Luminant Energy Company LLC v. Public Utility Commission of Texas ( 2023 )


Menu:
  •            TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-21-00098-CV
    Luminant Energy Company LLC, Appellant
    v.
    Public Utility Commission of Texas, Appellee
    DIRECT APPEAL FROM THE PUBLIC UTILITY COMMISSION OF TEXAS
    PROJECT NO. 51617
    OPINION
    In this direct appeal, we consider a challenge to the validity of a pair of related
    Orders issued by the Public Utility Commission (PUC, Commission) on February 15 and 16 of
    2021, respectively, governing scarcity pricing in the wholesale electricity market during Winter
    Storm Uri. See Order Directing ERCOT to Take Action and Granting Exception to Commission
    Rules, PUC Project No. 51617 (Feb. 15, 2021); Second Order Directing ERCOT to Take Action
    and Granting Exception to Commission Rules, PUC Project No. 51617 (Feb. 16, 2021). Appellant
    Luminant Energy Company LLC (Luminant) and aligned intervenors 1 (collectively, Appellants)
    1  Appellant-Intervenors are Constellation NewEnergy, Inc.; Exelon Generation Company,
    LLC; Logan’s Gap Wind LLC; Pattern Energy Group LP; Pattern Gulf Wind, LLC; Pattern
    Panhandle Wind, LLC; Pattern Panhandle Wind 2 LLC; RWE Renewables Americas LLC; Texpo
    Power LP; and TX Hereford Wind, LLC. Appellee-Intervenors are Calpine Corporation; Talen
    Energy Corporation; and TexGen Power, LLC. Intervenor DGSP2 LLC aligns with different
    parties on different issues.
    contend that the subject Orders (1) constitute de facto competition rules under Chapter 39 of the
    Texas Utilities Code, (2) were adopted in violation of the rulemaking provisions of the
    Administrative Procedure Act (APA), and (3) exceed the Commission’s statutory authority. We
    agree with Appellants’ first and third points and therefore do not reach the second. We reverse the
    Commission’s Orders and remand for further proceedings consistent with our ruling.
    I.
    BACKGROUND
    The generation and sale of electric power is subject to a number of unique physical
    and engineering constraints that make it unlike other goods and services. Although battery
    technology is constantly improving, electricity remains difficult to store at scale, meaning that
    most electricity generation must occur concurrently with consumption. See, e.g., TXU Generation
    Co., v. Public Util. Comm’n of Tex., 
    165 S.W.3d 821
    , 827 (Tex. App.—Austin 2005, pet. denied)
    (discussing background of electricity market in Texas).        Moreover, for technical reasons,
    generation and consumption must at all times be maintained in near-perfect balance at an
    equilibrium point of 60 Hertz, or else a total grid collapse, together with serious damage to grid
    equipment, could result. 
    Id. at 828
    . Moreover, constraints on transmission can result in grid
    congestion, and power generated in one geographic region may not be available to consumers in
    another. 
    Id. at 827
    .
    In part for the foregoing reasons, electric power in Texas as elsewhere was
    historically thought of as a “natural monopoly,” with economies of scope and scale that rendered
    it relatively insusceptible to efficient delivery through market competition. 
    Id.
     (citing Reliant
    Energy, Inc. v. Public Util. Comm’n of Tex., 
    101 S.W.3d 129
    , 133 (Tex. App.—Austin 2003),
    rev’d in part by CenterPoint Energy, Inc. v. Public Util. Comm’n of Tex., 
    143 S.W.3d 81
    2
    (Tex. 2004)). Through much of the Twentieth Century, electric utilities were authorized by law
    to operate in tightly regulated, vertically integrated monopolies throughout the state. Monopoly
    power meant that, in any given geographical area, only one electric utility was authorized to
    provide electricity to retail customers. Vertical integration meant that, for any given customer, a
    single entity controlled all three of the principal components of electricity delivery: “generation
    of power; transmission of that power on high-voltage lines over long distances; and distribution of
    power over shorter distances to the ultimate consumer.” TXU Generation, 
    165 S.W.3d at 827
    (quoting City Pub. Serv. Bd. of San Antonio v. Public Util. Comm’n of Tex., 
    9 S.W.3d 868
    , 870
    (Tex. App.—Austin 2000), aff’d, 
    53 S.W.3d 310
    , 312 (Tex. 2001)). Tight regulation meant that,
    for any utility, the rates it could charge for electricity were set by the Commission.
    The regulated monopoly model provided reliable electric power at a price to the
    consumer that actually fell year over year until the 1970s. Beginning in or around 1973, however,
    the OPEC oil embargo and the resultant energy crisis—which came at a time when a substantial
    portion of electricity generation in the U.S. was fueled by petroleum—produced dramatic price
    increases and gave rise to political pressure from consumers for some kind of reform in order to
    control costs. See Seth Blumsack, Measuring the Benefits and Costs of Regional Electric Grid
    Integration, 28 Energy L. J. 147, 149 (2007). In response, Congress and several states enacted
    measures to encourage competition in the electric power market through deregulation
    and restructuring. See, e.g., Public Utility Regulatory Policies Act of 1978, Pub. L. 95–617,
    
    92 Stat. 3117
     (allowing electricity production by independent producers in federally regulated
    markets). That restructuring has taken a variety of forms in different regions, but essential
    components typically include (1) the vertical disintegration of electric utilities into separate
    generation, transmission, and distribution utility entities; (2) retail competition at the generation
    3
    level, with customers able to choose from among competing providers selling at rates based on
    market prices rather than regulated costs; (3) the use of spot markets for energy and, in some cases,
    ancillary services such as capacity and reserves; and (4) the management of the transmission and
    distribution grid on a regional scale by an independent entity rather than the transmission owners.
    Blumsack, supra at 152.
    The latter feature was necessary to ensure that competing generators received
    nondiscriminatory access to transmission infrastructure in order to reach their customers. Put
    another way, for generation to be deregulated and open to competition, it was necessary for
    transmission to remain tightly regulated and transparent, lest transmission owners grant
    preferential access to favored generators. Toward that end, the Federal Energy Regulatory
    Commission (FERC) in 1996 issued Orders 888 and 889 to require transmission utilities to give
    generators nondiscriminatory access under an open-access tariff and to publish real-time available
    capacity.   See Order No. 888, Promoting Wholesale Competition Through Open Access
    Nondiscriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by
    Public Utilities and Transmitting Utilities, 
    61 Fed. Reg. 705
    -02 (1996) (codified at 18 C.F.R.
    pt. 35); Order No. 889, Open Access Same-Time Information System (formerly Real-Time
    Information Networks) and Standards of Conduct, 
    61 Fed. Reg. 21,737
    -01 (1996) (codified at
    18 C.F.R. pt. 37). These orders, together with Order 2000, introduced the closely related concepts
    of Independent System Operator (ISO) and Regional Transmission Organization (RTO).
    Order No. 2000, Regional Transmission Organizations, 
    65 Fed. Reg. 45,854
    -01 (2000) (codified
    at 18 C.F.R. pt. 35).     Though distinct in terms of governance structure and congestion
    protocols, ISOs and RTOs are sufficiently similar in function that the terms are often used
    interchangeably. Blumsack, supra at 147 n. 1. Either designation, RTO or ISO, refers to the
    4
    independent, not-for-profit organization that manages the joint transmission assets of a number of
    regionally interconnected transmission utilities in a deregulated region. Such entities have no
    assets of their own and take no position in the wholesale market, but are responsible for managing
    bulk transmission, ensuring equal access to the grid by customers and suppliers, dispatching
    reserve generation as needed to balance supply and demand, and often making a market for
    wholesale electric generation and ancillary services. Id. at 147. Today, seven such regional
    entities are operating in the United States, covering approximately half of the states and two-thirds
    of total annual demand.
    Texas’s foray into deregulation began in 1999, when the Legislature enacted Senate
    Bill 7, amending the Public Utility Regulatory Act (PURA) to deregulate Texas’ electricity market
    and require that wholesale and retail rates generally be set by competition rather than regulation.
    See Act of May 27, 1999, 76th Leg., R.S., ch. 405, 
    1999 Tex. Gen. Laws 2543
    , 2543–2625
    (codified at Tex. Util. Code §§ 39.001–.910.) Texas is distinct in that, by sheer size, its grid is one
    of the nation’s three major regional interconnections, and yet, because it is entirely within the state,
    it is not subject to FERC regulation. Nevertheless, deregulation in Texas has largely conformed
    to the pattern seen elsewhere in the country. With SB 7, the Legislature required monopolies in
    Texas to unbundle their generation, transmission, and distribution units and form separate entities.
    See Tex. Util. Code § 39.051(b). The newly deregulated market was placed under the regulatory
    jurisdiction of the PUC which, in turn, certified the Electric Reliability Council of Texas (ERCOT)
    as the ISO for a sprawling, self-contained grid that covers approximately 70 percent of the state
    geographically and serves approximately 90 percent of the state’s electricity customers. Texas
    Com. Energy v. TXU Energy, Inc., No. CA No. C-03-249, 
    2004 WL 1777597
    , at *1–2 (S.D. Tex.
    June 24, 2004), aff’d, 
    413 F.3d 503
     (5th Cir. 2005).
    5
    As the ISO, ERCOT is responsible for ensuring (inter alia) system reliability,
    nondiscriminatory access to transmission and distribution systems, and clearance of all market
    transactions in the region served by the grid. Importantly, ERCOT acts as the central counterparty
    for all transactions it settles and is deemed to be the sole buyer to each seller (typically a generator),
    and the sole seller to each buyer (typically a retailer) of all energy and related services. ERCOT
    Nodal Protocols § 1.2(4). From a central control room that has been likened to an air traffic control
    center, ERCOT monitors the flow of energy from more than 680 generation units to more than
    26 million customers over more than 46,500 miles of transmission lines, all while balancing
    generation with load to maintain a system frequency of 60 Hertz. Extreme weather condition
    preparedness/power outages: Hearing Before the S. Comm. On Bus. & Com. (Senate B&C Hr’g),
    87th Leg., R.S. (Tex. 2021) (testimony of Bill Magness, President and CEO, ERCOT); see also
    Bill Magness, Review of February 2021 Extreme Cold Weather Event—ERCOT Presentation at 4
    (Feb. 24, 2021). In addition to PURA and the substantive regulations adopted by the PUC pursuant
    to its rulemaking authority, ERCOT’s board is also authorized to adopt rules or so-called
    “protocols” that provide a framework for the administration of the electricity market, subject to
    Commission oversight and review. BP Chemicals, Inc. v. AEP Tex. Cent. Co., 
    198 S.W.3d 449
    ,
    452 (Tex. App.—Corpus Christi–Edinburg 2006, no pet.); Tex. Util. Code § 39.151(d), (g).
    Scarcity pricing
    By statute, the PUC is required to “adopt and enforce rules relating to the reliability
    of the regional electrical network” or “delegate to an independent organization responsibilities for
    adopting or enforcing such rules.” Tex. Util. Code § 39.151(d). In 2006, pursuant to that statutory
    directive, the Commission by rule established the general outline of a scarcity pricing mechanism
    6
    (SPM) for use during periods of high demand. 
    16 Tex. Admin. Code § 25.505
    (g) (effective
    May 30, 2019, to July 13, 2021). The rule required that ERCOT “use a stakeholder process to
    develop and implement rules” to add detail and specificity to the general mechanism.
    
    Id.
     § 25.505(h) (effective May 30, 2019, to July 13, 2021). Pursuant to an earlier version of that
    mandate, ERCOT in 2014 revised its protocols to include a complex mathematical formula and to
    enumerate several variables to determine when and how scarcity pricing takes effect. See
    ERCOT Nodal Protocols § 6.5.7.3.1, Determination of Real Time On-Line Reliability Deployment
    Price Adder.
    Scarcity pricing is limited by rule to a system-wide offer cap (frequently
    abbreviated “HCAP”) of $9,000 per megawatt hour (MWh).                    
    16 Tex. Admin. Code § 25.505
    (g)(6)(B) (effective May 30, 2019, to July 13, 2021). To put that figure in perspective, a
    typical market clearing price for electricity in Texas can be as little as $30/MWh. The reason for
    the orders-of-magnitude delta has to do with the way the state’s wholesale market is structured.
    Texas is what is known as an “energy-only” market, meaning that generators are
    compensated only for energy actually sold, as contrasted with a so-called “capacity” market, in
    which generators are compensated for making capacity available even if it is not ultimately used.
    A “base-load” generation utility (that is, one intended to operate continuously for long periods
    under normal market conditions) may incur significant initial costs investing in capacity, while
    expecting to recoup those costs through daily operations by offering at or below the market
    clearing price on most days. A so-called “peaker” generator, however, may invest a comparable
    amount of capital in generating capacity that it expects to use only during a few peak hours on
    summer afternoons. To defray the high costs of developing and maintaining such seldom-used
    capacity, it is necessary for such generators to receive a very high rate of return per megawatt hour
    7
    on the energy they do sell. Accordingly, the scarcity pricing mechanism is intended to accomplish
    two goals. First, by offering windfall prices to peak generators through a number of scarcity price
    “adders,” it creates incentives for any idle generation capacity to come online when demand (or
    “load”) threatens to exceed supply. Second, by imposing sticker-shock costs on consumption, it
    encourages conservation by any institutional consumers that may have some elasticity of demand,
    thus hopefully easing system load.
    Winter Storm Uri
    Texas typically experiences peak electricity demand during its long hot summers
    as consumers rely on electric power to run their air conditioners. In 2021, however, the winter
    weather event that has come to be known colloquially as Winter Storm Uri subjected the state’s
    electrical grid to historically unprecedented stress.
    The “perfect storm” of factors that would ultimately coalesce to produce Uri first
    came to meteorologists’ attention in late December and early January, with a rapid rise in
    temperatures by as much as 90 degrees in the Earth’s stratosphere over the North Pole. Senate
    B&C Hr’g, 
    supra
     at 08:28–54:30 (testimony of Bob Rose, Meteorologist, Lower Colorado River
    Authority). Known simply as a “sudden stratospheric warming event,” the phenomenon is not
    terribly unusual, occurring on average approximately once in four years, but, when combined with
    other factors, it can produce disruptions in the so-called “polar vortex,” allowing super-chilled
    arctic air to flow south and at ground-level altitudes. 
    Id.
     By late January, a pair of high-pressure
    ridges had begun to form near Greenland and the Gulf of Alaska, creating conditions favorable to
    a pronounced disruption of the jet stream that would allow bitterly cold Siberian air to spill over
    the pole and down across North America as far south as Texas. 
    Id.
    8
    The looming emergency did not go unnoticed by ERCOT. As early as November
    of 2020, the entity’s meteorologist issued a winter outlook for market participants warning of “very
    good” chances for an extreme cold weather event during the 2020-21 winter season. Magness,
    supra at 9. On February 3, 2021, ERCOT warned market participants and the public of the coldest
    weather of the year, with additional advisories, operating condition notices, and press releases
    issued on February 10, 11, 13, and 14. Id. In anticipation of possible weather-related outages,
    pre-event precautions included canceling planned maintenance outages for more than 1,600
    transmission devices, waiving COVID restrictions, activating additional on-site and remote
    engineering and support staff, and requesting emissions waivers from federal and state regulators.
    Id. at 8.
    The Arctic air first began to arrive in Texas on Friday, February 12, 2021, with up
    to half-inch accumulations of ice observed on some surfaces. Senate B&C Hr’g at 9:20 (Rose
    testimony). Temperatures remained low into the weekend, hovering in the 20s and 30s, but dipped
    significantly on Sunday, February 14, as Siberian air flooded into Texas and plunged temperatures
    into the teens. Id. On Monday, February 15, the statewide average temperature in Texas was
    11 degrees Fahrenheit. Id. Several cities posted record or near-record lows, with the Dallas–Fort
    Worth area logging its third lowest temperature ever observed at 2 degrees below zero, Austin
    logging its fifth lowest at 7 degrees, and Corpus Christi logging its all-time lowest observed
    temperature at 17 degrees. Id. Moreover, the duration of the freeze shattered records, with cities
    across north Texas experiencing more than 200 consecutive hours of temperatures below freezing,
    and parts of central Texas seeing more than 160 hours. Id. Temperatures in Austin remained
    below freezing for 144 consecutive hours, the longest period on record. Id. Unlike comparable
    cold-weather events in 1989 and 2011, the extreme cold combined with heavy precipitation to
    9
    produce record or near-record snowfall in parts of the state, with Dallas receiving 4–5 inches of
    accumulation over the weekend, Midland 5–6 inches, Austin between 6 and 8 inches (its fourth
    largest two-day total on record), and Del Rio nearly a foot of snow, an all-time record. Id. For
    temperatures alone, Uri entered the history books among the four or five coldest weather events
    since reliable recordkeeping began in 1895. Id. When duration and precipitation are taken into
    account, Uri may have been the most severe winter weather event in the recorded history of Texas.
    At 8:30 a.m. on the morning of Sunday, February 14, 2021, ERCOT issued a
    conservation alert and media appeal. Magness, supra at 11. By mid-morning, it was already
    becoming clear to ERCOT’s leadership that offers for so-called “ancillary services,” i.e., additional
    generation necessary to make up a shortfall in scheduled base generation relative to demand, would
    fall short of the anticipated load, and a watch to this effect was issued at 10:54 a.m. that morning.
    Id. Based on projected demand, it was anticipated that ERCOT would probably need to order
    transmission entities to “shed load” in order to maintain the 60-Hertz balance with generation, but
    it was expected that these measures would take the form of brief rotating outages that would not
    leave any customer without power for longer than a few hours. Senate B&C Hr’g 1:06:27
    (Magness testimony). Despite the fact that demand was projected to break an all-time record,
    exceeding even the highest summer demand on record, it appeared to ERCOT personnel as though
    the system had enough generation online to get through the ensuing days with minimal disruption
    to service. Id. As night fell, however, all of that began to change.
    At 9:58 p.m., ERCOT issued a reserve capacity watch. Magness, supra at 11.
    At 11:17 p.m., ERCOT deployed responsive reserve. Id. By 11:32 p.m., ERCOT issued another
    advisory, announcing a physical response reserve of less than 3,000 megawatts remaining. Id.
    By 12:15 a.m. on the morning of the 15th, reserves had fallen below 2,300 megawatts, sending
    10
    ERCOT into Energy Emergency Alert (EEA) Level 1. Id. By 1:07 a.m., reserves had fallen below
    1,750, triggering EEA2 and prompting deployment of load resources. Id. At 1:20 a.m., ERCOT
    entered EEA3—its highest alert level—and began ordering that load be shed. Id.
    As the storm continued to move southward through Texas in the early morning
    hours of the 15th, it froze poorly winterized natural gas wellheads and gathering lines, nearly
    halving the supply of the state’s predominant fuel for electric generation at a time when the gas
    was already in high demand for direct-burn home heating in many areas. As more and more
    generation units went offline for want of fuel, the plummeting electricity supply rapidly
    overwhelmed ERCOT’s ability to manage scarcity and began to threaten the stability of the grid
    itself. As of 1:23 a.m., a combined capacity of 35,343 megawatts of generation was reported
    offline due to weather-related causes, and the system frequency fell to 59.9 Hertz, prompting
    ERCOT to order 1,000 megawatts of load shed to stabilize it. Id. at 12. Just a few minutes later,
    however, at 1:26 a.m., three additional outages of 1,481 megawatts, 248 megawatts, and
    329 megawatts occurred in rapid succession, causing the system frequency to fall to under
    59.8 Hertz by 1:43 a.m. Id. This prompted another 1,000 megawatts of load shed, but the grid
    continued hemorrhaging generation, with outages of 606 megawatts, 688 megawatts, and
    511 megawatts, respectively, between 1:48 a.m. and 1:53 a.m. Id.
    These additional failures drove the grid past a critical threshold, as the system
    frequency dipped below 59.4 Hertz.      Id.; see also Senate B&C Hr’g at 1:16:30 (Magness
    testimony). At that level there existed an imminent risk of oscillations that could damage grid
    components, perhaps permanently. As a rule, the system could remain below 59.4 for no more
    than nine minutes. The grid frequency that night was below 59.4 for a total of four minutes and
    three seconds, during which time two more rounds of load shed were ordered, of 3,000 megawatts
    11
    and 3,500 megawatts, respectively. Magness, supra at 12. The frequency bottomed out at
    59.302 Hertz before beginning to recover. Id. By 2:03 a.m. it reached 60 Hertz again, but not
    before additional generation outages of 843 megawatts and 841 megawatts forced another 2,000
    megawatts of load shed, bringing the total load shed that night to a staggering 10,500 megawatts.
    The storm, at its worst, had taken out 48.6 percent of the generation available to
    ERCOT to manage the system. Id. at 13; see also Senate B&C Hr’g at 1:01:103 (Magness
    testimony). Some 4.5 million households and businesses lost power and, because of the volume
    of load shed, these outages could not easily be rotated without threatening critical infrastructure
    (e.g., hospitals). For that reason, many of the homes affected were left without power for days at
    a time during some of the coldest days ever recorded in the state’s history. Bad as this outcome
    was, ERCOT’s then-CEO later testified that it could have been much worse. The system had come
    perilously near collapse and, had it been allowed to fail, the result would have been a weeks-long,
    statewide blackout. The worst potential outcome had been averted.
    Also closely monitoring the situation that weekend were the then-current members
    of the Commission, all of whom have since resigned. During the course of the foregoing events,
    the previously established SPM (scarcity pricing mechanism) remained in effect but resulted in
    market clearing prices of just over $1,200/MWh. Hearing to examine billing errors resulting from
    Winter Storm Uri and explore the means available for correcting those errors: Hearing Before
    the S. Comm. on Juris., 87th Leg., R.S. (Tex. 2021) at 43:42—52 (Mar. 11, 2021) (testimony of
    Independent Market Monitor (IMM) director Carrie Bivens). In consultation with ERCOT
    personnel, then-PUC Chair DeAnn Walker concluded that the SPM had malfunctioned. Senate
    B&C Hr’g at 6:13:29 (testimony of DeAnn Walker, Chair, PUC). Chair Walker reasoned that the
    SPM was intended to move prices in an inverse correlation with reserve capacity and that, at load
    12
    shed, maximum demand had by definition been reached, such that the maximum offer price should
    be in effect as well. Id. Moreover, after speaking with ERCOT’s leadership, she had a working
    hypothesis to explain exactly why the SPM had failed. Specifically, her understanding was that,
    as the grid shed load pursuant to ERCOT’s emergency orders, the SMP algorithm erroneously
    disregarded the lost load altogether for purposes of computing price.
    The significance of this inference should not be understated. Clearing prices act as
    price signals, letting market participants know when additional generation is needed. According
    to Chair Walker’s interpretation, ERCOT’s computer system was, in effect, sending the market a
    false signal—signaling that additional generation was not needed, or at least not needed as urgently
    as was actually the case—and thereby failing to adjust incentives to answer the exigency presented
    by the storm.
    On the afternoon of February 15, 2021, the Commission held a brief open meeting
    in which the commissioners discussed the SPM and issued the first of the two Orders that are the
    subject of this litigation. Finding that the electricity market was clearing as low as $1,200 and that
    this outcome was “inconsistent with the fundamental design of ERCOT,” the Commission directed
    ERCOT “to ensure that firm load that is being shed in EEA3 is accounted for in ERCOT’s scarcity
    pricing signals.” Order Directing ERCOT to Take Action and Granting Exception to Commission
    Rules, PUC Project No. 51617 at 1-2 (Feb. 15, 2021) (First Order). The First Order stated, “If
    customer load is being shed, scarcity is at its maximum, and the market price for the energy needed
    to serve that load should also be at its highest.” Id. at 1. By its terms, the First Order applied only
    to the then-in-effect EEA event.
    Later that same day, ERCOT issued a market notice reflecting its understanding
    that the PUC’s “directive [was] based on the [PUC’s] observation in the order that energy prices
    13
    of less than $9,000/MWh during load shed conditions are ‘inconsistent with the fundamental
    design of the ERCOT market.’” ERCOT, M-C021521-01 Emergency Order of the Public Utility
    Commission Affecting ERCOT Market Prices (Feb. 15, 2021). ERCOT then adjusted its price
    algorithm to cause the market to clear at the $9,000/MWh cap.
    On the afternoon of the 16th, the Commission held a second meeting to revisit the
    First Order, ultimately issuing a second order that was substantially identical to the first, except
    that it rescinded language in the First Order that would have required retroactive repricing. Second
    Order Directing ERCOT to Take Action and Granting Exception to Commission Rules, PUC
    Project No. 51617 (Feb. 16, 2021) (Second Order). The Second Order again directed ERCOT that,
    if there was load shed, the market price for the energy needed to serve that load should also be “at
    its highest.” Id. at 1. ERCOT has since issued settlement statements to market participants
    reflecting the $9,000/MWh clearing price.
    II.
    PROCEDURAL HISTORY
    Appellant Luminant, a market participant subject to ERCOT protocols, filed its
    notice of direct appeal in this Court on March 2, 2021, challenging the first and second Orders as
    competition rules under Section 39.001(e) of the Utilities Code. Several parties intervened on
    either side. Generally, Appellants proceed on the theory that the subject Orders were procedurally
    invalid, beyond the PUC’s statutory authority to adopt, or both.             Luminant has also filed
    administrative challenges to settlement invoices issued by ERCOT for transactions during the
    storm, asserting that, because the subject Orders are invalid, the price of electricity in the settlement
    invoices is also incorrect. See Luminant v. Public Util. Comm’n, No. 03-21-00126-CV (Tex.
    App.—Austin).
    14
    In their responses, the Commission and its aligned intervenors argue that (1) the
    subject Orders are not rules; (2) if they are rules, they were adopted in substantial compliance with
    emergency rulemaking provisions of the APA; (3) the PUC was expressly authorized by statute to
    correct the allegedly erroneous pricing by the SPM; and (4) for a variety of reasons, this Court
    lacks subject-matter jurisdiction. As jurisdiction is a threshold issue, we address it first, before
    turning to the merits.
    III.
    DISCUSSION
    Subject-Matter Jurisdiction.
    The PUC challenges this Court’s subject-matter jurisdiction in five separate but
    sometimes overlapping arguments. Each is addressed in turn.
    Appellants’ Claims are Not Moot.
    The Commission argues first that, because the Orders by their own terms applied
    only during the then-in-effect EEA3 event and consequent load shed, the Orders have now expired,
    and any controversy between the parties is now moot. We disagree.
    Mootness doctrine generally requires that a case or controversy exist at all stages
    of a proceeding and that, if events resolve the dispute, the case should be dismissed as moot.
    See, e.g., Matthews v. Kountze Indep. Sch. Dist., 
    484 S.W.3d 416
    , 418 (Tex. 2016). Events that
    may render a case moot include the death of a party, the settlement of the claim, the repeal of a
    challenged statute—essentially any change in the facts that ends the controversy.                See
    Electric Reliability Council of Tex., Inc. v. Panda Power Generation Infrastructure Fund, LLC,
    
    619 S.W.3d 628
    , 634–35 (Tex. 2021). The doctrine has a constitutional dimension, in that it
    15
    prevents courts from rendering advisory opinions. Wilson v. Community Health Choice Tex., Inc.,
    
    607 S.W.3d 843
    , 849 (Tex. App.—Austin 2020, pet. denied) (citing Matthews, 484 S.W.3d at 418).
    Here, the controverted issue is the lawfulness of the Orders that purported to price
    electricity at its statutory cap of $9,000/MWh. If the Orders are held to have been lawful, so too
    (barring other grounds for challenge) will the invoices or settlement statements issued during the
    period in which the Orders were putatively in effect. If the Orders are held unlawful, Appellants
    (barring other factors not considered here) may succeed in their administrative challenges and
    secure adjustments to the invoiced amounts. The live controversy, then, is whether Appellants are
    presently entitled to the difference between the invoiced prices and the much lower clearing prices
    that they argue would have been charged in the absence of the allegedly invalid Orders. To grant
    or deny such material relief would not be to issue an advisory opinion.
    The Commission cites a number of cases for the proposition that, generally, “where
    an order expires by its own terms … all issues relating to the validity of the order become moot.”
    Rodriquez v. Texas Dep’t of Pub. Safety, 
    533 S.W.2d 849
    , 851 (Tex. App.—Tyler 1976, no writ).
    Upon review, however, we find the cited authorities consistent with our understanding. In
    Rodriquez, for example, the plaintiff appealed from a trial-court judgment affirming a 12-month
    administrative suspension of his certificate of appointment as a motor vehicle inspector and of his
    garage’s license as an official inspection station. 
    Id. at 850
    . By the time the case reached the Tyler
    court, however, the suspension had expired. 
    Id.
     On those facts, the court held the case to be moot.
    
    Id.
     at 850–51. In so holding, the court noted that “courts have sometimes entertained attacks on
    orders that have expired by their own terms because the person against whom such order was made
    might suffer some subsequent detriment if the legality of the order were not determined.” 
    Id. at 851
    . Rodriquez, however, sought “no relief other than reversal of the order of suspension”—he
    16
    did not, for example, claim to be entitled to monetary damages resulting from the suspension. 
    Id. at 851
    . As such, an order of reversal could have had no prospective effect on any party’s rights or
    duties. Here, in contrast, Appellants are separately disputing the settlement statements through
    ERCOT’s administrative ADR process, alleging unlawful overpricing of thousands of dollars per
    megawatt hour; our decision in this appeal may have very real material consequences for all
    involved. The “subsequent detriment” Appellants will experience if the Orders are allowed to
    stand will be the obligation to honor the allegedly unlawful price.
    In Texas Department of Agriculture v. Wild Boar Meats, LLC, the Department of
    Agriculture adopted an emergency rule to allow the temporary registration of a certain chemical
    pesticide for use in feral-hog abatement. No. 03-17-00514-CV, 
    2018 WL 3748677
    , at *1 (Tex.
    App.—Austin Aug. 8, 2018, pet. denied) (mem. op.). Wild Boar Meats, a company that purchased
    feral hogs and hog carcasses from local hunters for use in food products, believed the pesticide
    presented safety risks to humans and sued the Department challenging the validity of the rule. 
    Id.
    While the case was pending, the sole manufacturer to have requested registration under the rule
    asked the Department to cancel its request citing negative publicity, and the Department notified
    the Secretary of State that it was withdrawing the rule. Id. at *2. In reversing the trial court’s
    denial of the Department’s motion to dismiss on mootness grounds, this Court noted that the rule
    was withdrawn several months before the hearing on the motion to dismiss and that nothing in the
    record suggested any pesticide had ever been used under the rule, concluding that “any declaration
    regarding its validity would have no legal effect” and that the claim was therefore moot. Id. at *3.
    The present case is distinguishable. Whereas the declaration sought in Wild Boar would not have
    halted any actual or threatened use of the pesticide under the former rule, Appellants in this case
    seek to avoid the financial burden they will experience if required to honor the allegedly inflated
    17
    electricity pricing in their pending administrative challenges to the allegedly invalid rule at
    issue here.
    In Railroad Commission of Texas v. Oil Production Maintenance, Inc., the owners
    and operators of a gas well sued the Railroad Commission to set aside and enjoin enforcement of
    an order placing the well under a six-month restriction limiting the daily volume of gas that could
    be produced from it. 
    319 S.W.2d 822
    , 823 (Tex. App.—Austin 1958 writ ref’d n.r.e.). The trial
    court held in favor of the plaintiffs and granted the injunction but, by the time the case came before
    this Court on appeal, the six-month interval had run, and the order had expired of its own terms.
    
    Id.
     Accordingly, we set aside the judgment below and dismissed the case as moot. 
    Id. at 824
    . As
    in the other cases cited by the Commission—and unlike the present case—the plaintiff sought no
    greater relief than what had already been brought about by the expiration of the challenged rule.
    The same distinction applies to the cases Calpine cites in its brief. In State v. City
    of Austin, the State sought to enjoin local orders intended to limit the spread of COVID-19 by
    suspending restaurants’ dine-in food and beverage service each night from 10:30 p.m. to 6:30 a.m.
    over the holiday weekend beginning December 31, 2020, and ending January 3, 2021.
    No. 03-20-00619-CV, 
    2021 WL 1313349
    , at *1 (Tex. App.—Austin Apr. 8, 2021, no pet.) (mem.
    op.). The orders were in force for a total of 7.5 hours before being temporarily enjoined and then
    expiring by their own terms. Id. at *4. Despite the expiration, the State nonetheless proceeded
    with its suit. In dismissing, this Court noted that “nothing in the parties’ briefing or the record
    indicates that the local officials actually enforced the local orders during the single 7.5-hour period
    that they were in effect.” Id. at *5. We held that “[a]bsent any enforcement efforts,” the State’s
    18
    requested relief would have had no legal effect. Id. at *5 (emphasis added). 2 Impliedly, the
    outcome may have been different had the plaintiff been a business owner who sought relief from
    a fine issued under the complained-of order. Cf. Lowenberg, v. City of Dallas, 
    261 S.W.3d 54
    , 59
    (Tex. 2008) (suit for refund of allegedly unlawful municipal fire registration on ground that it was
    improper occupation tax not mooted by voluntary payment or subsequent repeal of ordinance).
    Perhaps the most factually similar case the Commission cites is the second of two
    cases styled El Paso County Hospital District v. Texas Health & Human Services Commission,
    cited for the proposition that, “[e]ven if ERCOT undertook to reconstruct alternative pricing, those
    calculations would not make previously issued statements for EEA3-operating days any less
    valid.” See 
    400 S.W.3d 72
    , 82 (Tex. 2013) (El Paso II). In El Paso II, a number of hospitals
    alleged that the Texas Health and Human Services Commission (HHSC) had used an invalid rule
    to calculate reimbursement rates for Medicaid services, resulting in alleged underpayments to the
    hospitals dating back years. Moreover, the hospitals in that case sought not only the prospective
    invalidation of the rule but the retroactive recalculation and recovery of past payments. The
    Commission’s reliance on El Paso II is problematic, however, because, in that case, the Texas
    Supreme Court did not reach the retroactivity issue for which the Commission now cites it. 
    Id. at 83
     (referring to El Paso Hosp. Dist. v. Texas Health & Human Servs. Comm’n, 
    247 S.W.3d 709
    (Tex. 2008) (El Paso I) and explaining that “[w]e did not decide [in El Paso I] whether the
    2    See also Methodist Hosps. of Dallas v. Texas Workers’ Compensation Comm’n,
    
    874 S.W.2d 144
    , 147 (Tex. App.—Austin 1994, no writ) (dismissing as moot challenge to expired
    rule when no other relief sought and no suggestion that ruling could result in the recovery of
    previously incurred costs or relief from previously assessed but unlawful fees or expenses); Young
    Trucking, Inc. v. Railroad Commission of Texas 
    781 S.W.2d 719
    , 720 (Tex. App.—Austin 1989,
    no writ) (dismissing as moot challenge to lapsed one-year administrative suspension of the
    plaintiff’s specialized motor carrier certificate when no prospective relief sought).
    19
    hospitals could reopen past agency proceedings or obtain relief for past years”). Moreover, much
    of the discussion of the availability of retroactive relief in that case concerned a close reading of
    administrative rules specifically applicable to HHSC and not relevant here. Finally, the relief
    sought here is not impermissibly retroactive because Appellants’ administrative challenges remain
    pending. Thus, nothing in El Paso II requires us to deem the previously issued Orders for EEA3
    a fait accompli, immune from review or revision.
    Here, Appellants do not merely seek a sterile declaration of the invalidity of a now-
    defunct rule. Rather, they dispute the enforceability in still-pending administrative challenges of
    settlement statements issued pursuant to, and after the expiration of the allegedly invalid rule.
    The Commission’s “Voidability” Argument Does not Defeat Jurisdiction.
    The Commission also contends that, even if we find the Orders not to have been
    adopted in substantial compliance with the Act, we cannot grant the relief Appellants seek because
    a rule is valid until adjudicated void. Section 2001.035 of the Texas Government Code provides
    that “[a] rule is voidable unless a state agency adopts it in substantial compliance with Sections
    2001.0225 through 2001.034.” Tex. Gov’t Code § 2001.035 (emphasis added). The Commission
    cites a number of cases for the proposition that a voidable rule—as opposed to a rule that is void
    ab initio—is valid until adjudicated void. See Meeker v. Tarrant Cnty. Coll. Dist., 
    317 S.W.3d 754
    ,
    761 (Tex. App.—Fort Worth 2010, pet. denied). Thus, the Commission reasons, “the validity of
    any actions ERCOT took in response to the … Orders in the interim (prior to a judgment in this
    case) is not contingent on previously-unadjudicated questions about APA compliance.” See
    Brazzel v. Murray, 
    481 S.W.2d 801
    , 803 (Tex. 1972). “At best,” the Commission concludes,
    20
    “Appellants’ APA challenge can invalidate only future efforts to include firm-load shed in
    calculating scarcity pricing signals.” We disagree.
    The Commission makes much of the distinction between an act that is void ab initio,
    which is a legal nullity, and an act that is merely voidable, and which therefore remains in effect
    until adjudicated void. The Commission would have us conclude that, upon holding a voidable
    rule to be void, a court is powerless to grant an aggrieved party any relief that would disturb the
    outcomes of actions previously undertaken pursuant to the then-voidable, now-void rule. We find
    that proposition poorly supported by the cases the Commission cites.
    Two such cases arose under the Texas Open Meetings Act, which provides that
    “[a]n action taken by a governmental body in violation of this chapter is voidable.” Tex. Gov’t
    Code § 551.141. In the first of these, Meeker challenged the validity of successive employment
    contracts between the Tarrant County College District and its chancellor, Dr. de la Garza, arguing
    that deliberations on the contracts violated the Open Meetings Act because the agenda notices for
    three meetings were improper, making two resultant contracts void. Meeker, 
    317 S.W.3d at 758
    .
    Meeker sought to enjoin the college from paying de la Garza’s salary or otherwise recognizing
    him as chancellor. 
    Id.
     Finally, Meeker sought attorney’s fees. 
    Id. at 760
    . The college prevailed
    on cross-motions for summary judgment, and Meeker appealed. 
    Id. at 758
    . While the appeal was
    pending, the college entered into an amended contract with de la Garza under which he would step
    down as chancellor and receive severance consideration for release of claims. 
    Id.
     The college
    then moved to dismiss the pending appeal as moot. 
    Id.
     In dismissing the case, the Fort Worth
    court held that, because all of Meeker’s requests for injunctive relief related to de la Garza’s service
    as chancellor, the cause was moot because de la Garza was no longer the chancellor. 
    Id.
     at 760
    (citing Day v. First City Nat’l Bank of Hous., 
    654 S.W.2d 794
    , 795 (Tex. App.—Houston [14th
    21
    Dist.] 1983, no writ) (“case is moot when the actions sought to be enjoined have been fully
    performed”)). The court similarly held that the final contract rendered moot the requests for
    declarations that the meeting notices violated the Open Meetings Act and the two prior
    employment contracts were void because the requested declarations could not affect a live
    controversy. Id. at 761. Finally, the court found the request for attorney’s fees to be wholly
    dependent on the claim for injunctive relief, and therefore also moot. Id. at 762.
    In Meeker, as in the cases discussed above involving expiration, the dispositive
    issue was that the plaintiff sought prospective relief against actions that were no longer in prospect.
    An injunction is inherently forward-looking, intended to prohibit present or future conduct. With
    de la Garza having stepped down as chancellor, an injunction purporting to prohibit his recognition
    in that office would have been pointless. His contracts having been superseded, any declaration
    would have been “ineffectual for want of a subject matter upon which it could operate.” Methodist
    Hosps., 
    874 S.W.2d at 147
    . Whereas, in the earlier cases, the allegedly valid rule had expired, in
    Meeker, the allegedly invalid contract had been superseded by a subsequent contract, but in neither
    scenario was the court confronted—as we are here—with the issue of whether an aggrieved
    plaintiff can recover damages (or obtain relief from obligations) incurred by reason of actions
    undertaken during the operation of the allegedly invalid rule or contract. True, the Meeker court
    noted that “[a]ctions in violation of [the Open Meetings Act] are voidable, not void, and remain
    valid until adjudicated and declared void,” apparently finding significance in the fact that “the
    [first] Contract had not been adjudicated void before the [second] Contract superseded it, and the
    [second] Contract had not been adjudicated void before the [final] Contract replaced it.” Meeker,
    
    317 S.W.3d at 761
    . While that language may be read to support the Commission’s position, we
    fail to see how it was essential to the outcome in Meeker itself. That is, we do not see how Meeker
    22
    would have had any greater or lesser entitlement to the prospective relief he sought if the
    employment contacts had been void ab initio. In that scenario, in our view, he still would have
    been improperly seeking to enjoin conduct completed in the past—the epitome of mootness.
    The second Open Meetings Act case is more distinct factually and, therefore, less
    instructive. In July of 2006, the City of Dallas executed the Love Field Agreement, formally
    binding itself to the terms of an earlier provisional agreement allegedly negotiated in violation of
    the Open Meetings Act. Love Terminal Partners v. City of Dallas, 
    256 S.W.3d 893
    , 896 (Tex.
    App.—Dallas 2008, no pet.). The federal government later enacted the Wright Amendment
    Reform Act of 2006, incorporating many provisions of the Love Field Agreement. 
    Id.
     The
    Plaintiffs (LTP) sued the city and others seeking declaratory and injunctive relief concerning Open
    Meetings Act violations in adopting the agreement. 
    Id.
     at 895–96. In affirming the trial court’s
    dismissal of the case as moot, the Dallas court held that the Reform Act’s incorporation of the
    contract made Dallas’ obligations a matter of federal law, rendering moot any challenge to the
    Love Field Agreement regarding such obligations. 
    Id. at 897
    .
    Like Meeker, the LTP case discusses the void/voidable distinction in terms
    superficially favorable to the Commission but ultimately of little relevance to the instant case. LTP
    had argued that, because the City’s conduct leading up to the agreement violated the Open
    Meetings Act, the resulting contract was void and, therefore, the Reform Act did not moot their
    claims. 
    Id.
     Admittedly, language in the opinion can be read as accepting LTP’s premise, if
    ultimately rejecting its conclusion. Although the court recites the rule that “if conduct is merely
    voidable, the act is valid until adjudicated and declared void,” 
    id.,
     it is unclear how the case could
    have come out differently had the agreement been void ab initio rather than merely voidable
    because the agreement’s terms had been incorporated into federal law at the time of the litigation.
    23
    What gave the agreement its continuing force, then, was not the (allegedly defective) process by
    which it was originally adopted but its incorporation into federal law. We do not understand our
    sister court to imply that, had it found the agreement void, it would have been free to enjoin Dallas’
    compliance with the federal Reform Act because, unbeknownst to the Congress that passed the
    bill and the President who signed it, they were incorporating a mere nullity into federal law.
    Rather, the LTP court probably meant nothing more than that the incorporation of the agreement
    into federal law rendered it too late for an adjudication of its voidability to have practical
    consequences for the parties, as they would be bound by the federal law in any event. This
    illustrates why the case is of limited use in resolving the present question. Whereas the operation
    of the Reform Act would have caused any intervention by the LTP court to be of no practical
    consequence, no comparable circumstance constrains our decision in the instant case. What
    Meeker and LTP have in common, then, is that, despite including language that, admittedly, can
    be read as supporting the Commission’s interpretation, the facts of each case disclose a wholly
    independent reason for reaching the result: the prospective nature of the relief sought in Meeker,
    and the intervention of the federal government in LTP.
    Of course, not every judgment or order overturning some putative official act
    necessarily operates to unwind every collateral consequence of the defunct act. The Commission
    cites Brazzel v. Murray, a 1972 case in which the Texas Supreme Court held that a judgment
    voidable for purely procedural reasons has practical effects until voided, unlike a void judgment
    that can have no effect from its inception. 
    481 S.W.2d 801
    , 803 (Tex. 1972). In that case, Brazzel
    obtained judgment against Murray at trial, but the Waco court reversed and remanded with costs
    assessed against Brazzel. Id. at 802. Under then-current procedural rules, the clerk of the appellate
    court was directed not to deliver the mandate of the court nor to certify the proceedings to the trial
    24
    court before the payment of costs, but the clerk did so in error. Id. Murray filed a motion to recall
    the mandate in the appellate court, which was granted, and later filed a motion to dismiss in the
    trial court, relying on a then-current rule providing that, if no mandate had issued within a year of
    final judgment, the trial court should dismiss the case from its docket. Id. Murray reasoned that,
    because the mandate had been issued in violation of the rule, the time during which the erroneously
    issued mandate had been in putative effect counted toward the one-year period prescribed by the
    rule. Finding that a year had passed after judgment without issuance of a mandate, the trial court
    dismissed the case, and the Corpus Christi court affirmed, holding that the erroneously issued
    mandate had been “void ab initio.” Id.
    The Supreme Court disagreed. The Court quoted liberally from the early case of
    Murchison v. White for the proposition that “[a] void act is one entirely null within itself, not
    binding on either party, and which is not susceptible of ratification or confirmation” such that “[its]
    nullity cannot be waived,” whereas “[a] voidable act is one which is not absolutely void within
    itself, but which is binding until disaffirmed, and which may be made finally valid by failure within
    the proper time to have it annulled, or by subsequent ratification or confirmation.” Brazzel,
    481 S.W.2d at 803 (quoting Murchison v. White, 
    54 Tex. 78
    , 81 (1880) (internal quotation marks
    omitted)). Concluding that “judgments which are rendered without observance of statutory
    requirements which are purely procedural are not void, however irregular or erroneous they may
    be,” the Court held that “[f]rom … the date of the original mandate, until … the date the original
    mandate was recalled, a mandate was on file with the trial court in this cause” and that, although
    “[it] was an unauthorized mandate, [it] was valid until recalled.” As such, “[at] no time [had] there
    been a period of twelve months in which no mandate has been filed with the trial court, as required
    by [then-existing rules], as a basis for dismissal.” Brazzel, 481 S.W.2d at 803.
    25
    But while Brazzel involves an official action that, once invalidated, was not entirely
    annulled, it does not stand for the proposition that Appellants here must live with the allegedly
    invalid electricity pricing at issue in this case without an opportunity for judicial review. In
    Brazzel, the primary defect in the mandate did not concern any relief to which Murray may have
    been entitled. True, Murray claimed a procedural right to challenge the validity of a mandate
    issued despite nonpayment of costs, but Murray did not claim the right to recover any costs
    incurred as a result of the mandate. The case therefore cannot be read to bar such recovery where
    such costs are at issue—nor to establish that the availability of such recovery would depend on
    whether the order was merely void rather than void ab initio. In any event, Appellants do not ask
    us to hold that the disputed Orders in this case were never issued. Rather, Appellants seek only a
    declaration as to the invalidity of the Orders, such that the pricing thereunder may not be applied
    in pending administrative proceedings. Such a declaration would not be inconsistent with Brazzel.
    In summary, none of the cases cited to us by the Commission or aligned intervenors
    compels support for the Commission’s position that courts lack jurisdiction to remedy actions
    undertaken pursuant to a voidable order before it is adjudicated as void. Our own review of the
    case law on this question inclines us to the opposite view.
    The cases on voidability, including those cited by the Commission, trace back to
    early cases addressing the voidability of private contracts. See, e.g., Cummings v. Powell, 
    8 Tex. 80
    (1852) (surveying then-current authorities on voidability of contracts with minors). Perhaps the
    most familiar context in which the void/voidability distinction arises is the voidability of a contact
    with a minor. The hornbook law is that a contract made with a minor is voidable at the minor’s
    election. Dairyland Cnty. Mut. Ins. v. Roman, 
    498 S.W.2d 154
    , 158 (Tex. 1973); Prudential Bldg.
    & Loan Ass’n v. Shaw, 
    26 S.W.2d 168
    , 171 (Tex. Comm’n App. 1930, judgm’t adopted).
    26
    Importantly, a contract so voided is deemed to have been void for both parties from the beginning.
    Kargar v. Sorrentino, 
    788 S.W.2d 189
    , 191 (Tex. App.—Houston [14th Dist.] 1990, no writ). The
    effect, therefore, is essentially identical to the remedy of rescission, i.e., to put the parties in their
    respective positions status quo ante, as though the contract had never formed. Accordingly, a
    minor who voids a contract on the ground of incapacity may recover the full amount of any
    consideration the minor has paid, but also must restore any consideration the minor has received.
    Shaw, 26 S.W.2d at 171; James v. Barnett, 
    404 S.W.2d 886
    , 888 (Tex. App.—Dallas 1966, writ
    ref’d n.r.e.); see also Hogue v. Wilkinson, 
    291 S.W.2d 750
    , 753 (Tex. App.—Texarkana 1956,
    no writ).
    The latter two points are crucial. The minor, upon attaining the age of majority,
    has the option to ratify and enforce the contract, enjoying the benefit of the bargain. That is the
    very definition of a voidable contract. See CONTRACT, Black’s Law Dictionary (11th ed. 2019)
    (defining “voidable contract” as “[a] contract that can be affirmed or rejected at the option of one
    of the parties”); Murchison, 
    54 Tex. at 81
     (“[a] voidable act is one … which may be made finally
    valid . . . by subsequent ratification or confirmation”). And yet, in the contract context, we find
    nothing resembling the rule against retroactive relief urged by the Commission. On the contrary,
    not only may the voiding party recover consideration already paid under the contract, if any, the
    voiding party must tender any consideration previously received in order to be restored to status
    quo ante. By parity of reasoning, it is unclear why a party aggrieved by the voidable act of a state
    agency should not be able to recover a remedial sum necessary to make it whole once the act is
    finally adjudicated void, or, as here, to avoid an obligation predicated on the void act.
    We are mindful that we have found no precedent that clearly and unambiguously
    disposes of the question before us. It is, moreover, entirely reasonable to suppose that some
    27
    allegedly invalid act by an agency may eventually become impracticable to remedy due to
    developments over the passage of time. In the above-cited case of Murchison v. White, an early
    case involving a challenge to the judgment of a probate court, the Texas Supreme Court held that
    “[a] voidable act is one which is not absolutely void within itself, but which is binding until
    disaffirmed, and which may be made finally valid by failure within the proper time to have it
    annulled, or by subsequent ratification or confirmation.” 
    54 Tex. at 81
     (emphasis added). The
    court did not specify the proper time in which to have an act annulled, but Appellants here filed
    their direct appeal within 15 days after the First Order was issued on February 15, 2021. Section
    39.001(f) of the Utilities Code, requires that validity challenges be brought “not later than the 15th
    day after the date on which the rule as adopted is published in the Texas Register.” It is undisputed
    that the Order challenged in this case was not filed in the Texas Register, so the event from which
    the statutory time limit is to run has not yet occurred. We think it consonant with the spirit and
    intent of the statute, however, to hold Appellants’ challenge, filed 15 days after the Order date, to
    be timely for purposes of the statutory provision. As such, we further conclude that, under
    Murchison, Appellants have acted “within the proper time” to have the Orders annulled.
    Appellants’ Alleged Injury is Redressable.
    The Commission next argues that this Court lacks jurisdiction because Appellants’
    claims are not redressable. We disagree.
    The Commission cites cases reciting the general standard that we lack jurisdiction
    over cases in which the alleged injury is not likely to be remedied by the requested relief. Referring
    to its own prior argument that Appellants can, at most, obtain a declaration concerning future
    application of the Orders but cannot disturb transactions already settled, the Commission reasons
    28
    that, because reversing the Orders “will not result in the return of any money that Appellants have
    already paid ERCOT pursuant to settlement invoices,” such reversal will not remedy Appellants’
    injury, and our jurisdiction to order such reversal fails for want of redressability. The Commission
    begs the question. It imports its own previous conclusion from its mootness/voidness argument
    and uses it as a premise in its redressability argument. Having rejected that conclusion in the
    former context, however, we likewise reject its application as a premise here. We see no reason
    why the resolution of challenges to settlement invoices in ADR proceedings, whether due and
    payable or already paid under timely preserved protest, cannot and should not be governed by this
    Court’s determination regarding appropriate pricing.
    Citing a pair of statutory provisions, the Commission contends that “Appellants
    cannot show that any further proceedings on remand to reconsider or further justify the substance
    of the orders . . . will lead to application of a different rule or otherwise change the outcome of any
    pending administrative disputes.” See Tex. Util. Code § 39.001(f); Tex. Gov’t Code § 2001.040.
    Section 39.001(f) of the Utilities Code provides that a court “shall . . . if appropriate on reversal,
    remand [a rule held to be invalid] to the commission for further proceedings.” Government Code
    Section 2001.040 requires that, on remanding certain rules to a state agency, a court “shall provide
    a reasonable time for the agency to either revise or readopt the rule through established procedure.”
    The Commission argues in essence that, for purposes of redressability analysis, these provisions
    render the question whether Appellants’ requested relief will remedy the alleged injury merely
    speculative, because the Commission may on remand simply ratify the previously adopted pricing
    Order. We disagree.
    First, we do not share the Commission’s view that the cited provisions limit our
    power to order an appropriate remedy. Taken in context, Section 39.001(f) of the Utilities Code
    29
    makes clear that we may affirm, reverse, or remand a rule. Reversal or remand of the rule could
    change the result of the pending administrative proceedings concerning amounts Appellants owe.
    Second, Section 2001.040 of the Government Code uses permissive language—a
    court “may remand” a rule—but does not expressly prohibit a court from reversing outright. To
    the extent any prohibition is thought to be implied by that provision, we think it controlled by the
    more specific authority found in the Utilities Code that permits remand “if appropriate” upon
    reversal, suggesting that reversal without remand is the default. See Tex. Util. Code § 39.001(f);
    see also id. § 39.001(e) (providing that “Judicial review of competition rules adopted by the
    commission shall be conducted under Chapter 2001, Government Code, except as otherwise
    provided by this chapter” (emphasis added)).
    Third, Section 2001.040 is limited by its own terms to remands based on a finding
    that an agency has not substantially complied with one or more procedural requirements of
    Sections 2001.0225 through 2001.034. Appellants’ challenge is not limited to alleged lack of
    compliance with those provisions, however, but includes others, such as the failure to file with the
    Secretary of State under Section 2001.036. Thus, even the Commission’s interpretation of Section
    2001.040 would not deprive us of jurisdiction for want of redressability.
    The Commission’s final argument on redressability in turn consists of three
    essential components: (1) that ERCOT, rather than the Commission, is the appropriate entity to
    initiate a market-wide price correction, and ERCOT is not a party; (2) that Section 39.001(f),
    Utilities Code, does not authorize us to order the PUC to order ERCOT to undertake such repricing;
    and (3) that ERCOT’s authority to act is too limited to redress Appellants’ injury and, in any case,
    that it is too late under the Nodal Protocols for ERCOT to act. We disagree.
    30
    First, we are not persuaded that ERCOT must be brought before us as a party in
    order for us to grant the requested relief in light of the Commission’s “complete authority” over
    ERCOT under Section 39.151(d), Utilities Code, together with ERCOT’s power to determine
    market clearing prices unless “otherwise directed by the commission” under Title 16, Texas
    Administrative Code Section 25.501(a), both of which provisions were expressly referenced in the
    Order that is the subject of this suit.
    Second, we do not find the limitation on our authority the Commission argues may
    be found in Section 39.001(f) of the Utilities Code. That provision directs a court of appeals
    considering a challenged rule “to render judgment affirming the rule or reversing and, if
    appropriate on reversal, remanding the rule to the commission for further proceedings, consistent
    with the court’s opinion and judgment.” Tex. Util. Code § 39.001(f) (emphasis added).
    Third, the Commission overstates the effects of the Nodal Protocols.            The
    Commission acknowledges that those rules “provide ERCOT with some discretion after settlement
    point prices have become final to determine that prices qualify for a correction and then seek
    ERCOT Board review of such prices.” Per the Nodal Protocols, however, ERCOT would have
    had to notice participants during the month after the subject Order was issued and, the Commission
    argues, “[t]hat ship has sailed.” Thus, “even if this Court were to order the PUC to issue an order
    directing ERCOT to resettle the market,” the Commission reasons, “Appellants have not identified
    any means under the Nodal Protocols by which ERCOT can now make any market-wide
    corrections to pricing for EEA3-operating days.” This argument lacks merit. The fact that ERCOT
    may be time-barred under the protocols from effecting a price correction on its own initiative has
    few if any implications for the question of whether it may do so pursuant to an order of this Court.
    While we can imagine scenarios in which limitations on an entity’s powers to act may operate as
    31
    practical limitations on what a court may order it to do, this is not such a case. Where, as here,
    administrative disputes of the settlement statements were timely initiated and stayed pending
    decision of this timely-filed direct appeal, we discern no reason why the notice provisions that
    would ordinarily apply to ERCOT acting alone should prevent us from hearing Appellants’
    challenge and, if appropriate, granting relief.
    The Orders are Rules.
    In its fourth challenge to this Court’s jurisdiction, the Commission argues that the
    Orders were not competition rules within the meaning of Section 39.001(e), Utilities Code, and
    thus are not subject to the direct-appeal process provided by that statute. We agree that the statute
    is jurisdictional; as such, unless we find the subject Orders to be rules, we must dismiss. Appellants
    propose that the APA’s definition of “rule” should govern here. The Commission contests the
    applicability of that definition, but also argues that, in any event, the Orders do not fall within its
    ambit. We will begin our analysis by assuming the statutory definition applies.
    The APA defines “rule” as “a state agency statement of general applicability that:
    (i) implements, interprets, or prescribes law or policy; or (ii) describes the procedure or practice
    requirements of a state agency,” including “the amendment or repeal of a prior rule”, but not
    including “a statement regarding only the internal management or organization of a state agency
    and not affecting private rights or procedures.” Tex. Gov’t Code § 2001.003(6). The Commission
    argues, first, that the Orders cannot be rules because they are not generally applicable but are mere
    statements regarding internal management or organization and not affecting private rights or
    procedures. We have previously observed that the distinction between a rule and an internally
    directed agency statement may sometimes be “elusive” but have held the “core concept” to be that
    32
    “the agency statement must in itself have a binding effect on private parties.” Slay v. Texas
    Comm’n on Envtl. Quality, 
    351 S.W.3d 532
    , 546 (Tex. App.—Austin 2011, pet. denied) (citing
    Texas Dep’t of Pub. Safety v. Salazar, 
    304 S.W.3d 896
    , 905 (Tex. App.—Austin 2009, no pet.)).
    The Commission reasons in essence that, because the Orders at issue here were directed to ERCOT
    rather than to market participants, the Orders could not in themselves bind private parties and thus
    cannot be rules within the meaning of the APA. We disagree.
    The Commission’s position here suffers from two significant defects. First, there
    is no dispute that the Orders at issue were intended to affect the rights of private parties and in fact
    did so. The Commission’s hypothetical scenario, in which ERCOT fails to comply with the Order,
    may be an interesting thought experiment, but it does not refute the conclusion that the purpose
    and effect of the subject Orders was to cause market participants to pay (or receive) $9,000/MWh
    during the EEA3 event. For this reason, we are also unpersuaded by the Commission’s proposed
    distinction between this case and the cases relied on by Appellants, involving “self-executing”
    rules rather than orders directed at (or through) ERCOT. The distinction arises from an artifact of
    the unique regulatory structure governing electric power in Texas, in which ERCOT acts as
    something akin to a subagency between the PUC and market participants. ERCOT is a separate
    entity, but one over which the PUC has “complete authority.” Tex. Util. Code § 39.151(d). Where,
    as here, ERCOT acts as the Commission’s agent, its acts are imputed to its principal. Put another
    way, we fail to see legal or factual support for the Commission’s proposed distinction that would
    insulate it from review in countless cases in which it acts through ERCOT.
    Second, the Commission’s argument proves too much. For, if being directed solely
    to ERCOT rather than to market participants sufficed to negate a statement’s status as a rule, any
    number of rules found in Title 16, Texas Administrative Code, Chapter 25 (“Substantive Rules
    33
    Applicable to Electric Service Providers”) would likewise not be rules. Indeed, Section 25.505 of
    that chapter, the subject of the Orders at issue in this case, consists almost entirely of mandatory
    directives to ERCOT, and was adopted entirely through the formal APA rulemaking process. We
    think no one would seriously dispute that that section is a rule. Section 25.505 is general, in the
    sense that it affects the entire unregulated market in this state, or 26 million customers, and there
    can be little doubt that it “(i) implements, interprets, or prescribes law or policy” within the
    meaning of Section 2001.003(6)(A) of the Government Code. And, by definition, “the amendment
    … of a prior rule” is itself a rule. Tex. Gov’t Code § 2001.003(6)(B). Thus, if the subject Order
    had the effect of amending a rule, then the Order by definition must also be a rule. Citing an
    outcome that was believed to be “contrary to the purpose of the rule,” the Commission in its Order
    expressly granted an “exception” to Section 25.505’s application, the basis for which is neither
    found in nor logically derived from the text of the rule itself. Accordingly, the effect of the Order
    on the cited rule fits the ordinary meaning of “amendment,” and the Order, however packaged,
    therefore fits the statutory definition of a “rule.”
    None of the cases the Commission cites compel the contrary conclusion. At issue
    in Slay, for example, was whether an internal memorandum detailing the Texas Commission on
    Environmental Quality’s (TCEQ) penalty policy constituted a rule for purposes of establishing
    jurisdiction under a statutory waiver of governmental immunity. Slay, 351 S.W.3d at 532. Critical
    to our finding that the trial court did not abuse its discretion in answering that question in the
    negative was the fact that, although TCEQ staff was required to follow the penalty policy’s
    methodology in determining penalty recommendations, the commissioners were not bound to do
    so when acting on those recommendations but retained discretion to depart from the methodology
    when imposing penalties. Id. at 546. This is a significant distinction. In the present case, the
    34
    Commission issued the directive to ERCOT with the expectation that it be followed. Though
    ERCOT might have declined to follow the Commission’s Order, but it had no discretion to do so
    and, in any event, it followed the Commission’s directive in fact.
    Similarly unavailing is Vista Community Medical Center, another case
    distinguishing internally directed statements from those of general applicability. Texas Mut. Ins.
    v. Vista Cmty. Med. Ctr., LLP, 
    275 S.W.3d 538
     (Tex. App.—Austin 2008, pet. denied). In Vista,
    we reversed the trial court’s determination that a one-page staff report, delivered by the director of
    medical review to the agency commissioners of the Texas Department of Insurance Division of
    Workers Compensation at an open meeting and arguing for one of two conflicting interpretations
    of an existing agency rule, was itself a rule that had to be adopted in conformance with APA
    rulemaking proposals. 
    Id.
     at 545–46. We found that the staff report was not a “statement by a
    state agency” within the meaning of the APA’s definition of a rule. 
    Id. at 555
    . We noted that the
    report “was a one-page document prepared by the director of the Medical Review Division … that
    was intended to address an internal agency matter—namely, the inconsistent application” of a
    particular rule. 
    Id.
     The present case could scarcely be more different. Here, the subject Orders
    were voted on and issued by the Commission. There is therefore no dispute that they constitute a
    statement by a state agency.
    We went further in Vista, noting that, even if the report had been an agency
    statement, it lacked other characteristics of a rule. We noted that “not every administrative
    pronouncement is a rule within the meaning of the APA.” 
    Id.
     (citing Texas Educ. Agency
    v. Leeper, 
    893 S.W.2d 432
    , 443 (Tex. 1994); Brinkley v. Texas Lottery Comm’n, 
    986 S.W.2d 764
    ,
    769 (Tex. App.—Austin 1999, no pet.)). Acknowledging that “agencies routinely issue letters,
    guidelines, and reports, and occasionally file briefs in court proceedings, any of which might
    35
    contain statements that intrinsically implement, interpret, or prescribe law, policy, or procedure or
    practice requirements,” we reasoned that subjecting every such statement to rulemaking
    requirements would make it impossible for an agency to carry out its legislative functions. 
    Id.
    (quoting Brinkley, 
    986 S.W.2d at 769
    ). In determining whether an agency’s interpretation of its
    own rule was also a rule, following the Supreme Court’s holding in El Paso I, we concluded that
    an interpretation that contradicted or otherwise amended an existing rule would be a new rule, but
    found no such amendment in the case then before us. 
    Id.
     at 555-56 (citing El Paso I, 247 S.W.3d
    at 714–15). The report “was presented to the Division at the January 2005 open meeting, but the
    Division simply thanked the director for the report and took no official action.” Id. Again, the
    present case could not be more different. Far from an internal discussion of opinion, the subject
    Order was just that—an order, intended to secure compliance by ERCOT and bring about a desired
    outcome. And, as already noted above, the Order at issue in this case had the effect of creating an
    extratextual exception to a previous rule, and therefore did not merely interpret but also amended
    that rule.
    Appellants Challenge the Validity of the Orders.
    The Commission further argues that we lack jurisdiction because Appellants
    challenge the application, rather than the validity of the subject Orders. We disagree. It is true
    that the PUC gave incomplete guidance to ERCOT, with the understanding that the latter entity
    would take appropriate measures to achieve the desired result. But from the face of the pleadings,
    it is apparent that most if not all Appellants clearly challenge not only the measures but the
    guidance itself.
    36
    In the subject Order, the Commission stated the problem it confronted as follows:
    ERCOT has informed the Commission that energy prices across the system
    are clearing at less than $9,000, which is the current system-wide offer cap
    pursuant to 16 TAC § 25.505(g)(6)(B). The Commission believes this
    outcome is inconsistent with the fundamental design of the ERCOT market.
    Energy prices should reflect scarcity of the supply. If customer load is being
    shed, scarcity is at its maximum, and the market price for the energy needed
    to serve that load should also be at its highest.
    Having thus summarized the problem it sought to address, the Commission continued,
    “[a]ccordingly, the Commission directs ERCOT to ensure that firm load that is being shed in EEA3
    is accounted for in ERCOT’s scarcity pricing signals.” Id.
    We read the foregoing Order to require—quite expressly—that ERCOT take steps
    necessary to ensure that energy prices would clear at $9,000 during the duration of the EEA3 event.
    We understand Appellants to complain that ERCOT in fact did so. We do not hear Appellants to
    challenge only the manner in which ERCOT achieved that result; nor has any party urged an
    interpretation of the Order in support of an argument that, for example, a rogue ERCOT made the
    complained-of pricing changes without authorization from the PUC. Moreover, Appellants
    explicitly invoke the language of a substantive and procedural validity challenge. In sum, we see
    nothing in the record or the briefing before us to indicate that this case involves a challenge to
    application rather than validity.
    For the reasons set forth above, we overrule the Commission’s challenges to our
    jurisdiction and proceed to consider the merits of the Appeal.
    Merits
    Appellants bring two challenges to the validity of the subject Orders in this case.
    First, Appellants argue that the Orders constitute competition rules and that the Commission in
    37
    adopting those rules failed to comply with APA’s regular or emergency rulemaking procedures.
    Second, as an independent ground for relief, Appellants contend that the substance of the Orders
    themselves exceeded the Commission’s statutory authority. Because we agree with Appellants as
    to the second ground, we do not address the first.
    Luminant’s substantive challenge to the Commission’s statutory authority in turn
    rests on two sub-arguments: first, that the subject Orders “contravene[ ] statutory language and
    run[ ] counter to statutory objectives that electricity prices should be determined by the normal
    forces of competition,” and, second, that the Orders were not properly limited in duration. Because
    we agree with the first of these arguments, we do not reach the second.
    State administrative agencies have only those powers that the legislature expressly
    confers upon them and those implied powers that are reasonably necessary to carry out their
    express functions or duties. See Public Util. Comm’n v. City Pub. Serv. Bd., 
    53 S.W.3d 310
    , 315
    (Tex. 2001).     Absent specific or implied statutory authority, an agency rule is invalid. 
    Id.
    Furthermore, an agency may not exercise what is effectively a new power based on a claim that
    the exercise is expedient for administrative purposes. 
    Id.
     To establish a rule’s facial invalidity, a
    challenger must show that the rule (1) contravenes specific statutory language; (2) is counter to
    the statute’s general objectives; or (3) imposes additional burdens, conditions, or restrictions in
    excess of or inconsistent with the relevant statutory provisions. Texas Ass’n of Acupuncture &
    Oriental Med. v. Texas Bd. of Chiropractic Exam’rs, 
    524 S.W.3d 734
    , 739 (Tex. App.—Austin
    2017, no pet).
    Determining the validity of a rule requires us to construe the statutory language
    from which the agency’s authority purportedly flows. Texas Orthopaedic Ass’n v. Texas State Bd.
    of Podiatric Med. Exam’rs, 
    254 S.W.3d 714
    , 719–20 (Tex. App.—Austin 2008, pet. denied). In
    38
    construing a statute, our primary objective is to give effect to the legislature’s intent. Liberty Mut.
    Ins. v. Adcock, 
    412 S.W.3d 492
    , 494 (Tex. 2013). “The ‘surest guide to what lawmakers intended’
    is the enacted language of a statute.” Youngkin v. Hines, 
    546 S.W.3d 675
    , 680 (Tex. 2018) (quoting
    Entergy Gulf States, Inc. v. Summers, 
    282 S.W.3d 433
    , 463 (Tex. 2009)). We defer to the agency’s
    construction of a statute “only when the statutory language is ambiguous.” Southwest Royalties,
    Inc. v. Hegar, 
    500 S.W.3d 400
    , 405 (Tex. 2016).             If the statute is unambiguous, agency
    deference “has no place.” TracFone Wireless, Inc. v. Commission on State Emergency Commc’ns,
    
    397 S.W.3d 173
    , 182 (Tex. 2013).
    Two Utilities Code provisions are key here.              The first provision is the
    policy-and-purpose provision set forth at the beginning Chapter 39, which includes the
    Legislature’s express finding that “the production and sale of electricity is not a monopoly
    warranting regulation of rates, operations, and services and that the public interest in competitive
    electric markets requires that … electric services and their prices should be determined by
    customer choices and the normal forces of competition.” 
    Id.
     § 39.001(a). That section further
    provides that “[r]egulatory authorities … shall authorize or order competitive rather than
    regulatory methods to achieve the goals of this chapter to the greatest extent feasible and shall
    adopt rules and issue orders that are both practical and limited so as to impose the least impact on
    competition.” Id. § 39.001(d).
    The second provision is Section 39.151(d), Utilities Code, which the Commission
    expressly invoked in the Orders. Importantly, the Orders expressly addressed the scarcity pricing
    mechanism that by its own terms was adopted pursuant to Section 39.151(d). See Tex. Admin.
    Code § 25.505(g)(6)(B) (eff. May 30, 2019, to July 13, 2021). Section 39.151 chiefly concerns
    the creation and management of ISOs but also provides, in relevant part, that “[t]he commission
    39
    shall adopt and enforce rules relating to the reliability of the regional electrical network and
    accounting for the production and delivery of electricity among generators and all other market
    participants, or may delegate to an independent organization responsibilities for establishing
    or enforcing such rules.” Tex. Util. Code § 39.151(d). “Independent organization” is defined
    as a region’s ISO, which, in this case, is ERCOT.           Id. § 39.151(b); Texas Com. Energy,
    
    2004 WL 1777597
    , at *2. An adjacent provision requires such entities to “ensure the reliability
    and adequacy of the regional electrical network.” 
    Id.
     § 39.151(a)(2).
    A threshold question is whether the authority granted by Section 39.151 qualifies,
    or is qualified by, the limitations imposed by 39.001. Put another way, the question is whether, or
    to what extent, Section 39.151’s directive to ensure system reliability provides an exception to
    Section 39.001’s general preference for reliance on competition rather than regulation to set prices.
    This appears to be a case of first impression. We must interpret statutory text in light of the statute
    as a whole. Davis v. Morath, 
    624 S.W.3d 215
    , 222 (Tex. 2021). We must, if possible, give effect
    to all included words without treating any language as surplusage. Hlavinka v. HSC Pipeline
    P’ship, LLC, 
    650 S.W.3d 483
    , 491 (Tex. 2022), reh’g denied (Sept. 2, 2022); see also Tex. Gov’t
    Code § 311.021 (providing that “[i]n enacting a statute, it is presumed that … the entire statute is
    intended to be effective”). Here, Section 39.001 makes clear that “competitive rather than
    regulatory methods” are preferred “to the greatest extent feasible,” and with “the least impact on
    competition.” Id. § 39.001(d). In contrast, Section 39.151 is silent as to whether “regulatory”
    rather than “competitive” methods may be adopted to ensure grid reliability. In the absence of
    specific guidance from Section 39.151, the Commission’s actions must be subject to the constraint
    provided by the text of Section 39.001. Fidelity to the whole-text canon, as codified in our Code
    Construction Act, requires that we give effect to the phrase “greatest extent feasible.” To find that
    40
    the subject Orders were compliant with this statutory constraint, then, we must find that the Orders
    could not have used “competitive rather than regulatory methods” to any greater extent than they
    did as issued. This we cannot do; the very notion is belied by the operation of the SPM as it existed
    immediately before the issuance of the subject Orders, and by the fact that, operating
    independently, this SMP did not result in “HCAP” pricing.
    In extreme circumstances under extraordinary pressure, the Commission exceeded
    its power by eliminating competition entirely. The previously adopted rule set the system-wide
    offer cap at $9,000/MWh. 
    16 Tex. Admin. Code § 25.505
    (g)(6)(B). The typical market clearing
    price in Texas can be $30/MWh. During Winter Storm Uri, the price had risen to just above
    $1,200, but that rise was not having the effect the Commission desired. The Orders, which we
    determined above are rules, instructed that if customer load is being shed, scarcity is at its
    maximum, and “the market price for the energy needed to serve that load should also be at its
    highest.” First Order, at 1; Second Order, at 1. Knowing that the First Order caused ERCOT to
    set the market clearing price at the market cap of $9,000/MWh, the Commission issued the Second
    Order with the identical language directing that the market price for energy be at its highest while
    there was load shed. For four days under the Orders, the minimum price was the same as the
    maximum price by operation of executive fiat. While the breadth of the Commission’s discretion
    largely resists sharp delineation, the Legislature clearly stated that the Commission’s rules must
    be “limited so as to impose the least impact on competition.” See Tex. Util. Code § 39.001(d)
    (emphasis added). Instead, the Orders had the maximum impact on competition conceivable by
    setting a single price for power and directing ERCOT to take all necessary steps to ensure the
    market cleared at that single price. While the extraordinary circumstances of Winter Storm Uri
    may have required extraordinary modifications to the SPM to send appropriate pricing signals to
    41
    prompt the necessary market response, the Commission here exceeded the Legislature’s limits on
    its power. Setting a single price at the rule-based maximum price violated the Legislature’s
    requirement in the Utilities Code Section 39.001(d) that the Commission use competitive methods
    to the greatest extent feasible and impose the least impact on competition.
    IV.
    CONCLUSION
    For the foregoing reasons, we reverse the Commission’s Orders of February 15
    and 16, 2021, and remand this case for further proceedings consistent with our ruling.
    _________________________________________
    Edward Smith, Justice
    Before Chief Justice Byrne, Justices Goodwin and Smith;
    Justice Goodwin not participating
    Reversed and Remanded
    Filed: March 17, 2023
    42
    

Document Info

Docket Number: 03-21-00098-CV

Filed Date: 3/17/2023

Precedential Status: Precedential

Modified Date: 3/21/2023

Authorities (20)

Kargar v. Sorrentino , 1990 Tex. App. LEXIS 757 ( 1990 )

Texas Association of Acupuncture and Oriental Medicine v. ... , 2017 Tex. App. LEXIS 1396 ( 2017 )

Meeker v. Tarrant County College District , 317 S.W.3d 754 ( 2010 )

City Public Service Board v. Public Utility Commission , 2000 Tex. App. LEXIS 103 ( 2000 )

Hogue v. Wilkinson , 1956 Tex. App. LEXIS 2349 ( 1956 )

Methodist Hospitals of Dallas v. Texas Workers' ... , 1994 Tex. App. LEXIS 502 ( 1994 )

Reliant Energy, Inc. v. Public Utility Commission , 101 S.W.3d 129 ( 2003 )

James v. Barnett , 1966 Tex. App. LEXIS 2278 ( 1966 )

Texas Orthopaedic Ass'n v. Texas State Board of Podiatric ... , 2008 Tex. App. LEXIS 3751 ( 2008 )

Brinkley v. Texas Lottery Commission , 1999 Tex. App. LEXIS 684 ( 1999 )

TXU Generation Co. v. Public Utility Commission , 2005 Tex. App. LEXIS 3771 ( 2005 )

BP Chemicals, Inc. v. AEP Texas Central Co. , 2006 Tex. App. LEXIS 6873 ( 2006 )

Texas Department of Public Safety v. Salazar , 304 S.W.3d 896 ( 2010 )

Murchison v. White, 54 Tex. 78 (Tex. 1880) , 1880 Tex. LEXIS 128 ( 1880 )

Love Terminal Partners, L.P. v. City of Dallas , 2008 Tex. App. LEXIS 4329 ( 2008 )

Rodriquez v. Texas Department of Public Safety , 1976 Tex. App. LEXIS 2463 ( 1976 )

Texas Mutual Insurance Co. v. Vista Community Medical ... , 275 S.W.3d 538 ( 2009 )

Railroad Commission of Texas v. Oil Production Maintenance, ... , 1958 Tex. App. LEXIS 1701 ( 1958 )

Day v. First City National Bank of Houston , 1983 Tex. App. LEXIS 4690 ( 1983 )

Young Trucking, Inc. v. Railroad Commission , 1989 Tex. App. LEXIS 3172 ( 1989 )

View All Authorities »