation Permit No. 2925
    previously issued for the Allens Creek Reservoir. The permit shall be issued in
    the name of the Texas Water Development Board and it shall have a priority date
    of September 1, 1999. The date to commence construction of the reservoir shall
    be not later than September 1, 2018. The [Commission1] may extend such time
    for beginning of construction for good cause.
    Id. § 1.02(b). To confirm the Commission’s authority, S.B. 1593 amended Chapter 11 to
    authorize the Commission to reissue certain permits without notice or hearing. Id. § 2.01
    (codified at Tex. Water Code § 11.1311).2
    The Commission reissued the permit—now called Permit 2925A—to the Board in
    February 2000. Meanwhile, the Authority exercised its option to purchase the reservoir site.
    The Authority paid $150,000 and received a deed to the site, subject to payment of the full
    purchase price. To secure financing for the site and the reservoir itself, the Authority turned to
    Houston.     Houston and the Authority executed an interlocal agreement specifying their
    responsibilities.   As an initial step, they agreed to jointly apply to the Water Board for a
    $20,000,000 loan to finance purchase of the site, with Houston committing to pay 70% and the
    Authority 30%. If the two were successful in obtaining the loan, the Authority agreed to convey
    to Houston a 70% interest in the site. Next, they would jointly apply to the Commission to
    reissue the permit jointly to them. Houston committed to pay 70% and the Authority 30% of the
    1
    S.B. 1593 names the Texas Natural Resource Conservation Commission, the
    predecessor of the Commission on Environmental Quality.
    2
    Section 11.1311, which was added by S.B. 1593, does not mention Permit 2925 by
    name but applies to “[a] permit for a reservoir project” that meets certain enumerated criteria.
    See Tex. Water Code § 11.1311(a). There is no suggestion that any other permit meets
    that criteria.
    4
    development and construction costs, with each party receiving a proportionate share of the water
    appropriated by the permit.
    The Water Board granted the loan application the same year. The Authority
    recorded its deed to the site but did not convey any interest to Houston. The Commission
    subsequently issued an amended Permit 2925A jointly to Houston and the Authority.3 The
    permit required that construction begin no later than September 1, 2018, and finish within three
    years. Failure to meet either deadline would cause the permit “to expire and become null and
    void” unless the Commission granted an extension.
    However, construction could not start immediately. The permit required the
    holders to design the reservoir, undertake a habitat mitigation study in cooperation with the
    Texas Parks and Wildlife Department, and develop a plan to mitigate the environmental effects
    of the reservoir. The design would have to comply with standards laid out in the Commission’s
    rules, and the plans would have to be submitted to the Executive Director of the Commission for
    approval “prior to beginning construction.” In addition to these state-law requirements, federal
    law required the parties to obtain a permit pursuant to Section 404 of the Clean Water Act from
    the Army Corps of Engineers.         Houston and the Authority executed a memorandum of
    understanding with the Texas Parks and Wildlife Department as an initial step towards meeting
    these requirements. The studies had not been completed as of the date of trial, and the two have
    not begun the process for acquiring the Section 404 permit. As the September 2018 deadline
    approached, Houston and the Authority requested an extension from the Legislature. In 2011,
    the Legislature agreed and directed the Commission to reissue the permit with a September 1,
    3
    The Water Development Board also retained an interest in the permit.
    5
    2025 deadline to begin construction. See Act of May 19, 2011, 82d Leg., R.S., ch. 434, § 2, sec.
    1.06, 
    2011 Tex. Gen. Laws 1104
    , 1104 (S.B. 1132). The Commission issued an amended
    permit—now called Permit 2925B—reflecting the new deadline.
    The permittees made no further progress developing the reservoir by the time the
    Legislature held hearings on H.B. 2846 in 2019. Representatives of the Authority, Houston, and
    other interested entities testified.   David Collingsworth, the Authority’s general manager,
    testified that Houston was uninterested in funding the project because it did not need additional
    water. Collingsworth testified that the Authority, in contrast, needs additional water to meet the
    needs of its customers in the region. Carol Haddock, Houston’s Director of Public Works,
    testified that Houston “did not necessarily fully appreciate the urgency of our partners” but was
    committed to the project. She estimated that Houston had spent approximately twenty-three
    million dollars on it to date. Other stakeholders testified in support of the bill and regarding the
    need for a reservoir in the area.
    H.B. 2846 passed the Legislature and was signed into law. It amends S.B. 1593
    to provide:
    Sec. 1.07. (a) Notwithstanding any other provision of this article, not later than
    January 1, 2020, the City of Houston shall enter into a contractual agreement with
    the Brazos River Authority to transfer to the Brazos River Authority all of the
    city’s ownership interests in the Allens Creek Reservoir project, including all
    required water right permits, along with the responsibility to construct the project
    in accordance with all associated statutory requirements and deadlines.
    (b) Construction of the reservoir is subject to the Brazos River Authority
    obtaining all necessary federal permits.
    (c) In addition to other necessary provisions, the contractual agreement described
    by Subsection (a) must include provisions for the transfer of an amount not to
    exceed $23 million from the Brazos River Authority to the City of Houston.
    6
    H.B. 2846, § 1, sec. 1.07, 2019 Tex. Sess. Law Serv. at 688.
    Shortly after H.B. 2846’s effective date, the Authority sent Houston a proposed
    amendment to the Interlocal Agreement reflecting H.B. 2846’s terms. Houston responded by
    suing the State and the Authority for declaratory relief that H.B. 2846 is invalid on multiple
    grounds. See Tex. Civ. Prac. & Rem. Code § 37.004(a) (authorizing suit for declaratory relief
    concerning validity of statutes). Houston filed a traditional motion for summary judgment, and
    the State and the Authority jointly filed a cross-motion for traditional summary judgment.4
    Houston separately filed objections to many of the exhibits attached to the cross-motion. The
    district court granted summary judgment to Houston and rendered declaratory relief that
    H.B. 2846 violates the Texas Constitution’s prohibitions on retroactive laws, local or special
    laws, and the forced sale of government property. The district court further concluded that
    H.B. 2846 is unenforceable because it “violates [Sections 272.001 and 552.020] of the Local
    Government Code.” Based on these declarations, the district court rendered judgment that
    H.B. 2846 “in its entirety is unconstitutional, void, and unenforceable.” In a separate order, the
    district court sustained Houston’s evidentiary objections in part and overruled them in part. The
    State and the Authority have appealed to this Court.
    EVIDENTIARY RULINGS
    Before turning to the merits of the parties’ cross-motions for summary judgment,
    we must determine what evidence is properly before us. The district court sustained Houston’s
    objections to, as relevant here, the transcript of a hearing before the Committee on Natural
    4
    The Authority also filed a third-party claim against Sylvester Turner, Mayor of the City
    of Houston, alleging that he acted ultra vires by refusing to execute the contract. The district
    court dismissed that claim for want of jurisdiction after concluding that H.B. 2846
    is unconstitutional.
    7
    Resources of the Texas House of Representatives on H.B. 2826 and the 2016 Region H Water
    Plan (2016 Plan). Appellants invite us to take judicial notice of both exhibits. See Office of Pub.
    Util. Counsel v. Public Util. Comm’n of Tex., 
    878 S.W.2d 598
    , 600 (Tex. 1994) (“A court of
    appeals has the power to take judicial notice for the first time on appeal.”). We will grant
    their request.
    A court may take judicial notice of “a fact that is not subject to reasonable dispute
    because it: (1) is generally known within the trial court’s territorial jurisdiction; or (2) can be
    accurately and readily determined from sources whose accuracy cannot reasonably be
    questioned.” Tex. R. Evid. 201(b). Houston argues that we may not take judicial notice of the
    transcript because it contains speculation. Specifically, Houston argues that the witnesses and
    legislators speculated as to Houston’s intentions regarding the project.          Leaving aside the
    question of whether those individual statements have evidentiary value, the fact that stakeholders
    testified regarding the need for the proposed reservoir and their concerns about H.B. 2846 is a
    matter of legislative record and not subject to reasonable dispute. See 
    id.
     We take judicial notice
    of the transcript and will incorporate it into our discussion of the merits of this appeal.5 See
    Zaatari v. City of Austin, 
    615 S.W.3d 172
    , 187 (Tex. App.—Austin 2019, pet. denied) (taking
    judicial notice of hearing testimony and other legislative history pertaining to challenged
    municipal ordinance); see also City of El Paso v. Fox, 
    458 S.W.3d 66
    , 72 (Tex. App.—El Paso
    2014, no pet.) (taking judicial notice of minutes of city council that were publicly available on
    council’s website).
    5
    We note that the district court overruled Houston’s objections to transcripts of two
    other committee hearings on H.B. 2846, both of which contain similar testimony.
    8
    Houston does not address whether we may properly take judicial notice of the
    2016 Plan. We take judicial notice of the 2016 Plan because it is a matter of public record and
    its accuracy is undisputed.6 See Office of Pub. Util. Counsel, 878 S.W.2d at 600 (authorizing
    courts to take judicial notice of records on file with state agencies that are capable of accurate
    and ready determination and whose accuracy cannot reasonably be questioned); see also MCI
    Sales & Serv., Inc. v. Hinton, 
    329 S.W.3d 475
    , 485 n.7 (Tex. 2010) (taking judicial notice of
    report issued by federal agency).
    DISCUSSION
    We now turn to whether the district court correctly granted summary judgment to
    Houston and declared that H.B. 2846 is void and unenforceable.
    Standard of Review
    Summary judgment is proper when there are no disputed issues of material fact
    and the movant is entitled to judgment as a matter of law. See Tex. R. Civ. P. 166a(c); AEP Tex.
    Cent. Co. v. Arredondo, 
    612 S.W.3d 289
    , 293 (Tex. 2020). We review an order granting
    summary judgment de novo, “taking as true all evidence favorable to the nonmovant and
    indulging every reasonable inference in the nonmovant’s favor.” AEP Tex., 612 S.W.3d at 293.
    When both parties move for summary judgment on the same issue, “we consider the evidence
    presented by both parties and determine all questions presented,” rendering the judgment the trial
    6
    Every five years, the Water Board adopts a state water plan incorporating regional
    water plans submitted by planning groups in different parts of the state. See Tex. Water Code
    §§ 16.051(a), .053. Region H is the planning area that includes Houston and the proposed
    Allens Creek Reservoir. The 2016 Plan details the anticipated uses of water from all sources in
    the region, including the proposed Allens Creek Reservoir. It also describes the regulatory steps
    that must be completed before construction can begin.
    9
    court should have rendered. See Bush v. Lone Oak Club, LLC, 
    601 S.W.3d 639
    , 646–47
    (Tex. 2020).
    A question of statutory construction is a legal one, which we also review de novo.
    
    Id.
     Our goal in construing a statute is to ascertain and give effect to the Legislature’s intent,
    looking first to the “plain and common meaning of the statute’s words.” 
    Id.
     (citing MCI Sales
    & Serv., Inc. v. Hinton, 
    329 S.W.3d 475
    , 500 (Tex. 2010)). In discerning a statute’s plain and
    common meaning, we “consider the context and framework of the entire statute and construe it
    as a whole.” Aleman v. Texas Med. Bd., 
    573 S.W.3d 796
    , 802 (Tex. 2019) (citing Cadena
    Comercial USA Corp. v. Texas Alcoholic Beverage Comm’n, 
    518 S.W.3d 318
    , 326 (Tex. 2017)).
    Statutory Claims
    We begin with the district court’s conclusion that H.B. 2846 is invalid because it
    “violates [sections 272.001 and 552.020] of the Local Government Code.”7 See Tex. Loc. Gov’t
    Code §§ 272.001(a) (requiring any “political subdivision of the state” to provide notice before
    transferring land unless enumerated exception applies), 552.020 (regulating water supply
    contracts between water districts and municipalities). Appellants argue that the district court
    erred because there is no conflict or, if one exists, H.B. 2846 controls. Houston responds that
    H.B. 2846 is invalid in that it requires Houston to execute a contract that violates sections
    272.001 and 552.020 of the Local Government Code. We agree with appellants.
    Houston’s argument is essentially that H.B. 2846 is invalid because it modifies
    sections 272.001 and 552.020. But the “Legislature’s power to amend or repeal an earlier statute
    7
    We address this ground for summary judgment first because it does not require us to
    decide whether H.B. 2846 is constitutional. See In re B.L.D., 
    113 S.W.3d 340
    , 349 (Tex. 2003)
    (“As a rule, we only decide constitutional questions when we cannot resolve issues on
    nonconstitutional grounds.”).
    10
    is generally limited only by federal or state constitutional provisions or federal law.” Graphic
    Packaging Corp. v. Hegar, 
    538 S.W.3d 89
    , 104 (Tex. 2017). “When statutes irreconcilably
    conflict, traditional rules of statutory construction dictate that the later enacted and more specific
    legislation should control.” Id. at 98. H.B. 2846 requires a single municipality to execute a
    contract with the Authority that contains specified terms. By contrast, Section 272.001 requires
    any “political subdivision of the state” to provide notice before transferring land unless an
    exception applies, Tex. Loc. Gov’t Code § 272.001(a), and Section 552.020 applies generally to
    water–supply contracts between municipalities and water districts, id. § 552.020.              These
    requirements first appeared in 1987. See Act of May 15, 1987, 70th Leg., R.S., ch. 149, § 1,
    
    1987 Tex. Gen. Laws 707
    , 1055–56, 1243–44. Assuming that a conflict exists, H.B. 2846
    controls because it is the later-enacted and more specific provision. See Hegar, 538 S.W.3d at
    98 (“As the later-enacted, more specific statute, section 171.106 prevails.”); Jackson v. State Off.
    of Admin. Hearings, 
    351 S.W.3d 290
    , 297 (Tex. 2011) (holding later-enacted and more specific
    statute controlled). The district court erred by overturning H.B. 2846 based on its conclusion
    that the legislation violates sections 272.001 and 552.020 of the Local Government Code.8
    8
    Houston also argues that the district court found that H.B. 2846 “also violates the Texas
    Local Government Code through [the Authority’s] Enabling Act.” The Authority’s enabling act
    is codified in the Special District Local Laws Code, not the Local Government Code. See
    generally Tex. Spec. Dist. Code §§ 8502.001–.020. But even if we were to assume that the
    district court’s declaration also encompasses this statute, we would still reject Houston’s
    argument. Houston argues that H.B. 2846 violates a provision authorizing the Authority to
    “execute contracts with municipalities in the state substantially in the manner prescribed by
    Section 552.020, Local Government Code[.]” See id. § 8502.006(c). H.B. 2846—which is more
    recent and pertains to a single contract—would prevail over that provision of the Authority’s
    Enabling Act. See Graphic Packaging Corp. v. Hegar, 
    538 S.W.3d 89
    , 98 (Tex. 2017) (“When
    statutes irreconcilably conflict, traditional rules of statutory construction dictate that the later
    enacted and more specific legislation should control.”).
    11
    Constitutional Challenges
    In considering Houston’s constitutional challenges to H.B. 2846, we begin with a
    presumption that the statute is valid. See In re Commitment of Fisher, 
    164 S.W.3d 637
    , 645
    (Tex. 2005) (“An analysis of the constitutionality of a statute begins with a presumption of
    validity.”). We start with Houston’s claim that H.B. 2846 is unconstitutionally retroactive
    because it is dispositive.
    The Texas Constitution prohibits the creation of retroactive laws. See Tex. Const.
    art. I, § 16 (“No bill of attainder, ex post facto law, retroactive law, or any law impairing the
    obligation of contracts, shall be made.”). “A retroactive law is one that extends to matters that
    occurred in the past.” Tenet Hosps. Ltd. v. Rivera, 
    445 S.W.3d 698
    , 707 (Tex. 2014); see also
    Union Carbide Corp. v. Synatzske, 
    438 S.W.3d 39
    , 55 (Tex. 2014) (“We have defined a
    retroactive law as ‘a law that acts on things which are past.’” (quoting Subaru of Am., Inc.
    v. David McDavid Nissan, Inc., 
    84 S.W.3d 212
    , 219 (Tex. 2002))). Appellants both argue
    that H.B. 2846 is not retroactive but present different arguments in support of their
    respective contentions.
    The Authority argues that nothing in H.B. 2846 defeats the presumption that
    statutes apply prospectively. Although the Authority is correct that courts “generally presume
    that statutes are prospective unless they are expressly made retroactive,” City of Austin
    v. Whittington, 
    384 S.W.3d 766
    , 790 (Tex. 2012), no specific language is required to defeat this
    presumption. Instead, courts construe the statutory text to determine the Legislature’s intent.
    See In re M.C.C., 
    187 S.W.3d 383
    , 384 (Tex. 2006) (per curiam) (explaining that statutes are
    “applied retroactively if the statutory language indicates that the Legislature intended that the
    statute be retroactive”). Construing H.B. 2846 as a whole, we agree that it has retroactive effect.
    12
    As we explain in greater detail below, the Commission’s grant of Permit 2925B conveyed a
    constitutionally protected property interest, which H.B. 2846 eliminated.         See Texas Water
    Rights Comm’n v. Wright, 
    464 S.W.2d 642
    , 648 (Tex. 1971) (holding statute authorizing
    forfeiture of water rights after period of nonuse applied retroactively because of its “definite
    impact on rights created before the effective date of the statute”); Zaatari, 615 S.W.3d at 188
    (holding municipal ordinance banning short-term rentals retroactive because it “operates to
    eliminate well-established and settled property rights that existed before the ordinance’s
    adoption”); see also Robinson v. Crown Cork & Seal Co., 
    335 S.W.3d 126
    , 139 (Tex. 2010)
    (noting that “[m]ost statutes operate to change existing conditions” (citing Wright, 464 S.W.2d
    at 648)).
    The State argues that H.B. 2846 does not change the “legal significance of actions
    Houston took in the past.” To the extent the State means that a law is only retroactive if it
    changes the effect of past conduct, we disagree. The Texas Constitution’s ban on retroactive
    laws is a “general prohibition” on applying laws to “matters which have occurred in the past[.]”
    Id. at 138. Thus, whether H.B. 2846 is retroactive does not turn on whether it changes the
    consequences of Houston’s past “actions.”9
    9
    We observe that the State relies on a case—Ramirez v. State, 
    184 S.W.3d 392
    , 395
    (Tex. App.—Dallas 2006, no pet.)—applying the constitutional prohibition on ex post facto
    laws. See Tex. Const. art. I, § 16 (“No bill of attainder, ex post facto law, retroactive law, or any
    law impairing the obligation of contracts, shall be made.”). The prohibition on ex post facto
    laws concerns legislation imposing punishment for past acts. Rodriguez v. State, 
    93 S.W.3d 60
    ,
    67 (Tex. Crim. App. 2002) (“[T]he mark of an ex post facto law is the imposition of what can
    fairly be designated punishment for past acts.” (citing De Veau v. Braisted, 
    363 U.S. 144
    , 160
    (1960))). Because H.B. 2846 is not a criminal statute, the ex post facto provision does not apply
    here. See Barshop v. Medina Cnty. Underground Water Conservation Dist., 
    925 S.W.2d 618
    ,
    633 (Tex. 1996) (“It is well established that the prohibition against ex post facto laws applies
    only to retroactive criminal or penal laws.”).
    13
    Next, the State argues that H.B. 2846 is not unconstitutionally retroactive because
    Houston’s right in the permit, if any, is not “vested.” Traditionally, courts concluded a law was
    unconstitutionally retroactive if it “takes away or impairs vested rights[.]” Subaru of Am.,
    84 S.W.3d at 219 (citing Ex parte Abell, 
    613 S.W.2d 255
    , 260 (Tex. 1981); McCain v. Yost,
    
    284 S.W.2d 898
    , 900 (Tex. 1955)). But as the State acknowledges elsewhere in its brief, the
    supreme court expressly rejected this test, explaining that “[w]hat constitutes an impairment of
    vested rights is too much in the eye of the beholder to serve as a test for unconstitutional
    retroactivity.” Robinson, 335 S.W.3d at 143. Instead, courts consider three factors in light of the
    prohibition’s dual objectives of “protect[ing] the people’s reasonable, settled expectations”—i.e.,
    that “the rules should not change after the game has been played,” and “protect[ing] against
    abuses of legislative power.” See id. at 138 (citing Landgraf v. USI Film Prods., 
    511 U.S. 244
    ,
    265–66 (1994)). Those factors are: (1) “the nature and strength of the public interest served by
    the statute as evidenced by the Legislature’s factual findings;” (2) “the nature of the prior right
    impaired by the statute;” and (3) “the extent of the impairment.”          Id. at 145.   This test
    acknowledges the heavy presumption against retroactive laws by requiring a compelling public
    interest to overcome the presumption.        Tenet Hosps., 445 S.W.3d at 707.         But it also
    appropriately encompasses the notion that “statutes are not to be set aside lightly.” Id. (citing
    Robinson, 335 S.W.3d at 146).
    We first consider whether H.B. 2846 serves a compelling public interest “as
    evidenced by the Legislature’s factual findings.” See Robinson, 335 S.W.3d at 145. Houston
    argues that the absence of findings is “fatal” to the statute’s constitutionality. However, the
    Court in Robinson considered the entire legislative record and additional related information, see
    id., and we have done the same in subsequent cases, see Zaatari, 615 S.W.3d at 189 (considering
    14
    legislative record and other pertinent information when applying Robinson test); Texas Educ.
    Agency v. American YouthWorks, Inc., 
    496 S.W.3d 244
    , 264 n.111 (Tex. App.—Austin 2016),
    aff’d sub nom. Honors Acad., Inc. v. Texas Educ. Agency, 
    555 S.W.3d 54
     (Tex. 2018) (same).
    Considering the legislative record and the other pertinent evidence in the record, we conclude
    that the public interest served by H.B. 2846 is slight.
    Appellants argue that H.B. 2846 is in the public interest because it is necessary to
    discharge the Legislature’s constitutional duty to conserve the State’s natural resources. See
    Tex. Const. art. XVI, § 59(a) (“The conservation and development of all of the natural resources
    of this State . . . [is] hereby declared [a] public right[ ] and dut[y]; and the Legislature shall pass
    all such laws as may be appropriate thereto.”). They argue that the record demonstrates that the
    Legislature reasonably determined that Houston should be removed from the project and that we
    should defer to that determination as in the public interest.
    We agree that constructing the reservoir is in the public interest. In addition to the
    findings in S.B. 1593, the legislative record of H.B. 2846 demonstrates the need for a reservoir in
    the region.10 We also agree that the record demonstrates that the Legislature acted out of
    concern for the delays in developing and constructing the proposed reservoir. Cf. Robinson,
    335 S.W.3d at 150 (noting that it “[a]ccept[s] the legislative record as indicating the reasons for
    [the Legislature’s] actions”).    However, nothing in the record supports a conclusion that
    H.B. 2846 resolves these concerns.
    10
    For example, Brazoria County Judge Matt Sebasta testified that the inability to obtain
    “firm water” resources threatens the county’s population growth. Tony Bennet, President of the
    Texas Association of Manufacturers, testified that the availability of affordable water rights is
    crucial to the region’s economy. A representative of Dow Chemical agreed, adding that his
    company twice decided against expanding in the region because of the scarcity of reliable
    water access.
    15
    Permit 2925B provides that failure to begin construction by September 1, 2025,
    renders the permit null and void. To reach that point, the Authority must first obtain a variety of
    regulatory authorizations. According to the 2016 Plan, these include:
    •   obtaining a permit under Section 404 of the Clean Water Act,
    •   obtaining a National Environmental Policy Act Environmental Impact
    Statement,
    •   completing a Cultural Resources Survey and National Register of Historic
    Places testing,
    •   developing a plan to mitigate the impact of the reservoir on the waters and
    wetlands of the United States, and
    •   completing ancillary studies required by the United States Fish and Wildlife
    Service and the Texas Parks and Wildlife Department to determine the
    presence of endangered species on the site and to assess the impact of
    the project.
    The 2016 Plan estimates a “10-year schedule” to complete these steps and an additional
    two-and-a-half- to three-and-a-half year allowance to design and construct the reservoir itself.
    David Collingsworth, the Authority’s general manager and CEO, told the Legislature in 2019
    that the permitting process would begin “in the next twelve months” and be complete within
    “5-7 years,” followed by three years of construction. In all, he estimated that “we are looking at
    a 10-year project here if, if all the stars align and everything goes right.”
    But even if Houston had transferred its interest to the Authority by the
    January 1, 2020, deadline, and the Authority had started the process immediately, less than five
    years would have remained until the September 1, 2025 deadline to begin construction. Neither
    appellant suggests that H.B. 2846’s statement that construction is subject to the Authority
    obtaining “all necessary federal permits” modifies that deadline, and we do not interpret it that
    16
    way. When the Legislature passed S.B. 1132 to extend the construction deadline, it did so in
    express terms:
    Time Limitation No. 7.a. in Permit No. 2925A issued by the Texas Natural
    Resource Conservation Commission, the predecessor agency to the Texas
    Commission on Environmental Quality, to the Texas Water Development Board
    is amended to require that construction of the Allens Creek Reservoir commence
    on or before September 1, 2025, and be completed not later than the fifth
    anniversary of the date construction of the reservoir commences.
    S.B. 1132, § 1, sec. 1.06 (a), 2011 Tex. Gen. Laws at 1104. If the Legislature intended in
    H.B. 2846 to extend the deadline, it could easily have done so.             See Zanchi v. Lane,
    
    408 S.W.3d 373
    , 380 (Tex. 2013) (noting that if the Legislature had intended service-of-citation
    rules to apply to service of expert reports in suits over health care liability claims, it “knew how
    to do so”).
    The permit would not expire if the Authority timely applied for an extension and
    the Commission subsequently granted one. However, an extension is not available as of right
    under the Commission’s rules. The Commission “may grant” an extension if the permit holder
    explains why construction “could not be commenced or completed within the time required” and
    demonstrates they acted with “reasonable diligence” to begin or complete construction on time.
    See 
    30 Tex. Admin. Code § 295.72
    (b) (Texas Comm’n on Envt’l Quality, Applications for
    Extension of Time). The parties did not utilize this procedure in 2011 but rather sought an
    extension from the Legislature. At oral argument, the Authority agreed that it will likely need to
    return to the Legislature for an extension of the construction deadline.
    Given the likelihood that Permit 2925B will expire unless the Legislature or the
    Commission takes further action, H.B. 2846 itself does little to advance construction of the
    reservoir. Appellants disagree, arguing that H.B. 2846 is necessary because the reservoir will
    17
    never be built if Houston is involved. Houston responds that the record does not support this
    view, attributing much of the delay to litigation over the Authority’s application for a separate
    permit to appropriate additional water from the proposed reservoir. Houston and the Authority
    reached a settlement in 2014 where they agreed to begin developing the reservoir after the
    Authority’s new permit became final and unappealable, which occurred four years later.11
    Setting aside whether the record supports either characterization of Houston’s involvement, the
    fact that removing Houston from the project has a rational relation to constructing the Allens
    Creek Reservoir does not automatically render H.B. 2846 constitutional. See Maple Run at
    Austin Mun. Util. Dist. v. Monaghan, 
    931 S.W.2d 941
    , 947 (Tex. 1996) (rejecting argument that
    “any law having a conservation purpose” necessarily does not violate constitutional prohibition
    on local or special laws); see also Robinson, 335 S.W.3d at 145 (reiterating that retroactive
    legislation is not exempt    “from the constitutional prohibition merely because there was a
    rational basis for its enactment, or even because, on balance, it is likely to do more good than
    harm”). The Legislature made no findings to justify H.B. 2846, and, based on the record before
    us, we conclude the public interest served is slight. Compare Tenet Hosps., 445 S.W.3d at 707
    (holding that retroactive provision of legislation that “was a comprehensive overhaul of Texas
    medical malpractice law” served compelling public interest), and Synatzske, 438 S.W.3d at 58
    (holding that retroactive legislation aimed at resolving asbestos-related litigation crisis and
    supported by legislative fact findings served compelling public interest), with Robinson,
    335 S.W.3d at 143–44 (holding that retroactive legislation ostensibly enacted for sole benefit of
    one entity and not supported by legislative fact findings did not serve compelling public interest).
    11
    We discuss this dispute in more detail in our consideration of the second
    Robinson factor.
    18
    Even if we were to conclude that H.B. 2846 serves a compelling interest, our
    consideration of the remaining Robinson factors—which require us to balance the purpose
    against the nature of the prior right and the extent to which the statute impairs that right—would
    still result in our conclusion that the statute is unconstitutionally retroactive. See Robinson,
    335 S.W.3d at 147–48. Regarding the nature of the prior right, we consider the extent to which
    the impaired right was “settled.” Id. at 142–43, 147, 149.
    The dissent argues that we should begin by analyzing whether Houston’s permit
    right is vested. In the dissent’s view, Robinson did not “vitiate the need to evaluate whether the
    prior right is vested” but rather taught that a showing of vested rights is not always required.
    Post at ___. Surveying decades of case law, the dissent argues that the prohibition on retroactive
    legislation “broadly protects rights” of individual and private entities—even if those rights are
    not vested—but protects a narrower class of rights held by municipal corporations and other
    political subdivisions. Id. at ___. The dissent “conclude[s] that when a municipal corporation
    asserts a prior right against the State to challenge a retroactive law as unconstitutional, the
    municipal corporation generally needs to demonstrate that the nature of its prior right against the
    State is a vested property right as a threshold requirement to trigger the Robinson” balancing test.
    Id. at ___.
    We read Robinson differently. Generally, before any constitutional rights attach,
    a litigant must possess a “liberty or property interest that is entitled to constitutional protection.”
    Klumb v. Houston Mun. Emps. Pension Sys., 
    458 S.W.3d 1
    , 15 (Tex. 2015). A constitutionally
    protected interest “must be a vested right, which is ‘something more than a mere expectancy
    based upon an anticipated continuance of an existing law.’”            
    Id.
     (quoting City of Dallas
    v. Trammell, 
    101 S.W.2d 1009
    , 1014 (Tex. 1937)). The term “vested right” had a “special
    19
    meaning” in the retroactivity context prior to Robinson, 335 S.W.3d at 140. Surveying its
    precedents applying the impairs-vested-rights test, the supreme court observed that “there are
    vested rights and then there are vested rights, and not all laws which may fairly be said
    to retroactively impair vested rights are constitutionally prohibited.”         Id. at 142.    In the
    court’s estimation:
    The dispute over whether to call something a vested right appears driven not so
    much by what the words mean as by the consequence of applying the label—that
    its impairment is prohibited. Or as one commentator has put it: “it has long been
    recognized that the term ‘vested right’ is conclusory—a right is vested when it has
    been so far perfected that it cannot be taken away by statute.”
    Id. at 143 (internal footnote omitted). The supreme court therefore discarded the impairs-vested-
    rights test in favor of the balancing test. See id. (“What constitutes an impairment of vested
    rights is too much in the eye of the beholder to serve as a test for unconstitutional retroactivity.”);
    In re Occidental Chem. Corp., 
    561 S.W.3d 146
    , 161 (Tex. 2018) (orig. proceeding) (explaining
    that Robinson “expressly rejected the vested-rights test”). While Robinson discarded the “special
    meaning” the term “vested” had taken on in retroactivity jurisprudence, it preserved the
    requirement that litigants possess an interest that is vested in the sense that is “more than a mere
    expectancy based upon an anticipated continuance of an existing law.” See, e.g., Honors Acad.,
    555 S.W.3d at 61. Every litigant who challenges a law as unconstitutionally retroactive must
    possess an interest that is “vested” in this sense. See id. at 61–69 (evaluating, for purposes of
    due process and retroactivity claims, whether charter school operator’s interest in charter rose to
    that level).
    To support its argument that that municipalities must possess an interest that is
    vested in the sense rejected in Robinson, the dissent turns to the general rule that “Municipal
    20
    Corporations do not acquire vested rights against the State” but that the “Legislature cannot by
    retroactive legislation applicable to municipal corporations destroy or impair vested rights which
    persons have acquired in their relationships with the municipal corporations.” Deacon v. City of
    Euless, 
    405 S.W.2d 59
    , 62 (Tex. 1966).        In Milam County v. Bateman—which addressed
    counties as political subdivisions of the State—the supreme court stated that:
    [T]he political rights and privileges delegated to counties are not within the
    constitutional prohibitions against retroactive laws and those which impair vested
    rights. A different principle, however, obtains as regards the rights of counties to
    property which they may acquire. Such rights, as a general rule, are protected by
    the same constitutional guarantees which shield the property of individuals.
    
    54 Tex. 153
    , 165–66 (Tex. 1880); see also Texas Antiquities Comm. v. Dallas Cnty. Cmty. Coll.
    Dist., 
    554 S.W.2d 924
    , 930 (Tex. 1977) (plurality op.) (applying Milam County); Love v. City of
    Dallas, 
    40 S.W.2d 20
    , 27 (Tex. 1931) (holding that even though school district had no vested
    right to continue operating, “the public that it represents has a vested right in the municipal
    property acquired for its benefit”). The dissent would proceed to determine whether Houston’s
    permit rights are “property” within the meaning of these decisions. We respectfully decline to do
    so because neither appellant argues that Houston’s status as a municipal corporation affected the
    nature of its right. And we are not required to address it because the rule announced in these
    cases does not necessarily implicate standing. See Wilson v. Andrews, 
    10 S.W.3d 663
    , 669 (Tex.
    1999) (repudiating dicta in Proctor v. Andrews, 
    972 S.W.2d 729
    , 734 (Tex. 1998), which had
    agreed with court of appeals that city lacked standing to raise due process and equal protection
    challenges because municipalities do not enjoy due process rights); Stop the Ordinances Please
    v. City of New Braunfels, 
    306 S.W.3d 919
    , 929 (Tex. App.—Austin 2010, no pet.) (noting that
    “plaintiff is not required to allege the deprivation of a ‘vested right’ constituting a due-process
    21
    violation to demonstrate the requisite infringement of a ‘legally protected interest’”).12 Instead,
    we evaluate the case as it has been presented to us by the parties.
    We now turn to determining Houston’s interest.13           Constitutionally protected
    property interests “are created and their dimensions are defined by existing rules or
    understandings that stem from an independent source such as state law[.]” Honors Acad.,
    555 S.W.3d at 61 (citing Board of Regents of State Colls. v. Roth, 
    408 U.S. 564
    , 577 (1972)).
    Appellants argue that the supreme court has already settled this issue by holding that no one has
    protected rights in unused water rights. E.g., Wright, 464 S.W.2d at 648 (explaining permittees
    were not “vested with the right of non-use of the water”). In this view, a water-appropriation
    permit is no more than a right to acquire water rights in the future through use. We disagree.
    First, the text of Permit 2925B clearly contemplates a lengthy process of
    development and construction before use of the appropriated water. In addition to the federal
    regulatory requirements, the permit requires the holders to submit to the Commission a federally
    12
    The dissent argues that we must perform this analysis because Robinson directs a
    reviewing court to consider the nature of the prior right, and the Authority and Houston both
    challenge whether Houston’s permit rights are entitled to protection. We agree that we must
    determine whether the prior right is entitled to protection, but we are not required to fashion an
    argument on a party’s behalf. See In re Thompson, 
    330 S.W.3d 411
    , 424 (Tex. App.—Austin
    2010, orig. proceeding) (explaining that “it is not court’s duty to ‘fashion a legal argument . . .
    when [party] has failed to do so’ and that it is inappropriate for appellate court to ‘speculate as to
    what [party] may have intended to raise’” (quoting Canton-Carter v. Baylor Coll. of Med.,
    
    271 S.W.3d 928
    , 931 (Tex. App.—Houston [14th Dist.] 2008, no pet.))). We therefore decline
    to address whether Houston’s status as a municipality affects whether its prior right is
    enforceable. Cf. Wilson v. Andrews, 
    10 S.W.3d 663
    , 669 (Tex. 1999) (explaining city had
    standing to assert due process claim and choosing to “assume without deciding that government
    entities can raise due process and equal protection challenges and confront the merits of its
    constitutional challenges.”).
    13
    To avoid confusion, we will refrain from using the term “vested” any further in
    determining the nature of Houston’s prior right. See Zaatari v. City of Austin, 
    615 S.W.3d 172
    ,
    190 (Tex. App.—Austin 2019, pet. denied) (“Regarding the nature of the prior right, we consider
    not whether the impaired right was ‘vested,’ but the extent to which that right was ‘settled.’”).
    22
    approved plan to mitigate the environmental effects, design the reservoir and obtain the
    Commission’s approval of the designs, and obtain the Commission’s approval of conservation
    and drought contingency for the facility.
    Second, Chapter 11 does not support appellants’ view of a water-appropriation
    permit. Although there is no doubt that “[n]o person is granted the right to waste water by not
    using it,” Lower Colo. River Auth., 689 S.W.2d at 882, Chapter 11 contemplates that using some
    water rights will require permit holders to construct the necessary facilities. The statute sets
    default deadlines to begin construction, see Tex. Water Code § 11.145, and authorizes
    cancellation of a permit if the permittee fails to begin construction on time, see id. § 11.146.14
    The Commission may issue temporary permits reallocating water rights while the development
    process is ongoing unless “the issuance of the permit will jeopardize financial commitments
    made for water projects that have been built or that are being built to optimally develop the water
    resources of the area.” See id. § 11.1381(b). Additionally, the statute exempts from cancelation
    for nonuse permits that were “obtained as the result of the construction of a reservoir funded, in
    whole or in part, by the holder of the permit.” See id. § 11.173(b)(4); 
    30 Tex. Admin. Code § 297.71
    (b)(6) (2021) (Texas Comm’n on Env’t Quality, Cancelation in Whole or in Part).
    These provisions apply fully to Permit 2925B despite the unique way it was
    issued. Section 11.1311 provides that a permit issued pursuant to that section—which Permit
    2925B was—“shall be administered in accordance with this chapter and as otherwise provided
    by law.” Tex. Water Code § 11.1311(c). Construed as a whole, Chapter 11 clearly indicates that
    a permit such as Houston’s is more than a mere expectation that the permit holder will one day
    14
    Section 11.146 does not apply to a permit to construct a reservoir that, like the Allens
    Creek proposal, can hold more than 50,000 acre-feet of water. See Tex. Water Code § 11.146(g).
    23
    acquire protected rights. See Honors Acad., 555 S.W.3d at 61 (“To have a constitutionally
    protected property interest, a person must have a ‘legitimate claim of entitlement’ rather than a
    mere ‘unilateral expectation.’” (quoting Roth, 
    408 U.S. at 577
    )); see also American YouthWorks,
    496 S.W.3d at 260 (explaining that “[s]ome substantive limit on the State’s discretion” to revoke
    benefit “is an essential characteristic of a property interest warranting constitutional protection”
    (citing Grounds v. Tolar Indep. Sch. Dist., 
    856 S.W.2d 417
    , 418 (Tex. 1993)).15
    Wright and the supreme court’s other cases involving property rights in water
    permits do not alter our conclusion.      Wright involved a challenge to a statute authorizing
    cancelation of a water permit after ten years of nonuse. 464 S.W.2d at 642. The supreme court
    agreed that the statute was retroactive because it impacted rights that existed before the statute’s
    effective date. Id. at 648. Rejecting the permit holders’ arguments that their permits did not
    require them to use the water, the court explained that a permit “by definition” conveys “only the
    right to use the water for beneficial purposes.” Id. at 647. “Inherently attached to a permit to
    appropriate waters, therefore, is the duty that the appropriator will beneficially use the water.”
    Id. at 648. Thus, the permittees could reasonably expect enforcement of conditions inherently
    attached to their permits, and the permits themselves carried no right to be forever free of a
    remedy to enforce those conditions. Id.
    15
    Houston argues that the effect of these provisions is that Houston is entitled to retain
    its permit until it expires unless the Commission cancels it through the procedure laid out in
    Chapter 11. Appellants respond that Chapter 11 “makes no difference” to Houston’s claim
    because the Legislature is not bound by its own statutes. We agree with appellants to the extent
    that Chapter 11 does not prevent the Legislature from acting to cancel Houston’s permit outside
    the context of Chapter 11. See Hegar, 538 S.W.3d at 104 (“[A]s a general rule, one ‘legislature
    cannot prevent future legislatures from amending or repealing a statute.’” (quoting Central
    Power & Light Co. v. Public Util. Comm’n of Tex., 
    649 S.W.2d 287
    , 289 (Tex. 1983))). But
    Chapter 11 is not irrelevant—it shapes the contours of Houston’s property interest.
    24
    The supreme court later rejected a retroactivity challenge to the Edwards Aquifer
    Act for similar reasons. See Barshop v. Medina Cnty. Underground Water Conservation Dist.,
    
    925 S.W.2d 618
    , 633–34 (Tex. 1996). Before the Act, withdrawal of groundwater from the
    aquifer was unrestricted. Id. at 624. The Act created an Authority to regulate groundwater
    withdrawals and, among other things, capped annual withdrawals and restricted withdrawals
    under a permit based on the owner’s historic use. Id. The court upheld the Act despite its
    retroactive effect because the landowners could have no settled expectation “that a limited
    resource like groundwater, affected by public and private interests, will not require allocation[.]”
    See Robinson, 335 S.W.3d at 145 (discussing Barshop, 925 S.W.2d at 633–34).
    Houston’s interest in Permit 2925B is more settled. Unlike the property owners in
    Barshop, Houston is relying on a permit allocating it a specific amount of water. And unlike the
    permits at issue in Wright, Houston’s permit contemplates a period of nonuse of the appropriated
    water. Houston could reasonably expect to rely on the terms of the permit. Appellants disagree,
    arguing that Houston could have no settled expectations in a permit it had not used and had
    refused to fund for two decades. However, the record shows that Houston could reasonably
    expect that the development process would not begin until 2018. In 2002—two years after the
    Commission reissued the permit jointly to the parties—the Authority filed with the Commission
    a separate application for a “System Operations Permit.” This application requested numerous
    authorizations, including a new appropriation of 400,000 acre-feet of state water. The new
    appropriation included additional water from the proposed Allens Creek Reservoir. Securing
    that portion of the appropriation required Houston’s approval. Houston refused and was among
    several parties who contested the application in an administrative proceeding. Houston and the
    Authority executed a settlement agreement in 2014 calling for Houston to withdraw its contest in
    25
    return for a share of the additional appropriation. The Settlement Agreement further provided
    that “[a]fter the Authority obtains a final and non-appealable Permit, Houston and the Authority
    shall enter into one or more subsequent Agreements . . . to provide for the implementation in
    detail of the terms generally contemplated by this Agreement” and the Interlocal Agreement,
    including “the development and design, construction, operation, and maintenance” of the
    proposed reservoir.    The Commission issued System Operations Permit No. 5851 to the
    Authority in 2016, but it did not become final and unappealable until 2018. The record contains
    no evidence that the negotiations called for in the settlement agreement took place.
    In sum, the terms of the permit, the governing statutory provisions, and the
    surrounding circumstances all contribute to a reasonable, settled expectation that Houston will
    retain its interest in Permit 2925B at least until September 1, 2025. Based on the record before
    us, we conclude that Houston’s property interest in Permit 2925B is “settled.”
    We now turn to the third Robinson factor, which directs us to consider the extent
    of H.B. 2846’s impairment of the settled rights. See Robinson, 335 S.W.3d at 145. Appellants
    concede that H.B. 2846 eliminates Houston’s 70% interest in the project but argue that the
    impairment is “minimal” because Houston has no need for the water for the next fifty years.
    Houston disagrees and cites Haddock’s affidavit regarding the role Houston’s rights in Permit
    2925B played in the City’s long-term water plans. Notwithstanding Houston’s relative need for
    the water, a water right is valuable in other ways beyond its immediate usefulness. A permanent
    water right is an easement that passes with title to the land and may be conveyed as with other
    rights in land. See Tex. Water Code § 11.040; Ware, 
    2017 WL 875307
    , at *1. Haddock testified
    that Houston’s interest in the project constitutes 15% of its total surface water rights and that
    Houston relied on the existence of this interest in its long-term water planning. H.B. 2846
    26
    undeniably eliminates Houston’s 70% interest in the project. The elimination of a right plainly
    has a significant impact on that right.16 See Robinson, 335 S.W.3d at 148.
    Because the record shows that H.B. 2846 serves a minimal public interest while
    having a significant impact on Houston’s well-settled property right, we hold that H.B. 2846 is
    unconstitutionally retroactive. See id. at 150. Consequently, the district court did not err in
    granting summary judgment to Houston on this ground. Having concluded that H.B. 2846 is
    unconstitutionally retroactive, we need not address Houston’s remaining constitutional
    challenges to that statute. See Tex. R. App. P. 47.1.
    CONCLUSION
    We affirm the district court’s judgment.
    __________________________________________
    Edward Smith, Justice
    Before Justices Goodwin, Triana, and Smith
    Dissenting Opinion by Justice Goodwin
    Affirmed
    Filed: June 30, 2021
    16
    Although H.B. 2846 eliminates Houston’s interest in the project, the impact on
    Houston’s obligation to repay the remainder of the loan from the Water Board to purchase the
    reservoir site is less clear. Executive Administrator of the Water Board Jeff Walker testified
    during the hearings in 2019 that Houston had paid eleven million dollars out of its fourteen-
    million-dollar share of the loan.
    27