ACI Design Build Contractors, Inc., D/B/A E3D Architecture and Engineering E3D LLC E3D, a Veritas Financial Series LLC Patrick Towne D/B/A E3D LLC Sustainable Building Solutions And E3D Architecture and Engineering v. 3405 Rainforest Drive, LLC and Michael Gill, Jr. ( 2024 )


Menu:
  •        TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
    NO. 03-22-00695-CV
    ACI Design Build Contractors, Inc., d/b/a E3D Architecture and Engineering; E3D LLC;
    E3D, a Veritas Financial Series LLC; Patrick Towne d/b/a E3D LLC Sustainable Building
    Solutions; and E3D Architecture and Engineering, Appellants
    v.
    3405 Rainforest Drive, LLC and Michael Gill, Jr., Appellees
    FROM THE 419TH DISTRICT COURT OF TRAVIS COUNTY
    NO. D-1-GN-21-003047, THE HONORABLE J. DAVID PHILLIPS, JUDGE PRESIDING
    MEMORANDUM OPINION
    ACI Design Build Contractors, Inc., d/b/a E3D Architecture and Engineering;
    E3D LLC; E3D, a Veritas Financial Series LLC; Patrick Towne d/b/a E3D LLC Sustainable
    Building Solutions; and E3D Architecture and Engineering (collectively, ACI Design) appeal
    from the final judgment confirming an arbitration award in favor of 3405 Rain Forest Drive,
    LLC and Michael Gill, Jr. (collectively, 3405 Rain Forest). We will affirm.
    BACKGROUND
    In January 2019, Gill and E3D LLC Sustainable Building Solutions entered into a
    fixed-price contract for the construction of a home at 3405 Rain Forest Drive in Westlake.
    Construction began in March 2019. During construction, changes were made to the scope of the
    project and 3405 Rain Forest paid additional requested sums related to the project. Although
    the parties offer differing accounts of the preceding events, in June 2021, ACI Design Build
    Contractors, Inc. d/b/a E3d Architecture and Engineering sued 3405 Rain Forest Drive LLC
    alleging causes of action for breach of contract and quantum meruit based on its assertion that
    3405 Rain Forest had failed to pay invoices submitted for construction services performed by
    ACI Design (Case 3047). In July 2021, 3405 Rain Forest sued ACI Design alleging that it had
    filed fraudulent liens on the project and seeking a declaration that the liens were invalid and
    unenforceable (Case 3106). ACI Design and 3405 Rain Forest agreed to consolidate the two
    cases into Case 3047 and also agreed to “draft an agreed motion to allow the Court to choose a
    neutral per the parties’ Rule 11 Agreement filed on September 20, 2021.”1 The parties then filed
    an agreed motion to consolidate, which the trial court granted.
    The parties filed another agreed motion in the consolidated case stating that “the
    parties have reached a settlement agreement disposing of the dispute” by agreeing to have a
    jointly selected “Appraisal expert” provide a decision regarding “the ultimate appraised cost of
    construction and allocation of costs to the Parties to determine any sums due from or to the other
    Party.”2 The parties asked the trial court to choose a “neutral” from a list of attorneys Board
    Certified in Construction Law by the Texas Board of Legal Specialization “to determine the
    value of the parties’ contract and change orders” and to stay all proceedings “including any
    pending discovery, unless so requested by the neutral selected by the Court.” In November
    1
    The Rule 11 Agreement did not define the term “neutral” in the context of the parties’
    agreement.
    2
    The parties stated that the terms of the “settlement agreement” were contained in a
    Confidential Mediator Proposal prepared by Lakeside Mediation Center that they maintain
    constituted a Rule 11 Agreement because it had been “filed with the court” as an attachment to
    ACI Design’s First Amended Answer, Affirmative Defenses, and Counterclaim filed to 3405
    Rain Forest’s petition in Case 3106.
    2
    2021, the court signed an agreed order that appointed Joe Basham “to act as the neutral to
    determine the value of the parties’ contract and change orders” and to “determine what amounts,
    if any, are owed to the builder or owner.” The order further provided that “the owner shall
    receive credit for all corrective work completed to obtain a certificate of occupancy from the
    City of Austin” and that the parties “may seek relief from the court to effectuate the
    determination of the neutral.” When Joe Basham declined the appointment due to a conflict of
    interest, the court signed a second agreed order on December 16, 2021 that was identical to the
    first except for naming Anthony Ciccone as the neutral in Joe Basham’s place.
    In February 2022, counsel for ACI Design filed a motion to withdraw, stating that
    he was “unable to communicate with [ACI Design] in a manner consistent with good attorney-
    client relations” and had “resigned as a W-2 employee and [ACI Design] has not paid wages
    dating back to Dec. 2021.” On March 15, 2022, 3405 Rain Forest filed a response to the motion
    to withdraw pointing out that the motion did not provide last known addresses for the plaintiffs
    and asserting that counsel for ACI Design “had a propensity to file withdrawal motions” in cases
    in which he represented ACI Design, causing litigation delays. 3405 Rain Forest stated that it
    did not oppose “the delay time it would take” ACI Design to find other counsel but requested
    that the court “impose a time limit for [ACI Design] to find counsel, preferably within 20 days of
    the signing of the withdrawal order.” The same day, 3405 Rain Forest also filed a “Motion for
    Contempt, to Show Cause, and Motion to Enforce” stating that the court had ordered “that
    Anthony Ciccone be the arbitrator for the matter,” and that while 3405 Rain Forest had “paid the
    arbitration fee,” ACI Design had neither “signed the arbitrator’s fee agreement nor paid the
    arbitrator’s fees thus delaying the resolution of this matter.” 3405 Rain Forest again catalogued
    the instances in which counsel for ACI Design had filed motions to withdraw in other cases.
    3
    3405 Rain Forest requested that the court issue an order requiring ACI Design to show cause as
    to why they had violated the court’s order by not signing “the arbitration agreement supplied by
    the Court appointed neutral, and have not paid their half of the arbitration fee.” The motion also
    stated:   “[T]he parties agreed in the Order to a court appointed neutral and to submit to
    arbitration. Thus, this Court has the ability to enforce the Order, and require [ACI Design] to
    sign the arbitration agreement and pay the required arbitration fee.” 3405 Rain Forest asked the
    court to find ACI Design in contempt of court and order that, if ACI Design failed to pay “the
    arbitrator’s fees and sign[] the arbitration agreement within 10 business days,” the court would
    strike ACI Design’s pleadings and render a default judgment in 3405 Rain Forest’s favor. ACI
    Design did not file a response to the Motion for Contempt, to Show Cause, and Motion to
    Enforce. Instead, one week later, on March 22, 2022, ACI Design’s counsel filed a second
    motion to withdraw and asked that the court sign an order “discharging [him] as attorney of
    record” for ACI Design.
    On March 25, 2022, the court signed an order stating its finding that ACI Design
    was in violation of “this Court’s Order dated December 16, 2021, which compelled the parties to
    arbitration.” The court ordered ACI Design to “sign the arbitrator’s fee agreement and pay all of
    the arbitrator’s fees [] within 10 business days of this order and appear before the arbitrator as
    he so schedules.” The order further stated that, if ACI Design failed to do so, 3405 Rain Forest
    “may have this Court hold a hearing to determine if” ACI Design’s pleadings and defenses
    should be stricken and default judgment entered in 3405 Rain Forest’s favor. ACI Design did
    not move for reconsideration, file a petition for writ of mandamus challenging the order, or
    otherwise lodge any objection to the trial court’s order.
    4
    On March 31, 2022, the trial court granted ACI Design’s counsel’s motion to
    withdraw. The order stated that the appearance of new counsel for ACI “will not be a basis for
    delay” and noted that the “current settings and deadlines” include “[p]ayment in the amount of
    $5,000.00 to Anthony Ciccone, appointed arbitrator, and the signing of corresponding arbitration
    fee agreement, on or before Ten (10) days from the date of the order regarding the same.”
    The record contains a document dated March 25, 2022, titled Arbitration Agreement and
    Appointment of Arbitrator prepared by Anthony Ciccone and signed by Michael Gill on behalf
    of 3405 Rain Forest on April 6, 2022, and by Patrick Towne on behalf of ACI Design on April 4,
    2022. The Arbitration Agreement provides:
    We, the undersigned, hereby agree to submit the above-referenced matter to
    Anthony F. Ciccone, as neutral and arbitrator, to arbitrate and issue an award
    granting a resolution to the dispute between the undersigned parties concerning
    the construction of the improvements to the property located at 3405 Rain Forest
    Drive, Austin, Texas 78613 (“Residence”), pursuant to that certain Agreed Order
    signed by Judge Mauzy on December 16, 2021.
    We further agree that a judgment of any court having jurisdiction may be entered
    upon the award. The final hearing shall take place in Austin, Texas. The parties
    agree that the American Arbitration Association Construction Industry Arbitration
    Rules and Mediation Procedures shall apply to this matter.
    In August 2022, 3405 Rain Forest filed a “Motion to Confirm Award of Arbitrator and for
    Entry of Final Judgment.” The motion stated that “the Court ordered the parties to participate in
    binding arbitration before Anthony Ciccone in an Order dated December 16, 2021” and that on
    August 5, 2022, “the Court-appointed Neutral/Arbitrator, Anthony Ciccone, signed an award in
    favor of” 3405 Rain Forest. The motion to confirm the arbitration award attached a “Final
    Findings of Neutral and Award” signed by Ciccone. Ciccone stated that he had conducted a
    preliminary meeting with the parties in which they agreed that they would submit “any position
    5
    papers, documents, or evidence” to him on or before May 21, 2022. Ciccone stated that the
    parties agreed that he could have “an ex parte communication with Patrick Towne so he could
    explain his side of the dispute.” Ciccone further stated:
    On or around June 23, 2022, I engaged in a phone conference with Patrick Towne
    during which he explained to me the background and history of the above-
    referenced matter from his perspective. During this conversation, I told
    Mr. Towne that we had not received a submission or any document in support of
    his claims. I further explained to Mr. Towne that we do not go out and gather
    evidence and perform an independent investigation. I further explained to
    Mr. Towne that if there are documents or a submission he would like considered
    then he would need to directly submit the documentation to this office for review.
    In the interest of fairness, I agreed to extend the submission deadline to July 1,
    2022, and I sent an email to the Parties disclosing the telephone conference.
    On or around July 1, 2022, I received an email from Mr. Towne which had
    several attachments. After the close of the evidence date, both parties submitted
    additional items of evidence and/or information. All late filed evidence,
    documents, and/or information was reviewed and considered in making this
    award.
    Ciccone then stated his findings that (1) 3405 Rain Forest overpaid ACI Design in the amount of
    $373,691.98 for construction of the residence and that amount represented a reasonable, fair, and
    equitable compensatory damages award; (2) 3405 Rain Forest should recover reasonable and
    necessary attorneys’ fees, expenses, and costs of $79,719.61; (3) 3405 Rain Forest should
    recover an additional $5,000.00 for arbitration fees; and (4) 3405 Rain Forest should be awarded
    $10,000 pursuant to Texas Civil Practice and Remedies Code chapter 12 based on ACI Design’s
    filing three separate liens on the residence with the intent to defraud.
    In its motion, 3405 Rain Forest requested that the court confirm the award
    pursuant to Texas Civil Practice and Remedies Code section 171.087. See Tex. Civ. Prac. &
    Rem. Code § 171.087 (providing that “unless grounds are offered for vacating, modifying, or
    correcting an award under Section 171.088 or 171.091, the court, on application of a party, shall
    6
    confirm the award”); see also id. §§ 171.088 (providing cirumstances under which, “on
    application of a party,” court shall vacate award), .091 (providing circumstances under which,
    “on application,” court shall modify or correct award). ACI Design did not file a response to the
    motion, nor did it file any application requesting that the court vacate or modify the award.
    The court held a hearing on the motion to confirm the award on September 28,
    2022. 3405 Rain Forest appeared through counsel and Patrick Towne appeared pro se. 3405
    Rain Forest requested that the court confirm the award pursuant to Texas Civil Practice and
    Remedies Code section 171.087, pointing out that there had been no application to vacate,
    modify, or correct the award. When asked whether he objected to the court’s confirming the
    award, Towne stated that it was his understanding that the neutral, Ciccone, would conduct an
    appraisal of the residence and then each party would “have their own appraisal or experts to
    review the appraisal” and “either agree with it or disagree with it.” The court explained to
    Towne that in arbitration the arbitrator makes a decision about contested facts and issues an
    opinion, which is then filed with the court for issuance of a judgment based on that opinion. The
    court stated that the arbitrator’s award can only be attacked on certain grounds such as intrinsic
    fraud or undue influence. The court then stated that it was going to render final judgment
    confirming the arbitration award and concluded the hearing. The trial court signed a Final
    Judgment that awarded 3405 Rain Forest the amounts of damages, attorneys’ fees, arbitration
    fees, and penalties under Texas Civil Practice and Remedies Code chapter 12 set forth in the
    arbitrator’s Final Findings and Award. This appeal followed.
    DISCUSSION
    ACI Design designates four issues on appeal, which reduce to complaints that:
    (1) the trial court erred by ordering the parties to arbitrate their dispute in the absence of an
    7
    arbitration agreement; and (2) the trial court erred in confirming the arbitration award. We
    address the related arguments in turn.
    ACI Design asserts that the trial court erred when, on March 25, 2022, it
    determined that ACI Design had violated a December 16, 2021 order compelling the parties to
    arbitrate their dispute and ordered ACI Design to “sign the arbitrator’s fee agreement” and
    “appear before the arbitrator as he so schedules.” On appeal, ACI Design disputes that the
    December 16, 2021 order was one compelling the parties to arbitrate—in essence asserting that
    the trial court misinterpreted its own order—and further argues that the trial court erred by
    ordering it to sign an arbitration agreement when it had not agreed to arbitrate its disputes with
    3405 Rain Forest. However, ACI Design waived these complaints when it failed to raise any
    objection to the court’s order and, instead, signed an arbitration agreement agreeing to submit its
    dispute with 3405 Rain Forest to arbitration, with Ciccone acting as the neutral arbitrator. See
    Tex. R. App. P. 33.1(a) (stating that generally, to preserve complaint for appellate review, party
    must complain to trial court by timely request, objection, or motion, and trial court must rule or
    refuse to rule on request, objection, or motion). ACI Design neither filed a response to 3405
    Rain Forest’s motion to compel ACI Design to pay the arbitration fee and sign the arbitration
    agreement Ciccone had prepared, nor did it object to the trial court’s order compelling arbitration
    by filing a motion for reconsideration informing the court of its position that the parties had
    not agreed to arbitration of their disputes. Regarding preservation of error, the Texas Supreme
    Court has stated:
    There are important prudential considerations behind our rules on preserving
    error. First, requiring that parties initially raise complaints in the trial court
    conserves judicial resources by providing trial courts the opportunity to correct
    errors before appeal. Second, judicial-decision making is more accurate when
    trial courts have the first opportunity to consider and rule on error. Third, a party
    8
    should not be permitted to waive, consent, or neglect to complain about an error
    at trial and then surprise his opponent on appeal by stating his complaint for the
    first time.
    Mansions in the Forest, L.P. v. Montgomery County, 
    365 S.W.3d 314
    , 317 (Tex. 2012) (cleaned
    up). Rather than notify the court of its position that the parties had not agreed to arbitration, ACI
    Design signed the arbitration agreement and participated in the arbitration proceeding conducted
    by Ciccone. See Tex. Civ. Prac. & Rem. Code § 171.001(a) (providing that written agreement to
    arbitrate is valid and enforceable if agreement is to arbitrate controversy that exists at time of
    agreement); (b) (providing that party may revoke agreement only on ground that exists at law or
    in equity for revocation of contract). The first time that any of the ACI Design parties asserted
    that they had not agreed to arbitrate the dispute was at the hearing on 3405 Rain Forest’s motion
    to confirm the arbitration award. Additionally, the statements to the court at the hearing on the
    motion to confirm were not specifically that ACI Design had not agreed to arbitrate but, rather,
    that Towne had a different understanding of how the dispute would be handled by the “neutral.”
    Finally, Towne’s objections could be made only on his own behalf, not on behalf of the other
    entities that were parties to the litigation. See Lori Bernice Sharp Tr. v. Phung, 
    622 S.W.3d 929
    ,
    929-30 (Tex. App.—Austin 2021, no pet.) (“According to Texas law, only a licensed attorney is
    allowed to represent other parties.”); see also 1 Fox 2 Prods., LLC v. Mercedes-Benz USA, LLC,
    No. 03-20-00101-CV, 
    2021 WL 81865
    , at *4 (Tex. App.—Austin Jan. 7, 2021, no pet.) (mem.
    op.) (dismissing corporate appellant’s issues raised in brief because LLC’s owner could not
    represent entity pro se).
    We next consider whether the trial court erred by confirming the arbitration
    award. As previously noted, the parties signed the arbitration agreement prepared by Ciccone,
    which stated that Ciccone would use the American Arbitration Association rules to resolve their
    9
    dispute. Rule 55(c) provides that the parties are “deemed to have consented that judgment upon
    the arbitration award may be entered in any federal or state court having jurisdiction thereof.”
    See https://www.adr.org/sites/default/files/ConstructionRules_web.pdf (last visited July 16,
    2024). We review a trial court’s decision to confirm or vacate an arbitration award de novo.
    Southwinds Express Constr., LLC v. D.H. Griffin of Tex., Inc., 
    513 S.W.3d 66
    , 70 (Tex. App.—
    Houston [14th Dist.] 2016, no pet.).      “Review of an arbitration award is ‘extraordinarily
    narrow.’” Amoco D.T. Co. v. Occidental Petroleum Corp., 
    343 S.W.3d 837
    , 841 (Tex. App.—
    Houston [14th Dist.] 2014, pet. denied) (quoting Statewide Remodeling, Inc. v. Williams, 244
    SW.3 565, 568 (Tex. App.—Dallas 2008, no pet.)).          We give an arbitration award great
    deference and indulge every reasonable presumption in favor of the award and none against it.
    CVN Grp., Inc. v. Delgado, 
    95 S.W.3d 234
    , 238 (Tex. 2002); Amoco D.T. Co., 
    343 S.W.3d at 841
    . The party seeking to vacate the award “bears the burden of presenting a complete record
    that establishes grounds for vacatur.” Kreit v. Brewer & Pritchard, P.C., 
    530 S.W.3d 231
    , 243
    (Tex. App.—Houston [14th Dist.] 2017, pet. denied) (quoting Amoco D.T. Co., 
    343 S.W.3d at 841
    ).
    The Texas Arbitration Act (TAA) requires trial courts to confirm an arbitration
    award “[u]nless grounds are offered for vacating, modifying, or correcting [the] award under
    Section 171.088 or 171.091.” Tex. Civ. Prac. & Rem. Code § 171.087. Here, 3405 Rain Forest
    petitioned the district court to confirm the award. ACI Design did not respond and made no
    effort to establish any of the grounds for vacating, modifying or correcting an arbitration award
    under the TAA or otherwise. As previously noted, Towne appeared at the hearing to confirm the
    award, without counsel, and stated that he had understood that Ciccone would conduct an
    appraisal of the residence and then each party would review the appraisal and “either agree with
    10
    it or disagree with it.” To the extent Towne’s comments constituted an assertion that there was
    no agreement to arbitrate, as the party seeking to vacate the arbitration award, he was obligated
    to present a record establishing that (1) there was no agreement to arbitrate; (2) this issue was not
    adversely determined in a motion to compel or stay arbitration; and (3) he did not participate in
    the arbitration without raising this objection. See id. § 171.088(a)(4); Patel v. Moin, No. 14-15-
    00851-CV; 
    2016 WL 4254016
    , at *3 (Tex. App.—Houston [14th Dist.] Aug. 11, 2016, pet.
    denied) (mem. op.); Aspri I nvests., LLC v. Afeef, No. 04-10-00573-CV, 
    2011 WL 3849487
    , at
    *4-5 (Tex. App.—San Antonio Aug. 31, 2011, pet. dism’d) (mem. op.). Towne failed to do so.
    Instead, the record reflects that on 3405 Rain Forest’s motion to compel, the trial court ordered
    the parties to arbitrate and further reflects that Towne never raised this objection when
    communicating with Ciccone and otherwise participating in the arbitration. On appeal, ACI
    Design argues that the trial court erred by confirming the award because the arbitrator
    adjudicated matters other than the amount that 3405 Rain Forest had overpaid for the
    construction project. Having never raised in the trial court an objection that the arbitrator’s
    award was beyond the scope of the arbitration agreement, ACI Design has failed to preserve this
    issue for appellate review. See Tex. R. App. P. 33.1.
    CONCLUSION
    For the foregoing reasons, we overrule ACI Design’s issues challenging the trial
    court’s order confirming the arbitration award and we affirm the trial court’s judgment.
    11
    __________________________________________
    Thomas J. Baker, Justice
    Before Justices Baker, Kelly, and Smith
    Affirmed
    Filed: July 18, 2024
    12
    

Document Info

Docket Number: 03-22-00695-CV

Filed Date: 7/18/2024

Precedential Status: Precedential

Modified Date: 7/23/2024