Baha v. United States ( 2015 )


Menu:
  •           In the United States Court of Federal Claims
    No. 14-494C
    (Filed: August 24, 2015)
    )
    MUHAMMAD TARIQ BAHA,                      )
    )      Motion to Dismiss; Lack of
    )      Jurisdiction; RCFC 12(b)(1); Failure to
    Plaintiff,            )      State a Claim; RCFC 12(b)(6);
    )      Pleading Contractual Provisions;
    v.                                        )      RCFC 9(k); Contract Disputes Act;
    )      Notice to Interested Parties; RCFC
    THE UNITED STATES,                        )      14(b)(3); RCFC 12(b)(7)
    )
    Defendant.            )
    )
    Mogeeb Weiss, Weiss Law PC, Alameda, CA, for plaintiff.
    James Sweet, Civil Division, U.S. Department of Justice, Washington, DC, with whom
    were Benjamin C. Mizer, Principal Deputy Assistant Attorney General, Robert E.
    Kirschman, Jr., Director, Franklin E. White, Jr., Assistant Director, for defendant.
    OPINION DENYING THE GOVERNMENT’S
    RENEWED MOTION TO DISMISS
    FIRESTONE, Judge.
    Pending before the court is the motion of defendant United States (“the
    government”) to dismiss the amended complaint of plaintiff, Muhammad Tariq Baha
    (“Mr. Baha”), pursuant to Rules 12(b)(1), 12(b)(6), and 12(b)(7) of the Rules of United
    States Court of Federal Claims (“RCFC”). Gov’t’s 2d Mot. to Dismiss, ECF No. 17
    (“Gov’t’s Mot.”).
    The complaint alleges that, from August 2002 until March 2014, the United States
    Army occupied a property known as Jill Fab house in Kabul, Afghanistan that plaintiff
    alleges belongs to him. Mr. Baha alleges that the government did not pay him any rent
    between September 2003 and September 2009, or between September 2012 and March
    2014. The plaintiff argues that pursuant to contracted agreement, the government owes
    him $54,000 per year for rent owed for September 2003 to September 2009 and $120,000
    per year for rent owed from September 2012 to March 2014.
    The government argues that the claims for unpaid rent for the period between
    September 2003 and September 2010 should be dismissed pursuant to RCFC 12(b)(6)
    and RCFC 9(k) because the plaintiff has failed to provide a copy of the 2002 lease
    agreement. Instead, the plaintiff submitted an amendment to that agreement signed on
    August 17, 2002, in which the government agreed to pay $54,000 per year for the term of
    the 2002 lease. The government also argues that, pursuant to RCFC 12(b)(1), the court
    lacks jurisdiction over plaintiff’s claim for rent allegedly owed for January, February, and
    March of 2014 because the claim plaintiff submitted under the Contracts Disputes Act
    (“CDA”), 41 U.S.C. § 7103, only requested rent accrued through the end of 2013.1
    Finally, the government argues that pursuant to RCFC 12(b)(7), the case should not
    proceed because, Mr. Baha, has failed to join the other owners of the Jill Fab house. The
    government argues that the Jill Fab is owned by several individuals, who, in addition to
    Mr. Baha, inherited it from Mr. Baha’s father. According to the government, these
    1
    The government initially claimed that plaintiff was barred from seeking rent allegedly owed
    after 2009 based upon a claim for payment that the plaintiff submitted to the contracting officer
    in January of 2010. However, in his opposition to defendant’s motion to dismiss, plaintiff
    attached a second claim that Mr. Baha had submitted to the contracting officer on January 19,
    2014. App’x to Pl.’s Opp. to Gov’t’s Mot. (“Pl.’s App’x”) 1-2, ECF No. 18-1.
    2
    individuals are indispensable parties and that the case should be dismissed because they
    were not joined. In the alternative, the government requests, pursuant to RCFC 14(b),
    that the court provide notice to these heirs, as interested parties, in order to give them an
    opportunity to intervene. The plaintiff argues that he alone owns the subject property
    under Afghan law and he alone had the authority to lease the property and therefore other
    heirs are not indispensable. Pl.’s Opp. to Gov’t’s Mot. (“Pl.’s Opp.”), ECF No. 18.
    For the reasons set forth below, the government’s motion to dismiss is DENIED.
    However, because the court finds that individuals other than Mr. Baha potentially have an
    interest in the property and the leases at issue, the court GRANTS the government’s
    motion to provide notice to the other heirs of the property.
    I.     BACKGROUND
    A.      Facts2
    Mr. Baha alleges that he possesses a deed for a residential house in Kabul,
    Afghanistan known as the Jill Fab house. Am. Compl. ¶ 7. Mr. Baha alleges that, on
    August 10, 2002, he entered into Lease No. SWD-OEF-0027 (“27 Lease”), an agreement
    to rent the Jill Fab house to the government. Am. Compl. ¶ 5. Mr. Baha states that he
    “does not have a copy of this written Lease Agreement” and alleges that this is “because
    Defendant refused to provide Plaintiff with a copy.” 
    Id. Shortly after
    the 27 Lease was
    2
    The facts as stated are taken from the allegations in the plaintiff’s complaint attached
    documents, as well as the documents attached to the government’s motion to dismiss and the
    plaintiff’s opposition. At this time, the parties have not challenged the authenticity of any of
    these documents.
    3
    signed, a dispute arose as to whether Mr. Baha’s father, Ghuiam Bahawoudin,3 or another
    person, Haji Jamil, owned the house. Am. Compl. Ex. 1. As a consequence, on August
    17, 2002, the government entered into a supplement to the 27 Lease (“27 Lease
    Supplement”). The agreement was between the government and “Ghuiam Baoddin [son
    of] Niaz Mohammad, acting by and through his son Muhammad Tariq Baha.” Am.
    Compl. Ex. 1 at 1. Under the 27 Lease Supplement, the government took possession of
    the house, but the parties agreed that the government would not make payment until an
    Afghan court determined legal ownership and title to the house. 
    Id. Paragraph 3
    of the
    27 Lease Supplement, entitled “RENTAL” stated that “The Lessee will pay the Lessor
    rent at the rate of $54,000 (U.S. Dollars) for the term.” 
    Id. At the
    time 27 Lease
    Supplement was signed, Mr. Bahawoudin was deceased. App’x to Gov’t’s Mot. (“Gov’t
    App’x”) 15; Pl.’s Opp. 5.
    Mr. Baha alleges that he successfully prevailed in the Afghanistan Supreme Court
    against all challenges to the title of the house in 2009. Am. Compl. ¶ 7; Gov’t App’x 15-
    19. The Afghanistan Supreme Court decision found that Mr. Bahawouddin was the
    rightful owner of the property and that, since he was deceased, the property belonged to
    his heirs. Gov’t App’x 15, 17-18. The Afghanistan Supreme Court decision also
    indicates that, in addition to Mr. Baha, the other heirs are Mr. Bahawouddin’s widow,
    Kobra, and his other children: Mohammad Hamed, Mohammad Khaled, Qudsia, Fahima,
    Afifa, Fariha, and Tuba (collectively, “other potential heirs”). Gov’t App’x 15.
    3
    Mr. Baha’s father is referred to variously as Mr. Baoddin or Mr. Bahawouddin. For
    consistency, this opinion refers to him as Mr. Bahawouddin.
    4
    The parties entered into a second lease agreement for the same property, Lease
    No. DACA-TAN-5-11-0032 (“32 Lease”), on August 8, 2011. Gov’t App’x 5-14. The
    32 Lease, signed by Mr. Baha, stated that the agreement was between the government
    and “the heirs of Bahawouddin, Son of Neyaz Mohammad Represented by Mohammad
    Tariq [Baha].” 
    Id. at 5.
    The 32 Lease gave the government the right to the property from
    September 25, 2011 to September 24, 2012, with a right to renew for up to four years
    under the same terms. 
    Id. The government
    agreed to pay an annual rent of $120,000. 
    Id. Mr. Baha
    alleges that the government paid him rent from September 2009 through
    September 2012 at a rate of $120,000 per year for a total of $360,000. Am. Compl. ¶ 6.
    However, Mr. Baha alleges that the government stopped paying rent in September of
    2012, but remained on the property until March of 2014. Am. Compl. ¶ 8. Mr. Baha also
    alleges that the government never paid the rent due between September 2003 and
    September 2010, while Mr. Baha was litigating the title issue. Am. Compl. ¶¶ 1, 9.
    Mr. Baha submitted two CDA claims, the first in January 2010 seeking rent and
    other damages accrued between 2002 and 2009 in the amount of $1,615,000, Gov’t
    App’x 1-3, and the second in January of 2014 for rent and other damages accrued through
    December of 2013 in the amount of $2,109,000, Pl.’s App’x 1-2.
    B.     The Court’s Order Regarding Plaintiff’s Amended Complaint
    On June 9, 2014, Mr. Baha filed his initial complaint in this court. Following a
    hearing on the government’s first motion to dismiss, the court issued an order permitting
    Mr. Baha to amend his complaint and directing Mr. Baha to address three issues raised in
    the government’s initial motion to dismiss. Jan. 16, 2015 Order at 1 (“Order”), ECF No.
    5
    13. First, Mr. Baha was directed to “only make claims based on documents that can be
    located and attached to the amended complaint.” 
    Id. Second, Mr.
    Baha was directed to
    show “that he has satisfied the requirements for a CDA claim” by submitting a claim
    regarding rent allegedly due between September 2012 and March 2014, “or consider
    withdrawing the claim until he can meet the CDA’s jurisdictional requirements.” 
    Id. Third, Mr.
    Baha was directed to allege whether or not he was the sole heir to the Jill Fab
    house. 
    Id. at 2.
    Mr. Baha filed an amended complaint on March 10, 2015. The government
    renewed its motion to dismiss on May 15, 2015. The court finds that oral argument on
    the government’s renewed motion is not necessary.
    II.    STANDARD OF REVIEW
    Under the Tucker Act, an action may be maintained in this court only if it is
    “founded either upon the Constitution, or any Act of Congress or any regulation of an
    executive department, or upon any express or implied contract with the United States, or
    for liquidated or unliquidated damages in cases not sounding in tort.” 28 U.S.C. §
    1491(a)(1). A plaintiff seeking to litigate in the Court of Federal Claims “bears the
    burden of establishing subject-matter jurisdiction by a preponderance of the evidence.”
    Hopi Tribe v. United States, 
    782 F.3d 662
    , 666 (Fed. Cir. 2015) (quoting M. Maropakis
    Carpentry, Inc. v. United States, 
    609 F.3d 1323
    , 1327 (Fed. Cir. 2010)). “Determination
    of jurisdiction starts with the complaint, which must be well-pleaded in that it must state
    the necessary elements of the plaintiff’s claim, independent of any defense that may be
    interposed.” Holley v. United States, 
    124 F.3d 1462
    , 1465 (Fed. Cir. 1997) (citations
    6
    omitted). If a motion to dismiss for lack of subject matter jurisdiction challenges the
    jurisdictional facts alleged in the complaint, the court may consider relevant evidence
    outside the complaint in order to determine whether it has jurisdiction. Banks v. United
    States, 
    741 F.3d 1268
    , 1277 (Fed. Cir. 2014) (citing Reynolds v. Army & Air Force
    Exch. Serv., 
    846 F.2d 746
    , 747 (Fed. Cir. 1988)).
    A complaint must contain “a short and plain statement of the claim showing that
    the pleader is entitled to relief[.]” RCFC 8(a)(2). A complaint that offers “labels and
    conclusions,” or “a formulaic recitation of the elements of a cause of action will not do.”
    Ashcroft v. Iqbal, 
    556 U.S. 662
    , 678 (2009) (quoting Bell Atlantic Corp. v. Twombly,
    
    550 U.S. 544
    , 555 (2007)). Nor does it suffice to tender “naked assertion[s] devoid of
    further factual enhancement.” 
    Id. (quoting Twombly,
    550 U.S. at 557). Thus, the factual
    allegations (as opposed to the legal conclusions) must be sufficient to “nudge” a claim
    “across the line from conceivable to plausible.” 
    Id. at 683
    (quoting 
    Twombly, 550 U.S. at 570
    ).
    III.   DISCUSSION
    A.     Plaintiff’s Complaint Satisfies RCFC 9(k) and the Court’s Order
    The government argues that this court does not possess jurisdiction to consider
    Mr. Baha’s claim for rent between September 2003 and September 2010 because he
    failed to attach a copy of the 27 Lease, and has failed to identify the substantive
    provisions of the lease upon which he relies. Therefore, the government argues, plaintiff
    does not meet the requirement of RCFC 9(k). This rule sets the pleading requirements
    for bringing a claim founded on a contract or treaty in this court, providing that:
    7
    In pleading a claim founded on a contract or treaty, a party must identify
    the substantive provisions of the contract or treaty on which the party relies.
    In lieu of a description, the party may annex to the complaint a copy of the
    contract or treaty, indicating the relevant provisions.
    RCFC 9(k).4 The government also argues that plaintiff has not satisfied this court’s prior
    Order stating that plaintiff “shall only make claims based on documents that can be
    located and attached to the amended complaint.” Gov’t’s Mot. 6 (quoting Order at 1).
    The court disagrees with the government and finds that Mr. Baha has satisfied
    both RCFC 9(k) and this court’s prior order. In his amended complaint, Mr. Baha admits
    that he “does not have a copy of [the original 27] Lease Agreement[.]” Am. Compl. ¶ 5.
    He did, however, attach a copy of the 27 Lease Supplement, which he argues proves both
    that a contract existed and that under its terms he was entitled to a $54,000 annual rent for
    “the term” of the Lease. The government argues that his claim based upon the 27 Lease
    must be dismissed because the 27 Lease Supplement does not establish that the
    government would owe $54,000 annually for rent, and instead “only provides a payment
    of $54,000 for ‘the term,’ not per year, as Mr. Baha asserts.” Gov’t’s Mot. 6.
    The court agrees with the plaintiff and finds that 27 Lease Supplement attached to
    plaintiff’s amended complaint is sufficient to satisfy the terms of the court’s prior order
    as well as RCFC 9(k). Plaintiff has alleged that the 27 Lease required the government to
    pay him $54,000 per year in rent, an allegation supported by the lease supplement, which
    is sufficient to satisfy RCFC 9(k). Given that the government does not refute plaintiff’s
    4
    Satisfaction of RCFC 9(k) is a jurisdictional requirement. See Gonzalez–McCaulley Inv. Grp.,
    Inc. v. United States, 
    93 Fed. Cl. 710
    , 715 (2010).
    8
    assertion that it has a copy of the 27 Lease, the court finds that attaching the 27 Lease
    Supplement to plaintiff’s complaint satisfies the court’s order.
    B.     Plaintiff Has Satisfied the CDA’s Claim Requirement
    The government argues that, under the CDA, the court lacks jurisdiction over
    plaintiff’s claim for unpaid rent for January, February, and March of 2014 because
    plaintiff only demanded rent due through December 2013 in the claim that he submitted
    on January 19, 2014. Under the CDA, “[e]ach claim by a contractor against the Federal
    Government relating to a contract shall be submitted to the contracting officer for a
    decision.” 41 U.S.C. § 7103(a)(1). A claim is “a written demand or written assertion by
    one of the contracting parties seeking, as a matter of right, the payment of money in a
    sum certain, the adjustment or interpretation of contract terms, or other relief arising
    under or relating to this contract.” 48 C.F.R. § 52.233-1(c). Because the claim
    requirement is jurisdictional, the failure to submit a valid claim that conforms with the
    CDA’s requirements must result in the dismissal of the complaint. Northrop Grumman
    Computing Sys., Inc. v. United States, 
    709 F.3d 1107
    , 1112 (Fed. Cir. 2013) (“If a
    purported claim is found to be insufficient for any reason, the insufficiency is fatal to
    jurisdiction under the CDA.” (citing Sharman Co. v. United States, 
    2 F.3d 1564
    , 1568
    (Fed. Cir. 1993)).
    The court finds that plaintiff has established jurisdiction under the CDA for the
    entire amount he seeks in his amended complaint, including the first three months of
    9
    2014.5 In order to establish jurisdiction in this court, the prerequisite claim must include
    “an adequate statement of the amount sought and an adequate statement of the basis of
    the request.” K-Con Bldg. Sys., Inc. v. United States, 
    778 F.3d 1000
    , 1005 (Fed. Cir.
    2015) (citing Joseph Morton Co. v. United States, 
    757 F.2d 1273
    , 1281 (Fed. Cir. 1985)).
    However, the requirement that a claim include a statement of the amount sought does not
    preclude the court from taking jurisdiction even if there are “adjustments in amounts
    ‘based upon matters developed in litigation.’” 
    Id. (quoting Tecom,
    Inc. v. United States,
    
    732 F.2d 935
    , 937-38 (Fed. Cir. 1984)). In Modeer v. United States, the court found that
    it had jurisdiction over a claim for which damages had continued to accrue after the claim
    was submitted to the contracting officer. 
    68 Fed. Cl. 131
    , 137 (2005) aff’d, 183 F. App’x
    975 (Fed. Cir. 2006). The court reasoned that “if the dollar value of a claim increases
    based on new information available only after the claim was submitted to the contracting
    officer,” the plaintiff was not required to resubmit the claim so long as the amount that
    the plaintiff claims in litigation “arises from the same operative facts as the original claim
    and claims the same categories of relief.” 
    Id. (citing Cerberonics,
    Inc. v. United States,
    
    13 Cl. Ct. 415
    , 418 (1987)).
    Plaintiff’s 2013 claim to the contracting officer stated that he was seeking
    $10,000 per month in unpaid rent pursuant with his contract with the government. Pl.’s
    App’x 2. In the present litigation, plaintiff seeks the same monthly rent for three
    additional months under the same theory. See Am. Compl. ¶ 18. Therefore, the court
    5
    Because this challenge is jurisdictional, the court is permitted to look at documents outside of
    the pleadings. 
    Banks, 741 F.3d at 1277
    .
    10
    “will have to review the same or related evidence” that was before the contracting officer
    in this litigation. Kinetic Builder’s Inc. v. Peters, 
    226 F.3d 1307
    , 1312 (Fed. Cir. 2000)
    (citing Placeway Constr. Corp. v. United States, 
    920 F.2d 903
    , 907 (Fed. Cir. 1990)).
    The claim before the contracting officer and the complaint before this court therefore
    involve the “same operative facts,” 
    id., and the
    dollar value of the claim only increased
    based on events which occurred “only after the claim was submitted to the contracting
    officer,” 
    Modeer, 68 Fed. Cl. at 137
    . Therefore, the claim in plaintiff’s complaint is the
    same as the one he presented to the contracting officer. Conseqently, the government’s
    motion to dismiss plaintiff’s claim for rent allegedly owed for January, February, and
    March of 2014 is denied.
    C.     Mr. Baha is a Real Party in Interest, but Other Interested Parties Must
    be Notified
    The government argues Mr. Baha lacks capacity to prosecute this case because
    Mr. Bahawouddin’s heirs are the real party in interest, not Mr. Baha. Under RCFC
    17(a)(1), “[a]n action must be prosecuted in the name of the real party in interest.” RCFC
    17(a). The government argues that the other heirs, who are identified in the Afghanistan
    Supreme Court decision as Mr. Baha’s siblings and his father’s wife, must be joined to
    this litigation as indispensable parties under RCFC 19(a). In the alternative, the
    government asks the court to provide notice to the other heirs under RCFC 14(b), and has
    provided the court with their contact information. According to the government, Mr.
    Baha’s siblings have contacted the government and expressed an interest in collecting the
    rent on the property.
    11
    The court finds that, as one of Mr. Bahawouddin’s heirs, Mr. Baha is one of the
    real parties in interest to this case.6 The 27 Lease Supplement is “between Ghuiam
    Bawoddin [son of] Niaz Mohammad, acting by and through his son Muhammad Tariq
    Baha,” and the Government. Am. Compl. Ex. 1 at 1. The 32 Lease is between “the heirs
    of Bahawouddin, Son of Neyaz Mohammad Represented by Mohammad Tariq [Baha]”
    and the Government. Gov’t App’x. 5. The Afghanistan Supreme Court decision—upon
    which Mr. Baha relies to trigger the rent obligation—indicates that the owners of the
    subject property are Mr. Bahawouddin’s heirs including Mr. Baha, his mother, his two
    brothers, and his five sisters. Gov’t App’x 15, 17-18. In addition to having an interest in
    the property itself, Mr. Bahaouddin’s other heirs may have an interest in the proceeds of
    the leases at issue in this case. The 32 Lease in particular states that the Lessor includes
    the “heirs of Bahaouddin,” Gov’t App’x 5, using the plural to indicate that Mr. Baha was
    only one of several heirs intended to benefit from the proceeds of the lease.
    Because Mr. Bahaouddin’s other children and his widow may have an interest in
    the outcome of this litigation, the court orders that they must be given notice under RCFC
    14(b). See RCFC 14(b)(1) (“The court, on motion or on its own, may notify any person .
    . . who is alleged to have an interest in the subject matter of the suit.”). In an attempt to
    6
    Mr. Baha argues he may bring this case without joining the other heirs under RCFC
    17(a)(1)(F), which states that “a party with whom or in whose name a contract has been made for
    another’s benefit” is permitted to “sue in [his] own name[] without joining the person for whose
    benefit the action is brought.” RCFC 17(a)(1)(F). However, there is nothing in Mr. Baha’s
    amended complaint, which makes no mention of anyone with an interest in the property other
    than himself, indicating that he he is bringing this suit on the other heirs’ behalf. The court
    therefore finds that RCFC 17(a)(1)(F) is inapplicable.
    12
    show that he may prosecute this case on his own, Mr. Baha has provided a declaration
    from Rona Kabiri, an attorney licensed to practice law in Afghanistan. Pl.’s App’x 25-
    28. Ms. Kabiri states that under Afghan law, plaintiff “has complete possessory right
    over the property” and that plaintiff’s siblings “cannot maintain any action against Baha
    in an Afghan court for right to the property because they have never identified themselves
    as the issue of the deceased.” 
    Id. at 11
    (citing Afghan Civil Code Art. 11, 499). The
    court does not have sufficient information at this time to determine whether Mr. Baha is
    correct regarding the laws of Afghanistan. However, the court finds that under RCFC
    14(b), the other heirs have at least enough of an alleged interest in the subject of the
    litigation that they must be given notice and an opportunity to assert any potential claims.
    Therefore, for the reasons stated above, the court finds that the below-identified
    heirs have an interest in the property that is subject to the litigation and may be entitled to
    payment under the 32 Lease and/or the 27 Lease.7 As such, notice shall be provided to
    the individuals identified below:
    Qudsia Badghisy                                   Fahima Ahrary
    In care of Yegana Badghisy                        Ascherring 11
    502 Patterson View SW                             21035 Hamburg,
    Calgary, Alberta T3H3J9                           GERMANY
    CANADA                                            Tel: 01149407355346
    Tel: (403) 479-9050                               Famihab@hotmail.de
    Fariha Samadzada                                  Mohammad Hamid Baha
    5838 Montevino Dr.                                47 Kincora View NW
    San Jose, CA 95123                                Calgary, Alberta T3R1M4
    Tel: (408) 229-9785                               CANADA
    7
    At this time, the court defers ruling on the government’s contention that the other heirs are
    necessary parties under RCFC 19(b).
    13
    massood_sam@sbcglobal.net                      Tel: (403) 247-5734
    Afifa Baha                                     Tooba Baha
    28863 Bay Heights Rd.                          4525 Riding Club Ct.
    Hayward, CA 94542                              Hayward, CA 94542
    Tel: (510) 397-2288                            Tel: (510) 583-0157
    Cell: (510) 461-7005                           Cell phone: 510-676-2746
    zubeen_2@yahoo.com                             Tbaha11@hotmail.com
    Mohammad Khalid Baha                           Kobra Baha Kakar
    661 Logan Lane                                 4525 Riding Club Ct.
    Danville, CA 94526                             Hayward, CA 94542
    avgan@sbcglobal.net
    IV.    CONCLUSION
    For the reasons stated above, the government’s motion to dismiss is DENIED.
    The government’s motion to require notice to the other potential heirs is GRANTED.
    The Clerk is directed to deliver notice to the government, as the moving party, for service
    on the above-named persons. RCFC 14(b)(4)(A). Pursuant to RCFC 14(b)(4)(B), the
    government shall serve the notice, together with the pleadings filed in this case, by
    registered or certified mail. The above-identified persons shall have 42 days after notice
    is issued to file an appropriate pleading. RCFC 14(c)(2). The case will remain stayed for
    a period of 60 days to allow for notices to be issued and for the persons identified to file
    pleadings. Responses to those pleadings shall be in accordance with the court’s rules.
    IT IS SO ORDERED.
    s/Nancy B. Firestone
    NANCY B. FIRESTONE
    Judge
    14