Quanterion Solutions, Inc. v. United States ( 2021 )


Menu:
  •              In the United States Court of Federal Claims
    No. 21-493
    (Filed Under Seal: November 18, 2021)
    (Reissued: November 29, 2021)
    )
    QUANTERION SOLUTIONS, INC.,                )       Pre-award bid protest; SBA’s decision
    )       accepting a procurement into the 8(a)
    Plaintiff,                   )       program; “new work;” “price increase;”
    )       standing
    v.                                  )
    )
    UNITED STATES,                             )
    )
    Defendant,                   )
    )
    and                                 )
    )
    KAPILI SERVICES, LLC,                      )
    )
    Defendant-Intervenor.        )
    )
    Bret S. Wacker, Clark Hill PLC, Detroit, Michigan for plaintiff, Quanterion Solutions,
    Inc. With him on the briefs were J. Christopher White, Clark Hill PLC, Lansing, Michigan, and
    Evan A. Rossi, Rossi & Rossi, New York Mills, New York.
    Andrew Hunter, Trial Attorney, Commercial Litigation Branch, Civil Division, United
    States Department of Justice, Washington, D.C. for the United States. With him on the briefs
    were Brian M. Boynton, Acting Assistant Attorney General, and Martin F. Hockey, Jr., Acting
    Director, and L. Misha Preheim, Assistant Director, Commercial Litigation Branch, Civil
    Division, United States Department of Justice. Of counsel was Judith L. Richardson, Associate
    General Counsel, Defense Threat Reduction Agency.
    Damien C. Specht, Morrison & Foerster LLP, Washington, D.C. for defendant-
    intervenor, Kāpili Services, LLC. Of counsel were James A. Tucker and Alissandra D. Young,
    Morrison & Foerster LLP, Washington, D.C.
    OPINION AND ORDER 1
    LETTOW, Senior Judge.
    In this pre-award bid protest, Quanterion Solutions, LLC (“Quanterion”) challenges the
    Small Business Administration’s (“SBA”) determination that a proposed 8(a) contract involved
    new work, excusing SBA from the obligation to conduct an adverse impact analysis of
    Quanterion prior to accepting the requirement and proposed new awardee into the 8(a) program.
    Quanterion has filed a motion for judgment on the administrative record of SBA’s decision. See
    Pl.’s Mot., ECF No. 63. Both defendant, United States, and defendant-intervenor, Kāpili
    Services, LLC (“Kāpili”), have submitted cross-motions. See Def.’s Cross-Mot., ECF No. 69,
    and Def.-Int.’s Cross-Mot., ECF No. 68. The case is fully briefed, see Pl.’s Reply and Resp.,
    ECF No. 70; Def.’s Reply, ECF No. 71; Def.-Int.’s Reply, ECF No. 72, and a hearing was held
    November 3, 2021. For the reasons stated in this opinion, the court DENIES Quanterion’s
    motion and GRANTS the defendants’ cross-motions.
    BACKGROUND 2
    This bid protest involves the Defense Threat Reduction Agency (“DTRA” or “the
    agency”) and its Information Analysis Center (“DTRIAC”). The agency’s mission is to enable
    the Department of Defense and the United States government “to prepare for and combat
    weapons of mass destruction and improvised threats and to ensure nuclear deterrence.” AR 8-
    152. 3 The program conducted by DTRIAC “provide[s] timely electronic access to all nuclear
    weapons test data, legacy and current, to U.S. [g]overnment programs supporting U.S. [n]uclear
    [d]eterrent missions.” Id. The agency conducted market research in 2019 in anticipation of a
    new contract to continue the “[c]ore [o]perations” of an existing contract under the program
    (then performed by Quanterion), as well as to undertake two new initiatives within the
    1
    Because of the protective order entered in this case, this opinion was initially filed under
    seal. The parties were requested to review the decision and provide proposed redactions of any
    confidential or proprietary information. The resulting redactions are shown by elipses enclosed
    by brackets, e.g., “[***].”
    2
    The recitations that follow constitute findings of fact by the court from the
    administrative record of the procurement filed pursuant to Rule 52.1(a) of the Rules of the Court
    of Federal Claims (“RCFC”). See Bannum, Inc. v. United States, 
    404 F.3d 1346
    , 1356 (Fed. Cir.
    2005) (specifying that bid protest proceedings “provide for trial on a paper record, allowing fact-
    finding by the trial court”).
    3
    The administrative record filed with the court in accord with RCFC 52.1(a) is divided
    into tabs and is consecutively paginated. The record will be cited by tab and page, e.g., “AR
    ___-___.”
    2
    anticipated contract. 
    Id.
     As a result of this market research, the agency identified Kāpili, a
    Native-Hawaiian-Owned small business, which the agency intended to submit to SBA for
    acceptance into the 8(a) business development program. AR 9-169. 4
    The agency submitted a letter to SBA in June 2020, offering the new contract
    requirement, as well as Kāpili, into the 8(a) program and asserting that the proposed contract
    involved new work, obviating the need to assess whether awarding the contract to Kāpili would
    have an adverse impact on the incumbent, Quanterion. AR tab 11. After SBA failed to respond
    to the agency’s offer letter within five business days, the agency treated Kāpili as automatically
    accepted into the 8(a) program. AR 14-338; AR 14-345; AR 21-488. The agency publicly stated
    that it would award a sole-source, 8(a) contract, prompting Quanterion to contact the agency in
    July 2020 to inquire whether SBA had conducted an adverse impact analysis. AR 21-495 to 497.
    The agency responded that it was unaware of whether SBA had conducted an adverse impact
    analysis. AR 21-496.
    Within about a week of this exchange, DTRA contacted SBA to inquire whether an
    adverse impact analysis was necessary. AR 21-487 to 488. SBA responded by telephone, asking
    for the agency’s “offer letter, the [p]rogram [m]anager[’s] analysis of . . . new work, and the
    [agency’s] correspondence . . . with the incumbent.” AR 23-502. SBA clarified a few days later
    by email that DTRA could apply “the 25% rule” to determine whether the anticipated contract
    was new, but it expected “to see the 25% increase [in cost] stemming from new contract
    requirements that would involve meaningfully different capabilities or work.” AR 24-505. The
    agency responded that different capabilities or work accounted for at least 35% of the
    contemplated contract cost increase. AR 26-517.
    In August 2020, SBA formally responded to the agency’s request, indicating its
    acceptance of the new contract requirement and Kāpili into the 8(a) program on the ground that
    SBA had found no adverse impact to Quanterion (not on the ground that the agency advanced—
    that the contract requirement involved new work). AR 31-1076. In October 2020, the agency
    sent Kāpili a request for proposal for the anticipated contract. AR 39-1110. Kāpili in turn
    submitted its proposal to the agency in December 2020. AR 60b-5152.
    Quanterion filed a pre-award bid protest before the Government Accountability Office
    (“GAO”) in November 2020 challenging SBA’s decision. AR 45-4836. GAO dismissed
    plaintiff’s protest as untimely, AR 50-5097, after which Quanterion filed the protest currently
    before the court in January 2021, see Compl., ECF No. 1.
    4
    “Section 8(a) [of the Small Business Act] authorizes the Small Business Administration
    . . . to enter into procurement contracts with other federal agencies and to subcontract
    performance of these contracts to disadvantaged small businesses.” Infiniti Info. Sols., LLC v.
    United States, 
    92 Fed. Cl. 347
    , 349 (2010).
    3
    In connection with the pending protest, Kāpili contacted the agency in March 2021 to
    inform it that, as of January 1, 2021, Kāpili no longer qualified as small under the size standard
    applicable to the anticipated contract. AR 60d-5294. It averred, however, that it had met the
    applicable size standard when SBA accepted it into the 8(a) program in August 2020 and when it
    submitted its proposal to the agency in December 2020. 
    Id.
     It indicated that any action by the
    agency that resulted in a new 8(a) acceptance date would likely render Kāpili ineligible for the
    projected contract. 
    Id.
     Finally, Kāpili proposed changing the size standard to accommodate its
    new size or awarding the contract to one of its “8(a) sister firms.” AR 60d-5295.
    In the proceedings before the court, Quanterion filed a motion for judgment on the
    administrative record, see ECF No. 30, after which the government moved to remand the case to
    the SBA to reconsider its 8(a) acceptance decision. See Def.’s Mot. for Voluntary Remand, ECF
    No. 35. The government averred that SBA’s 8(a) acceptance “letter did not address the
    documentation and analysis provided by DTRA regarding the question of whether the program
    was ‘new’ within the meaning of SBA regulations.” Id. at 3. Instead, according to the
    government, SBA’s letter had stated that it had conducted an analysis and found no adverse
    impact against Quanterion. Id. The government asserted that SBA should have focused on
    whether the requirement was new, as indicated in the agency’s offer letter, and should not have
    conducted an adverse impact analysis. Id. The court ultimately granted the remand. See Order
    of April 20, 2021, ECF No. 40.
    On remand, SBA withdrew Kāpili’s acceptance into the 8(a) program. AR 57-5141. The
    agency submitted a new 8(a) offer letter to SBA, supported by detailed documentation explaining
    the types and cost of work performed under the existing Quanterion contract requirement and the
    contemplated Kāpili contract requirement. AR tab 60. Included was a detailed memorandum by
    the project manager that concluded that new work made up at least 35% of the increase in cost of
    the contemplated Kāpili contract. AR 60g-5406. Based on the agency’s documentation, SBA
    again accepted Kāpili into the 8(a) program, this time on the grounds that the contract involved
    new work and that no adverse impact analysis of Quanterion was required. AR 58-5143.
    STANDARDS FOR DECISION
    A. Motion for Judgment on the Administrative Record
    The standards of the Administrative Procedure Act (“APA”), 
    5 U.S.C. § 706
    , govern the
    court’s consideration of a protest of the government’s decisions regarding the award of a
    contract. See 
    28 U.S.C. § 1491
    (b)(4) (“In any action under this subsection, the courts shall
    review the agency’s decision pursuant to the standards set forth in section 706 of title 5.”).
    Under the APA, the court may set aside a government procurement decision that is “arbitrary,
    capricious, an abuse of discretion, or otherwise not in accordance with law,” 
    5 U.S.C. § 706
    (2)(A), subject to the traditional balancing test applicable to a grant of equitable relief, see
    4
    PGBA, LLC v. United States, 
    389 F.3d 1219
    , 1224-28 (Fed. Cir. 2004); Hyperion, Inc. v. United
    States, 
    115 Fed. Cl. 541
    , 550 (2014). “The focal point for judicial review should be the
    administrative record already in existence, not some new record made initially in the reviewing
    court.” Florida Power & Light Co. v. Lorion, 
    470 U.S. 729
    , 743 (1985) (brackets omitted)
    (quoting Camp v. Pitts, 
    411 U.S. 138
    , 142 (1973)).
    The court may not “substitute its judgment for that of the agency,” Hyperion, 115 Fed.
    Cl. at 550 (quoting Keeton Corrs., Inc. v. United States, 
    59 Fed. Cl. 753
    , 755 (2004) (in turn
    quoting Citizens to Preserve Overton Park, Inc. v. Volpe, 
    401 U.S. 402
    , 416 (1971), abrogated
    on other grounds as recognized in Califano v. Sanders, 
    430 U.S. 99
    , 105 (1977))), but “must
    uphold an agency’s decision against a challenge if the ‘contracting agency provided a coherent
    and reasonable explanation of its exercise of discretion,’” 
    id.
     (quoting Axiom Res. Mgmt., Inc. v.
    United States, 
    564 F.3d 1374
    , 1381 (Fed. Cir. 2009)). This is so even if the clarity of the
    agency’s decision is “less than ideal,” so long as “the agency’s path may reasonably be
    discerned.” Federal Commc’ns Comm’n v. Fox Television Stations, Inc., 
    556 U.S. 502
    , 513-14
    (2009) (quoting Bowman Transp., Inc. v. Arkansas-Best Freight Sys., Inc., 
    419 U.S. 281
    , 286
    (1974)). “‘[T]he deference afforded to an agency’s decision must be even greater when a trial
    court is asked to review a technical evaluation’ because of the highly specialized, detailed, and
    discretionary analyses frequently conducted by the government.” CSC Gov’t Sols. LLC v. United
    States, 
    129 Fed. Cl. 416
    , 434 (2016) (quoting L-3 Commc’ns EOTech, Inc. v. United States, 
    83 Fed. Cl. 643
    , 650 (2008)) (additional citations omitted).
    The court may overturn the government’s procurement decision only “if ‘(1) the
    procurement official’s decision lacked a rational basis; or (2) the procurement procedure
    involved a violation of regulation or procedure.’” Centech Grp., Inc. v. United States, 
    554 F.3d 1029
    , 1037 (Fed. Cir. 2009) (quoting Impresa Construzioni Geom. Domenico Garufi v. United
    States, 
    238 F.3d 1324
    , 1332 (Fed. Cir. 2001)). In conducting the rational-basis analysis, the
    court looks to “whether the contracting agency provided a coherent and reasonable explanation
    of its exercise of discretion,” Axiom, 
    564 F.3d at 1381
     (quoting Impresa Construzioni, 
    238 F.3d at 1333
    ), and affords “contracting officers . . . discretion upon a broad range of issues,”
    AgustaWestland N. Am., Inc. v. United States, 
    880 F.3d 1326
    , 1332 (Fed. Cir. 2018) (quoting
    Impresa Construzioni, 
    238 F.3d at 1332-33
    ). Accordingly, “the disappointed bidder bears a
    heavy burden of showing that the award decision had no rational basis.” Centech, 
    554 F.3d at 1037
     (quoting Impresa Construzioni, 
    238 F.3d at 1332-33
    ). Protests alleging a violation of
    regulation or procedure “must show a clear and prejudicial violation.” Axiom, 
    564 F.3d at 1381
    (quoting Impresa Construzioni, 
    238 F.3d at 1333
    ).
    B. Standing
    The plaintiff has the burden of establishing standing to bring a bid protest. See Myers
    Investigative & Sec. Servs., Inc. v. United States, 
    275 F.3d 1366
    , 1369 (Fed. Cir. 2002) (quoting
    5
    Lujan v. Defenders of Wildlife, 
    504 U.S. 555
    , 561 (1992)). “A party seeking to establish
    jurisdiction under § 1491(b)(1) must show that it meets § 1491(b)(1)’s standing requirements,
    which are ‘more stringent’ than the standing requirements imposed by Article III of the
    Constitution.” Diaz v. United States, 
    853 F.3d 1355
    , 1358 (Fed. Cir. 2017) (quoting Weeks
    Marine, Inc. v. United States, 
    575 F.3d 1352
    , 1359 (Fed. Cir. 2009)). To satisfy these more
    stringent requirements, a plaintiff must show that it is an “interested party,” see Digitalis Educ.
    Sols., Inc. v. United States, 
    664 F.3d 1380
    , 1384 (Fed. Cir. 2012) (quoting Rex Serv. Corp. v.
    United States, 
    448 F.3d 1305
    , 1307 (Fed. Cir. 2006)), and “that it was prejudiced by a significant
    error in the procurement process,” Labatt Food Serv., Inc. v. United States, 
    577 F.3d 1375
    , 1378
    (Fed. Cir. 2009) (citing JWK Int’l Corp. v. United States, 
    279 F.3d 985
    , 988 (Fed. Cir. 2002)).
    An interested party is an “actual or prospective bidder[] or offeror[] whose direct
    economic interest would be affected by the award of the contract or by the failure to award the
    contract.” Weeks Marine, 575 F.3d at 1359 (quoting American Fed’n of Gov’t Emps. v. United
    States, 
    258 F.3d 1294
    , 1302 (Fed. Cir. 2001)). To have a direct economic interest, the plaintiff
    must show that it had a substantial chance of winning the contract. See Digitalis, 664 F.3d at
    1384. An interested party suffers prejudice from a significant procurement error when “but for
    the error, it would have had a substantial chance of securing the contract.” CliniComp Int’l, Inc.
    v. United States, 
    904 F.3d 1353
    , 1358 (Fed. Cir. 2018) (emphasis omitted) (quoting Labatt, 
    577 F.3d at 1378
    ); see also Red Cedar Harmonia, LLC v. United States, 
    144 Fed. Cl. 11
    , 21 (2019),
    aff’d, 
    840 Fed. Appx. 529
     (2020). The prejudice inquiry and the economic-interest inquiry must
    not be conflated—“an error [may be] non-prejudicial to an economically interested offeror.”
    CliniComp, 904 F.3d at 1358 (quoting Labatt, 
    577 F.3d at 1379-80
    ); see also Veteran Shredding,
    LLC v. United States, 
    140 Fed. Cl. 759
    , 765 (2018) (“Despite the potential relevance of prejudice
    in determining substantial chance, direct economic interest should still be evaluated separately
    from prejudice.”). “[A] party cannot be prejudiced unless it first has a substantial chance of
    [obtaining the] award.” Veteran Shredding, 140 Fed. Cl. at 765.
    ANALYSIS
    Quanterion’s bid protest is governed primarily by the Code of Federal Regulations
    applicable to SBA’s 8(a) program. “A procuring activity contracting officer indicates his or her
    formal intent to award a procurement requirement as an 8(a) contract by submitting a written
    offering letter to SBA.” 
    13 C.F.R. § 124.502
    (a). “Upon receipt of the procuring activity’s offer
    of a procurement requirement, SBA will determine whether it will accept the requirement for the
    8(a) [business development (‘BD’)] program.” 
    13 C.F.R. § 124.503
    (a). “Where SBA decides to
    accept an offering of a sole source 8(a) procurement, SBA will accept the offer both on behalf of
    the 8(a) BD program and in support of a specific Participant. As part of its acceptance of a sole
    source requirement, SBA will determine the eligibility of the Participant identified in the offering
    letter, using the same analysis set forth in § 124.501(g).” 
    13 C.F.R. § 124.503
    (a)(1). “Before a
    6
    Participant may be awarded . . . a sole source . . . 8(a) contract, SBA must determine that the
    Participant is eligible for award.” 
    13 C.F.R. § 124.501
    (g).
    Quanterion’s protest centers on the determination to admit Kāpili into the 8(a) program,
    i.e., to consider the requirement and the proposed 8(a) participant eligible for the 8(a) program.
    Plaintiff’s arguments fall into two categories: challenges to SBA’s decision to treat the proposed
    requirement as comprising new work and challenges to SBA’s decision regarding Kāpili’s
    eligibility, specifically its size.
    A. Adverse Impact Exception for New Work
    “SBA will not accept a procurement for award as an 8(a) contract if,” among other
    circumstances, “SBA has made a written determination that acceptance of the procurement for
    8(a) award would have an adverse impact on an individual small business.” 
    13 C.F.R. § 124.504
    (c). “[A]dverse impact does not apply to ‘new’ requirements. A new requirement is
    one which has not been previously procured by the relevant procuring activity.” 
    13 C.F.R. § 124.504
    (c)(1)(ii). Notably, “[t]he expansion or modification of an existing requirement may be
    considered a new requirement where the magnitude of change is significant enough to cause a
    price adjustment of at least 25 percent (adjusted for inflation) or to require significant additional
    or different types of capabilities or work.” 
    13 C.F.R. § 124.504
    (c)(1)(ii)(C).
    The court addresses the parties’ threshold dispute concerning new work under §
    124.504(c)(1)(ii)(C). Citing a recent GAO decision, Quanterion asserts that the regulation must
    be read in the conjunctive, i.e, that magnitude of change of at least 25% must come from
    significant additional or different types of capabilities or work. Pl.’s Mot. at 37 (citing Eminent
    IT, LLC, B-418570, 2020 CPD ¶ 222, 
    2020 WL 4260503
     (Comp. Gen. June 23, 2020)). The
    government and Kāpili counter that the correct reading of the regulation is in the disjunctive, i.e.,
    that either a price adjustment of 25% or additional or different types of capabilities or work may
    independently constitute new work. Def.’s Cross-Mot. at 10; Def.-Int.’s Cross-Mot. at 4; see
    also Hr’g Tr. 28:24 to 29:9 (Nov. 3, 2021); Hr’g Tr. 40:17 to 25. 5 In its recently promulgated
    definition of a “follow-on requirement or contract,” SBA acknowledged that the expansion or
    modification concept is disjunctive, 
    13 C.F.R. § 124.3
     (“As a general guide, if the procurement
    satisfies at least one of these . . . conditions, it may be considered a new requirement.”);
    however, SBA has expressed its preference against a strict, disjunctive approach focused on the
    25% element of the rule in favor of a conjunctive approach that deemphasizes the 25% element
    of the rule, see 
    13 C.F.R. § 124.3
     (“However, meeting any one of these conditions is not
    dispositive that a requirement is new. In particular, the 25 percent rule cannot be applied rigidly
    in all cases.”); see also Consolidation of Mentor-Protege Programs and Other Government
    Contracting Amendments, 
    85 Fed. Reg. 66188
     (Oct. 16, 2020) (“Amend § 124.504 by . . .
    5
    The date will be omitted from further citations to the transcript of the hearing held on
    November 3, 2021.
    7
    [r]emoving the word ‘will’ and adding in its place ‘may’ in paragraph (c)(1)(ii)(C).”); AccelGov,
    LLC v. United States, __ Fed. Cl. __, No. 21-1647C, 
    2021 WL 4808039
    , at *7-8 (Sep. 30, 2021)
    (“In 2020, the SBA amended the regulation to ensure a twenty-five percent price variance would
    not be dispositive.” (citing 
    85 Fed. Reg. 66188
    )). It is apparent, moreover, from the
    administrative record that SBA informed DTRA that § 124.504(c)(1)(ii)(C) was to be read in the
    conjunctive. See AR 24-505 (emails between SBA and DTRA stating the requirement in the
    conjunctive). The court will therefore decline the parties’ invitation to read
    § 124.504(c)(1)(ii)(C) as strictly disjunctive or conjunctive. To do so is unnecessary both
    because of SBA’s regulations and—as defendants aver, see Def.’s Cross-Mot. at 10-11, 28; Def.-
    Int.’s Mot. at 10-12—because the new requirement would pass muster under either the
    disjunctive or conjunctive reading of the regulation.
    Turning to the parties’ arguments, Quanterion contends that SBA’s decision to readmit
    the requirement and Kāpili into the 8(a) program was procedurally irrational because SBA’s
    acceptance letter lacks any explanation as to how or why it concluded that the Kāpili contract
    comprises new work, see Pl.’s Mot. at 29-31, and because it provides summary conclusions
    instead of reasoned explanation, see id. at 31. Namely, SBA’s second acceptance decision,
    according to plaintiff, lacks any discussion, analysis, or explicit adoption of DTRA’s document
    submissions, as well as applicable regulations. Id. at 31-32. The government counters that
    SBA’s decision to admit the new requirement and Kāpili into the 8(a) program was not arbitrary
    and capricious for failure to explain its reasoning because SBA necessarily relied upon the
    agency’s “considered analysis of its own requirement.” Def.’s Cross-Mot. at 9, 28-29.
    Alternatively, defendant avers that the administrative record provides sufficient support for
    DTRA’s decision even if the court considers SBA’s second acceptance decision insufficiently
    detailed or explained. Id. at 9, 29-30. Kāpili, as defendant-intervenor, adds that Quanterion’s
    argument boils down to a disagreement with “DTRA’s technical judgment and the SBA’s
    acceptance of the requirements into the 8(a) program,” which decisions are entitled to deference
    because of DTRA’s expertise in the existing and new contract requirements. Def.-Int.’s Cross-
    Mot. at 5-6.
    The court concurs with the government and Kāpili that SBA’s second acceptance letter
    reasonably implies that SBA reviewed, relied on, and agreed with DTRA’s documentary
    submissions. Compare AR 58-5143 (“The offer letter indicates that this is a new 8(a)
    requirement.”) (emphasis added), with id. (explaining that no adverse impact analysis was
    conducted “based upon the procurement history revealed in the offer letter”) (emphasis added). 6
    6
    Quanterion acknowledges SBA’s reliance on DTRA’s documentary submissions in its
    motion for judgment. See Pl.’s Mot. at 41 (“The SBA failed in its responsibility to obtain a
    complete record through ordinary due diligence, and instead blindly accepted DTRA’s
    unsubstantiated claims and presentations created in response to [Quanterion’s] challenge to the
    acceptance of the Proposed Requirement into the 8(a) BD Program.” (emphasis added)).
    Notably, the regulatory framework for offering a potential 8(a) contract requirement and
    8
    While the clarity of SBA’s second offer letter may be “less than ideal,” the court has no
    difficulty discerning “the agency’s path” from DTRA’s submissions to SBA’s acceptance
    decision. Fox, 
    556 U.S. at 513-14
    . From this inference, the court looks to the administrative
    record to determine whether DTRA’s documents provide “a coherent and reasonable
    explanation” of its conclusion that the contemplated Kāpili contract consisted of new or
    substantially different work under 
    13 C.F.R. § 124.504
    (c)(1)(ii)(C). Hyperion, 115 Fed. Cl. at
    550. 7
    DTRA’s submissions first establish the value of the Quanterion contract at $25.37
    million, adjusted for inflation at $30.60 million, and converted from an 81-month period of
    performance to a 60-month (five-year) period of performance to match the new contract
    requirement at $22.66 million. AR 60g-5416. The agency’s documents explain how these
    figures were calculated. AR 60g-5418 (listing executed task orders under the Quanterion
    contract, total cost, periods of performance, and sources of funding); AR 60g-5409 (adjusting the
    initial contract value “based on an estimated inflation factor of 21% for total inflation from 2015
    (middle of the 2014 IDIQ [p]eriod of [p]erformance [(the Quanterion contract)]) to 2023 (middle
    of the FY21-26 [period of performance (the Kāpili contract)])”); AR 60g-5409 n.14 (explaining
    calculation of inflation rate). The DTRA submissions then establish the value of the
    participant to SBA places the burden on the procuring agency, which implies that SBA is
    permitted to rely on the submissions that the regulation requires the agency to produce. See 
    13 C.F.R. § 124.502
     (outlining the agency’s responsibilities regarding its offering letter to SBA);
    see also MCB Lighting & Elec., B-406703, 2012 CPD ¶ 206, 
    2012 WL 2878575
    , at *3 (Comp.
    Gen. Jul. 13, 2012) (“As a general matter, the SBA is entitled to rely on a contracting agency’s
    representations in making decisions regarding 8(a) acquisitions, and SBA’s regulations place
    primary responsibility on the procuring agency to submit all relevant information necessary to
    SBA’s decision-making process.”).
    7
    In its motion for judgment and at a hearing before the court on November 3, 2021,
    Quanterion urged a narrow review of the administrative record limited to a line-by-line
    comparison of its performance work statement and the performance work statement for the
    anticipated Kāpili contract. Pl.’s Mot. at 36-37; Hr’g Tr. 14:2 to 9. Plaintiff contends that this
    limited record review proves that the Quanterion and Kāpili contract requirements are “nearly
    identical.” Pl.’s Mot. at 37. The court rejects plaintiff’s notion that administrative review should
    not include the entire administrative record. See 
    5 U.S.C. § 706
     (“[T]he court shall review the
    whole record.”). At bottom, Quanterion’s request that the court limit its review to the
    performance work statements is an invitation to substitute its own judgment for that of the
    procuring officials at DTRA, something the court is not permitted to do. See Hyperion, 115 Fed.
    Cl. at 550. While the court is obliged to compare performance work statements as part of its
    review of the administrative record, see, e.g., AccelGov, ___ Fed. Cl. at ___; 
    2021 WL 4808039
    ,
    at *8-9, it will not consider that segment of the record to be uniquely pertinent, especially where
    there is no regulatory requirement for the agency to submit such statements with its offer letter to
    SBA, see 
    13 C.F.R. § 124.502
     (listing required contents of offer letter, without mentioning
    performance work statements).
    9
    contemplated contract to Kāpili at [***] million, while also explaining the sources used in
    forming the basis for this calculation and adjustments for inflation. AR 60g-5420 (listing labor
    categories and total cost based on a cross-referenced internal government cost estimate (“IGCE”)
    prepared for the proposed acquisition); AR 60g-5411 (“The IGCE assumed a constant 3% year-
    over-year inflation rate for FY21 through FY26. As such the 5-year (60-month) totals shown in
    Table 3 are effectively in FY23 dollars (the middle of the 5-year [period of performance]). The
    loading factors and fee rates used in the IGCE were based on the vendor proposals for [Task
    Orders] 0001 and HDTRA1-19-F-0079. The labor mix, subcontractor costs, and other direct
    costs (ODCs) were based on the Performance Work Statement (PWS), Quality Assurance
    Surveillance Plan (QASP), and Contract Delivery Requirements Lists (CDRLs) prepared for the
    acquisition.”) (footnotes omitted). Under a disjunctive reading of § 124.504(c)(1)(ii)(C), the
    proposed contract requirement would constitute new work because the price adjustment would
    amount to [***] of the cost of the existing requirement, well exceeding the 25% requirement.
    See AR 60g-5417 (“When compared to the 2014 IDIQ 5-year [period of performance] baseline
    ($22.66M), this ‘price adjustment’ (+[***] over the baseline) increases to +[***].”).
    The documents also provide a rational basis for the determination that the new contract
    requirement consisted of a price adjustment greater than 25% due to new or different types of
    work under the conjunctive reading of § 124.504(c)(1)(ii)(C). After demonstrating the value of
    the existing and new requirements, DTRA’s submissions describe the nature of the performance
    areas under the Kāpili contract as “Core Operations,” “The Nuclear Information Analysis
    Center,” and “The Advanced Search and Discovery Program.” AR 60g-5410. The documents
    explain that,
    [Core Operation] tasks and scope are similar for both the 2014 IDIQ [(the
    Quanterion contract)] and FY21-26 Requirements [(the Kāpili contract)]. [Nuclear
    Information Analysis Center] tasks contain a mixture of tasks similar to the existing
    requirement but also require[] some tasks and skills that are substantially different
    from those required for the 2014 IDIQ. Effort under both of these Program Areas
    is to be increased under the FY21-26 Requirement. The [Advanced Search and
    Discovery] R&D Program Area is fully new for FY21-26, requiring new
    capabilities and work.
    AR 60g-5410. The submitted materials then analyze, line by line, the types of work required
    under the existing and new requirements, demonstrate where tasks are the same, mixed, or
    entirely new, and indicate the percentage cost of new work under the projected Kāpili contract
    compared to the Quanterion contract. AR 60g-5421 to 5428. The documents conclude that
    “[t]he estimated cost of the [Advanced Search and Discovery] tasks represent a ‘price
    adjustment’ of +[***] relative to the inflation-adjusted, total cost ($30.60M) of the 2014 IDIQ
    [(the Quanterion contract)]. When compared to the 2014 IDIQ 5-year [period of performance]
    baseline ($22.66M), this . . . ‘price adjustment’ increase to +[***].” AR 60g-5417.
    10
    The court reviews the administrative record to ascertain whether SBA had a rational basis
    for accepting the requirement and Kāpili into the 8(a) program. Centech, 
    554 F.3d at 1037
    . The
    dispositive question is whether the record provides a coherent and reasonable explanation for the
    challenged decision. Hyperion, 115 Fed. Cl. at 550. The submissions described above provide
    the court with the requisite line of reasoning. DTRA envisioned a contract similar to
    Quanterion’s but with two additional performance areas of mixed or entirely new work. The
    documentation is coherent and detailed. The court cannot adopt Quanterion’s position that SBA
    acted arbitrarily or capriciously in deferring to DTRA’s detailed and documented analysis of the
    existing and new requirements without substituting its own judgment for that of the agency.
    Quanterion also raises a substantive disagreement with SBA’s decision to admit the
    requirement and Kāpili into the 8(a) program. Namely, it urges that DTRA’s submissions to
    SBA erred in determining that plaintiff had not performed certain work categories under the
    existing requirement, such as machine learning-related tasks, and that informal, internal agency
    communications referring to the new requirement as a “follow-on” contract disprove the
    agency’s representations to SBA that the requirement included new types of work. Pl.’s Mot. at
    33-41. 8 These other arguments against SBA’s determination ask the court to substitute its
    judgment for that of the agency’s procurement personnel who, unlike the court, have direct
    knowledge of the existing and new contracts and are therefore more qualified to make the
    assessment detailed above. See Terex Corp. v. United States, 
    104 Fed. Cl. 525
    , 532 (2012)
    8
    Similarly, Quanterion raises a variety of cost-related arguments, reiterating its earlier
    contentions either that, procedurally, SBA irrationally relied upon DTRA’s document
    submissions or that, substantively, the total cost increase of the new requirement did not exceed
    25% of the existing requirement and include new work. Pl.’s Mot. at 42-47. For example,
    plaintiff invokes the internal government cost estimate included in DTRA’s second offer letter to
    SBA to argue that SBA failed to take “[a] close look” at the agency’s cost estimate, id. at 44,
    engaged in a “mistaken analysis” of the new requirement’s cost estimate, id. at 46, did not
    “conduct proper diligence” in reviewing the cost estimate, id., and “failed to properly engage
    with the available precedent” applicable to the cost estimate, id. at 47. On these bases,
    Quanterion avers that SBA should have rejected the agency’s cost estimate, applied hypothetical
    surge pricing to Quanterion’s contract to match the surge pricing estimated on the new
    requirement, and conducted its own cost analysis of the proposed Kāpili contract, to conclude
    that the new requirement was only minimally more expensive than the existing requirement. Id.
    at 43-46; see also Pl.’s Reply at 24 (arguing that the agency’s submissions to SBA failed to
    “substantiate” DTRA’s “estimate as reflective of the actual true cost of the contract, to describe
    which work is ‘new’ or ‘meaningfully different’ based on [the proposed performance work
    statement], or how the [estimated] ‘surge options’ are not just more of the same work performed
    by QSI.”). As explained supra, SBA was entitled to rely on DTRA’s assessment, so long as
    there was a coherent explanation in the record. See Centech, 
    554 F.3d at 1037
    . Even if the court
    treated Quanterion’s cost arguments as independent protest grounds, procedural errors in
    estimating cost fail to demonstrate that the new requirement did not contemplate new types of
    work. Without that, plaintiff cannot show any prejudice in the agency’s cost estimate or internal
    budgeting processes. See, infra, at 13-14.
    11
    (“[W]here the resolution of an issue ‘requires a high level of technical expertise,’ it is ‘properly
    left to the informed discretion of the responsible federal agencies.’” (quoting Kleppe v. Sierra
    Club, 
    427 U.S. 390
    , 412 (1976))). In this instance, the court defers—as SBA did—to the
    procuring agency’s technical expertise as to the nature of its research and development
    requirements under the Advanced Search and Discovery program area, as it is coherently and
    reasonably explained in the record. See Alabama Aircraft Indus., Inc.-Birmingham v. United
    States, 
    586 F.3d 1372
    , 1375 (Fed. Cir. 2009) (requiring deference to an agency’s decision if,
    among other things, it is not “so implausible that it could not be ascribed to a difference in view
    or the product of agency expertise” (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto.
    Ins. Co., 
    463 U.S. 29
    , 43 (1983))). Quanterion’s arguments against the merits of SBA’s and
    DTRA’s conclusions only amount to a second plausible reading of the administrative record and
    would not satisfy plaintiff’s “heavy burden of showing that the award decision had no rational
    basis.” Centech, 
    554 F.3d at 1037
    .
    The level of deference owed in the context of an 8(a) procurement is considerable. Data
    Transformation Corp. v. United States, 
    13 Cl. Ct. 165
    , 173 (1987) (“Judicial intrusion into the
    procurement process is generally infrequent, limited and circumspect. The discretion inherent in
    the section 8(a) contractor selection process requires even greater judicial restraint.” (internal
    citations omitted)). In light of this level of deference, and the thoroughness and rationality of the
    agency’s explanation, Hyperion, 115 Fed. Cl. at 550, the court upholds SBA’s determination that
    the anticipated Kāpili contract consisted of new or substantially different types of work. SBA
    was therefore excused under 
    13 C.F.R. § 124.504
    (c)(1)(ii)(C) from conducting an adverse impact
    analysis on Quanterion prior to accepting the new requirement and Kāpili into the 8(a) program.
    B. Size Eligibility of Proposed 8(a) Participant
    SBA has a duty to verify a proposed 8(a) participant’s size eligibility. “Eligibility is
    based on 8(a) BD program criteria, including whether the Participant,” among other conditions,
    “[q]ualifies as a small business under the size standard corresponding to the [North American
    Industry Classification System (“NAICS”)] code assigned to the requirement.” 
    13 C.F.R. § 124.501
    (g)(1). SBA’s duty to verify a proposed participant’s size is reiterated in 
    13 C.F.R. § 124.503
    (c): “SBA will determine whether an appropriate match exists where the procuring
    activity identifies a particular Participant for a sole source award. . . . Once SBA determines
    that a procurement is suitable to be accepted as an 8(a) sole source contract, SBA will normally
    accept it on behalf of the Participant recommended by the procuring activity, provided that . . .
    [t]he Participant is small for the size standard corresponding to the NAICS code assigned to the
    requirement by the procuring activity contracting officer.”
    Quanterion makes two size-related arguments against SBA’s decision to admit the new
    requirement and Kāpili into the 8(a) program. First, it asserts that SBA’s decision was
    procedurally deficient because SBA did not conduct a second size determination on remand.
    12
    Pl.’s Mot. at 25-26. Second, it contends that SBA’s decision was substantively deficient because
    Kāpili, by its own admission, is no longer a small business under the NAICS code that applies to
    the challenged procurement. Pl.’s Mot. at 27-28. The government counters that Quanterion
    lacks standing to challenge Kāpili’s size eligibility because Quanterion is not an 8(a) participant
    and that controlling regulations do not require the SBA to conduct a second size determination.
    Def.’s Cross-Mot. at 39-43. Kāpili’s arguments are materially identical. Def.-Int.’s Cross-Mot.
    at 21-30.
    The parties dispute the timing of SBA’s obligation to verify a proposed participant’s size
    eligibility. Quanterion cites 
    13 C.F.R. § 124.501
    (g) (“SBA will determine eligibility at the time
    of its acceptance of the underlying requirement into the 8(a) BD program for a sole source 8(a)
    contract.”). Pl.’s Mot. at 25-26. It argues that because SBA withdrew its acceptance of the
    requirement and Kāpili into the 8(a) program on remand, this regulation required a new size
    verification before reaccepting both into the program. 
    Id.
     Had SBA done so, plaintiff contends,
    Kāpili would have been disqualified because, as it acknowledged, it no longer meets the size
    standard applicable to the new requirement. 
    Id.
    The government and Kāpili counter with 
    13 C.F.R. § 121.404
    (a) (“SBA determines the
    size status of a concern, including its affiliates, as of the date the concern submits a written self-
    certification that it is small to the procuring activity as part of its initial offer or response which
    includes price.”), and 
    13 C.F.R. § 121.603
    (a) (“A[n] 8(a) BD Participant must certify that it
    qualifies as a small business under the NAICS code assigned to a particular 8(a) BD subcontract
    as part of its initial offer including price to the procuring agency. The Participant also must
    submit a copy of its offer, including its self-certification as to size, to the appropriate SBA
    district office at the same time it submits the offer to the procuring agency.”). Def.’s Cross-Mot.
    at 41; Def.-Int.’s Cross-Mot. at 25. They argue that Kāpili’s size certification, submitted with its
    offer in December 2020, was still valid after SBA’s adoption on remand, obviating the need to
    reverify its size upon reacceptance. Def.’s Cross-Mot. at 41-42 Def.-Int.’s Cross-Mot. at 28-29;
    see also 
    13 C.F.R. § 121.603
    (c)(1) (“Where SBA verifies that the selected Participant is small
    for a particular procurement, subsequent changes in size up to the date of award . . . will not
    affect the firm’s size status for that procurement.”).
    For purposes of Quanterion’s bid protest, if defendants’ contention prevailed, and the
    court applied 
    13 C.F.R. §§ 121.404
    (a) and 121.603(a) and (c), there would be no error, and,
    therefore, no prejudice to Quanterion. Alternatively, if Quanterion’s argument prevailed, and the
    court applied 
    13 C.F.R. § 124.501
    (g) the way that plaintiff proposes, there would be a procedural
    error but no harm to Quanterion. Though Quanterion would have prevailed in challenging
    SBA’s size verification, ostensibly removing Kāpili from consideration now that it has surpassed
    the applicable size standard, the proposed requirement would still consist of new work that
    would permit DTRA to resubmit it to the 8(a) program with any other eligible 8(a) participant.
    The court does not, by this reasoning, decide the merit of defendants’ shared contention that
    13
    SBA could use the substitution mechanism of 
    13 C.F.R. § 124.503
    (e) to replace Kāpili with the
    other potential 8(a) contractor that DTRA had identified during market research. Def.’s Cross-
    Mot. at 40-41; Def.-Int.’s Cross-Mot. at 24-25. The court, instead, notes that because SBA made
    a rationally supported decision that the requirement involved new work, the requirement would
    still involve new work even if the court remanded the case for a subsequent procedural error,
    effectively precluding Quanterion from showing a substantial chance of obtaining an award. See
    Axiom, 
    564 F.3d at 1381
     (requiring that plaintiff “must show a clear and prejudicial violation” to
    prevail on a violation of regulation or procedure (emphasis added)); Digitalis, 664 F.3d at 1384
    (requiring showing that plaintiff had a substantial chance of winning the contract); Veteran
    Shredding, 140 Fed. Cl. at 765 (“[A] party cannot be prejudiced unless it first has a substantial
    chance of [obtaining the] award.”).
    The court therefore rejects Quanterion’s challenge of SBA’s size verification process in
    its decision to reaffirm the requirement and admit Kāpili into the 8(a) program.
    CONCLUSION
    For the foregoing reasons, Quanterion’s motion for judgment on the administrative record
    is DENIED, and defendant’s and defendant-intervenor’s motions for judgment on the
    administrative record are GRANTED.
    The Clerk shall enter judgment in accord with this disposition.
    No costs.
    It is so ORDERED.
    s/ Charles F. Lettow
    Charles F. Lettow
    Senior Judge