Big Oak Farms, Inc. v. United States ( 2019 )


Menu:
  •          In the United States Court of Federal Claims
    No. 11-275L
    (Filed: January 11, 2019)
    )
    BIG OAK FARMS, INC., et al.,                  )
    )     Fifth Amendment Taking Claims;
    Plaintiffs,             )     Motion to Dismiss; 
    28 U.S.C. § 2501
    ;
    )     Time-barred; Relation Back; RCFC
    v.                                            )     15(c); Class Action Tolling; RCFC
    )     12(b)(6).
    THE UNITED STATES,                            )
    )
    Defendant.              )
    )
    Benjamin D. Brown, Washington, DC, and J. Michael Ponder, Cape Girardeau,
    MO, for plaintiff. Laura Alexander, Washington, DC, of counsel.
    Taylor Ferrell and Sean C. Duffy, U.S. Department of Justice, Environmental and
    Natural Resources Division, Washington, DC, with whom was Jean E. Williams, Deputy
    Assistant Attorney General, for defendant. Brigman Harman, U.S. Department of Justice,
    Washington, DC, of counsel.
    OPINION
    FIRESTONE, Senior Judge.
    Pending before the court is the United States’ (the “government”) motion filed on
    March 29, 2018 (ECF No. 125) to dismiss the claims of over 120 plaintiffs (hereinafter
    “additional plaintiffs”) on the grounds that their claims, identified for the first time in the
    Third Amended Complaint filed on March 16, 2018 (ECF No. 121),1 are time-barred
    under 
    28 U.S.C. § 2501.2
    This case was initially filed on May 3, 2011 (ECF No. 1) on behalf of 34 plaintiffs
    and an unidentified class of additional plaintiffs. In the original complaint, the plaintiffs
    claimed that they were bringing the action on behalf of themselves and an alleged class
    following flooding that began “at approximately 10 p.m. on May 2, 2011” when the
    United States Army Corps of Engineers (“the Corps”) “intentionally breached the Birds
    Point levee . . . and inundated approximately 130,000 acres of Mississippi and New
    Madrid Counties, Missouri with flood waters from the Mississippi River.” Compl. ¶ 20.
    Some of the original 34 plaintiffs had granted easements to the Corps to allow for their
    land to be flooded during certain conditions and received payments for their easement.
    The plaintiffs who had granted these easements to the Corps also alleged that, to the
    extent the easements were enforceable, that the Corps had exceeded the scope of its
    easements. Amend. Compl. ¶¶ 95-102 (ECF No. 32).
    The government moved to dismiss the takings claims set forth in the initial March
    3, 2011 complaint on September 9, 2011 for failure to state a claim upon which relief can
    be granted (ECF No. 19) under Rule 12(b)(6) of the Rules of the United States Court of
    1
    On April 23, 2012, the plaintiffs filed a second amended complaint (ECF No. 32). On March
    16, 2018, the plaintiffs filed their third amended complaint, but improperly filed and titled it as
    their second amended complaint (ECF No. 121). Thus, the court will refer to the March 16, 2018
    complaint as the Third Amended Complaint.
    2
    “Every claim of which the United States Court of Federal Claims has jurisdiction shall be
    barred unless the petition is filed within six years after such claim first accrues.” 
    28 U.S.C. § 2501
    .
    2
    Federal Claims (“RCFC 12(b)(6)”). On May 4, 2012, the court granted the government’s
    motion to dismiss the plaintiffs’ takings claims (ECF No. 35). However, shortly
    thereafter the Supreme Court issued its decision in Arkansas Game & Fish Commission v.
    United States, 
    568 U.S. 23
     (2012) and after additional briefing on the Supreme Court’s
    decision, the court reinstated the plaintiffs’ takings claims on July 23, 2013 (ECF No. 61)
    and the parties began discovery.
    After fact discovery was completed in 2016, the parties filed cross-motions for
    partial summary judgment on plaintiffs’ taking claims (ECF Nos. 100, 101). The court
    denied summary judgment on March 17, 2017 stating that there were disputed issues of
    fact regarding whether the property damage suffered from activation of the Floodway
    was the same as would have occurred had the government not breached the levee or, if
    the flooding was greater than would have occurred without the breached levee, whether
    the benefits the plaintiffs have received from operation of the levee system outweighed
    the harm caused by the breach of the Birds Point Levee. Big Oak Farms, Inc. v. United
    States, 
    131 Fed. Cl. 45
    , 54 (2017).
    In a joint status report filed on November 21, 2017 (ECF No. 120), the plaintiffs
    informed the court that despite having earlier agreed to seek class certification after the
    court’s ruling on summary judgment, the plaintiffs decided not to seek class certification.
    Instead, the plaintiffs informed the court that they had decided to amend their complaint
    to remove the request for class certification and instead to amend their complaint to name
    additional individual plaintiffs. On March 16, 2018, plaintiffs filed what is now their
    Third Amended Complaint (ECF No. 122). The Third Amended Complaint includes the
    3
    claims of the original plaintiffs as set forth in the Second Amended complaint but does
    not include allegations to support a class action and now also adds the claims of over 120
    additional parties seeking just compensation under the Fifth Amendment based on the
    Corps’ breach of the Birds Point Levee on May 2, 2011.
    On April 27, 2018, the government filed the pending motion to dismiss the claims
    of the additional plaintiffs for lack of subject matter jurisdiction under RCFC 12(b)(1) on
    the grounds that the additional plaintiffs’ claims, which were filed more than six years
    after the Corps breached the Birds Point levee, are barred by the six-year statute of
    limitations in 
    28 U.S.C. § 2501
     (ECF No. 125). The plaintiffs argue in response that the
    claims of the added plaintiffs relate back to the original complaint filed on May 3, 2011
    under RCFC 15(c)(1)(B).3 The plaintiffs also argue that because the initial complaint
    included allegations regarding a claim for a class action, the statute of limitations was
    tolled for the period of time the plaintiffs had maintained a claim for class certification
    and thus the claims of the additional plaintiffs are timely.
    For the reasons that follow, the court finds that the claims of the additional
    plaintiffs do not relate back to the original May 3, 2011 complaint and that a claim for a
    class action does not toll the statute of limitations where, as here, the court has never
    ruled on or has been asked to rule on class certification. Therefore, the court GRANTS
    3
    “[A]n amendment of a complaint relates back to the date of the original complaint when . . . the
    amendment asserts a claim or defense that arose out of the conduct, transaction, or occurrence set
    out—or attempted to be set out—in the original pleading.” RCFC 15(c)(1)(B).
    4
    the government’s motion to dismiss the claims of the additional plaintiffs first named in
    the Third Amended Complaint on the grounds that their claims are time-barred.
    I.     FACTUAL BACKGROUND
    The facts surrounding the breach of the Birds Point Levee which gave rise to this
    case can be found at this court’s opinion in Big Oak Farms, Inc. v. United States, 
    131 Fed. Cl. 45
     (2017) denying summary judgment and will not be repeated here. Set forth
    below are the facts from the original, First, Second, and Third Amended complaints that
    the additional plaintiffs rely on in support of their contention that the court has
    jurisdiction to hear their claims. These facts are deemed true unless otherwise noted.
    As noted above, 34 plaintiffs filed a Class Action complaint on May 3, 2011,
    stating that the action was being brought “on Behalf of a Class consisting of: all persons
    and entities who owned property in the affected Birds Point New Madrid County
    Floodway at the time the levee was breached” and that “[t]he Class is so numerous a
    joinder of the individual members of the proposed Class is impracticable.” Compl. ¶¶ 45-
    56. In the initial complaint, the plaintiffs identified 34 plaintiffs. 
    Id. ¶ 2-16
    .4
    4
    The plaintiffs named in the Second Amended Complaint as listed in its caption are: Big Oak
    Farms, Inc.; Mt. Level Farms, Co., Inc.; Stallings Brothers Farms; Burke Land Co.; Emmitt
    Burke, Individually; Brad Hequembourg Farms; Brad and Susan Hequembourg, Individually;
    Terry and Judy Hequembourg, Individually; Wolf Island Farms, Inc.; Mark and Rebecca Dugan,
    Individually; M & M AG Farms, Investments; Mike Hutcheson and Marty Hutcheson,
    Individually; Jennifer T. Baker Trust; Lindsay and Monica Goodin, Individually; John and Clyda
    Goodin, Individually; Stephen and Janette Story Farms, Inc.; Shew & Presson Farms, Inc.; Roy
    Presson, Individually; Ray Presson, Individually; Jack Feezor, Individually; The Orvil Shew
    Marital Trust; Story Farms, Inc.; Story Land, Inc.; Sunburst Plantation, Inc.; Lester Goodin and
    Janet Goodin, Individually; Consolidated Drainage District No. 1 of Mississippi County,
    Missouri; Dee Goodin, Individually. In its initial complaint, Consolidated Drainage District No.
    1 of Mississippi County, Missouri was not listed as a plaintiff.
    5
    On July 11, 2011, the plaintiffs filed an amended Class Action complaint (ECF
    No. 8). In that amended complaint, the plaintiffs expanded their class action allegations to
    include:
    All persons and entities who owned and/or leased real and/or personal property
    and/or who owned business in the Birds Point-New Madrid Floodway that were
    damaged or destroyed by floodwaters pursuant to Defendant’s operation of the
    Floodway on May 2, 2011. Excluded from the Class are Defendant, Defendant’s
    officers, legal representatives, and assigns.
    Amend. Compl. ¶ 66.
    The amended complaint further stated that the action was being brought “as a class
    action because, upon information and belief, the Class includes hundreds if not thousands
    of members[.]” 
    Id. ¶ 67
    . In that same amended complaint, plaintiffs alleged that “[a]ll
    Plaintiffs own real property within the Birds Point-New Madrid Floodway. . . .” 
    Id. ¶ 31
    .
    The amended complaint also included a fact that “[a]pproximately 90 residences were
    destroyed by the intentional breaches of the levee and subsequent flooding.” 
    Id. ¶ 60
    .
    Plaintiffs filed a Second Amended Complaint on April 17, 2012 (ECF No. 31) but
    did not change any of the named plaintiffs or allegations regarding the nature of alleged
    class.5 The parties filed a Joint Preliminary Status Report (“JPSR”) on August 9, 2012
    (ECF No. 40), in which they agreed that “[i]f members of the putative class wish to
    proceed in this case as named plaintiffs rather than absent class members, such elections
    5
    The Second Amended Complaint was brought by Big Oak Farms, Inc. and included the same
    33 plaintiffs, with the addition of Consolidated Drainage District No. 1 of Mississippi County,
    Missouri, and was filed on behalf of a proposed class of persons or entities that owned land or
    business within the floodway. The aforementioned sections quoted from the amended complaint
    remained the same.
    6
    [needed to] be made by February 15, 2013.” JPSR at 2. The parties further agreed that
    they planned to “make a proposal to the Court regarding the schedule for . . . briefing
    regarding class certification” after the court ruled on the parties’ cross-motions for
    summary judgment under RCFC 56. 
    Id. at 5
    .
    On April 28, 2017, after the court denied the cross-motions for summary
    judgment, the government filed a joint proposed schedule (ECF No. 116) which stated
    that because “this is a complicated case due to the numerous properties involved . . . fact
    discovery will require a significant amount of time.” The parties proposed that plaintiffs
    submit their motion for class certification on September 22, 2017. 
    Id.
     The court adopted
    the proposed schedule on May 30, 2017, (ECF No. 117). On September 21, 2017, the
    parties filed a joint motion to extend the deadline for class certification for 60 days (ECF
    No. 118).6 The court adopted the extension in a scheduling order the next day (ECF No.
    119).
    On November 21, 2017, the parties filed a joint status report (“JSR”) (ECF No.
    120) in which the plaintiffs elected not to seek certification of a class but to instead
    proceed with only individual claims. The status report stated that the “[p]laintiffs have
    elected not to seek to certify a class or multiple subclasses in this action,” and “[i]nstead,
    [the plaintiffs] will be proceeding with non-class claims.” JSR at 1. Further, the JSR
    6
    That motion explained that the parties were conferring about “whether a class action is the best
    vehicle for resolving the Plaintiffs’ claims or whether other procedural avenues might be more
    efficient” and that the extension would “allow the parties to more fully consider the complexities
    of this case and the best manner in which to address them before burdening this Court with a
    class certification motion.” 
    Id.
    7
    indicated that the “[p]laintiffs will be filing an amended complaint in coming weeks to
    reflect the absence of class claims. This amended complaint may or may not reflect the
    explicit addition of previously unnamed class members who wish to proceed in the
    litigation in light of the fact that their claims will not be pursued in a class action.” 
    Id.
     In
    that same JSR, the government “indicated that [the government] will move to dismiss any
    such claims as time-barred.” 
    Id.
    Four months later, the plaintiffs filed a motion for leave to file the Third Amended
    Complaint on March 16, 2018 (ECF No. 121). Pls.’ Mot. for Leave to File Second Am.
    Compl. & Mem. In Supp. (“Mot. for Leave”). Plaintiffs asserted that “absent class
    members” were coming forward “to convert their claims from class claims to individual
    claims . . . .” Mot. for Leave at 1. The Third Amended Complaint identified 123
    additional plaintiffs and removed all references to class action claims in the complaint.
    
    Id.,
     Ex. 1.7 The United States did not oppose the motion to amend but alerted the court of
    7
    The Third Amended Complaint did not include nine of the plaintiffs named in the Second
    Amended Complaint. Those nine plaintiffs are M & M Ag Farms Investments; Story Land, Inc;
    Sunburst Planation, Inc; Emmitt Burke; Judy Hequembourg; Lester Goodin; Janet Goodin; and
    Dee Goodin. Therefore, only 25 plaintiffs included in the Second Amended Complaint were also
    identified in the Third Amended Complaint (hereinafter “original 25 plaintiffs”). The additional
    plaintiffs first identified in the Third Amended Complaint: Preston Adams, Brent Adams and
    Valarie Adams Smith; Larry and Cathy Allred; John and Joyce Anderson; Bayou Du Chein,
    LLC; Roland and Carolyn Ashby; Sam G. Austin; Charles and Leslie Babb; Five Star Farms,
    Inc.; Daniel J. Babb Farms; Jackie L. and Paula F. Barker Trust; Abner M. Beck Living Trust
    and Julia R. Beck Living Trust; Joe and Dora Brown; Fred and Cheryl Bryant; Fred Bryant Inc.;
    Susan H. Bryant; J Bryant, Inc.; Michael Bryant; Bryant Farms Inc.; Mildred Burnett; Carol A.
    and Ronnie L. Butler; Jeffrey D. Byrne; Nita S. Byrne; Richard Crawford; Rodney Crawfod;
    James M. Cullison Family Trust; William and Pam Deline; Deline Farms Partnership; Brian Dill
    Farms; William D. and Ginger Dill; William C. and Laverne Dunn; William Feezor for B & F
    Farms, Inc.; Alice B. Fox Family Trust; Leslie S. Fox Living Trust; Leslie Fox Farms, L.P.; Jay
    and Lucille Frazier; Leonard Gallion; Albert Goodin; R. E. Lee Goodin; Goodin Farms; Goodin
    Land Co.; Robert and Sharon Henry; Terry Hequembourg; Thomson Heirs; Amos Frank and
    8
    its intention “to separately move to dismiss the claims brought by the newly-identified
    plaintiffs for the first time in the proposed amended complaint on the basis that those
    claims are barred by the applicable statute of limitations.” Joint Mot. to Amend Schedule
    ¶ 1, ECF No. 123.
    The Third Amended Complaint stated that the “actions are properly brought and
    litigated together and relate back to the initial complaint in this matter because certain
    questions of law or fact are common to all plaintiffs and have been put at issue since the
    initial complaint in this matter. . . .” Third Am. Compl. ¶ 187.
    Elizabeth Higgerson; Glenn M. Hillhouse Farms, Inc.; Hillhouse Farms, Inc.; Hillhouse Family,
    LLC; Col. David K. Holland Revocable Living Trust; Claire M. Holland; Claire M. Holland
    Revocable Living Trust; Nancy N. Holland Revocable Living Trust; David K. Holland Jr. and
    Jennifer Kalfsbeek, Holland/Kalfsbeek Joint Revocable Living Trust; Mary Hough; Hunter
    Padberg, LLC; Jon and Tammi Hutcheson; MKH Farms, LLC; Joe Hutchison; Jenita B. Jones;
    McIvan Jones; Jones Family Farms; McIvan Jones Farms, Inc.; Michael Kemp; Michael Kemp
    Inc.; Mary Beth Lee & Phyllis Aduddell; Terry and Mary Beth Lee; Abbie Story LeFevre; Alan
    Long and Gary Long; Carolyn Luebke; Marshall Affiliates, Inc.; Arthur Mattingly for Virginia
    Dare Farms, Inc.; Stanley D. May; Laura B. Meek for Janet Bondurant Q-tip Trust; Louis Miller
    for Ringo Farms Corp.; Michael and Janet Bogle Monk; James C. Moreton Living Trust and
    Eleanor P. Moreton Living Trust; John C. and Nancy E. Moreton; Moreton Farms, Inc.; Moreton
    Farms, Inc.; Moreton Partnership; Robert and Donna Morgan; Moxley Farms, Inc.; E. Moxley,
    Inc.; P & J Moxley Farms, LLC; Kevin S. and Jonell L. Nally; D. Lowell and Joan J. Nally;
    Marilyn Nally; Joe Oliver and David Oliver for Bur Oak Farms; Robert and Gloria Osborn; Scott
    Peters; JSP Farms; Albert Peters; Pinhook Hunting Club, LLC; Pinhook Hunting Club
    Properties, LLC; John L. and Sammie L. Ponder; Catherine Presson; Daisy R. Reeves and
    Florence Canepari; O.A. Reeves Trust; David and Marilyn Renaud; Lindsay Camp Ringo, Sr.;
    Mary Katherine Servatius Family Trust; Roy and Barbara Smith; Bart Stallings; Jeff Stallings;
    JBS Farms, Inc.; Bart & Jeff Stallings Farms; Martin Stallings; A.L. Story, Inc.; ABC Farms,
    Inc.; Ernest Story; Shelby Story; Stephen and Karen Story; Ernest Tate; Neal Tinnon; Milus and
    Wanda Wallace; Mary Ellen Weaver and Gene R. McClay; Gene R. McClay Revocable Living
    Trust; White Oaks Ranch, L.P.; C. David Williams; Donald Williams Farms, Inc.; Donald
    Williams; Donald Williams Living Trust; Elizabeth Williamson Trust; John R. Wilson.
    9
    II.    LEGAL STANDARDS
    The standards upon which motions to dismiss for lack of subject matter
    jurisdiction can be granted are well-settled. “Whether this court has subject matter
    jurisdiction is a threshold matter, and, if no jurisdiction exists, the Court must order
    dismissal without further proceedings.” Vanquish Worldwide, LLC v. United States, 
    134 Fed. Cl. 72
    , 76 (2017) (citing PODS, Inc. v. Porta Stor. Inc., 
    484 F.3d 1359
    , 1365 (Fed.
    Cir. 2007). The plaintiff has to establish the court’s subject matter jurisdiction “by a
    preponderance of the evidence.” Fid. & Guard. Ins. Underwriters, Inc. v. United States,
    
    805 F.3d 1082
    , 1087 (Fed. Cir. 2015) (citing Brandt v. United States, 
    710 F.3d 1369
    ,
    1373 (Fed. Cir. 2013)). “In deciding a motion to dismiss for lack of subject matter
    jurisdiction, the court accepts as true all uncontroverted factual allegations in the
    complaint, and construes them in the light most favorable to the plaintiff.” Estes Exp.
    Lines v. United States, 
    739 F.3d 689
    , 692 (Fed. Cir. 2014). However, if the factual
    allegations in the complaint supporting jurisdiction are challenged only the
    uncontroverted factual allegations are accepted as true. 
    Id.
     (citations omitted).
    Additionally, the court can “look beyond the pleadings and ‘inquire into jurisdictional
    facts’ to determine whether jurisdiction exists.” BRC Lease Co. v. United States, 
    93 Fed. Cl. 67
    , 71 (2010) (quoting Rocovich v. United States, 
    933 F.2d 991
    , 993 (Fed. Cir.
    1991)).
    Claims under the Tucker Act are subject to the six-year statute of limitations set
    forth in 
    28 U.S.C. § 2501
    . “A claim under the Tucker Act accrues as soon as all the
    events have occurred that are necessary to enable plaintiff to bring suit.” Fredericksburg
    10
    Non-Profit Housing Corp. v. United States, 
    113 Fed. Cl. 244
    , 252 (2013) (citing
    Goodrich v. United States, 
    434 F.3d 1329
    , 1333 (Fed. Cir. 2006)). “As a matter of law, a
    takings claim accrues when all the events have occurred which fix the liability of the
    Government and entitle the claimant to institute an action.” CRV Enters., Inc. v. United
    States, 
    86 Fed. Cl. 758
    , 769 (2009) (internal quotations and alterations omitted) (quoting
    John R. Sand & Gravel Co. v. United States, 
    457 F.3d 1345
    , 1355-56 (Fed. Cir. 2006),
    aff’d 
    552 U.S. 130
     (2008)), aff’d, 
    626 F.3d 1241
     (Fed. Cir. 2010).
    The statute of limitations set in 
    28 U.S.C. § 2501
     is jurisdictional. John R. Sand &
    Gravel Co., 
    552 U.S. at 133
    . Rather than protecting “a defendant’s case-specific interest
    in timeliness,” a jurisdictional statute of limitations works “to achieve a broader system-
    related goal, such as facilitating the administration of claims, limiting the scope of a
    government waiver of sovereign immunity, or promoting judicial efficiency[.]” 
    Id.
    (citations omitted). Jurisdictional statutes of limitations require “a court to decide a
    timeliness question despite a waiver” and “forbid[] a court to consider whether certain
    equitable considerations warrant extending a limitations period.” 
    Id. at 134
    . Thus,
    “equitable tolling and estoppel do not extend the six-year statute of limitations embedded
    in U.S.C. § 2501.” CRV Enters., 86 Fed. Cl. at 769 (citation omitted).
    III.   DISCUSSION
    The government argues that the claims of the additional plaintiffs first identified in
    the Third Amended Complaint must be dismissed from the action for lack of jurisdiction
    because the claims of these plaintiffs were filed more than six years after the breach of
    the Birds Pointe levee on May 2, 2011 and are thus time-barred under 
    28 U.S.C. § 2501
    .
    11
    The plaintiffs do not dispute that the claims of the additional plaintiffs have been filed
    outside the six-year statute of limitations set under 
    28 U.S.C. § 2501
     but argue that the
    claims relate back to the original complaint under RCFC 15(c) and are therefore timely.
    In the alternative they argue the claims are timely because the statute of limitations was
    tolled while plaintiffs were seeking class action status under the Federal Circuit’s holding
    in Bright v. United States, 
    603 F.3d 1273
     (Fed. Cir. 2010). Both of the plaintiffs’
    contentions are examined below in turn.
    A.     The Additional Plaintiffs’ Claims Do Not Relate Back Under RCFC
    15(c)
    RCFC 15(c)(1)(B) provides that “an amendment of a complaint relates back to the
    date of the original complaint when . . . the amendment asserts a claim or defense that
    arose out of the conduct, transaction, or occurrence set out—or attempted to be set out—
    in the original pleading.” The Federal Circuit has allowed RCFC 15(c) to “overcome the
    government’s challenge based upon the six-year statute of limitations[,]” when the claim
    “sufficiently relates back to [the] original complaint.” Barron Bancshires, Inc. v. United
    States, 
    366 F.3d 1360
    , 1370 (Fed. Cir. 2004); see also Snoqualmie Tribe of Indians ex
    rel. Skykomish Tribe of Indians v. United States, 
    178 Ct. Cl. 570
    , 588 (1967) (finding that
    the additional claim was “sufficiently closely related” to apply the relation back
    doctrine).
    In deciding whether an amended complaint adding additional plaintiffs sufficiently
    relates back, this court generally applies a four-factor test. See Holland v. United States,
    12
    
    62 Fed. Cl. 395
    , 407-8 (2004).8 Under this test, relation back is favored where 1) the
    claim arose out of the ‘same conduct, transaction, or occurrence’ as the original
    complaint; 2) the new plaintiff shares an ‘identity of interest’ with the original plaintiff;
    3) the defendant had ‘fair notice’ of the new plaintiff’s claim; and 4) the addition of the
    new plaintiff causes the defendant prejudice. These factors overlap to some degree,
    however, each factor will be individually examined below.
    Whether the additional claims arise out of the same conduct, transaction, or
    occurrence for purposes of relation back turns on an examination of the government
    actions giving rise to the plaintiffs’ claims. The government concedes that “the claims of
    the new landowners arise out of the same event” but argue that “there are distinct
    transactions that give rise” to each of the plaintiffs’ claims. Def.’s Mot. to Dismiss at 10.
    In making this argument the government states that “because a taking analysis will
    require an evaluation of the particular property interests pertaining to each parcel,
    8
    The Federal Circuit has not had occasion to rule on this four-factor test, but these same factors
    are relied upon in other circuits including the D.C. Circuit. Leachman v. Beech Aircraft Corp.,
    
    694 F.2d 1301
    , 1309 (D.C. Cir. 1982) (We find persuasive the . . . need to limit relation back of
    claims asserted by additional plaintiffs in some way beyond the ‘conduct, transaction, or
    occurrence’ test that applies to relation back of amendments generally. Without some limit, total
    strangers with claims arising out of a multi-victim incident might join pending actions long after
    the statute of limitations had lapsed”); In re Syntex Corp. Sec. Litig., 
    95 F.3d 922
    , 935 (9th Cir.
    1996) (finding that a change relates back “only when: 1) the original complaint gave the
    defendant adequate notice of the claims of the newly proposed plaintiff; 2) the relation back does
    not unfairly prejudice the defendant; and 3) there is an identity of interests between the original
    and newly proposed plaintiff”); Bayatfshar v. Aeronautical Radio, Inc., 
    934 F. Supp. 2d 138
    , 144
    (D.D.C. 2013). Notably, some circuits do not permit adding additional plaintiffs under Rule
    15(c) after the statute of limitations. See Asher v. Unarco Material Handling, Inc., 
    596 F.3d 313
    ,
    318 (6th Cir. 2010) (“The precedent of this circuit clearly holds that an amendment which adds a
    new party creates a new cause of action and there is no relation back to the original filing for
    purposes of limitations”) (citation omitted).
    13
    including the existence and terms of flowage easements,” each claim contains distinct
    evidentiary concerns. Id. at 10-11. Plaintiffs respond that “[t]here is not a single
    allegation of conduct that differs between the initial Complaint and the Third Amended
    Complaint, nor are there descriptions of any additional – or any fewer – transactions or
    occurrences described in the Third Amended Complaint that were not present in the
    original pleading.” Pls.’ Resp. at 9-10. The plaintiffs argue that all of the flooding at issue
    in this case arises from the Corps’ breach of the Birds Point Levee on a single day, May
    2, 2011.
    The court agrees with the plaintiff that the takings claims arose from the same
    action or event – the Corps’ breach of the Birds Point Levee. The government is also
    correct that the takings claims of each individual property owner are different. However,
    the fact that the takings claims of each property owner is different and that each will have
    to establish their own taking claim under the multi-factor test established for temporary
    takings in Arkansas Game and Fish Comm’n v. United States, 
    568 U.S. 23
     38-39 (2012)
    does not mean that the underlying government action giving rise to the taking is different
    for each plaintiff in this case. The court thus finds that this factor weighs in the additional
    plaintiffs’ favor.
    Whether the additional plaintiffs share an identity of interest with the original
    plaintiffs presents a more difficult issue. The government argues based on prior precedent
    that to meet this criteria, the additional plaintiffs and original plaintiffs must be
    essentially one in the same in order to satisfy this factor test. Snoqualmie Tribe, 178 Ct.
    Cl. at 588; Nielsen v. Prof’l Fin. Mgmt., LTD., 
    682 F. Supp. 429
     (D. Minn. 1987). The
    14
    plaintiffs argue, in response, that the identity of interest factor is concerned primarily
    with “notice” and whether the claims of the old and additional plaintiffs are sufficiently
    related that the government understood that additional plaintiffs also had takings claims
    arising from the same event. The court finds that both parties have over-stated their
    positions and that the identity of interest factor is intended to ensure that the old and
    additional plaintiffs are sufficiently related such that the claims of the additional plaintiffs
    were in effect part of the litigation from the outset of the litigation.
    In this regard, the plaintiffs argue that because the case was initially filed as a class
    action that the additional plaintiffs’ claims were in effect part of the litigation from the
    outset. The government argues this is not true because the takings claims of the old and
    additional plaintiffs while based on the same event are inherently different and are not the
    same for each. According to the government, each plaintiff will need to establish that the
    temporary flooding of his or her property amounts to a taking. As such, the government
    argues the takings claims of the additional plaintiffs were not before the court at the
    outset of the litigation.
    The court agrees with the government that it is not enough to have identified a
    potential class of persons with property that was flooded by the same event to meet the
    “identify of interest” test. Different from other class actions where perhaps all of the class
    plaintiffs suffer the same injury from the same event, in this case, there is no basis to
    conclude that each of the additional plaintiffs suffered the same level of temporary
    flooding that the original plaintiffs endured. Whether the additional plaintiffs can
    establish a takings claim will turn on their individual circumstances, as the Supreme
    15
    Court explained in Arkansas Game and Fish, the duration and severity of the flooding
    must be assessed on a case by case basis along with the character of the land at issue and
    the landowner’s reasonable investment expectations. 
    568 U.S. at 38-39
    . Put another way,
    while the flooding may have been caused by a single event, each plaintiff will have to
    establish the government’s liability for an individual temporary taking based on their own
    unique factual circumstances. For similar reasons, this court in another flooding takings
    case held that plaintiffs who sought to join the litigation after the statute of limitations
    had passed had filed too late because the “geographic proximity of a discrete parcel of
    land to property owned by plaintiffs asserting a takings claim is not enough” to satisfy the
    identify of interest test for purposes of RCFC 15(c). Creppel v. United States, 
    33 Fed. Cl. 590
    , 596 (1995). The court finds that the reasoning in Creppel is applicable to this case
    and that regardless of whether the government understood that other landowners may also
    have been flooded by the breach of the Birds Pointe Levee, the additional plaintiffs have
    not shown that their claims for a temporary taking are sufficiently similar to the takings
    claims brought by the plaintiffs identified in the Second Amended Complaint that their
    claims were effectively before the court such that the additional plaintiffs can meet the
    identity of interest test.
    Regarding the third factor – whether the defendant had fair notice of the additional
    plaintiffs’ claims – the court finds, for essentially the same reasons as discussed above,
    that this factor weighs against permitting the additional plaintiffs’ claims to relate back to
    the original complaint. While it is true that the government was on notice that the original
    plaintiffs planned to seek class certification on behalf of potentially “thousands” of other
    16
    landowners who had property flooded by the breach of the Birds Pointe Levee, the court
    agrees with the government that “mere reference to a class action in the original
    complaint did not apprise the United States of the identity of the new claimants that
    would assert takings claims, nor of any property-specific facts related to their takings
    claims.” Def.’s Mot. to Dismiss at 10. Rule 15(c) requires more than notice of a potential
    class to establish notice of individual plaintiff claims.
    In the Second Amended Complaint (ECF No. 32), filed before the statute of
    limitations had run, the plaintiffs described the class as follows: “All persons and entities
    who owned and/or leased real and/or personal property and/or who owned business in the
    Birds Point-New Madrid Floodway that were damaged or destroyed by floodwaters
    pursuant to Defendant’s operation of the Floodway on May 2, 2011.” Sec. Amend.
    Compl. ¶ 66. This description did not put the government on notice of any specific
    location, property interest, or the damage to property for any of the newly named
    plaintiffs under the standards set in Arkansas Game and Fish. Had the plaintiffs identified
    with some precision the facts giving rise to the temporary takings claims for various
    categories of landowners under the Arkansas Game and Fish criteria perhaps the Second
    Amended Complaint would have given the government fair notice of the additional
    plaintiffs’ claims. However, this is not the case. As discussed above, because Arkansas
    Game and Fish establishes a multi-factor test that must be satisfied on a case-by-case
    basis to establish liability for a temporary taking, something more than notice that many
    property owners were affected by flooding is required to meet the notice of the claim
    criteria. For these reasons, the court finds that the government did not have fair notice of
    17
    the additional plaintiffs’ claims before the statute of limitations expired to satisfy RCFC
    15(c).
    Finally, as to whether adding the additional plaintiffs’ claims will cause the
    defendant prejudice the court finds as follows. “Undue prejudice may be found when an
    amended pleading would cause unfair surprise to the opposing party, unreasonably
    broaden the issues, or require additional discovery.” Cooke v. United States, 
    79 Fed. Cl. 741
    , 742-43 (2007) (citation omitted). The government argues that adding over 100
    additional claimants would lead to “potentially significant expansion of discovery.”
    Def.’s Mot. to Dismiss at 11. The plaintiffs respond that “the newly-named Plaintiffs are
    indeed all persons or entities who owned property in the affected floodway” so “no undue
    prejudice could possibly result from relation back.” Pls.’ Resp. at 17. Plaintiffs further
    argue that the additional plaintiffs’ claims “would not be subject to detailed discovery for
    some time” and “each scheduling proposal in this case has explicitly addressed the timing
    and mechanisms for resolving these claims.” 
    Id.
    The court again agrees with the government that allowing relation back to include
    123 more plaintiffs would be prejudicial to the government in this case. Increasing the
    number of plaintiffs by over 100 creates a clear litigation burden particularly given the
    years that have passed and the proof required to prove impacts to property more than
    seven years after the flooding in 2011. Accordingly, this factor also weighs against
    allowing for relation back of the additional 123 plaintiffs’ claims.
    In sum, for the reasons stated above, the court finds that the majority of factors for
    allowing relation back weigh against plaintiffs and thus the court finds that the claims of
    18
    the additional plaintiffs first identified in the Third Amended Complaint are barred by the
    statute of limitations in 
    28 U.S.C. § 2501
     unless tolling of the statute of limitations
    applies.
    B.      The Class Action Tolling Doctrine Does Not Apply Here Where
    Plaintiffs Failed to File a Motion and Receive a Ruling On Class
    Certification
    The Federal Circuit has allowed for tolling of the statute of limitations in 
    28 U.S.C. § 2501
     under certain circumstances involving class actions. See Bright v. United
    States, 
    603 F.3d 1273
    , 1285 (2010).9 In Bright, the plaintiff, in a takings case, had filed a
    class action complaint and sought class certification before the statute of limitations had
    run, but class members did not have the opportunity to opt in until after the statute of
    limitations had run. 
    Id. at 1277
    . In allowing for tolling in that circumstance, the Federal
    Circuit held that “when class certification is sought prior to the expiration of [section
    2501’s limitations] period, but the complaint is not amended to add other named plaintiffs
    as putative class members until after the expiration of the period . . . [t]he statute of
    limitations is tolled during the period the Court of Federal Claims allows putative class
    9
    There is no question that the Tucker Act’s statute of limitations at 
    28 U.S.C. § 2501
     cannot be
    tolled equitably by this court. In John R. Sand & Gravel Co., the Supreme Court stated that
    Section 2501 was jurisdictional in that it “seek[s] to achieve a broader system-related goal, such
    as . . . limiting the scope of a governmental waiver of sovereign immunity.” 
    552 U.S. at 133
    . The
    Supreme Court later clarified that it has “repeatedly held that [the Tucker Act’s] 6-year limit [is]
    jurisdictional and thus not subject to equitable tolling.” United States v. Kwai Fun Wong, 
    135 S. Ct. 1625
    , 1634 (2015). The Federal Circuit stated that “the fact that equitable tolling is barred
    under section 2501 does not mean that class action statutory tolling is also barred. The two
    concepts are different.” Bright, 
    603 F.3d at 1287
    . The Federal Circuit distinguished equitable
    tolling which “permits courts to modify a statutory time limit” from class actions where courts
    do “not modify a statutory time limit” but “suspend[] or toll[] the running of the limitations
    period for all purported members of a class once a class suit has commenced.” 
    Id. at 1287-88
    .
    19
    members to opt in to the class.” 
    Id. at 1290
    . In allowing for tolling under the factual
    circumstance in Bright, the Federal Circuit left unanswered the question “of whether
    tolling would be allowed where a class certification was sought after the limitations
    period.” 
    Id.
     at 1290 n9. The Federal Circuit also had no occasion to consider the issue
    presented here, i.e. whether tolling is allowed where the original plaintiffs never sought
    class certification and then after the statute of limitations had run voluntarily amended
    their complaint to remove the request for class certification and instead added plaintiffs to
    the complaint as though they were “opting into” a case where class certification was
    granted.
    The plaintiffs argue that this court should treat the additional plaintiffs like the
    plaintiffs allowed to opt in to Bright and allow for tolling because the plaintiffs in this
    case originally requested class certification in the prayer of relief of their Second
    Amended Complaint. Pls.’ Resp. at 23. The plaintiffs requested that “the Court issue an
    appropriate Order certifying the Class pursuant to the Court’s Rule 23, designating the
    named Plaintiffs as the representatives for such Class, and appointing Plaintiffs’ counsel
    as counsel for the Class.”).10 Sec. Am. Compl. at 20 ¶ 1. According to the plaintiffs, the
    statute of limitations was tolled until the request for certification in the prayer for relief
    was abandoned in the Third Amended complaint when the additional plaintiffs joined the
    lawsuit.
    10
    “At an early practicable time after a person sues as a class representative, the court must
    determine by order whether to certify the action as a class action.” RCFC 23(c)(1)(A).
    20
    The government argues that plaintiffs’ reliance on Bright is misplaced because
    Bright only allows for tolling where class certification is granted and time is needed, after
    the limitations period has passed, to allow members of the class to join the case as parties
    under the court’s opt in class action procedure.11 Here, the government explains, the
    plaintiffs never sought class certification and when they abandoned their request for class
    status after the statute of limitations had expired, they relinquished their tolling claim.
    The court agrees with the government that Bright does not allow for tolling in this
    case. Had the plaintiffs in this case timely sought a ruling on class certification and the
    court had granted certification, they could rely on Bright. However, the plaintiffs did not
    follow the court’s class action procedure in this case and thus Bright does not apply.
    The plaintiffs argue that by filing a complaint which contains class claims and a
    request for class certification in the prayer for relief that the rationale that supported
    tolling in Bright should be extended to apply in this case. In support of their argument,
    the plaintiffs cite two cases where this court permitted class tolling where the motion for
    class certification was submitted after the statute of limitations had expired. Pls.’ Resp. at
    22 (citing Geneva Rock Products, Inc. v. United States, 
    100 Fed. Cl. 778
     (2011) and
    Toscano v. United States, 
    98 Fed. Cl. 152
     (2011)). Plaintiffs argue that so long as there
    was a request for class certification in the complaint pending before the court, tolling
    should be allowed.
    11
    The government argues following the Supreme Court’s ruling in California Public Employees’
    Retirement System (“CalPERS”) v. ANZ Securities, Inc., 
    137 S. Ct. 2042
     (2017), that Bright may
    no longer be good law. Because the court agrees with the government that Bright does not
    authorize tolling in this case, it has no occasion to rule on whether Bright remains good law.
    21
    The government argues that plaintiffs’ argument conflicts with the express holding
    in Bright which rejected the “contention that the filing of the original complaint satisfied
    the limitations requirement of section 2501 outright for all putative members of the
    class.” Bright, 
    603 F.3d at 1283
    . The holding in Bright, the government argues, extends
    only to cases where there was a motion and ruling on class certification.
    The court agrees with the government. Whereas here the plaintiffs never moved
    for ruling on their request for class certification in their prayer for relief, there was
    nothing more than a class complaint pending before the court and under the holding in
    Bright a class complaint is not sufficient to toll the statute of limitations. If by simply
    filing a class action complaint a party could unilaterally toll the statute of limitations and
    then have new parties join the litigation as though the new parties were opting into a class
    action without any court ruling on class certification, why would any party seek class
    certification before this court. Plaintiffs’ approach, if adopted, would create a major
    jurisdictional loophole and is thus rejected.12
    CONCLUSION
    For the forgoing reasons, the government’s motion to dismiss the additional
    plaintiffs’ claims first listed in the Third Amended Complaint as time-barred under RCFC
    12(b)(1) is GRANTED. The parties shall file a proposed draft order dismissing the
    additional plaintiffs whose claims are time-barred by the statute of limitations and file a
    12
    As discussed at the oral argument, the statute of limitations problem in this case is a problem
    of the plaintiffs’ own making. The plaintiffs were aware of Bright and the limits of its holding
    and had more than enough time to file an appropriate motion for class certification.
    22
    joint status report proposing a schedule for next steps for resolving the litigation. The
    plaintiff shall also file a Fifth Amended Complaint that reflects the court’s ruling in this
    opinion and identifies the remaining plaintiffs. The aforementioned draft order, joint
    status report, and amended complaint shall be filed by January 18, 2019.
    IT IS SO ORDERED.
    s/Nancy B. Firestone
    NANCY B. FIRESTONE
    Senior Judge
    23