Pae Aviation and Technical Services, LLC v. United States ( 2021 )


Menu:
  • Sn the Gnited States Court of Federal Claims
    No. 21-1469
    (Filed Under Seal: August 10, 2021)
    Reissued: September 9, 2021!
    PAE AVIATION & TECHNICAL
    SERVICES, LLC,
    Plaintiff,
    Vv.
    THE UNITED STATES,
    Defendant,
    and
    DYNCORP INTERNATIONAL, LLC,
    Defendant-Intervenor.
    Nee Ne ee Ne Ne Ne ee ee Ne “ee “ee Se Se Se Se Se Se
    Robert Nichols, Nichols Liu, LLP, Washington, DC, for plaintiff.
    Kelly A. Krystyniak, U.S. Department of Justice, Civil Division, Washington, DC, for defendant.
    Scott Michael McCaleb, Wiley Rein, LLP, Washington, DC, for defendant-intervenor.
    OPINION & ORDER
    SMITH, Senior Judge
    Before the Court is defendant’s and defendant-intervenor’s respective Motions to Dismiss
    Count VII to the Complaint under Rule 12(b)(6) of the Rules of the United States Court of
    Federal Claims (“RCFC”) for failure to state a claim upon which relief can be granted.”
    : An unredacted version of this opinion was issued under seal on August 10, 2021.
    2 On June 24, 2021, defendant-intervenor filed its Motion to Dismiss under Counts VII and
    I. See generally Defendant-Intervenor’s Motion to Dismiss, ECF No. 22. On July 8, 2021,
    plaintiff voluntarily withdrew Count I of its Complaint. Plaintiff's Response to Defendant and
    Defendant-Intervenor’s Motions to Dismiss at 2, ECF No. 33. Accordingly, the Court need not
    address Count I of the Complaint nor defendant-intervenor’s theory of dismissal pertaining to
    this Count.
    -|-
    Additionally, before the Court is the plaintiffs Motion for Preliminary Injunction and Motion for
    Temporary Restraining Order. For the reasons discussed below, the Court grants defendant’s
    and defendant-intervenor’s Motion to Dismiss, denies plaintiff's Motion for Preliminary
    Injunction, and denies plaintiff's Motion for Temporary Restraining Order.
    I. Background
    A. General Facts and Procedural History
    The plaintiff in this post-award bid protest, PAE Aviation & Technical Services, LLC
    (“PAE”), is the incumbent contractor for the U.S. Customs and Border Protection’s (“CBP” or
    “Agency”) National Maintenance and Logistics Support Contract (““NAMLS”) — providing
    maintenance and logistics support services for the Agency’s aircraft. See Complaint at 3, ECF
    No. | [hereinafter Compl.]. On June 1, 2018, the Agency issued the Request for Proposals under
    solicitation no. 70B02C18R00000063 (“RFP” or the “Solicitation”) with a twelve-month base
    period and nine one-year option periods. /d. at 1, 3.
    The Agency originally selected DynCorp International, LLC (‘DynCorp”) as the
    awardee. /d. at 6. On June 24, 2019, PAE and another offeror, Vertex, protested the award at
    the Government Accountability Office (“GAO”). /d. at 7. On July 8, 2019, the Agency notified
    offerors of its intent to take corrective action. /d. PAE and DynCorp then filed numerous
    protests related to the scope of that corrective action. /d. On May 15, 2020, the Agency selected
    PAE for award. /d. at 8. On June 22, 2020, DynCorp filed a protest at the GAO. /d. On July
    10, 2020, the Agency again took corrective action. /d. On January 28, 2021, the Agency
    informed PAE that it had awarded the successor contract to DynCorp. /d. On March 1, 2021,
    PAE protested this award at the GAO, which was ultimately denied on June 8, 2021. /d. at 10.
    On June 14, 2021, plaintiff filed its Complaint with this Court. See generally Compl.
    Currently, plaintiff continues to operate through a bridge contract set to expire on
    September 30, 2021. Plaintiff's Motion for Preliminary Injunction at 38, ECF No. 28
    [hereinafter Pl.’s Mot. for Preliminary Injunction]. The Agency intends to initiate transition of
    the NAMLS contract to DynCorp during the pendency of this protest, with the period of
    performance to commence on October 1, 2021 — after resolution of this protest. See
    Defendant’s Response in Opposition to Plaintiff's Motion for Preliminary Injunction at 7, ECF
    No. 29 [hereinafter Def.’s Resp. ].
    Il. Motions to Dismiss
    On June 14, 2021, plaintiff filed its Complaint with this Court, alleging various errors
    with the Agency’s award. See generally Compl. At issue is Count VII, wherein the plaintiff
    alleges that DynCorp exerted “improper political interference” which contributed to the
    Agency’s award decision. /d. at 22-25. On June 24, 2021 defendant and defendant-intervenor
    filed their respective Motions to Dismiss Count VII to the Complaint. See generally Defendant's
    Motion to Dismiss, ECF No. 23 [hereinafter Def.’s Mot. to Dismiss]; see a/so Defendant-
    Intervenor’s Motion to Dismiss, ECF No. 22 [hereinafter Def.-Int.’s Mot. to Dismiss]. On July
    8, 2021, plaintiff filed its Response to defendants’ Motions. See generally Plaintiff's Response
    -2-
    to Defendant and Defendant-Intervenor’s Motions to Dismiss, ECF NO. 33 [hereinafter Pl.’s
    Resp. to Mots.’ to Dismiss]. On July 12, 2021, defendant and defendant-intervenor filed their
    respective replies to plaintiff's Response. See generally Defendant’s Reply in Support of its
    Motion to Dismiss, ECF No. 38 [hereinafter Def.’s Reply in Support of its Mot. to Dismiss]; see
    also Defendant-Intervenor’s Reply in Support of its Motion to Dismiss, ECF No. 36 [hereinafter
    Def.-Int.’s Reply in Support of its Mot. to Dismiss].
    A. Standard of Review
    Defendant moves to dismiss Count VII of Plaintiff's Complaint under RCFC 12(b)(6) for
    failure to state a claim upon which relief may be granted. To survive dismissal, plaintiff's
    Complaint must “contain sufficient factual matter, accepted as true, to ‘state a claim to relief that
    is plausible on its face.’” Ashcroft v. Iqbal, 
    556 U.S. 662
    , 678 (2009) (citing Bell Atl. Corp. v.
    Twombly, 
    550 U.S. 544
    , 570 (2007)). A claim has “facial plausibility” when the “plaintiff pleads
    factual content that allows the court to draw the reasonable inference that the defendant is liable
    for the misconduct alleged.” /gbal, 
    556 U.S. at 678
     (emphasis added). Importantly, /gba/ has
    clarified that the requirement for a claim to have “facial plausibility” is not akin to a “probability
    requirement”; rather, the plausibility standard “asks for more than a sheer possibility that a
    defendant has acted unlawfully.” /d.
    The Court will start its inquiry by identifying pleadings that “are no more than
    conclusions,” such that they are not entitled to the assumption of truth. /gbal, 
    556 U.S. at 679
    .
    In other words, “the court must not mistake legal conclusions presented in a complaint for factual
    allegations which are entitled to favorable inferences.” Peraton Inc. v. United States, 
    146 Fed. Cl. 94
    , 100 (2019) (internal citations omitted). Indeed, the Court will assume the veracity of
    well-pleaded factual allegations, and then “determine whether they plausibly give rise to an
    entitlement to relief.” /gbal, 
    556 U.S. at 679
    .
    Next, the Court will determine whether a complaint has stated a plausible claim for relief,
    a “context-specific task that requires the reviewing court to draw on its judicial experience and
    common sense.” /d. at 679. “[W]here the well-pleaded facts do not permit the court to infer
    more than the mere possibility of misconduct, the complaint has alleged—but it has not
    ‘show[n]’—‘that the pleader is entitled to relief.’” Jd. (citing Fed. R. Civ. P. 8(a)(2)). The Court
    will analyze whether well-pleaded factual allegations nudge plaintiffs claim “across the line
    from conceivable to plausible.” /d. at 680; see also Harmonia Holdings Grp., LLC v. United
    States 
    999 F.3d 1397
    , 1405 (Fed. Cir. 2021).
    B. Analysis on Count VII
    Defendant’s Motion to Dismiss argues that Count VII of plaintiff's Complaint should be
    dismissed because plaintiff has not put forth facts sufficient to support a plausible claim. See
    Def.’s Mot. to Dismiss at 4. Defendant argues that plaintiff has hinged its argument on two facts
    of public record which do not meet the 12(b)(6) standard as articulated above. Specifically,
    defendant argues that plaintiff's allegation of “political interference” depends on two facts: (1)
    DynCorp hired a lobbyist shortly before the Agency’s decision to take corrective action, and (2)
    1 EE 551.0
    -3-
    money to political action committees during the 2020 presidential-election cycle to support
    former President Trump. /d. at 6; see also Def.’s Reply in Support of its Mot. to Dismiss at 2.
    Defendant posits that these facts are not enough for plaintiff's allegation to survive this Court’s
    12(b)(6) review. See Def.’s Mot. to Dismiss at 4-8. Defendant-intervenor similarly argues that
    plaintiff's Complaint does not have any specific factual allegation that the Agency engaged in
    improper evaluation or source selection activity that compromised competition. See Def.-Int.’s
    Mot. to Dismiss at 12. Additionally, defendant-intervenor argues that allegations of lobbying
    activity or political contributions do not plausibly lead to inferences of impropriety. /d. at 13-17.
    Plaintiff's Response to Defendants’ Motions to Dismiss argue that it has pled sufficient
    facts to “state a plausible claim of improper political influence and bias.” Pl.’s Resp. to Mots.’ to
    Dismiss at 3. Specifically, plaintiff argues that the public and undisputed facts show that
    DynCorp lobbied the Agency and the Department of Homeland Security (“DHS”), and that the
    made “hefty” contributions to President
    Trump at “exactly the same time period” that the Agency took corrective action, re-evaluated
    proposals, and awarded to DynCorp. /d. Additionally, plaintiff argues that defendants’
    arguments prematurely address the merits, which are inapplicable at this stage of the proceeding.
    Id. at 4-7.
    After careful review of the briefs, the Court finds that plaintiff has not met the pleading
    standard to survive a motion to dismiss under RCFC 12(b)(6). The Court starts its inquiry by
    identifying factual allegations that warrant an assumption of truth versus legal conclusions which
    are not entitled to a favorable inference. The parties present two undisputed facts: (1) DynCo
    lobbied the Agency and DHS before the award to DynCorp, and (2) a DynCorp’s
    made contributions to political action committees supporting then-President
    Trump. Plaintiff argues that given these facts and timeline, there is a plausible claim of political
    interference and bias. Plaintiff's claim is a legal conclusion of political interference and bias
    which is not entitled to a favorable inference. See Peraton, 146 Fed. Cl. at 100 (stating that “the
    court must not mistake legal conclusions presented in a complaint for factual allegations which
    are entitled to favorable inferences.”). Itis also not supported by any facts beyond the hiring of a
    lobbyist and the contribution by = DynCorp. What is missing is any scintilla of
    evidence that any government official did anything wrong.
    However, even if this Court were to construe plaintiffs claim as a factual allegation,
    entitling it to a favorable inference, plaintiff has not provided a plausible claim for relief under
    12(b)(6). See id. To determine whether factual allegations plausibly give rise to an entitlement
    to relief, the Court will engage in a “context-specific task” in which the Court will draw on its
    “Judicial experience and common sense.” /gbal, 
    556 U.S. at 679
    . Here, the pleaded facts do not
    permit the Court to infer more than the mere possibility that the Agency acted based on improper
    political influence and bias. See 
    id.
     (“But where the well-pleaded facts do not permit the court to
    infer more than the mere possibility of misconduct, the complaint has alleged—but it has not
    ‘show[n]’—‘that the pleader is entitled to relief.’”). In other words, there is no link or causal
    connection between the facts provided and the alleged misconduct. See Harmonia Holdings
    Grp., LLC, 999 F.3d at 1407 (holding that a plaintiff must plead sufficient factual allegations to
    demonstrate “the indicia of [impropriety] were so compelling that the contracting officer
    necessarily abused his discretion. .. .”). Further, the Court finds nothing improper with legal
    -4-
    campaign contributions or the act of retaining a lobbyist. Unless plaintiff can provide something
    more — factual allegations that would nudge plaintiffs claim “across the line from conceivable
    to plausible” — this Court is unpersuaded by plaintiff's arguments. /gbal, 
    556 U.S. at 680
    .
    Accordingly, defendant’s and defendant-intervenor’s Motions must be granted.
    Il. Injunction
    On June 28, 2021, plaintiff filed its Motion for Preliminary Injunction, seeking to enjoin
    the Agency from commencing transition activities. See generally P|.’s Mot. for Preliminary
    Injunction. On July 1, 2021, defendant filed its Response, generally asserting that plaintiff’ s
    Motion fails to meet the preliminary injunction standard. See generally Def.’s Resp. On that
    same day, defendant-intervenor filed its Response, raising similar arguments. See generally
    Defendant-Intervenor’s Response in Opposition to Plaintiff's Motion for Preliminary Injunction,
    ECF 30 [hereinafter Def.-Int.’s Resp. in Opp. to Pl’s Mot. for Preliminary Injunction].
    Shortly afterwards, on July 9, 2021, plaintiff filed its Motion for Temporary Restraining
    Order — reiterating the arguments in its Motion for Preliminary Injunction. See generally
    Plaintiff's Motion for Temporary Restraining Order, ECF No. 35 [hereinafter Pl.’s Mot. for
    TRO]. On July 12, 2021, defendant-intervenor responded to plaintiff's Motion for Temporary
    Restraining Order. See generally Defendant-Intervenor’s Response to Plaintiff's Motion for
    Temporary Restraining Order, ECF No. 37 [hereinafter Def.-Int.’s Resp. to Pl.’s Mot. for TRO].
    On July 19, 2021, defendant filed its Response to Plaintiff's Motion for Temporary Restraining
    Order. See generally Defendant’s Response to Plaintiff's Motion for a Temporary Restraining
    Order, ECF No. 42 [hereinafter Def.’s Resp. to Pl.’s Mot. for TRO]. Plaintiff's Motions are fully
    briefed and ripe for review.
    Preliminary injunctions and temporary restraining orders are “extraordinary and drastic
    remed[ies] .. . that should not be granted unless the movant, by a clear showing, carries the
    burden of persuasion.” Mazurek v. Armstrong, 
    520 U.S. 968
    , 972 (1997) (citation omitted). A
    plaintiff seeking a preliminary injunction or a temporary restraining order must establish the
    following: “(1) that [it] is likely to succeed on the merits, (2) that [it] is likely to suffer
    irreparable harm in the absence of preliminary relief, (3) that the balance of equities tips in [its]
    favor, and (4) that an injunction is in the public interest.’”*? Am. Signature, Inc. v. United States,
    
    598 F.3d 816
    , 823 (Fed. Cir. 2010) (quoting Winter v. Natural Res. Def. Council, Inc., 
    555 U.S. 7
    , 20 (2008)). “No single factor is determinative, and the weakness of the showing regarding
    one factor may be overborne by the strength of the others.” Munilla Constr. Mgmt., LLC vy.
    United States, 
    130 Fed. Cl. 131
    , 135 (2016) (internal citations omitted). However, at the same
    time, “‘the absence of an adequate showing with regard to any one factor may be sufficient,
    given the weight or lack of it assigned [to] the other factors, to justify ... denial.’” /d. (quoting
    Chrysler Motors Corp. v. Auto Body Panels of Ohio, Inc., 
    908 F.2d 951
    , 953 (Fed. Cir. 1990)).
    3 “The standards for determining whether to grant a temporary restraining order are the
    same as those that apply to a motion for a preliminary injunction.” Munilla Constr. Mgmt., LLC
    v. United States, 
    130 Fed. Cl. 131
    , 135 (2016).
    -5-
    Upon careful review and for the reasons stated below, the Court finds that an award of temporary
    and preliminary injunctive relief is inappropriate in this case.
    First, the Court finds that plaintiff has not demonstrated that it is likely to succeed on the
    merits. Plaintiff has not shown overwhelming evidence that it is right and defendant is wrong.
    While plaintiff alleges numerous Agency errors, defendant has presented a reasonable response.
    Plaintiff cannot prevail on a preliminary injunction so the Court must resolve this case in a final
    decision. Plaintiffs allegations include the following: (1) CBP’s failure to evaluate DynCorp’s
    cost proposal in light of a recent change in corporate ownership, (2) CBP’s erroneous evaluation
    of plaintiffs labor proposal and failure to seek clarifications, (3) CBP’s unequal treatment in the
    evaluation of the parties’ proposals, (4) DynCorp’s wrongful political interference in the
    procurement process, and (5) CBP’s failure to amend the solicitation to reflect its changed needs.
    Pl.’s Mot. for Preliminary Injunction at 13-36; see also Compl. Under the APA standard of
    review, agency procurement actions may be set aside if they are “arbitrary, capricious, an abuse
    of discretion, or otherwise not in accordance with the law.” 
    28 U.S.C. § 1491
    (b)(4); 
    5 U.S.C. § 706
    (2)(A). The arbitrary and capricious standard, applicable here, is a highly deferential one.
    See Advanced Data Concepts, Inc. v. United States, 
    216 F.3d 1054
    , 1058 (Fed. Cir. 2000). Thus,
    “Tif the [C]Jourt finds a reasonable basis for [an] agency’s action, the [C]ourt should stay its hand
    even though it might, as an original proposition, have reached a different conclusion as to the
    proper administration and application of the procurement regulations.” Honeywell, Inc. v. United
    States, 
    870 F.2d 644
    , 648 (Fed. Cir. 1989) (quoting M. Steinthal & Co. v. Seamans, 
    455 F.2d 1289
    , 1301 (D.C. Cir. 1971)). Accordingly, plaintiff bears a heavy burden in order to prevail in
    this protest. See Jmpresa, 238 F.3d at 1338 (emphasis added).
    Next, the Court concludes that plaintiff has failed to demonstrate that it is likely to suffer
    irreparable harm in the absence of preliminary or temporary relief. In its Motion, plaintiff asserts
    that it will be irreparably harmed if transition of the contract to DynCorp occurs for the following
    reasons: (1) “DynCorp’s transition will allow it to appropriate PAE’s technical efficiencies and
    cost savings[,]” and (2) DynCorp’s transition will result in “incumbent employee turnover.”
    Pl.’s Mot. for Preliminary Injunction at 9, 12. Specifically, plaintiff alleges that its cost proposal
    was “informed by [its] role as the incumbent contractor for the last [eleven] years of this
    contract.” /d. at 9. Thus, if transition is to occur, DynCorp will gain insight into PAE’s concept
    of operations — to PAE’s competitive disadvantage in a potential recompete. /d. at 9-10.
    Further, plaintiff posits that, as DynCorp proposed to hire many of PAE’s incumbent personnel,
    it fully expects DynCorp to engage in aggressive efforts to capture its incumbent workforce. /d.
    at 12. Finally, plaintiff cautions that if an injunction is not issued, it will be obligated, under the
    Worker Adjustment and Retraining Notification (“WARN”) Act, to inform its employees no
    later than August 1, 2021 of an impending mass lay off — which would be premature, given that
    the Court would not have had an opportunity to weigh in on the merits of this protest. /d.; see
    also 
    29 U.S.C. §§ 2101-09
     (WARN Act).
    In response, defendant avers that the harms plaintiff identifies do not constitute
    irreparable harm as they are routine consequences of an incumbent contractor losing an award
    and commencing transition. Def.’s Resp. at 9. Defendant maintains that “the harm PAE
    -6-
    identifies [is] contingent employment offers and DynCorp[’s] access to government-owned
    information.” /d. (emphasis in original). If such harms typically met the standard, “only in rare
    instances would the commencement of transition activities not justify a preliminary injunction.”
    Id. at 1 (emphasis omitted). Based on the above, defendant asserts that “[plaintiff’s] [M]otion is
    a transparent request that it be awarded an additional bridge contract regardless of the outcome
    of this protest, ensuring that, even if the Government does prevail, DynCorp [will] not be
    prepared to begin performance on October 1[, 2021.]” /d. at 10 (emphasis added).
    Upon careful review, the Court agrees with defendant’s arguments and finds that
    plaintiff's allegations of injury fail to demonstrate irreparable harm. It is well-settled precedent
    that “‘[a] preliminary injunction will not [be] issued simply to prevent a mere possibility of
    injury, even where prospective injury is great. A presently existing, actual threat must be
    shown.’” Eskridge Rsch. Corp. v. United States, 
    92 Fed. Cl. 88
    , 98 (2010) (quoting Qingdao
    Taifa Grp. Co. v. United States, 
    581 F.3d 1375
    , 1379 (Fed. Cir. 2009) (citation omitted)). “Such
    a threat of imminent, irreparable injury exists when a plaintiff shows that, absent a preliminary
    injunction, it would be deprived of the only remedy available were it to succeed on the merits.”
    IBM Corp. v. United States, 
    118 Fed. Cl. 677
    , 683 (2014) (citations omitted) (emphasis added).
    In this case, plaintiff admits that it holds a bridge contract with the Agency, expiring on
    September 30, 2021. Pl.’s Mot. for Preliminary Injunction at 38. Meanwhile, oral argument on
    the parties’ Cross-Motions for Judgment on the Administrative Record is scheduled for
    September 8, 2021. See Scheduling Order, ECF No. 44. Given the expedited timeline, the Court
    will be able to decide the merits of plaintiff's protest before the expiration of plaintiff's bridge
    contract. Further, and most importantly, the transition activities the Agency seeks to commence
    are standard in the procurement context. See Def.’s Resp. at 1 (Transition activities include
    “receiving and reviewing contract performance data, conducting inventories... , and issuing
    contingent job offers to current PAE employees.”). While the Court recognizes that such
    transition activities may expose DynCorp to propriety information, such information is
    government-owned and will be limited in scope. Based upon the above, the Court finds that
    plaintiff's Motion fails to establish irreparable harm and a preliminary injunction is not a proper
    remendy for PAE to litigate its claims. See Eskridge, 92 Fed. Cl. at 98.
    Lastly, the Court finds that the balance of equities and public interest tips against an
    award of temporary or preliminary relief. In its Response, defendant indicated that the Agency
    would suffer immense harm if DynCorp is not permitted to begin transition, and ultimately full
    performance, as soon as possible. Def.’s Resp. at 15 (emphasis added). This is because the
    contract at issue includes a new requirement that a contractor have a Safety Management System
    that it will merge with the Agency’s before full performance is to commence. /d. (emphasis
    added). Thus, if DynCorp is not permitted to begin the process of aligning its system with the
    Agency’s, a necessary transition activity, the aircraft maintenance and safety failures that would
    follow could be disastrous. /d. at 16. Further, without the commencement of transition, and if
    the Government prevails in this protest, DynCorp will not be prepared to begin performance on
    October 1, 2021 — after the Court issues its decisions on the merits. /d. at 10.
    Taken together, the Court concludes that plaintiff has not demonstrated that the balance
    of equities and public interest favors granting the extraordinary relief it seeks.
    -7-
    IV. Conclusion
    For the reasons set forth above, defendant’s Motion to Dismiss is hereby GRANTED,
    defendant-intervenor’s Motion to Dismiss is hereby GRANTED, plaintiffs Motion for
    Preliminary Injunction is hereby DENIED. For the same reasons as the Motion for Preliminary
    Injunction, plaintiff's Motion for Temporary Restraining Order is hereby DENIED.
    IT IS SO ORDERED.
    s§ Goren Lh, (Amith
    Loren A. Smith,
    Senior Judge