Prescient, Inc. v. United States , 2016 U.S. Claims LEXIS 274 ( 2016 )


Menu:
  •            In the United States Court of Federal Claims
    Bid Protest
    No. 16-109C
    (Filed Under Seal: March 29, 2016 | Reissued: April 6, 2016)*
    )     Keywords: Post-Award Bid Protest;
    PRESCIENT, INC.,                            )     Motion for Judgment on the
    )     Administrative Record; Standing;
    Plaintiff,                  )     Disparate Treatment; Material
    )     Deficiencies.
    v.                                     )
    )
    THE UNITED STATES OF AMERICA,               )
    )
    Defendant,                  )
    )
    and                                    )
    )
    MATT MARTIN REAL ESTATE                     )
    MANAGEMENT, LLC,                            )
    )
    Defendant-Intervenor.       )
    )
    Janine S. Benton, Benton, Potter and Murdock, P.C., Falls Church, VA, for Plaintiff, with whom
    were Sharon A. Roach, Of Counsel, Kathy C. Potter, Of Counsel, John M. Murdock, Of Counsel,
    and Rosanne E. Stafiej, Of Counsel.
    Eric P. Bruskin, Trial Attorney, with whom were Benjamin C. Mizer, Principal Deputy Assistant
    Attorney General, Robert E. Kirschman, Jr., Director, and Douglas K. Mickle, Assistant
    Director, Commercial Litigation Branch, Civil Division, United States Department of Justice,
    Washington, DC, for Defendant. Julie K. Cannatti, Of Counsel, and Blythe I. Rodgers, Of
    Counsel, U.S. Department of Housing and Urban Development, Washington, DC.
    Keir X. Bancroft, Venable LLP, Washington, DC, for Defendant-Intervenor, with whom were
    Nathaniel S. Canfield, Collier L. Johnson II, Venable LLP, Washington, DC, and J. Scott
    Hommer III, Venable LLP, Tysons Corner, VA.
    *
    This Opinion was originally issued under seal, and the parties were given the opportunity to
    request redactions. Neither party requested redactions, and the opinion is now being reissued in
    full.
    OPINION AND ORDER
    KAPLAN, Judge.
    The plaintiff in this case is Prescient, Inc. (Prescient), an unsuccessful offeror in a
    procurement for asset management services. Prescient filed this post-award bid protest to
    challenge a decision of the Department of Housing and Urban Development (HUD) finding its
    proposal technically unacceptable under the terms of the solicitation and excluding it from
    further consideration for an award.
    Currently before the Court are the parties’ cross-motions for judgment on the
    administrative record. For the reasons set forth below, Prescient’s motion is DENIED and the
    government’s cross-motion is GRANTED.
    BACKGROUND
    I.      HUD’s Asset Management Solicitation
    A. Overview
    The Department of Housing and Urban Development, through the Federal Housing
    Administration (FHA), administers a single-family home mortgage insurance program in which
    the FHA insures approved lenders against the risk of financial loss. AR Tab 2H at 492. In the
    event of a default on an FHA-insured home mortgage, HUD may take possession of the property.
    Id. As a result of its acquisition of these properties, HUD manages and sells a large inventory of
    single-family homes, endeavoring to do so “in a manner that promotes home ownership,
    preserves communities, and maximizes return to the FHA insurance funds.” Id.
    HUD contracts with real estate management and marketing companies across the country
    to service HUD’s Real-Estate Owned (REO) portfolio. To that end, on August 25, 2014, HUD
    initiated the procurement that is the subject of this action when it issued Solicitation No.
    DU204SA-13-R-0005. See AR Tab 2. The solicitation involved twelve geographic areas. These
    included, as is relevant to this case, area 2D, which covered HUD properties in Kansas,
    Oklahoma, Arkansas, Louisiana, Missouri, and Southern Texas. AR Tab 2H at 640–41. The
    contract to be awarded was a hybrid indefinite-quality/indefinite-quantity/indefinite-delivery
    contract with both fixed-price/fixed-unit-rate and cost-reimbursable contract line items. Id. at
    638.
    As the solicitation described, the “purpose of this performance based contract [was] to
    obtain marketing and sales services for HUD’s REO properties.” Id. at 494. The Performance
    Work Statement (PWS) identified five objectives for Asset Managers (AM):
    1.   Properties are accurately and competitively valued.
    2.   Sales achieve the highest net return.
    3.   Holding time is minimized.
    4.   Sales create owner-occupant opportunities.
    5.   Closing proceeds are properly accounted for and delivered to HUD in a timely
    manner.
    2
    Id. at 494–95.
    According to the solicitation, and consistent with Federal Acquisition Regulation (FAR)
    15.306(a), HUD intended to award the contract without conducting discussions with the offerors.
    Id. at 637; see also FAR 15.306(a)(1) (“Award may be made without discussions if the
    solicitation states that the Government intends to evaluate proposals and make award without
    discussions.”). As a result, the solicitation prompted offerors to provide their “best terms from a
    cost or price and technical standpoint.” Moreover, the solicitation noted that the Contracting
    Officer (CO) may “limit the number of proposals in the competitive range to the greatest number
    that will permit an efficient competition among the most highly rated proposals.” Id.
    The solicitation provided that awards would be made to offerors whose proposals
    represented the best value to the agency based on a performance/price trade-off methodology.
    Under that process, technical approach would be evaluated on a pass-fail basis, and a trade-off
    would be conducted between past/present performance and price, with the former
    “approximately equal” in weight to the latter. Id. at 654.
    B. Technical Evaluation
    Offerors were instructed to divide their proposals into four volumes: Volume I: RFP
    Documents; Volume II: Technical Proposal; Volume III: Past/Present Performance Proposal; and
    Volume IV: Business Proposal. Id. at 644–53. Volume II, the technical proposal, was to include
    three sub-factors: a Work Flow Chart; an Organizational Chart; and a Condensed Marketing
    Plan. Id. at 645–48. The solicitation contained discrete requirements to be addressed for each
    sub-factor. Id. Volume II was also to include a “Technical Proposal narrative” that “include[d]
    all the information required [in Volume II] in detailed content.” Id. at 646.
    This bid protest concerns only Prescient’s compliance with the first sub-factor, which
    required that offerors submit a Work Flow Chart that 1) “include[d] the specific process steps,
    timing and decision points that reflect[ed] how the Offeror [would] manage a typical property
    consistent with HUD’s process under the requirements of the PWS;” and 2) discussed each of the
    five objectives for asset managers set forth above. Id. at 646. The solicitation stated that offerors
    were required to include in their proposals a narrative “that adds detail to the Offeror’s workflow
    chart.” Id. at 646–47.
    The solicitation specifically informed offerors that the agency would evaluate the
    technical proposals “on the information presented therein.” Id. It stated that offerors “shall
    provide [a] convincing rationale to address how the Offeror intends to meet the [government’s]
    requirements.” Id. Moreover, the solicitation stated that “[a]ny information not in its appropriate
    Section and not cross-referenced to a specific location will be assumed to have been omitted.” Id.
    HUD stated that it would begin its evaluation by reviewing an offeror’s Technical
    Proposal to “determine if the Offeror provides a sound, compliant approach that meets the
    requirements of [the solicitation] and demonstrates a thorough knowledge and understanding of
    those requirements and associated risks.” Id. at 655. The agency stated that it would
    independently evaluate each of the sub-factors listed above on a “pass/fail” basis. Id.
    3
    The solicitation set forth specific criteria by which the agency would evaluate the
    offeror’s Work Flow Chart. It stated that the Offeror’s work flow processes would be evaluated
    to determine if they provided “a sound, acceptable design that demonstrates the Offeror’s
    approach, methods and procedures and are in compliance with the [PWS].” Id. at 655. In
    addition, offerors would be evaluated “on their demonstrated understanding of the mission
    objective and its ability to manage the minimum five [PWS objectives for asset managers (set
    forth above)].” Id.
    Under the solicitation’s criteria, an acceptable technical rating would be assigned where
    the proposal “clearly meets the requirements of the solicitation” so that “[t]he risk of
    unsuccessful contract performance is low.” Id. An unacceptable rating would be given to a
    proposal that “contains deficiencies and does not clearly meet the requirements of the
    solicitation,” signifying that “[t]he risk of unsuccessful contract performance is high.” Id. The
    solicitation defined a “deficiency” as “[a] material failure of a proposal to meet a Government
    requirement or a combination of significant weaknesses in a proposal that increases the risk of
    unsuccessful contract performance to an unacceptable level.” Id. at 656.
    Finally, the solicitation noted that “[t]he government has no intention of evaluating
    technically unacceptable proposals on Price and Past/Present Performance.” Id. at 654. As a
    result, if an offeror’s proposal failed in any one of the technical sub-factors, the government
    would not evaluate that proposal further. Id.
    II.    Prescient’s Offer and HUD’s Determination that Prescient’s Technical Approach
    was Unacceptable
    Prescient submitted its proposal for area 2D to HUD on September 23, 2014. AR Tab 6C.
    The proposal was divided into four volumes, as required by the solicitation. Id. Volume II of
    Prescient’s offer included an “Executive Summary of the Technical Proposal,” a Work Flow
    Chart, an Organizational Chart, and a “Draft Marketing Plan.” Id. at 3081–3105.
    HUD convened a Technical Evaluation Panel (TEP) to review the twenty-four proposals
    submitted for area 2D. See AR Tab 9A. According to the Source Selection Plan, TEP members
    were to independently evaluate the offers, “discuss their individual evaluations to the extent
    necessary to reach a consensus opinion,” and then “rate and determine the technical acceptability
    of each proposal.” AR Tab 1A at 9. The TEP was also directed to develop a TEP Report that
    “state[d] the conclusion and then provide[d] specifics on any deficiencies of the Technical
    Proposal that support the conclusions and identify citations within the proposal to support the
    rating.” Id. at 9–10.
    The TEP rated Prescient’s proposal “Technically Unacceptable.” AR Tab 9A at 4407–08.
    The TEP report concluded that Prescient “provided a not sound and not compliant technical
    approach which did not meet the requirements of the PWS and did not demonstrate a thorough
    knowledge and understanding of those requirements and their associated risks.” Id. at 4407.
    Specifically, according to the TEP, Prescient’s proposal “had several contradictions with the
    PWS requirements which is a strong indication that [Prescient] does not understand the
    requirements and tasks of this solicitation.” Id.
    4
    First, the report noted that Prescient’s Work Flow Chart called for new appraisals “for
    transition properties and properties where contracts fell through and the appraisal is over 6
    months” old. AR Tab 6C at 3087. Section 5.2.1.2.3 of the solicitation, however, specifies that
    “[n]ew appraisals other than the appraisal that is used as one or more multiple valuation tools to
    help establish list price, if applicable, can only be ordered with GTR approval.”
    1
    AR Tab 2H at 522. The TEP determined that Prescient’s proposal conflicted with
    section 5.2.1.2.3 because Prescient’s Work Flow Chart did not state that it would seek GTR
    approval before ordering a new appraisal. AR Tab 9A at 4407.
    Second, as described in the solicitation, HUD “offers properties for sale through direct
    and competitive sales methods.” AR Tab 2H at 527. Direct sales are implemented through,
    among other things, a tenant’s exercise of his right of first refusal and a lottery process. Id. at
    528–31. If direct sales methods are unsuccessful, then the properties are to be sold on a
    competitive basis. Id. at 533. That competitive sales process begins with a relatively short
    “exclusive listing period” during which only certain individuals, organizations and government
    entities may bid on properties, and then proceeds to an “extended listing period” where
    properties are listed for sale to all bidders. Id. at 533–35.
    The TEP found that the duration periods for the lottery and exclusive listing processes
    that were set forth in Prescient’s Work Flow Chart were inconsistent with those set forth in the
    PWS. AR Tab 9A at 4407. In particular, section 5.2.2.2.3 of the solicitation states that certain
    single-unit properties and uninsurable properties “shall be listed for sale on the HUD Bid Site for
    a period of seven (7) calendar days (the Lottery Period).” AR Tab 2H at 531. The TEP found that
    Prescient’s proposal did not meet this requirement because its Work Flow Chart proposed a five
    day listing period for those properties. AR Tab 9A at 4407.
    Additionally, section 5.2.2.3.1 of the solicitation called for a fifteen-day exclusive listing
    period for insured and insured with escrow properties. AR Tab 2H at 533. Prescient’s Work
    Flow Chart, however, proposed a ten-day listing period for insured with escrow properties. AR
    Tab 6C at 3089. The TEP explained that because “[t]he offeror may not reduce the Exclusive
    period from 15 days to 10 days for [insured with escrow] properties,” Prescient’s proposal was
    deficient in this respect as well. AR Tab 9A at 4407.
    Finally, the TEP concluded that Prescient’s Work Flow Chart did not adequately address
    the first of the five objectives for asset managers listed in the PWS, requiring that properties be
    “accurately and competitively valued.” Id. The TEP found that Prescient’s proposal was deficient
    in this regard because it did not specify that Prescient would use a combination of valuation tools
    to develop the list price, as the TEP concluded was required by section 5.2.1.7 of the solicitation.
    Instead, Prescient’s proposal stated that it would use an appraisal to determine a property’s list
    price, resorting to other valuation tools only if its review of the appraisal revealed weaknesses.
    1
    “GTR” refers to a Government Technical Representative, an agency representative who “is
    responsible for giving Contractors technical advice and guidance related to the work required by
    the contract.” AR Tab 2H at 499.
    5
    AR Tab 6C at 3087. As a result, the TEP concluded that the Work Flow Chart did not
    “satisfactorily address properties being accurately and competitively valued.” Id. at 4407.
    The TEP rated Prescient’s technical proposal acceptable as to the other two sub-factors
    (Organizational Chart and Condensed Marketing Plan). Id. at 4408. However, because the TEP
    found Prescient’s Work Flow Chart unacceptable, and because the sub-factors were evaluated
    independently on a pass/fail basis, Prescient’s overall Technical Approach did not receive a
    passing rating. Id. at 4407; AR Tab 2H at 654–55.
    III.   Notification of Unacceptable Rating and HUD’s Contract Award to Matt Martin
    Real Estate Management
    As noted, HUD received twenty-four offers for area 2D. AR Tab 8 at 4345–46. Of those
    offers, thirteen (including Prescient’s) were found technically unacceptable.
    On August 25, 2015, HUD notified Prescient that its offer was technically unacceptable
    and that, “[i]n accordance with Section M.2 titled ‘Evaluation Approach’, paragraph 2, of the
    solicitation, ‘the government has no intention of evaluating technically unacceptable proposals
    on Price and Past/Present Performance,’ therefore; your proposal will not receive any further
    consideration under this solicitation.” AR Tab 10A at 4924. Further, Prescient was advised that
    “[t]he Contracting Officer has made the decision to enter into discussions with those Offerors
    who are determined technically acceptable with reasonable and balanced pricing prior to award,
    pursuant to FAR 15.306(c), and has established a competitive range for purposes of efficiency.”
    Id. However, the contracting officer advised Prescient, “[b]ecause your proposal was rated
    technically unacceptable, your proposal will be excluded from the competitive range, and you
    will not have an opportunity to revise your initial proposal.”2 Id.
    As permitted by FAR 15.505, Prescient requested a pre-award debriefing. Pursuant to
    FAR 15.505(b), HUD elected to perform a post-award written debriefing instead. AR Tab 12I at
    5482.
    On September 25, 2015, HUD awarded the contract for area 2D to defendant-intervenor
    Matt Martin Real Estate Management LLC (MMREM). AR Tab 12M at 5497. Thereafter, on
    October 9, 2015, HUD sent Prescient a post-award debriefing letter. AR Tab 11C at 4945–48.
    The letter included a review of the findings of the TEP and notified Prescient that its Technical
    2
    While the final TEP Report is dated August 24, 2015, the CO’s competitive range
    determination memorandum is dated July 17, 2015. See AR Tab 9A, AR Tab 8. According to the
    CO’s declaration, she prepared the competitive range memorandum on the basis of a draft of the
    TEP Report that was available to her on July 17, 2015. She states that before she sent the August
    25, 2015 notification letters to Prescient and other excluded offerors, she ensured that all of the
    information in the competitive range memorandum accurately reflected the final TEP report. She
    did not, however, update the date on her competitive range determination. Barbee Decl. ¶ 3,
    Def.’s Cross-Mot. for J. on the Admin. R. Ex. 1, ECF No. 34.
    6
    Rating was “Unacceptable” because its Work Flow Chart was deemed “Unacceptable.” Id. at
    4946. It also informed Prescient that HUD had awarded MMREM the contract. Id. at 4497.
    Thereafter, Prescient sent the CO a letter “disagree[ing] with the finding of the
    government’s Technical Evaluation Panel” and asking several questions related to the TEP’s
    finding that the proposal was technically unacceptable. AR Tab 13G at 5525–26. HUD
    responded on October 14, 2015. In this response letter, the CO wrote that “Prescient submitted
    an unacceptable Workflow Chart that ignored mandatory time requirements, and would
    potentially cost the Government additional monies associated with unnecessary appraisals.” AR
    Tab 13H at 5528–29.
    IV.    GAO Protest
    Prescient filed a protest of the contract award with the Government Accountability Office
    (GAO) on October 19, 2015. AR Tab 12P. GAO responded to Prescient’s complaint on
    November 18, 2015. AR Tab 12N. Meanwhile, after multiple protests were filed for area 2D,
    HUD informed MMREM that it was staying performance of the contract. AR Tab 12K at 5487.
    On December 29, 2015, Precision Asset Management Corporation, another disappointed
    offeror, filed a complaint in this Court challenging HUD’s evaluation of its proposal. See
    Precision Asset Mgmt. Corp. v. United States, No. 15-cv-1495, 
    2016 WL 900097
     (Fed. Cl. Feb.
    26, 2016). GAO then dismissed Prescient’s complaint, citing 
    4 C.F.R. § 21.11
    (b), which directs
    the GAO to dismiss complaints where the matter involved is the subject of litigation before a
    court of competent jurisdiction. AR Tab 12O at 5513.
    V.     This Action
    On January 21, 2016, Prescient filed the present complaint in this Court. Compl., ECF
    No. 1. It filed an amended complaint on January 27, 2016. Am. Compl., ECF No. 6. After the
    case was filed, the government agreed to delay its implementation of the contract award to
    MMREM until April 1, 2016.
    In its complaint, Prescient alleges that HUD committed a variety of errors in its
    evaluation of Prescient’s technical proposal, and that HUD unreasonably rated the proposal
    technically unacceptable. Am. Compl. at 7–15. It seeks a declaratory judgment that HUD’s
    evaluation of its proposal was arbitrary, capricious, and contrary to law and an order requiring
    HUD to terminate its contract with MMREM and re-compete the contract. Id. at 4.
    On January 27, 2016, the Court granted MMREM’s motion to intervene as a defendant-
    intervenor. ECF No. 5, 6. The government filed the administrative record on February 5, 2016.
    ECF No. 23. Prescient then filed a motion to supplement the administrative record, which the
    Court denied by Order of February 12, 2016. See Order, ECF No. 24.
    Prescient’s motion for judgment on the administrative record was filed on February 17,
    2016. ECF No. 32. The government filed its cross-motion and response on March 1, 2016, ECF
    No. 35, as did MMREM, ECF No. 36. Oral argument on the cross-motions was held on March
    17, 2016.
    7
    DISCUSSION
    I.        Jurisdiction
    A. The Court of Federal Claims’ Bid Protest Jurisdiction
    In accordance with 
    28 U.S.C. § 1491
    (b)(1), the Court of Federal Claims has jurisdiction
    to “render judgment on an action by an interested party objecting to . . . a proposed award or the
    award of a contract or any alleged violation of statute or regulation in connection with a
    procurement or a proposed procurement.” In order to invoke the Court’s bid protest jurisdiction a
    plaintiff must be an “interested party.” CGI Fed. Inc. v. United States, 
    779 F.3d 1346
    , 1348 (Fed.
    Cir. 2015); Myers Investigative and Sec. Servs., Inc. v. United States, 
    275 F.3d 1366
    , 1369 (Fed.
    Cir. 2002). As the Federal Circuit has explained, an “interested party” is “an actual or
    prospective bidder . . . whose direct economic interest would be affected by the award of the
    contract.” CGI Fed., 779 F.3d at 1348 (quoting Am. Fed’n of Gov’t Emp., AFL-CIO v. United
    States, 
    258 F.3d 1294
    , 1299 (Fed. Cir. 2001); see also Info. Tech. & Applications Corp. v.
    United States, 
    316 F.3d 1312
    , 1319 (Fed. Cir. 2003).
    In a post-award bid protest, the protestor has suffered prejudice if it would have had a
    “substantial chance” of winning the award “but for the alleged error in the procurement process.”
    Info. Tech., 
    316 F.3d at
    1319 (citing Alfa Laval Separation, Inc. v. United States, 
    175 F.3d 1365
    ,
    1367 (Fed. Cir. 1999)); see also Weeks Marine, Inc. v. United States, 
    575 F.3d 1352
    , 1359 (Fed.
    Cir. 2009); Rex Serv. Corp. v. United States, 
    448 F.3d 1305
    , 1308 (Fed. Cir. 2006). “In other
    words, the protestor’s chance of securing the award must not have been insubstantial.” Info.
    Tech., 
    316 F.3d at 1319
    . Put differently, the protester must have been “prejudiced” by the alleged
    error. Tinton Falls Lodging Realty, LLC v. DMC Management Servs., LLC, 
    800 F.3d 1353
    ,
    1358 (Fed. Cir. 2015).
    Prescient is an interested party with standing to invoke this Court’s jurisdiction. First, it
    was an actual offeror because it submitted a proposal in response to the solicitation. Second, but
    for what Prescient alleges was an arbitrary and capricious finding by the TEP that its proposal
    was technically unacceptable, Prescient would have had a substantial chance of winning the
    award. Thus, had the TEP found Prescient’s technical proposal acceptable, Prescient would have
    been included in the competitive range. Prescient, therefore, has established that there was a
    substantial chance that it would have received the award because, absent the alleged errors, its
    proposal would have been “within the zone of active consideration.” C.A.C.I., Inc.-Fed. v.
    United States, 
    719 F.2d 1567
    , 1574–75 (Fed. Cir. 1983) (quoting Morgan Business Associates v.
    United States, 
    619 F.2d 892
    , 896 (Ct. Cl. 1980)). As a result, Prescient has standing to bring this
    complaint and the Court has jurisdiction to reach the merits of its complaint.
    II.       Legal Standards
    A. Standard for Granting Motions for Judgment on the Administrative Record
    Pursuant to RCFC 52.1, the court reviews an agency’s procurement decision based on the
    administrative record. Axiom Res. Mgmt., Inc. v. United States, 
    564 F.3d 1374
    , 1379 (Fed. Cir.
    2009). Thus, to resolve a motion for judgment on the administrative record, the court conducts an
    8
    expedited trial on the paper record, making factual findings where necessary. Bannum, Inc. v.
    United States, 
    404 F.3d 1346
    , 1354 (Fed. Cir. 2005). The court’s inquiry is “whether, given all
    the disputed and undisputed facts, a party has met its burden of proof based on the evidence in
    the record.” A&D Fire Prot., Inc. v. United States, 
    72 Fed. Cl. 126
    , 131 (2006) (citing Bannum,
    
    404 F.3d at 1356
    ). Unlike a summary judgment proceeding, genuine issues of material fact will
    not foreclose judgment on the administrative record. Bannum, 
    404 F.3d at 1356
    .
    B. Standard of Review in Bid Protest Cases
    The standard of review used to evaluate agency decisions in bid protest cases is the same
    as the standard used to evaluate agency action under the Administrative Procedure Act (APA), 
    5 U.S.C. § 706
     (2012). See 
    28 U.S.C. § 1491
    (b)(4) (stating that “[i]n any action under this
    subsection, the courts shall review the agency’s decision pursuant to the standards set forth in
    section 706 of title 5”). Under that standard, to successfully challenge an agency’s procurement
    decision, a plaintiff must show that the decision was “arbitrary, capricious, an abuse of
    discretion, or otherwise not in accordance with law.” 
    5 U.S.C. § 706
    (2)(A); Bannum, 
    404 F.3d at 1351
    . “The arbitrary and capricious standard applicable here is highly deferential. This standard
    requires a reviewing court to sustain an agency action evincing rational reasoning and
    consideration of relevant factors.” Advanced Data Concepts, Inc. v. United States, 
    216 F.3d 1054
    , 1058 (Fed. Cir. 2000) (citing Bowman Transp., Inc. v. Ark.-Best Freight Sys., Inc., 
    419 U.S. 281
    , 285 (1974)).
    In a bid protest, the disappointed offeror “bears a heavy burden” in attempting to show
    that a procuring agency’s decision lacked a rational basis. Impresa Construzioni Geom.
    Domenico Garufi v. United States, 
    238 F.3d 1324
    , 1338 (Fed. Cir. 2001). Indeed, such a
    challenge can succeed only where the agency “entirely failed to consider an important aspect of
    the problem, offered an explanation for its decision that runs counter to the evidence before the
    agency, or [the decision] is so implausible that it could not be ascribed to a difference in view or
    the product of agency expertise.” Ala. Aircraft Indus., Inc.–Birmingham v. United States, 
    586 F.3d 1372
    , 1375 (Fed. Cir. 2009) (alteration in original) (quoting Motor Vehicle Mfrs. Ass’n of
    U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 
    463 U.S. 29
    , 43 (1983)). Further, to survive review,
    “[t]he agency need only articulate ‘a rational connection between the facts found and the choice
    made.” Sci. and Mgmt. Res., Inc. v. United States, 
    117 Fed. Cl. 54
    , 63 (2014) (quoting State
    Farm, 
    463 U.S. at 43
    ).
    III.      Merits of Prescient’s Bid Protest
    A. GTR Approval of Second Appraisal (section 5.2.1.2.3)
    1. TEP Finding of Deficiency
    As noted, the solicitation required that a HUD property be appraised in preparation for its
    listing for sale. AR Tab 2H at 522. Specifically, section 5.2.1.2 states that after a property is
    inspected, “the Contractor shall obtain an AS IS appraisal performed by an FHA roster
    appraiser” in order to develop the property’s list price. 
    Id.
     The solicitation further states at
    section 5.2.1.2.3 that “[n]ew appraisals other than the appraisal that is used as one or more
    9
    multiple valuation tools to help establish list price, if applicable, can only be ordered with GTR
    approval.” 
    Id.
    The TEP found that Prescient’s proposal conflicted with section 5.2.1.2.3 because
    Prescient’s Work Flow Chart did not provide for GTR approval in circumstances where a new
    appraisal was to be ordered. AR Tab 9A at 4407. Instead, it included the unqualified statement
    that, “[f]or transition properties and properties where contracts fell through and the appraisal is
    over 6 months, a new appraisal will be ordered.” AR Tab 6C at 3087 (emphasis supplied).
    Prescient contends that the TEP’s conclusion that its proposal conflicted with section
    5.2.1.2.3 was arbitrary and capricious. In particular, it focuses on HUD’s debriefing letter, which
    included an observation that Prescient’s proposal could “potentially cost the Government
    additional monies associated with unnecessary appraisals.” AR Tab 13H at 5528–29. Prescient
    contends that this statement was erroneous because the solicitation made clear that only
    “appraisals used to establish list price would be compensated as pass through expenses.” Pl.’s
    Mem. in Supp. of Pl.’s Mot. for J. on the Admin. R. (Pl.’s Mem.) at 7, ECF No. 33 (citing the
    solicitation at AR Tab 2H at 484–85). In fact, Prescient observes, it expressly acknowledged in
    its draft marketing plan that “only the first appraisal is reimbursable by HUD.” AR Tab 6C at
    3100.
    The Court agrees with Prescient that the debriefing letter’s observation that Prescient’s
    proposal could potentially require the government to pay for additional appraisals appears to be
    an error because the solicitation specifies that the cost of additional appraisals will be borne by
    the contractor, not the government. Nonetheless, the solicitation did not condition the
    requirement of GTR approval on whether or not HUD would be required to pay separately for
    any additional appraisals; as noted, under the solicitation HUD would not be liable for such
    additional expenses. Therefore, Prescient’s acknowledgement of its own liability to bear the
    costs of any additional appraisals did not bring its proposal into compliance with section
    5.2.1.2.3. HUD’s conclusion that Prescient’s proposal conflicted with the solicitation’s
    requirement that contractors receive GTR approval before ordering a second appraisal was
    neither arbitrary, capricious, nor contrary to law.3
    3
    There is no merit to Prescient’s contention that its “failure to add express language regarding
    GTR approval of a second appraisal does not show that it took exception to this requirement or
    that it would bypass GTR approval, findings that are required to support a determination that it
    did not conform its proposal to the Solicitation.” Pl.’s Mem. at 33 (citing IBM Corp. v. United
    States, 
    119 Fed. Cl. 145
    , 156 (2014)). In IBM, this Court declined to find arbitrary and
    capricious a contracting officer’s conclusion that certain reservation-of-right language in the
    successful offeror’s proposal was not inconsistent with the terms of the solicitation. 119 Fed. Cl.
    at 156. To be sure, the Court observed that the offeror’s failure to take exception to the relevant
    provisions of the solicitation was one factor that supported the contracting officer’s
    determination that the successful offeror’s proposal conformed to the solicitation. Id. But there
    were also numerous other indicia of the proposal’s conformity to the solicitation that the Court
    found sufficient to support the agency’s decision in that case, particularly given the highly
    deferential standard of review that is applicable to such agency judgment calls. See id.
    (discussing other indicia and concluding that “reading the proposal as a whole, and given the
    10
    2. Allegations of Disparate Treatment
    Prescient alleges that the TEP subjected it to disparate treatment when it determined that
    Prescient’s offer did not conform to section 5.2.1.2.3. It claims that two other offerors whose
    proposals were found technically acceptable, Offerors 27 and 40, also proposed that they would
    conduct additional appraisals without stating that they would first seek GTR approval.
    Prescient’s allegation is incorrect as to Offeror 27. It is true that Offeror 27’s Work Flow
    Chart states: “Request an As Is appraisal or another eval method. Ensure appraiser is in FHA
    roster / Repeat every 6 months if appraisal expires.” AR Tab 5E at 1844. But Offeror 27’s “Work
    Flow Narrative” clarifies that, “[w]ith GTR approval, new appraisals will be ordered every six
    (6) months until the property is sold.” Id. at 1847.
    Prescient is correct, however, as to Offeror 40. Its “Work Flow Narrative” states, without
    qualification, that “[a] new appraisal will be ordered for aged inventory six months since the last
    appraisal.” AR Tab 5H at 2274. As Prescient notes, the TEP nonetheless found Offeror 40’s
    Work Flow Chart technically acceptable. AR Tab 9A at 4668.
    While Prescient has identified a discrepancy in the TEP’s treatment of Offeror 40’s Work
    Flow Chart, the Court does not believe that this single discrepant result provides a sufficient
    basis for concluding that the TEP’s evaluation of Prescient’s proposal was arbitrary and
    capricious. Instead, it shows (at most) that the TEP committed an error when it failed to rate
    Offeror 40’s proposal technically unacceptable. But “[t]o prevail in a bid protest, a protester must
    show a significant, prejudicial error in the procurement process.” Alfa Laval Separation, 
    175 F.3d at 1367
    ; see also Labatt Food Serv., Inc. v. United States, 
    577 F.3d 1375
    , 1380 (Fed. Cir.
    2009) (observing that “[t]o establish prejudice a protestor must show that there was a substantial
    chance it would have received the contract but for the government’s error in the bid process”).
    In this case, even if the agency had properly found Offeror 40’s proposal technically
    unacceptable, that would not have resulted in Prescient’s inclusion in the competitive range. It
    would have resulted only in Offeror 40’s exclusion. Accordingly, the Court concludes that the
    TEP did not commit any error, prejudicial or otherwise, when it found that Prescient’s technical
    proposal did not conform to section 5.2.1.2.3.
    other indications of [the successful offeror’s] willingness to conform itself to the PWS contained
    in its proposal, it was reasonable for the Army to read the language” as conforming). In this case,
    of course, other than the fact that Prescient did not take exception to the GTR approval
    requirement, there are no indicia of an intent to seek such approval. Further, the applicable
    principles of deference cut against Prescient in this case, as the Court is here reviewing an
    agency determination of non-conformity, whereas in IBM the plaintiff was challenging just the
    opposite, namely an agency finding that the successful offeror’s proposal did conform to the
    solicitation.
    11
    B. Lottery Period (Section 5.2.2.2.3)
    Section 5.2.2.2.3 of the solicitation (entitled “Lottery Period”) provides that “[p]rior to
    the Exclusive Listing Period, single-unit properties located in Revitalization Areas and
    uninsurable properties located in approved purchase areas of an approved nonprofit or
    government entity shall be listed for sale on the HUD Bid Site for a period of seven (7) calendar
    days (the Lottery Period).” AR Tab 2H at 531. The purpose of the lottery period is to allow
    qualifying individuals, nonprofit organizations, and government entities an opportunity to
    acquire these particular properties at a discount, before they are listed for a competitive sale. See
    id. at 530.
    Prescient’s Work Flow Chart states that “[p]rior to Exclusive Listing Period, properties
    located in Revite areas and uninsured properties that are located in approved purchase areas are
    listed for 5 days and if bids are received on the 6th day awarded by a lottery system.” AR Tab 6C
    at 3089. The TEP concluded that the Lottery Period proposed in the chart (5 days) conflicted
    with the Lottery Period specified in section 5.2.2.2.3 of the solicitation (7 days). See AR Tab 9A
    at 4407.
    Prescient contends that the TEP’s conclusion was arbitrary and capricious because it did
    not take into consideration the discussion of the lottery period contained in Prescient’s draft
    marketing plan. There, Prescient states that “[i]f a property is located in a Revite area and/or is
    [uninsured], it is open to the ‘Lottery’ during Step 3 for seven (7) calendar days to permit
    [governmental] and eligible organizations in HUD discount programs to submit bids prior to the
    Exclusive Listing Period.” AR Tab 6C at 3101. Prescient argues that “[i]f anything, the five days
    in Prescient’s Workflow Chart was a mere clerical error that was corrected elsewhere.” Pl.’s
    Mem. at 34. It further contends that “[a]ll material necessary to demonstrate compliance . . . was
    contained on the face of Prescient’s proposal,” and that, therefore, “its proposal should not have
    been determined to be technically unacceptable on this basis.” Id. (citing DMS All-Star Joint
    Venture v. United States, 
    90 Fed. Cl. 653
    , 666 n.16 (2010)).
    These contentions are unpersuasive. First, the language in the Work Flow Chart setting a
    five-day, rather than a seven-day lottery period, does not appear to reflect a “clerical error.” The
    Work Flow Chart does not simply contain the number five rather than the number seven; it also
    explains what will occur if bids are received on the sixth day. See AR Tab 6C at 3089. This
    implies, if not establishes, an intentional designation of a five, rather than seven-day lottery
    period in the Work Flow Chart, as opposed to a mere clerical error.
    Further, in order to be found technically acceptable, a proposal must “clearly meet[] the
    requirements of the solicitation.” AR Tab 2H at 655. Prescient’s proposal, however, was
    ambiguous at best, because it contained inconsistent lottery periods, one which conformed to the
    solicitation and another which did not. In addition, the lottery period that conformed to the
    solicitation was not listed in the Work Flow Chart, as required; instead, it was contained in the
    marketing plan, which was provided to address an entirely separate sub-factor. The TEP was
    under no obligation to canvas Prescient’s technical volume in search of a conforming lottery
    period. ST Net, Inc. v. United States, 
    112 Fed. Cl. 99
    , 110 (2013) (“[A]n agency is not required
    to sift through a proposal in order to identify information that the offeror failed to include in the
    correct place.”); Vanguard Recovery Assistance v. United States, 
    101 Fed. Cl. 765
    , 786–87
    12
    (2011) (“[I]t is the responsibility of the offeror to prepare its proposal according to the
    [solicitation’s] specifications, and not the obligation of the agency to piece together a
    nonconforming proposal.”); see also AR Tab 2H at 646 (provision in solicitation specifying that
    “[a]ny information not in its appropriate Section and not cross-referenced to a specific location
    will be assumed to have been omitted”). Therefore, it was not arbitrary, capricious, or contrary to
    law for the TEP to conclude that Prescient’s proposal did not meet the requirements of section
    5.2.2.2.3 of the solicitation.
    C. Exclusive Listing Period (Section 5.2.2.3.1)
    1. TEP Finding of Deficiency
    Section 5.2.2.3.1 of the solicitation provides that if a property has not been sold pursuant
    to the lottery or one of the other direct sales methods set forth in section 5.2.2, it “shall be listed
    on P260’s bid site for an exclusive listing period, during which only bids received from
    individual purchasers who intend to occupy a property as their primary residence, qualified
    nonprofit organizations and government entities may be submitted.” See AR Tab 2H at 533. The
    solicitation further provides that the time period for the exclusive listing “varies based on the
    insurability of a property.” 
    Id.
     It specifies a fifteen-day exclusive listing period for owner-
    occupant buyers for insured and insured with escrow properties. 
    Id.
     It further instructs with
    respect to the timing for bid opening and acceptance that “[t]he contractor shall open and review
    bids received for insured/insured with escrow properties on the next business day following the
    tenth (10th) day of the Exclusive Listing Period.” Then, “[i]f no winning bid is accepted by the
    tenth (10th) day . . . the Contractor shall open and review daily bids up to the fifteenth (15th) day.”
    Finally, “[i]f no winning bid is accepted in the fifteen (15) day Exclusive Listing Period, the
    Contractor shall extend the listing to all buyers by listing the property in the Extended Listing
    Period.” 
    Id.
     at 533–34.
    The section of Prescient’s Work Flow Chart entitled “Competitive Exclusive Listing
    Period” stated as follows: “Insured 15 day period, Insured w/Escrow 10 day period.” See AR
    Tab 6C at 3089. It further stated that, “[r]eview of bids occur on the next day after the period
    ends and then daily afterward if no acceptable bids were received.” 
    Id.
     The TEP concluded that
    Prescient’s proposed listing period was technically unacceptable because it had “reduce[d] the
    Exclusive period from 15 days to 10 days for [insured with escrow] properties.” AR Tab 9A at
    4407.
    Prescient argues that, contrary to the TEP’s conclusion, its proposal conforms to the
    solicitation. It points again to its marketing plan, which contains language that it claims clarifies
    the timelines set forth in its Work Flow Chart. Specifically, the Draft Marketing Plan, like the
    Work Flow Chart, states that that the “[t]imeline [for the exclusive listing period] is 15 days for
    Insured (IN) and 10 days [for] Insured with Escrow (IE) listings” and that “[i]f no bids are
    acceptable, daily bid opening commences until an acceptable bidder can be awarded.” AR Tab
    6C at 3102. But the marketing plan contains a further statement not included in the Work Flow
    Chart that “[i]f no bids are received or none are acceptable, after the 16th day, property moves to
    the Extended Listing Period, and is open to all bidders, including investors.” 
    Id.
     Prescient argues
    that this last sentence establishes that its proposal conformed to the 15-day exclusive listing
    period because “[f]or both insured and insured with escrow properties, bids would be opened
    13
    after the 10th day, and if no acceptable bid had been received, there would be daily bid openings
    through the 15th day.” Pl.’s Mem. at 8.
    The Court concludes that it was not arbitrary and capricious for the TEP to conclude that
    Prescient’s proposal did not conform to section 5.2.2.3.1. As noted, in order to be found
    technically acceptable, the proposal must “clearly” meet the requirements of the solicitation. The
    Work Flow Chart was facially inconsistent with the requirements of the solicitation because it
    proposed two different listing periods for the two categories of insured properties (fifteen days
    for insured and ten days for insured with escrow), while section 5.2.2.3.1 sets forth a single
    listing period for both (15 days). As was the case with the non-conforming lottery periods, the
    agency was not required to examine other parts of Prescient’s proposal in order to attempt to
    resolve the discrepancy in the exclusive listing periods reflected in the Work Flow Chart. And
    even had it reviewed the language in the draft marketing plan, that language was also inexact. It
    also contained a ten-day exclusive listing period for insured with escrow properties, even as it
    stated (incongruously) that “[f]or both insured and insured with escrow properties, bids would be
    opened after the 10th day, and if no acceptable bid had been received, there would be daily bid
    openings through the 15th day.” See AR Tab 6C at 3102.
    In short, Prescient’s proposal did not clearly meet the requirements of section 5.2.2.3.1.
    The TEP’s conclusion that Prescient’s proposal “reduced the Exclusive period from 15 days to
    10 for [insured with escrow] properties” was neither arbitrary, capricious, nor contrary to law.
    See AR Tab 9A at 4407.
    2. Disparate Treatment
    As it argued with respect to section 5.2.1.2.3, Prescient alleges that the TEP found the
    proposals of Offerors 27 and 37 consistent with section 5.2.2.3.1, despite the fact that they
    proposed “the same approach as Prescient.” Pl.’s Mem. at 22. This argument has no merit.
    Thus, Offeror 27’s Work Flow Chart in fact sets forth a fifteen-day period for both
    insured and insured with escrow properties. It reads as follows: “Is it insured or insured
    w/escrow? (Yes); Winning bids received by 10th day (No); Review each day of bids until 15th
    day.” AR Tab 5E at 1845. Similarly, its work flow narrative includes this passage:
    For [insured] and [insured with escrow] assets the Firm will review bids on the first
    business day following the 10th day of the Exclusive Listing Period. . . . From this point
    on, bids will be reviewed each day until the winning bid is received. If no winning bids
    are received by the 15th day of the Exclusive listing period, the Firm will extend the offer
    to all buyers by listing the property in the Extended Listing Period.
    Id. at 1849.
    Offeror 37’s proposal also does not distinguish between insured and insured with escrow
    properties; it establishes a 15-day exclusive listing period for both. AR Tab 5G at 2186. The
    Work Flow Chart states: “Insurable Marketing: 7 day lottery period (as applies) / 1-10 day
    owner/owner occupant sealed bid / 11-15 day owner-occupant daily bid.” Id.
    14
    In short, unlike Prescient, neither Offeror 27 nor Offeror 37 submitted ambiguous
    proposals that appeared to subject insured properties and insured with escrow properties to
    different exclusive listing periods. Prescient, accordingly, has not shown that its proposal was
    evaluated disparately with respect to the requirements of section 5.2.1.2.3.
    D. Initial List Price (Section 5.2.1.7)
    As noted above, the first of the five objectives for asset managers set forth in the
    solicitation was the accurate and competitive valuation of HUD properties. To that end, section
    5.2.1.7 of the solicitation, titled “Initial List Price,” states that “[t]he Contractor shall establish
    and record in P260 an initial list price based on any combination of valuation tools (i.e. appraisal,
    BPO, AVM, etc.)4 as authorized by the GTR and record in P260 an initial list price based on the
    valuation tools used as required by paragraph 24 CFR 291.100(b) for all properties. . . .” AR Tab
    2H at 524.
    Prescient’s Work Flow Chart proposed to establish the initial list price by ordering an
    appraisal, which would be subjected to a preliminary review for quality control purposes. If the
    appraisal did not pass the review, the Work Flow Chart indicated that a BPO “may be ordered to
    verify sales price for [quality control] purposes, if warranted.” AR Tab 6C at 3087.5 Thus, under
    Prescient’s proposal, list price would be established based solely on an appraisal, if the appraisal
    was found acceptable after Prescient’s quality control review. Prescient’s proposal did not
    provide, as a matter of course, for the use of more than one valuation tool to set price.
    The TEP found Prescient’s proposal unacceptable because it did not propose “using a
    combination of valuation tools (i.e. appraisal, BPO, AVM etc.) as required in Section 5.2.1.7” of
    the solicitation. AR Tab 9A at 4408. For that reason, the TEP concluded that Prescient had
    “failed to satisfactorily address properties being accurately and competitively valued.” Id. at
    4407.
    Prescient does not deny that its proposal does not require that a combination of tools
    always be used when establishing list price. Instead, it argues that section 5.2.1.7 of the
    solicitation gives asset managers the option of either using a combination of valuation tools to set
    4
    “BPO” refers to Broker Price Opinion and “AVM” refers to Automated Valuation Method. AR
    Tab 2H at 495.
    5
    Specifically, Prescient’s Work Flow Chart stated as follows:
    Appraisal received and a preliminary review is made by appraisal staff for [quality
    control] purposes. The review entails verification that comps were in proximity and
    reasonable and adjustments were consistent with industry standards to verify the value is
    reasonable. In addition the disposition appears reasonable based on the facts stated within
    the appraisal. . . . If appraisal does not pass [quality control] area . . . . A BPO may be
    ordered to verify sales price for QC purposes, if warranted.
    AR Tab 6C at 3087.
    15
    list price if authorized by the GTR or, instead, using only an appraisal as required by 
    24 C.F.R. § 291.100
    (b) for all properties. Pl.’s Mem. at 10.
    There is no question that Section 5.2.1.7 is very poorly written. If taken literally, it
    appears to require that a contractor record two list prices: one that is established “based on any
    combination of valuation tools (i.e. appraisal, BPO, AVM, etc.) as authorized by the GTR” and
    one that is “based on the valuation tools used as required by paragraph 24 CFR 291.100(b) for all
    properties . . . .” The latter regulation establishes as a general policy for the sale of HUD
    acquired properties that “[t]he list price, or asking price assigned to the property is based upon an
    appraisal conducted by an independent real estate appraiser using nationally recognized industry
    standards for the appraisal of residential property.” 
    24 C.F.R. § 291.100
    (b).
    Of course, it makes little sense to require the contractor to establish two different list
    prices, one based on a combination of tools and one based solely on an appraisal. And it makes
    no sense at all to require that the contractor record two different list prices. Further, section
    5.2.1.7 includes the phrase “tools used as required by paragraph 24 CFR 291.100(b) for all
    properties” (emphasis supplied), but 
    24 C.F.R. § 291.100
    (b) refers to a single tool—an
    appraisal—as the basis for setting list price.
    At oral argument in this case, the government argued that section 5.2.1.7 requires offerors
    to use a combination of tools (i.e., more than one tool) to establish list price. It contended that the
    citation to 
    24 C.F.R. § 291.100
    (b) in the second clause of the section was part of a “confusing
    effort” to confirm HUD’s intent that the reference to “any combination of valuation tools” be
    interpreted to require that one of the multiple tools used must be an appraisal. Oral Arg. at
    23:00–25:00.
    The Court finds the government’s interpretation of the provision tortured, at best. There
    was no need for the solicitation to make clear in the second clause of section 5.2.1.7 that an
    appraisal was always required to be used as a valuation tool because (as discussed above) section
    5.2.1.2 already required that an appraisal be obtained whenever a property was to be sold. See
    AR Tab 2H at 522. If the government intended to reinforce that requirement in section 5.2.1.7
    and to avoid the implication that an appraisal need not be one of the tools used as part of “any
    combination of valuation tools” then the method it chose to do so—requiring contractors to also
    record a price based on “valuation tools used as required by paragraph 24 CFR 291.100(b)”—
    was a peculiar way to accomplish it. HUD could have simply reworded the first clause of that
    section to read: “[t]he Contractor shall establish and record in P260 an initial list price based on
    an appraisal combined with any other valuation tool(s) as approved by the GTR.”
    Prescient, on the other hand, interprets section 5.2.1.7 to give the contractor two options
    for setting the list price. On the one hand, it may use “any combination of valuation tools,” so
    long as such combination was authorized by the GTR. On the other, it may rely exclusively on
    an appraisal because appraisals are “valuation tools used as required by paragraph 24 CFR
    291.100(b).” Pl.’s Mem. at 27.
    Prescient’s interpretation, of course, requires the Court to treat the word “and” as used in
    section 5.2.1.7 as disjunctive, rather than conjunctive. “The usual meaning of the word ‘and’ . . .
    is conjunctive, and ‘unless the context dictates otherwise, the ‘and’ is presumed to be used in its
    16
    ordinary sense . . . .” Reese Bros. v. United States, 
    447 F.3d 229
    , 235–36 (3d Cir. 2006) (quoting
    Am. Bankers Ins. Grp. v. United States, 
    408 F.3d 1328
    , 1332 (11th Cir. 2005)); OfficeMax v.
    United States, 
    428 F.3d 583
    , 589 (6th Cir. 2005) (citing in part Crooks v. Harrelson, 
    282 U.S. 55
    ,
    58 (1930)); Webster’s Third New International Dictionary 80 (2d ed. 2002); 1A Norman J.
    Singer, Statutes and Statutory Construction § 21.14 at 179–80 (6th ed. 2002)). Where, however,
    treating the word “and” as conjunctive could lead to an “anomalous or absurd result,” it may be
    appropriate to treat it as disjunctive. See Reese Bros., 
    447 F.3d at
    235–36; see also Peacock v.
    Lubbock Compress Co., 
    252 F.2d 892
    , 893 (5th Cir. 1958) (observing that “‘[i]n the construction
    of statutes, it is the duty of the Court to ascertain the clear intention of the legislature” and that
    “[i]n order to do this, Courts are often compelled to construe ‘or’ as meaning ‘and,’ and again
    ‘and’ as meaning ‘or’” (quoting United States v. Fisk 
    70 U.S. 445
    , 448 (1866))).
    For the reasons set forth above, the Court concludes that reading the word “and” in the
    conjunctive sense does lead to absurd or anomalous results in the context of section 5.2.1.7. As
    noted, if “and” is used in the conjunctive sense then the solicitation would require that the
    contractor establish and record two different list prices for a single piece of property—one based
    on a combination of evaluation tools and one based on an appraisal alone. By contrast, if “and” is
    interpreted in the disjunctive, as Prescient argues, then a contractor would be able to base the list
    price on “any combination of valuation tools” if that were authorized by the GTR, or on an
    appraisal (as is required under the general policy set forth at 
    24 C.F.R. § 291.100
    (b) for all HUD
    properties). This reading of the section is most consistent with its language and is also consistent
    with HUD’s general policy, which provides for reliance upon appraisals to set list price.
    This reading of section 5.2.1.7 is also consistent with the rest of the solicitation. Pursuant
    to section 5.2.1.2, the contractor must “obtain an AS-IS appraisal performed by an FHA roster
    appraiser.” AR Tab 2H at 522. The same section further provides that “the contractor shall work
    with HUD should alternate methods other than an appraisal be used to obtain the initial list
    price.” This phrase, read in context, clearly suggests that the use of alternate methods other than
    an appraisal is optional, but that if such other methods are used, the contractor is required to
    work with HUD on the development of the list price.
    Further, section 5.2.1.2.3, which is entitled “New Appraisals and Report,” states that
    “[n]ew appraisals other than the appraisal that is used as one or more multiple valuation tools to
    help establish list price, if applicable, can only be ordered with GTR approval.” 
    Id.
     Although
    also not a model of grammatical clarity, this section is most naturally read to indicate that the
    appraisal can serve as the “one” valuation tool used to establish list price, or can be one of the
    “multiple valuation tools” used for that purpose.
    In short, the Court concludes that Prescient’s interpretation of section 5.2.1.7 is the only
    reasonable one given its language and the context in which it appears. Accordingly, HUD was
    incorrect when it concluded that Prescient’s proposal was deficient based on its inconsistency
    with section 5.2.1.7 because it “failed to satisfactorily address properties being accurately and
    competitively valued,” and that conclusion may not serve as the basis for finding Prescient’s
    proposal technically unacceptable.
    17
    E. Materiality of Deficiencies
    It is well-established that “‘a proposal that fails to conform to the material terms and
    conditions of the solicitation should be considered unacceptable and a contract award based on
    such an unacceptable proposal violates the procurement statutes and regulations.’” Centech Grp.,
    Inc. v. United States, 
    554 F.3d 1029
    , 1038 (Fed. Cir. 2009) (quoting E.W. Bliss Co. v. United
    States, 
    77 F.3d 445
    , 448 (Fed. Cir. 1996)). Further, “[t]o be acceptable, a proposal must represent
    an offer to provide the exact thing called for in the request for proposals, so that acceptance of
    the proposal will bind the contractor in accordance with the material terms and conditions of the
    request for proposals.” Centech, 
    554 F.3d at 1037
    .
    As described above, the Court has upheld the TEP’s findings as to three of the four
    inconsistencies it identified between Prescient’s proposal and the terms of the solicitation.
    Prescient contends, however, that there is nothing in the record that reflects HUD’s consideration
    of whether Prescient’s failures to meet the requirements of the solicitation were “material” ones.
    Pl.’s Mem. at 32. It further argues that even assuming that its proposal was inconsistent with the
    solicitation in one or more of the respects identified in the TEP report, the inconsistencies
    “whether taken individually or collectively, are not material and should not be the basis for a
    determination of technically unacceptable.” 
    Id.
    Prescient’s arguments lack merit. As noted, the TEP rated Prescient’s technical proposal
    unacceptable. Under the solicitation, a finding of technical unacceptability means that the
    proposal contained deficiencies. A “deficiency” is defined, in pertinent part, as “a material
    failure of a proposal to meet a Government requirement.” AR Tab 2H at 656. In its report, the
    TEP specified and discussed each of the four deficiencies that formed the bases for the
    unacceptable rating. AR Tab 9A at 4407–08. Thus, the TEP’s conclusion that Prescient’s
    proposal was unacceptable was necessarily also a conclusion that the inconsistencies it identified
    constituted material failures to meet the requirements of the solicitation. In that regard, the Court
    notes that a separate discussion of materiality is not required because the TEP’s path of
    reasoning can be discerned from its report considered in the context of the solicitation’s
    requirements. See State Farm, 
    463 U.S. at 43
     (court will “uphold a decision of less than ideal
    clarity if the agency’s path may reasonably be discerned”) (quoting Bowman, 419 U.S. at 286).
    Further, the TEP’s conclusion that Prescient’s proposal materially failed to meet the
    terms of the solicitation is supported by the record. “A solicitation term is material where it has
    more than a negligible impact on the price, quantity, quality, or delivery of the subject of the
    bid.” Blackwater Lodge & Training Ctr., Inc. v. United States, 
    86 Fed. Cl. 488
    , 505 (2009)
    (citations omitted). By contrast, “[d]e minimis errors are those that are so insignificant when
    considered against the solicitation as a whole that they can safely be ignored and the main
    purposes of the contemplated contract will not be affected if they are.” Grumman Data Sys.
    Corp. v. Dalton, 
    88 F.3d 990
    , 1000 (Fed. Cir. 1996); see also E.W. Bliss, 
    77 F.3d at
    448–49
    (observing that “[w]here a defect in a bid is trivial or a mere formality, not material, the bid is
    not required to be rejected out of hand”) (quoting M.W. Kellogg Co./ Siciliana Appalti
    Costruzioni v. United States, 
    10 Cl. Ct. 17
    , 26 (1986)).
    In this case, each of the three inconsistencies that the Court has concluded the TEP
    reasonably identified constitutes a failure to comply with a material term of the solicitation.
    18
    Thus, the failure to seek GTR approval before conducting a second appraisal implicates one of
    the “five primary objectives” for asset managers—specifically, the objective that requires them
    to “ensure that properties are accurately and competitively valued.” See AR Tab 2H at 494–95.
    The proposal’s reduction in the length of the exclusive listing period for insured with escrow
    properties, within which owner occupants, among other select prospective purchasers can bid on
    the properties, implicated another of the five primary objectives—ensuring that “sales create
    owner occupant opportunities.” See 
    id.
     It also frustrated agency policy by reducing the window
    within which certain non-profit organizations and governmental entities might take advantage of
    the discounts available to them during the exclusive listing period. See id. at 530. The reduction
    in the lottery period similarly subverts HUD’s goal of offering certain types of properties to
    eligible persons at a discount under its “Good Neighbor Next Door” program. Id. at 529.
    Further, it was not the responsibility of the agency to sift through Prescient’s proposal
    and piece together a compliant offer. Rather, “[i]t is well established that all offerors . . . are
    expected to demonstrate their capabilities in their proposals.” Software Eng’g Servs., Corp. v.
    United States, 
    85 Fed. Cl. 547
    , 555 (2009) (quoting Int’l Res. Recovery, Inc. v. United States, 
    60 Fed. Cl. 1
    , 6 (2004)). “Undoubtedly, an offeror carries the burden of presenting ‘an adequately
    written proposal, and an offeror’s mere disagreement with the agency’s judgment concerning the
    adequacy of the proposal is not sufficient to establish that the agency acted unreasonably.’”
    Westech Intern., Inc. v. United States, 
    79 Fed. Cl. 272
    , 296 (2007) (quoting United Enter. &
    Assocs. v. United States, 
    70 Fed. Cl. 1
    , 26 (2006)). Indeed, under the solicitation at issue in this
    case, a proposal had to “clearly meet[] the requirements of the solicitation” in order to be rated
    technically acceptable. AR Tab 2H at 655.
    In short, each of the terms of the solicitation with which Prescient failed to comply is
    directly related to the accomplishment of important agency objectives under the procurement.
    None of them involved “de minimis errors” that “can safely be ignored.” Further, the TEP’s
    conclusion that Prescient failed to clearly meet the requirements of the solicitation is amply
    supported by the record. Therefore, the Court finds that the TEP’s conclusion that Prescient’s
    proposal was technically unacceptable was neither arbitrary, capricious, nor contrary to law.6
    6
    In addition to challenging the unacceptable rating the TEP assigned, Prescient also takes issue
    with the statement in the contracting officer’s competitive range memorandum that “any offerors
    receiving an unacceptable rating were reviewed prior to establishing the Competitive Range in
    order to determine the specific nature of any identified deficiencies and whether or not the
    identified deficiencies could be corrected.” It also challenges her statement that proposals found
    technically unacceptable “had major revisions that could not be corrected through discussions
    and are not capable of being made technically acceptable.” Pl.’s Mem. at 24–25. To the extent
    that Prescient is arguing that the record lacks adequate documentation that a review was
    conducted “to determine the specific nature of any identified deficiencies and whether or not the
    identified deficiencies could be corrected,” the Court finds that argument without merit. See id.
    at 13. First, in the Court’s view, the contracting officer’s reference to a “review” refers to the
    review that the TEP conducted, which culminated in the assignment of an unacceptable technical
    rating to Prescient. Second, and in any event, whether or not the identified deficiencies could
    theoretically be corrected (if the agency chose to give Prescient and other offerors the
    opportunity to do so) is irrelevant because the solicitation mandated that any proposal found
    19
    CONCLUSION
    For the reasons discussed above, Prescient’s motion for judgment on the administrative
    record is DENIED and the government’s cross-motion is GRANTED. Accordingly, Prescient’s
    complaint is hereby DISMISSED. The Clerk is directed to enter judgment accordingly. The
    parties shall bear their own costs.
    IT IS SO ORDERED.
    s/ Elaine D. Kaplan
    ELAINE D. KAPLAN
    Judge
    technically unacceptable would not be given further consideration, and it did not provide offerors
    with any right to correct deficiencies in their technical proposals. See ST Net, Inc., 112 Fed. Cl.
    at 111 (in a negotiated procurement where discussions not required, agency not required to give
    offeror an opportunity to correct and revise a technically defective proposal).
    20
    

Document Info

Docket Number: 16-109C

Citation Numbers: 125 Fed. Cl. 475, 2016 U.S. Claims LEXIS 274, 2016 WL 1367409

Judges: Elaine D. Kaplan

Filed Date: 3/29/2016

Precedential Status: Precedential

Modified Date: 11/7/2024

Authorities (20)

Crooks v. Harrelson , 51 S. Ct. 49 ( 1930 )

E.W. Bliss Company v. United States , 77 F.3d 445 ( 1996 )

Centech Group, Inc. v. United States , 554 F.3d 1029 ( 2009 )

Labatt Food Service, Inc. v. United States , 577 F.3d 1375 ( 2009 )

Motor Vehicle Mfrs. Assn. of United States, Inc. v. State ... , 103 S. Ct. 2856 ( 1983 )

Impresa Construzioni Geom. Domenico Garufi v. United States , 238 F.3d 1324 ( 2001 )

Rex Service Corp. v. United States , 448 F.3d 1305 ( 2006 )

Alfa Laval Separation, Inc. v. United States, and Westfalia ... , 175 F.3d 1365 ( 1999 )

American Bankers Insurance Group v. United States , 408 F.3d 1328 ( 2005 )

Reese Brothers, Inc. v. United States , 447 F.3d 229 ( 2006 )

Caci, Inc.-Federal v. The United States , 71 A.L.R. Fed. 338 ( 1983 )

american-federation-of-government-employees-afl-cio-american-federation , 258 F.3d 1294 ( 2001 )

Alabama Aircraft Industries, Inc.—Birmingham v. United ... , 586 F.3d 1372 ( 2009 )

United States v. Fisk , 18 L. Ed. 243 ( 1866 )

Bannum, Inc. v. United States , 404 F.3d 1346 ( 2005 )

R. A. Peacock, M. L. Coffer, and H. J. Wilson v. Lubbock ... , 252 F.2d 892 ( 1958 )

Grumman Data Systems Corporation v. John H. Dalton, ... , 88 F.3d 990 ( 1996 )

Myers Investigative and Security Services, Inc. v. United ... , 275 F.3d 1366 ( 2002 )

Advanced Data Concepts, Incorporated v. United States , 216 F.3d 1054 ( 2000 )

Axiom Resource Management, Inc. v. United States , 564 F.3d 1374 ( 2009 )

View All Authorities »