    In the United States Court of Federal Claims
    Sub-Master Docket No. 17-9001L
    (Filed: October 28, 2022)
    **********************************           )     Taking via government-induced flooding
    IN RE UPSTREAM ADDICKS AND                   )     of private property; post-trial decision on
    BARKER (TEXAS) FLOOD-                        )     just compensation for six bellwether
    CONTROL RESERVOIRS                           )     plaintiffs; text of flowage easement to be
    )     filed in pertinent title records of affected
    **********************************           )     properties
    THIS DOCUMENT APPLIES TO:                    )
    )
    ALL UPSTREAM CASES                           )
    )
    **********************************           )
    Daniel H. Charest and E. Lawrence Vincent, Burns Charest LLP, Dallas, Texas, Charles
    Irvine, Irvine & Conner PLLC, Houston, Texas, and Edwin Armistead Easterby, Williams Hart
    Boundas Easterby, P.C., Houston, Texas, Co-Lead Counsel for Upstream Plaintiffs. With them
    at trial were Vuk. S. Vujasinovic, VB Attorneys, PLLC, Houston Texas, Lawrence G. Dunbar,
    Dunbar Barder, PLLC, Houston, Texas, and Amanda Klevorn, Burns Charest LLP, Dallas,
    Texas.
    Kristine S. Tardiff, Trial Attorney, Environment & Natural Resources Division, United
    States Department of Justice, Concord, New Hampshire. With her at trial and on the briefs were
    Laura W. Duncan, Environment & Natural Resources Division, United States Department of
    Justice, Galveston, Texas, Frances B. Morris, Samuel R. Vice, and Frank Singer, Trial Attorneys,
    Environment & Natural Resources Division, United States Department of Justice, Washington,
    D.C. With them at trial was James Purcell, United States Army Corps of Engineers, Galveston,
    Texas. With them at closing arguments was David Harrington, Trial Attorney, United States
    Department of Justice, Washington, D.C.
    OPINION AND ORDER
    LETTOW, Senior Judge.
    At issue are the financial consequences of flooding of private property located “upstream
    of the federally designed, built, and maintained Addicks and Barker Dams” and “within the
    Addicks and Barker Reservoirs;” that occurred when Tropical Storm Harvey (“Harvey”) “doused
    Houston with an average of 33.7 inches of rain over a four-day period” in August 2017. In re
    Upstream Addicks & Barker (Texas) Flood-Control Reservoirs, 
    146 Fed. Cl. 219
    , 227 (2019). After
    Harvey, “hundreds of owners of ‘upstream’ properties,” including the bellwether plaintiffs here,
    brought suit against the United States, claiming that its operation of the Addicks and Barker
    Dams resulted in “the government-controlled inundation of their properties” by Harvey
    floodwater and constituted an uncompensated taking. 
    Id. at 227-28
    . The Harvey flooding cases
    were initially consolidated into a single Master Docket for plaintiffs both upstream and
    downstream of the Addicks and Barker Dams. The Master Docket was subsequently divided
    into separate sub-master dockets for upstream and downstream properties. 
    Id. at 228
    . The
    upstream cases were further bifurcated into liability and damages phases, and discovery on
    liability proceeded with a focus on thirteen bellwether plaintiffs. 
    Id.
     Following disposition of
    motions, the case proceeded to a 10-day trial in May 2019 in Houston on the issue of liability.
    
    Id.
    Thereafter, “the court found the United States liable to thirteen bellwether property
    owners under the Fifth Amendment of the United States Constitution for the taking of a non-
    categorical, permanent flowage easement on their properties as a result of government-induced
    flooding during Tropical Storm Harvey, produced by the government’s construction,
    maintenance, and operation of the Addicks and Barker Dams.” In re Upstream Addicks & Barker,
    
    148 Fed. Cl. 274
    , 275 (2020) (citing In re Upstream Addicks & Barker, 
    146 Fed. Cl. 219
    ).
    With that decision in hand, the cases moved to discovery on just compensation. Of the
    thirteen test property plaintiffs at issue in the liability trial, the properties of six test plaintiffs
    were chosen for the just compensation phase. In re Upstream Addicks & Barker, 148 Fed. Cl. at
    275. The covid pandemic delayed trial preparations, but the necessary work was nonetheless
    completed and trial was held in Houston, Texas from May 31 to June 10, 2022. Post-trial
    briefing was undertaken, and a closing hearing was held on September 29, 2022. This decision
    follows.
    FACTS 1
    A. Tropical Storm Harvey, Flooding, and the Liability Trial
    Factual circumstances were critical to the court’s liability determination. First, in
    response to a series of serious storms in the first half of the twentieth century, the United States
    Army Corps of Engineers (“the Corps”) designed and built the Addicks and Barker Dams. The
    dams’ purpose is to impound rainwater upstream to prevent flooding to downstream property in
    and around downtown Houston. See In re Upstream Addicks & Barker, 146 Fed. Cl. at 228-33.
    In constructing the dams, the Corps acquired land upstream of the dams to create reservoirs to
    hold impounded water but chose not to purchase enough property to accommodate the storage
    capacity of the dams’ design. Id. The reservoirs are ordinarily dry but impound water during
    and after rain events. After the Corps constructed the dams, it decided to install gates at the
    dams in the 1940s and 1960s to control the release of impounded water from the reservoirs. Id.
    at 233-34; see also Tr. 1297:1-11 (Vail). Then, in the late 1970s the privately-held grazing
    pastures and rice fields on land upstream were replaced with housing developments. In re
    Upstream Addicks & Barker, 146 Fed. Cl. at 234. Subsequently, the Corps conducted a study of
    1
    This recitation of facts constitutes the court’s principal findings of fact in accord with
    Rule 52(a) of the Rules of the Court of Federal Claims (“RCFC”). Other findings of fact and
    rulings on questions of mixed fact and law are set out in the analysis.
    2
    the Addicks and Barker dams and reservoirs, which disclosed “a dramatic increase to the
    maximum design spillway . . . and . . . a higher probable maximum precipitation value.” Id. at
    234-35. The Corps responded by strengthening and modifying the dams to reduce seepage and
    enhance stability, but it did not expand the government-owned reservoirs. Id. at 235-36. The
    Corps continued to conduct studies into the twenty-first century, recognizing “[t]he possibility of
    flooding lands in the reservoirs beyond the government-owned land,” id. at 234, but “the Corps
    decided to take no action” to mitigate that upstream risk. Id. at 236-37.
    When Hurricane Harvey arrived on August 25, 2017, and “stalled over the Houston
    metropolitan area for four more days,” the Corps operated the Addicks and Barker Dams
    according to the design criteria, impounding water in the upstream reservoirs. See In re
    Upstream Addicks & Barker, 146 Fed. Cl. at 240-41. The Corps’ official operating procedures for
    the dams provided that the dam gates be operated in a controlled manner to prevent flooding
    downstream, even when such operation would flood upstream private property beyond the
    government-owned land. Id. Accordingly, during Hurricane Harvey, “[t]he flood pools in the
    reservoirs crested at a record pool elevation of 101.6 feet in Barker and 109.1 feet in Addicks on
    August 30, 2017,” flooding private property. Id. at 241.
    This flooding damaged the houses and property of bellwether test plaintiffs Todd and
    Cristina Banker, Elizabeth Burnham, Scott Holland, Christina Micu, Catherine Popovici, and
    Kulwant Sidhu. The Bankers’ home—located at 4614 Kelliwood Manor Lane, Katy, Texas—
    experienced 1.1 feet of flooding that remained in the home for four days. See In re Upstream
    Addicks & Barker, 146 Fed. Cl. at 241. Ms. Burnham’s home—located at 15626 Four Season
    Drive, Houston, Texas—experienced approximately four to five feet of flooding, which persisted
    at least seven days. Id. at 241-42. Mr. Holland’s home—located at 1923 Wingleaf Drive,
    Houston, Texas—experienced 1.5 feet of flooding that lasted three and a half days. Id. at 242.
    Ms. Micu’s home—located at 6411 Canyon Park Drive, Katy, Texas—had approximately two
    feet of flooding, which “was present in the home for about ten days.” Id. Ms. Popovici’s
    home—located at 19927 Parsons Green Court, Katy, Texas—experienced no flooding inside the
    residence, but water came “within a couple inches of entering” the home, damaged the garage,
    Tr. 799:17-23 (Popovici), and was on the property “between four and six days.” See In re
    Upstream Addicks & Barker, 146 Fed. Cl. at 243. 2 Mr. Sidhu had two test properties at issue in
    the liability and just compensation trials, both condominiums located at 16111 Aspenglenn
    Drive, Houston, Texas. Id. One unit was located on the ground level and experienced 2.4 feet of
    flooding for around four and one-half days, while an upstairs unit did not suffer any flooding. Id.
    Following the court’s liability opinion, the parties asked the court to clarify the date and
    physical scope of the government’s taking, which the court did on April 30, 2020. See In re
    Upstream Addicks & Barker, 148 Fed. Cl. at 275-78. That opinion specified that until Harvey,
    impounded water at the Addicks and Barker Reservoirs had only slightly exceeded
    government-owned land and minimally flooded private property, so the government’s “physical
    invasion of plaintiffs’ properties began on August 28, 2017[,] and ‘crested at a record pool
    2
    Citations to the trial transcript are cited as “Tr. _____ (Witness).” Citations to joint
    exhibits are shown as “JX___,” plaintiff’s exhibits are identified as “PX-JC___,” or
    “PX-JC___(name)” specific test property exhibits include plaintiff’s name and are marked as
    “name-JC,” and defendant’s exhibits are denoted as “DX___.”
    3
    elevation of 101.6 feet in Barker and 109.1 feet in Addicks on August 30, 2017.’” Id. at 276-77
    (quoting In re Upstream Addicks & Barker, 148 Fed. Cl. at 241). The court therefore determined
    that the government’s taking occurred on August 30, 2017. Id. at 277. It further concluded that
    because “no taking occurs until water enters the property,” the extent of the government’s
    easement corresponded to the peak flooding on August 30, 2017, not the dams’ highest design
    pool level. Id. at 278.
    B. The Just Compensation Trial
    After the court resolved a series of discovery and procedural disputes, see, e.g., In re
    Upstream Addicks & Barker, 
    152 Fed. Cl. 114
     (2021) (addressing a discovery dispute), and 
    157 Fed. Cl. 189
     (2021) (denying class certification), the just-compensation trial took place in
    Houston, Texas, from May 31 through June 10, 2022. At issue were the flowage easement’s
    scope based on Corps policies and meteorological circumstances, the test properties’ values,
    plaintiffs’ personal property losses, an appropriate interest award, and whether the just
    compensation award should be reduced to reflect federal benefits plaintiffs received.
    1. Scope of the easement.
    The purpose and design of the Addicks and Barker Dams make the court-ordered
    easement necessary. Colonel Timothy Vail, the commander and district engineer for the Corps’
    Galveston district, testified that the dams’ purpose is to impound water upstream before it flows
    downstream and floods downtown Houston. Tr. 1311:13-22 (Vail). Because the dams’ storage
    capacity exceeds government-owned land, operating the dams as planned under certain
    meteorological conditions entails a risk to upstream private property, human health and safety,
    and public infrastructure. Tr. 1317:16 to 1318:8 (Vail). As the dams currently exist, the
    government can account for this risk to upstream properties from peak reservoir pool elevations
    only by acquiring an interest in the properties. See PX-JC773 at 8.
    (a) Corps’ policies regarding easements.
    At trial, Paula Johnson-Muic and Timothy Nelson testified about the Corps’ policies
    regarding easements, both in general and as applied to the court-ordered easement in this case.
    Ms. Johnson-Muic, the Corps’ highest civilian authority on real estate issues across the United
    States, focused on the Corps’ Real Estate Handbook and policies. See Tr. 136:10-13, (Johnson-
    Muic); JX1007. The Real Estate Handbook, published in 1985 and periodically updated
    thereafter, is a reference manual the agency uses when making real estate decisions, such as
    managing flowage easements. See Tr. 139:8-13 (Johnson-Muic). Mr. Nelson, the chief of the
    Corps’ Real Estate Division within the Galveston District, related means of enforcing
    government property rights to land, including the land subject to the court-ordered permanent
    flowage easement in this case. Tr. 310:9-18, 364:12-16 (Nelson).
    Under Corps’ policy, as confirmed by Ms. Johnson-Muic’s testimony, “[w]henever a
    plaintiff successfully prosecutes litigation which establishes that an interest in real property has
    been taken, the interest so taken should be confirmed in the form of a grant, wherever possible,”
    and such “instrument should be recorded in the public land records and permanently retained in
    the real estate files as evidence of the interest taken.” JX1007 at 5-71, ¶ 5-22; Tr. 143:8-24,
    4
    145:19-24, 147:24 to 148:6 (Johnson-Muic). By recording the instrument, the Corps notifies the
    public of the property interest acquired. Tr. 153:10-13 (Johnson-Muic). Nonetheless, she
    testified that the Corps sometimes does not record an instrument to memorialize such
    conveyances. Tr. 149:2-18, 157:3-13 (Johnson-Muic); but see Tr. 264:12-14 (Johnson-Muic)
    (“Q: The Corps policy calls for the recordation, correct? A: Yes.”); JX1007 at 5-74, ¶ 5-24(e)
    (outlining the Corps’ policy to record the judgment conveying a property interest in event that
    court does not issue a deed confirming the conveyance). The Corps retains the discretion to
    enforce its property rights. See Tr. 227:2-5, 232:13 to 233:1 (Johnson-Muic); but see PX-JC352
    at 3, ¶ 6 (Corps Memorandum of May 10, 2019) (“Encroachments and trespasses of government
    real property shall be identified and resolved in a timely manner.”). 3
    The easement here permits the Corps to store water during occasional flooding by the
    operation of the Addicks and Baker Dams and allows plaintiffs to continue lawful use of the
    property subject to the risk of occasional flooding. See In re Upstream Addicks & Barker, 148
    Fed. Cl. at 278. Accordingly, the Corps understands the flowage easement here to be a non-
    standard or atypical easement because the fee owners of the burdened properties “retain the right
    to lawful use of their property” according to state and local laws, which includes human
    habitation and maintaining existing structures on the properties. Tr. 204:13-25, 296:7 to 297:9
    (Johnson-Muic).
    The Corps’ understanding of “occasional flooding” as used to describe the easement here
    encompasses anything less than permanently inundating the burdened property. Tr. 166:18 to
    167:7, 169:17-21 (Johnson-Muic). On this understanding, the court-ordered easement permits
    the Corps to flood burdened properties whenever operation of the Addicks and Barker Dams so
    requires, i.e., when meteorological events threaten downstream properties and cause impounded
    waters to exceed the capacity of the government-owned property making up much of the
    reservoir. Tr. 174:9 to 175:2, 175:22 to 176:11, 184:11-25, 188:20 to 189:25 (Johnson-Muic).
    The Corps may enforce its easement against any residual fee owner of burdened property
    who interferes with the government’s rights as the dominant estate holder. Tr. 164:23 to 165:3
    (Johnson-Muic). Specifically, Mr. Nelson testified that efforts to exclude floodwaters from
    upstream properties subject to the permanent flowage easement would be contrary to the Buffalo
    Bayou and Tributaries project’s purpose and would encroach on the government’s easement. See
    Tr. 361:14-25, 367:6 to 368:8 (Nelson). For example, the Corps could and would prevent a
    burdened property’s owner from using fill or building a berm to reduce the risk of flooding. See
    Tr. 176:12-24 (assuming a standard easement), 194:18-21, 197:4-11, 200:24 to 201:7, 201:21 to
    202:13 (Johnson-Muic) (indicating attempts to circumvent the easements’ restrictions “may”
    3
    Specifically, the Corps may protect its rights through litigation. Tr. 233:22 to 234:1,
    (Johnson-Muic); see also Tr. 305:11 to 306:25 (Johnson-Muic) (stating that litigation about the
    relationship between the Corps and the fee owner under an easement is “a real possibility”). The
    exercise of that discretion would turn on the Corps’ technical and legal analysis of the potential
    encroachment and whether it would “substantially interfere” with the government’s property
    rights under the easement. Tr. 279:14 to 280:8, 284:4-22, 290:2-17 (Johnson-Muic); see also
    Tr. 396:18 to 397:12 (Nelson) (describing Corps procedures governing engineering assessments
    of whether a potential encroachment impairs the project); JX1010 at 4, ¶ 1.6.3 (defining
    encroachment for Corps policy purposes).
    5
    constitute encroachment); JX1010 at 3, ¶ 1.5 (“It is the intention of the Corps to protect project
    authorized purposes . . . by preventing new encroachments.”); JX1007 at 8-12, ¶ 8-24(b)
    (explaining that using landfill to alter an easement’s contours “would be considered an
    encroachment”) (citing United States v. Fisher-Otis Co., Inc., 
    496 F.2d 1146
     (10th Cir. 1974));
    but see Tr. 212:13-25, 213:23 to 214:1, 215:6-17 (Johnson-Muic) (explaining that JX1007 at 8-
    12, ¶ 8-24(b) predates the atypical easement in this case and could be interpreted to apply only to
    standard easements).
    (b) Meteorological factors.
    The plaintiffs’ primary expert on meteorological developments and the likelihood of
    flooding was Dr. Philip Bedient, an engineering professor at Rice University who researches
    hydrology, disaster management, and flood modeling and prediction systems. See PX-JC873 at
    4. Dr. Bedient estimated “the frequency or chance of occurrence of flood stages within Addicks
    and Barker Reservoirs between . . . [g]overnment-[o]wned [l]and . . . and the maximum pool
    level reached during the Harvey 2017 storm event, and then used that information to provide
    estimates of the frequency and duration of various pool levels at each of the . . . [t]est
    [p]roperties.” Id. at 2. Using stage level data provided by the Corps, Dr. Bedient estimated that
    the maximum flood pool stage observed during Harvey “approximates between a 35-year and a
    100-year recurrence event, while the . . . pool stage [on government-owned land] approximates a
    10-20 year recurrence event.” PX-JC873 at 2-3; see also Tr. 1241:10-21, 1247:17 to 1248:1
    (Bedient).
    Mario Beddingfield, a hydraulic engineer for the Corps, testified that flooding beyond
    government-owned land would occur more frequently than the government had previously
    thought. Tr. 903:1-7 (Beddingfield). Mr. Beddingfield spoke to stage frequency analyses, the
    preparation of which he oversaw when the Corps created a provisional 2019 Water Control
    Manual. Tr. 905:22 to 906:3 (Beddingfield). The pool elevation levels in the prior version of the
    Manual from 2012 were based on an approximately 30-year period of record back to the early
    1980s, a period in which the highest precipitation event was a 1992 storm that peaked at a level
    of 93.6 inches of water behind the Addicks and Barker Reservoirs. Tr. 908:2-6, 933:5 to 934:20
    (Beddingfield). Since that time, Mr. Beddingfield testified that changed conditions—i.e., a boom
    in urbanization and increasingly frequent and severe storms—have caused more water to
    accumulate at times in the Addicks and Barker Reservoirs. Tr. 942:6 to 951:20 (Beddingfield);
    see also Tr. 1303:10-18 (Colonel Timothy Vail) (confirming that the Corps has received
    information from the National Oceanic and Atmospheric Administration indicating increased
    “frequency and intensity of rainfall events”). The 2019 Manual does not account for these
    changed conditions. Tr. 952:3-19 (Beddingfield). According to Mr. Beddingfield, accounting
    for these developments leads to higher storm and runoff levels and an overall higher frequency
    curve than those presented in the 2019 Manual. Tr. 969:1 to 980:25 (Beddingfield); see also
    JX1021A and JX1021B (demonstrative exhibits representing a higher frequency curve that
    includes the top ten storms, including Harvey). Mr. Beddingfield testified that this adjusted
    curve would “approximately” place the Harvey event between a 20- and 50-year event. Tr.
    987:5-11 (Beddingfield). Mr. Beddingfield also testified that each test property is within the 20-
    to 50-year flood event frequency, except for Ms. Micu’s home which is within a 10-20-year
    flood event frequency. Tr. 990:2 to 992:21 (Beddingfield).
    6
    The government called Dr. John England, a lead civil engineer in the Corps’ Risk
    Management Center and expert in flood hydrology, to rebut Dr. Bedient’s analysis. See Tr.
    2490:3 to 2491:1 (England). Dr. England’s rebuttal consisted of two main criticisms. First, Dr.
    England opined that Dr. Bedient’s report did not follow industry best practices. Tr. 2531:18 to
    2534:16 (England). Second, Dr. England opined that Dr. Bedient used a small data set to
    produce an estimate of flood frequency. Tr. 2528:3 to 2532:24 (England). Dr. England also
    testified that Dr. Bedient’s report looked only at elevation data but ignored storage capacity data
    specific to the Addicks and Barker Reservoirs. Tr. 2518:18 to 2519:21 (England). In Dr.
    England’s opinion, these errors caused Dr. Bedient to reach a flood frequency estimate five times
    more frequent than his own estimate. Tr. 2529:16-19, 2533:25 to 2534:2 (England).
    Dr. Barry Keim, a professor at Louisiana State University specializing in precipitation
    frequency analysis, challenged Dr. Bedient’s conclusions concerning rainfall frequency. Tr.
    2577:13 to 2580:1 (Keim). Dr. Keim criticized Dr. Bedient’s data set and methods, opining that
    Dr. Bedient’s estimated frequency of a Harvey-like flood event over the Addicks and Barker
    reservoirs was too frequent to be the result of proper analysis. See Tr. 2610:9-19 (Keim). For
    example, Dr. Bedient’s analysis considered the total rainfall from several storm events, rather
    than only the rainfall from each of those storms that fell specifically on the reservoirs. Tr.
    2596:17 to 2601:18 (Keim). Moreover Dr. Bedient’s data set did not include storms before the
    1970s. Tr. 2606:18 to 2607:5 (Keim). A longer period of record, according to Dr. Keim, would
    produce more accurate results that are closer to the government estimates of the frequency of
    Harvey-like flood events. Tr. 2607:8-19; 2612:5-15 (Keim).
    Mark Glaudemans, branch chief over the Water Resources Services Branch of the
    National Weather Service, likewise defended the government’s current precipitation frequency
    estimates. Tr. 2029:12 to 2031:9 (Glaudemans). Specifically, he testified that the National
    Oceanic and Atmospheric Administration (“NOAA”) estimates that the frequency of a 33-inch
    rainfall over the Addicks and Barker Reservoirs is 1-in-1000 years. Tr. 2045:3-10
    (Glaudemans). 4 NOAA’s estimate includes Harvey data as well as data from sources that, in
    some instances, date back 150 years and correlate records gathered from hundreds of recording
    stations over 120 years. Tr. 2031:6-9, 2035:22 to 2037:24 (Glaudemans); DX1339 at 15.
    Nonetheless, the data NOAA used were not adjusted to reflect the upward trend in rainfall
    observed over the last two decades as distinct from the broader 150-year period. Tr. 2048:25 to
    2051:3 (Glaudemans). Mr. Glaudemans also acknowledged that at least two storm events within
    two years of each other have exceeded NOAA’s estimate for 1,000-year events, i.e., both
    Hurricane Harvey in 2017 and Tropical Storm Imelda in 2019 produced over 40 inches of
    rainfall. Tr. 2060:11 to 2064:17 (Glaudemans).
    4
    These estimates are contained in NOAA Atlas 14, which estimates the precipitation
    frequencies of various locations. Tr. 2035:6-21 (Glaudemans).
    7
    2. Appraisal of test properties.
    Real estate appraisers determine a subject property’s value by determining its best use
    and analyzing its characteristics and aspects of the relevant market. See PX-JC156 (Interagency
    Land Acquisition Conference, Uniform Appraisal Standards for Federal Land Acquisitions
    (“Yellow Book”) at 8, § 1.1 (2016). The Yellow Book outlines the standards for developing “an
    opinion of market value that can be used to determine just compensation under federal law.” Id.
    at 3, § 0.1. Here both parties have adopted appraisal approaches outlined in the Yellow Book.
    The Yellow Book requires appraisers to apply the before and after rule to determine just
    compensation. This approach measures the difference between the parcel’s before-taking value
    and its after-taking value. Yellow Book at 17, § 1.2.7.3.4. The Yellow Book identifies three
    approaches to valuing land: (1) the sales comparison approach, (2) the cost approach, and (3) the
    income approach. Id. at 26-35, §§ 1.5.2-1.5.4.
    The sales comparison approach is “normally the preferred method of valuation.” Yellow
    Book at 26, § 1.5.2. Appraisers applying this approach identify “sales of properties with the
    same highest and best use as the subject property that are as close in proximity” and as close to
    the time of the taking as possible. Id. Each sale is then adjusted to account for differences
    between the comparable and subject properties. Id. Next, the resulting “sales data is [sic]
    reconciled to a final opinion of market value.” Id. The sales comparison approach requires that
    comparable sales be between “willing and reasonably knowledgeable buyers and sellers.” Id. at
    95, § 4.2.1.3 (emphasis omitted). To qualify, buyers and sellers need not be “all-knowing.” Id.
    Under the cost approach, the land’s market value, separate from the value of any
    improvements and typically determined according to the sales comparison approach, is added to
    the depreciated cost of reproducing or replacing improvements on the property. Yellow Book at
    33, § 1.5.3. Replacement costs are estimated based on current, local market labor and material
    costs. Id. It is reduced to account for “depreciation from all causes.” Id. at 34, § 1.5.3.1.2.
    Finally, the income approach applies to income-generating properties. Yellow Book at
    35, § 1.5.4. For rental properties, the income approach calculates the market rent by analyzing
    comparable leases and deducting operating expenses to determine the net operating income. Id.
    at 35-36 §§ 1.5.4.1-1.5.4.3.
    Here, the parties disagree on both the before and after valuations. Regarding the before-
    taking values, the parties’ primary disagreement concerns the selection of comparable properties
    and whether to make quantitative or qualitative adjustments to account for any differences from
    the subject properties. See Def.’s Post-Trial Mem. at 17-19, ECF No. 570. Their disagreements
    on the after-takings valuation are more fundamental. The parties debate whether the market is
    aware of the flowage easement, and, as a result, whether a direct sales comparison methodology
    can be applied at all. They also disagree on how to account for subsequent repairs and
    renovations and whether just compensation should be limited to the flooding actually caused by
    the Addicks and Barker Dams, as distinct from flooding that would have occurred if the dams
    were never built. See Pls.’ Post-Trial Resp. at 72-73, ECF No. 571.
    8
    Plaintiffs’ valuations.
    Two experts estimated the before-taking and after-taking values of the test properties for
    the plaintiffs, and a third estimated the diminution percentage.
    Timothy Archibald and Matthew Deal estimated the test properties’ before-taking values
    using the sales comparison approach. Both determined that the Sidhu properties were best used
    as condominium projects and that the other properties were best used as single-family residences.
    See generally PX-JC877, 878, 880-884 (Archibald appraisals); PX-JC886-891 (Deal appraisals).
    For the Sidhu condominium units, Mr. Archibald and Mr. Deal each provided estimates under
    the income approach as well. See PX-JC883 at 25-28, PX-JC884 at 24-27 (Archibald);
    PX-JC890 at 42-43, PX-JC891 at 42-43 (Deal).
    The plaintiffs contend that the market is unaware of the flowage easement and,
    accordingly, that no direct comparison of sales can be used to determine the bellwether
    properties’ after-taking value. See Pls.’ Pre-Trial Mem. at 16, ECF No. 466. Plaintiffs stress the
    distinction between market awareness of a flood risk and market awareness of a flowage
    easement because an easement grants dominant estate rights, including the right to prevent
    mitigation efforts and the right to store water inside structures. See PX-JC1025 at 7 (identifying
    eleven significant differences between flowage easements and flood risks); see also Pls.’ Post-
    Trial Br. at 14, n.49, ECF No. 568 (arguing that the easement “prohibit[s] the property owner
    from interfering with the government’s use of the easement”).
    As evidence that the market is unaware of the flowage easement, plaintiffs rely on the
    lack of activity in the title insurance industry, the dearth of public-facing Flood Insurance Rate
    Maps (“FIRMs”) demarcating the Harvey flood pool, and property sellers’ general failure to
    disclose the existence of an unrecorded easement in state-required disclosure forms.
    Mr. Robert Philo, a real estate attorney who has worked in the title insurance industry for
    more than 40 years, Tr. 434:23 to 435:9 (Philo), testified that the title insurance industry is
    unaware of the court-ordered easement. Tr. 462:3-19 (Philo). He averred that if the industry
    were aware, there would be several observable responses. For instance, some buyers would opt
    out of sales after learning of the easement, Tr. 469:3-7 (Philo), and title insurance companies
    would likely take exception to the easement—meaning they would not cover financial losses the
    easement inflicts, Tr. 470:23-471:5—causing lenders to stop issuing mortgages, increase interest
    rates, Tr. 481:22-482:19, or demand a higher down payment for encumbered properties. Tr.
    487:20 to 488:6. Mr. Philo testified that none of these downstream effects has occurred, so the
    title industry is unaware of the easement. See Tr. 462:15 to 463:4 (Philo).
    Moreover, FEMA (Federal Emergency Management Agency) and Harris County
    officials, who collaborate on FIRMs that demarcate flood pools, see Tr. 740:18 to 742:10
    (Wanhanen), averred that the FIRM maps showing the Harvey flood pool had not been made
    public. See Tr. 726:6 to 727:11 (Wanhanen); Tr. 530:16-21 (Hahn). Corps employees indicated
    that “multiple sources” had asked the Corps to include reservoir inundation limits on public-
    facing FIRMs. JX1078; see also Tr. 560:6-15 (T. Ward). These sources also reminded the
    Corps that FIRMs are “the main source residents use for flood risk information for their
    property.” PX-JC371. But FEMA’s public-facing maps nonetheless do not show the Harvey
    flood pool. Tr. 530:16-21 (Hahn).
    9
    Additionally, one of plaintiffs’ appraisal experts, Dr. Randall Bell, testified that an
    unrecorded easement was disclosed on only three of 1,288 seller’s disclosure forms for
    properties sold within the Harvey flood area between September 1, 2019 and October 31, 2021.
    See PX-JC1025 at 22-23; Tr. 2790:22 to 2793:13 (Bell). Nine sellers related the property was in
    a flood way, 68 that the property was in a reservoir, and 71 that the property was in a flood pool.
    See PX-JC1025 at 22-23; Tr. 2793:15 to 2796:14 (Bell). According to Dr. Bell, these seller’s
    disclosures are a place to go to determine market awareness “[i]f you had an authentic interest in
    understanding the level of market knowledge,” and these low reporting numbers indicate the
    market is largely unaware of the easement. Tr. 2797:1 to 2799:2 (Bell).
    Plaintiffs’ after-market appraisals also accounted for repair costs. Matison Construction
    Estimating and DeFacto Consulting Group provided estimates for plaintiffs. DeFacto estimated
    repair costs for the Banker, Burnham, Micu, and Sidhu unit 603 test properties. See generally
    PX-JC1113 (Banker); PX-JC1114 (Burnham); PX-JC1115 (Micu); and PX-JC1116 (Sidhu 603).
    DeFacto’s estimate relied on the government experts’ scope of work, dimensional information,
    and quantity of materials. Tr. 1782:2 to 1783:16 (Lozos); but see Tr. 2444:9-16 (McReynolds)
    (indicating these scopes of work were general, and plaintiffs’ experts had to fill in the details).
    These figures were accepted during the liability phase. 5 DeFacto then used the “published cost
    data for the area immediately after . . . Harvey” to determine material costs. Tr. 1782:2-9; see
    also Tr. 1786:3-16 (Lozos) (describing the Xactimate tool that gathers and publishes costs by zip
    code on a monthly basis). Matison followed a similar approach but arrived at somewhat
    different estimates. 6
    Aside from specific cost estimates for restoring the test properties, the Internal Revenue
    Service (IRS) published Revenue Procedure 2018-09 to help individuals calculate the financial
    loss Hurricane Harvey inflicted upon personal-use residential property. Rev. Proc. 2018-09,
    2018-02 IRB 290. When one’s property is damaged, a taxpayer can reduce his or her taxable
    income by the amount of damages. See 
    26 U.S.C. §§ 165
    (a), (h). IRS procedure 2018-09
    provides tables taxpayers can use to calculate a safe harbor number by which they can reduce
    their taxable income. Rev. Proc. 2018-09, 2018-02 IRB 293. These tables allow a taxpayer to
    calculate their deduction without obtaining appraisals or contractor estimates of the property
    damage they suffered. Tr. 886:18 to 887:8 (Ward). 7
    5
    Plaintiffs called Mr. Timothy Lozos as an expert to testify regarding the cost of
    repairing the plaintiffs’ flooded real property structures. He calculated the costs of remediating
    the Banker structures to be $166,740.29, PX-JC1113 at 40, the Burnham structures to be
    $106,777.59, PX-JC1114 at 21, the Micu structures to be $121,908.83, PX-JC1115 at 32, and
    Sidhu unit 603 to be $49,101.09, PX-JC1116 at 19.
    6
    The plaintiffs’ did not call a witness to testify to the truth of the Matison expert reports,
    so they were excluded. Tr. 1708:21 to 1710:13. The court did, however, permit Mr. Deal to rely
    upon those estimates. Tr. 1710:8-13 (court).
    7
    Donald Ward, a lead appraiser with the IRS, was called by plaintiffs to testify regarding
    the development of the Cost Index Per Square Foot tables published in Revenue Procedure 2018-
    09 and, more specifically, the data used to develop the values in the “Texas” columns in that
    procedure and a Memorandum captioned Hurricane Harvey & Irma Disaster Area—Casualty
    10
    Mr. Sidhu provided evidence of the actual costs associated with repairing the
    condominium units following Harvey. See JX1172; Sidhu-JC83 at 964-967. Repairs and lost
    income amounted to $29,504.11 for the downstairs unit and $1,194.99 for the upstairs unit.
    JX1172.
    In the after-taking analysis, both Mr. Archibald and Mr. Deal concluded that the best use
    of the Banker, Burnham, Micu, and Popovici properties, and the Sidhu upstairs condominium,
    was residential. Tr. 1533:17 to 1534:5 (Deal); Tr. 1992:16 to 1993:15 (Archibald). Mr.
    Archibald also deemed the best use of the Sidhu downstairs condominium to be residential, Tr.
    1992:16 to 1993:15 (Archibald), while Mr. Deal deemed its best use to be speculative because
    the estimated repair costs exceeded his appraisal of its before-taking value, Tr. 1534:6-24 (Deal).
    As a result of positing that the market remains unaware of the easement, plaintiffs’ after-
    taking appraisals were not based on a direct sales comparison. See, e.g., PX-JC877 at 30
    (Archibald) (indicating no comparable sales could be located because “the market has no notice
    of the government’s right to ‘occasionally’ inundate the properties”); PX-JC886 at 23 (Deal)
    (“We performed an exhaustive search and were unable to confirm transactions of comparable
    single-family residential properties similarly encumbered.”); PX-JC897 at 105 (Bell) (“[T]here is
    a lack of general awareness regarding the flowage easement.”).
    Mr. Archibald instead referenced data and studies on how flooding and flowage
    easements affect property value. See, e.g., PX-JC881 at 33. Mr. Archibald consulted a chart
    devised by Donald Sherwood to determine the diminution in value attributable to the flowage
    easement itself. Id. at 33-34. He then considered the repair cost estimates submitted by DeFacto
    and Matison to assess the total diminution to property value in the after-taking, uncured
    condition. Id. at 35-36. He concluded that the government’s taking caused a diminution in the
    fair market value between 85-95% in the single-family home properties that experienced
    structural flooding—the Banker, Burnham, and Micu residences. Id.; see also Pls.’ Pre-Trial
    Mem. at 24. He concluded that the Sidhu downstairs unit’s entire value had been taken and
    applied a 99% diminution factor. PX-JC883 at 33. Even though the upstairs unit was not
    flooded, he applied a 51% diminution factor because the flowage easement burdened common
    areas of the condominium complex. PX-JC884 at 36. Because there was no structural flooding
    on Ms. Popovici’s property and only 55.9% of her property was subject to the flowage easement,
    Mr. Archibald applied a diminution factor of 51%. Pls.’ Pre-Trial Mem. at 24, PX-JC882 at 28-
    34.
    For the Sidhu condominiums, Mr. Archibald also applied this diminution factor to his
    before-taking figures under the income approach. PX-JC884 at 36.
    Loss Determination and a spreadsheet titled Hurricane Safe Harbor Calculations 09/2017.xlsx.
    See DX1990 at 2. Safe Harbor provisions allow taxpayers to calculate tax deductions using a
    standardized formula. Tr. 887:2-8 (Ward). This cost index table helps individuals calculate the
    Harvey-related losses that the taxpayer can deduct from his or her taxable income.
    11
    Mr. Archibald calculated Mr. Holland’s leasehold interest to be $3,300 by multiplying
    Mr. Holland’s leasehold advantage 8 by six—the number of months remaining on his lease. Pls.’
    Pre-Trial Mem. at 25.
    Mr. Deal also did not base his after-taking appraisals on a direct sales comparison.
    Instead, he first determined the maximum value remaining after the taking based on various
    market studies, a literature review, and research in reservoir databases. See, e.g., PX-JC888 at
    17; PX-JC889 at 17-18; PX-JC890 at 15-16. He then determined the immediate compensable
    damage to improvements on the test properties under a modified sales-comparison approach and
    a cost-comparison approach. Under the modified sales-comparison approach, Mr. Deal analyzed
    diminution in value suffered by comparable properties that were sold in an un-remediated state.
    See, e.g., PX-JC886 at 83-84 (Banker); PX-JC887 at 84-86 (Burnham); PX-JC888 at 79-82
    (Micu); PX-JC889 at 77-79 (Popovici); PX-JC890 at 79-81 (Sidhu 603); PX-JC891 at 80-82
    (Sidhu 604). In the cost-comparison approach Mr. Deal considered the construction cost
    estimates submitted by Matison Construction Estimating and DeFacto Consulting Group, and, as
    a third alternative, generated safe harbor numbers using Revenue Procedure 2018-09. See, e.g.
    PX-JC886 at 85-86 (Banker); PX-JC887 at 86-88 (Burnham); PX-JC888 at 83-85 (Micu); PX-
    JC889 at 79 (Popovici); 9 PX-JC890 at 81-83 (Sidhu 603). 10
    Mr. Deal then selected a figure within the cost range established by these measures and
    subtracted it from the maximum market value remaining after the taking to determine the
    diminution value. See, e.g., PX-JC886 at 86-87 (Banker); PX-JC887 at 87-88 (Burnham); PX-
    JC888 at 84-85 (Micu); PX-JC889 at 79-80 (Popovici); PX-890 at 83 (Sidhu 603); PX-891 at 82
    (Sidhu 604). Mr. Deal testified that the Banker home diminished by 66%, PX-JC886 at 87, the
    Burnham property by 91%, PX-JC887 at 88, and the Micu home by 77%, PX-JC888 at 85. See
    also Pls.’ Pre-Trial Mem. at 23. Mr. Deal’s market research led him to conclude that the Corps’
    easement diminished the Popovici property’s value by 17%. PX-JC889 at 80. Mr. Deal found
    diminutions in value of 94% and 17% for Sidhu units 603 and 604, respectively. PX-JC890 at
    83; PX-JC891 at 83.
    Dr. Randall Bell, a licensed real estate appraiser, computed a diminution percentage. Tr.
    1821:15 to 1822:18. Dr. Bell determined that “market resistance” to purchasing a property with
    8
    Mr. Archibald used Mr. Holland’s leasehold advantage, $550, because he determined
    that Mr. Holland’s monthly rental payment, $1,200, was under-market, which Mr. Archibald
    determined to be $1,750. Tr. 1948:6 to 1949:14 (Archibald).
    9
    For the Popovici structures Mr. Deal considered only the estimate submitted by
    Matison.
    10
    Because the cost estimate for repairs to the Sidhu downstairs unit “far exceed[ed] the
    Maximum Remaining Market Value of the property,” Mr. Deal found the taking resulted in a
    complete economic loss of the improvements and determined the after-taking value by applying
    Mr. Sidhu’s and his sister-in-law’s 0.9% undivided interest appurtenant in 603 to the land’s value
    after the taking. See PX-JC890 at 81-83.
    12
    the Sidhu properties. DX1006 at 11623-37 (Sidhu Unit 603); DX1007 at 11708-22 (Sidhu Unit
    604).
    To ensure the comparisons were precise, Mr. Lucco then adjusted his valuation where
    appropriate to reflect differences in the comparable sales he selected or, alternatively, explained
    why no adjustment was necessary. See, e.g., DX1005 at 11555-57 (Popovici) (considering, for
    example, adjustments reflecting differences in the room count, area of above-grade, finished
    living space that was air-conditioned, car storage, exterior amenities, and construction quality).
    Defendant contends that the market is aware of “the conditions of the easement” because
    it knew of the flooding caused by Harvey and “the easement is based on the extent of actual
    flooding behind the dams during the Harvey event.” See Def.’s Pre-Trial Mem. at 4-5, ECF No.
    507. The government relies on publicly available maps of the Harvey flood pool, seller’s
    disclosures, and social and news media coverage of the flooding. See id. at 19.
    Mr. Lucco concluded the market was aware of the easement’s conditions after surveying
    various sources “such as media reports, USACE reports and meetings, public meetings, litigation
    outreach, online resources, flood-related closures, professional knowledge, [p]laintiffs’
    [u]pstream takings claims, flood insurance, Multiple Listing Service (MLS) listings, and seller’s
    disclosures.” DX1001 at 11790-91, ¶ 66.
    While plaintiffs focused on whether sellers checked the box on the disclosure form
    indicating the existence of an unrecorded easement, the government focused on whether sellers
    disclosed prior structural or property flooding, flooding caused by the failure or breach of a
    reservoir, or flooding caused by natural events elsewhere on the form. See Tr. 2820:10 to
    2821:10 (Bell); see generally JX1127 (cataloguing local MLS listings). Indeed, many sellers of
    properties subject to the court’s easement did indicate the property had flooded during Harvey
    without disclosing an unrecorded easement. See, e.g., DX1676 at 49000; PX-JC1201 at 2-3
    (disclosing previous structural and property flooding and that the unit flooded completely “from
    Addicks Reservoir overflow during Hurricane Harvey”); PX-JC1189 at 2-3 (disclosing flooding
    “due to hurricane Harvey aftermath” and “release [sic] of water from Barker Dam”). Defendant
    also produced MLS real estate listings containing information about flood history and risk. See,
    e.g., DX1021 at 12800 (E.g., “[t]his house was flooded during Hurricane Harvey.”); id. at 12804
    (“[H]ome did flood in Harvey due to reservoir and owner has mold remediation certificate.”).
    Moreover, public-facing maps of the Harvey flood pool were available on the Harris
    County Flood Control District website during and after Harvey. Tr. 556:22 to 557:14 (T. Ward).
    The maps illustrated which areas would be flooded depending on the water elevation in the
    Addicks and Barker Reservoirs. DX1356; DX1357; Tr. 632:11-24 (T. Ward). Maps depicting
    the flood pool were also published in the Texas Tribune less than two months after Harvey. See
    DX1080 at row 1500; Neena Satija and Kiah Collier, Houston officials let developers build
    homes inside reservoirs. But no one warned buyers., The Texas Tribune (Oct. 12, 2017),
    https://apps.texastribune.org/harvey-reservoirs/.
    Defendant also accounted for repair costs necessary to restore the test properties. Mr.
    John McReynolds estimated the repair costs under the government’s estimated level of flooding
    that would have occurred even without the Addicks and Barker dams. He generated two sets of
    15
    figures, one that accounted for upgrades and depreciation and one that did not. See DX1097 at
    12156-58.
    In formulating his opinions, Mr. McReynolds first determined each property’s condition
    “immediately prior to the loss” and the reasonable repairs necessary to restore the property to
    that condition. Tr. 2415:13-22 (McReynolds). Mr. McReynolds entered this scope of work into
    Xactimate to estimate the price of materials at the time the work would be performed. Tr.
    2416:16-25 (McReynolds). Finally, before writing his report, Mr. McReynolds applied his
    professional judgment to adjust the resulting estimate to match unique features of the properties
    in question and account for economies of scale impacting the work to be performed. Tr. 2418:3-
    18 (McReynolds).
    Defendant’s after-taking valuation was also based on the direct sales comparison
    approach. Mr. Lucco provided an after-taking valuation for each property in its damaged
    condition. For the properties that suffered structural flooding—Banker, Burnham, Micu, and
    Sidhu—Mr. Lucco also estimated the after-taking value according to their repaired condition. 14
    He used the same search parameters to select comparable properties but focused on sales
    occurring after August 30, 2017. See DX1002 at 11215, 11250 (Banker), DX1003 at 11321,
    11375 (Burnham), DX1004 at 11443, 11487 (Micu), and DX1006 at 11623, 11649 (Sidhu
    603). 15
    Except for the downstairs Sidhu unit discussed infra, Mr. Lucco determined the after-
    taking value for the properties in their damaged state by searching for comparable properties that
    had suffered similar flooding. See DX1002 at 11231 (Banker); DX1003 at 11345 (Burnham);
    DX1004 at 11462 (Micu); DX1005 at 11571 (Popovici); 16 DX1007 at 11734 (Sidhu 604). Each
    14
    Mr. Lucco did not calculate the after-taking repaired values of the Popovici and Sidhu
    upstairs properties because “there was no interior structural flooding of these properties requiring
    repairs.” Def.’s Pre-Trial Mem. at 22. The government contends that the after-taking value
    should be assessed based on the properties in their damaged condition if structural repairs are
    deemed non-consequential and should be assessed based on the repaired condition if repairs are
    deemed consequential damages, which it urges must not be included in a just compensation
    award. Def.’s Post-Trial Mem. at 26, n.40.
    15
    For both Sidhu units, Mr. Lucco also conducted an income approach analysis to assess
    the after-taking value of the properties as renovated. DX1006 at 11664 (Sidhu 603), DX1007 at
    11749 (Sidhu 604). For the downstairs unit, the income approach yielded a range of $52,706-
    58,667, DX1006 at 11665, and for the upstairs unit, $48,094-53,533. DX1007 at 11750. While
    Mr. Lucco took the income approach estimates into consideration, he gave most weight “to the
    [s]ales [c]omparison [a]pproach as it best represents the actions of buyers and sellers in the
    marketplace.” DX1006 at 11666, DX1007 at 11751.
    16
    Because the Popovici property suffered site but not structural flooding except for the
    garage, Mr. Lucco looked for comparable sales for property that had “site flooding . . . as
    opposed to structure flooding.” Tr. 2287:20 to 2288:3 (Lucco). Mr. Lucco testified, however,
    that he based this information on GIS mapping and aerial imagery and not on information from
    the listing agents for those comparable property sales. Tr. 2308:5 to 2310:8 (Lucco).
    16
    of these comparable properties for the Banker, Burnham, and Micu properties had also suffered
    structural flooding, and Mr. Lucco applied a seven dollar per square foot downward adjustment
    to the first floor living spaces to reflect the fact that comparable “sales of damaged properties
    reflect[ed] some work completed after flood waters receded, e.g., removal of wet materials, such
    as sheet rock, insulation, flooring.” See, e.g., DX1002 at 11235 (Banker); DX1003 at 11351
    (Burnham), and DX1004 at 11467 (Micu). For the Sidhu upstairs unit, Mr. Lucco made a
    deduction to account for a special assessment that condominium owners had to pay to cover
    damage to the common areas. Tr. 2290:16-23 (Lucco). 17 In appraising the Popovici property,
    Mr. Lucco considered “a small amount of repairs associated with the garage.” Tr. 2285:15 to
    2287:5 (Lucco).
    Regarding the Sidhu downstairs unit’s after-taking damaged value, in his view there were
    insufficient sales of comparable condominium units. DX1006 at 11669 (Sidhu 603).
    Accordingly, Mr. Lucco appraised the unit’s value by deducting the estimated renovation costs
    from the after-taking renovated value. Id. at 11670. He estimated the property’s renovation
    costs to be $40,000 by multiplying the costs Mr. Sidhu submitted by a factor between 1.5 and 2
    times the repair costs to reflect the risk an investor would associate with a renovation project.
    Id.; see also Tr. 2292:21 to 2294:10 (Lucco) (describing how he calculated the after-renovated
    value).
    The below table summarizes Mr. Lucco’s appraisal conclusions:
    Before         Diminution    After-          Diminution    After-
    Value          From          Taking          From          Taking
    After-        Damaged         After-        Repaired
    Damage        Value           Repaired      Value
    Scenario                      Scenario
    Banker        $510,000       48%           $265,000        13%           $445,000
    Burnham       $175,000       60%           $70,000         none          $185,000
    Micu          $260,000       40%           $155,000        6%            $245,000
    Popovici      $605,000       1%            $600,000        n/a           n/a
    17
    Plaintiffs also claim a $1,079.98 assessment for the special assessment the homeowners
    association (HOA) charged Mr. Sidhu for the downstairs unit, JX1172, but Mr. Sidhu testified
    that he received a $1,200 reimbursement from the HOA that was related to the special
    assessment. Sidhu-JC62; Tr. 1736:1-5 (Sidhu).
    17
    Sidhu         $50,000        2%             $48,900        n/a            n/a
    Upstairs
    Sidhu      $50,000           52%            $23,900        none           $63,900
    Downstairs
    3. Personal property and fixtures valuation.
    Plaintiffs also request compensation for personal property damaged when the government
    took the permanent flowage easement. In general, plaintiffs calculate this amount by multiplying
    each item’s replacement cost by a depreciation rate that accounts for how age affects the item’s
    value over time. See PX-JC867 at 3. Plaintiffs each catalogued their personal property, 18 and
    their expert, Mr. Lozos, calculated and applied a depreciation rate. See id. at 2-4; Tr. 1773:20 to
    1774:2 (Lozos). Mr. Lozos arrived at the depreciation value by referring to four different
    depreciation guides, including as his primary reference the Joint Military Industry Depreciation
    Guide. PX-JC867 at 4-7; 1774:11-19 (Lozos). He determined the actual cash value of the
    Banker personal property to be $90,592.34, Burnham to be $21,088.63, Micu to be $43,984.85,
    Popovici to be $7,193.41, and Holland to be $79,087.52. 19 PX-JC867 at 6; see generally id.
    App. II (itemizing personal property values and applying depreciation to determine award
    amount). Mr. Sidhu provides receipts for replacement appliances in the downstairs unit totaling
    $1,900.40. Sidhu-JC52; Sidhu-JC89.
    Aside from arguing that plaintiffs’ personal property losses are non-compensable
    consequential damages, the government contests plaintiffs’ personal property valuation on
    various grounds. In general, the government argues that plaintiffs have failed to meet their
    burden of establishing losses and corresponding values for all the personal property claimed.
    Def.’s Post-Trial Mem. at 79. In particular, the government challenges plaintiffs’ inclusion of
    various costs as personal property costs; plaintiffs’ assertion that certain property was damaged
    by Harvey; and plaintiffs’ valuation of expensive items. After adjusting for these costs,
    defendant contends the Bankers suffered $16,527.41 in personal property losses; Holland,
    $37,957.52; Micu, $42,184.85; and Popovici and Sidhu no compensable losses. See id. at 90.
    The government offers no adjustment to Ms. Burnham’s total claimed personal property loss of
    $21,088.63. See id.
    The parties contest whether landscaping constitutes personal property separate from real
    property. The Bankers claim $8,500 in yard landscaping and sod. PX-JC867 App. II at Banker
    18
    Tr. 91:17-18 (Burnham) (“All of these items right here were owned by me.”); Tr.
    115:14-20 (Micu) (indicating all the personal property lost was shared with her husband).
    19
    Elsewhere plaintiffs claim Mr. Holland suffered $91,837.52 in personal property loss,
    adding $12,750 for damage to his vehicles, Ms. Popovici $8,283.69, and Mr. Sidhu $4,195.31.
    See Pls.’ Post-Trial Br. at 40.
    18
    1. 20 Ms. Popovici likewise provides two invoices, bearing 2020 dates, for landscaping services
    totaling $11,559.74. JX1170; JX1171.
    The parties further disagree on whether the plaintiffs have proven that personal items
    were damaged by the taking, including above-flood-level property and the Popovicis’ car, and
    whether Ms. Micu had an obligation to redeem rather than dispose of up to $1,800 in mutilated
    currency. Specifically, the Bankers claim $162.50 for a microwave located above the flood
    level, as well as a refrigerator valued at $285 that the Bankers did not have before Harvey. PX-
    JC867 App. II at Banker 1-2; Tr. 775:15 to 776:14 (Banker).
    Ms. Popovici submits evidence that repairs to her garage door frame cost $806.11,
    JX1165, and repairs to the garage door’s torque, part of the mechanism that opens the garage
    door, for $595.38, JX1167; Popovici Resp. to Req. for Admis. No. 14, ECF No. 534-36 Tab 40
    at 5. Ms. Popovici further claims $2,390.97 for cleaning services performed on her home’s
    heating, ventilation, and air conditioning system in November 2018. JX1168; see also 2019
    Liability Trial Tr. 822:2-23 (Popovici) (testifying that the units themselves were not damaged by
    flooding). 21 In addition, Ms. Popovici seeks to recover $1,239.11 in repair costs associated with
    flushing brake fluid and replacing the starter in her Toyota Sequoia. JX1169; Tr. 824:25 to
    825:18 (Popovici) (excluding from her claim $25.50 incurred for a state inspection). She
    testified that these repairs were made necessary because her husband drove the car off the
    property through flooded streets during Harvey. Tr. 824:13-24 (Popovici).
    Ms. Micu’s claims for damaged currency involve $1,000 in cash and a piggybank
    containing an unknown amount of additional money, which Mr. Lozos depreciated to $800. See
    PX-JC867 App. II at Micu 7, 9. In addition to lost cash, Ms. Micu also claims losses for “piles”
    of personal property that Ms. Micu disposed of without confirming whether the items were
    damaged during Harvey or salvageable. Tr. 112:17 to 113:12 (Micu).
    The parties also contest whether plaintiffs have established the depreciated value of
    certain high-value items, namely antiques, heirlooms, and specialty items claimed by Mr.
    Holland and cars owned by the Bankers. Mr. Lozos testified that antiques “need more
    documentation than just what’s claimed” but did not receive any supporting documentation for
    plaintiffs’ antique claims. Tr. 1798:5-18 (Lozos). As a result, Mr. Lozos was unable to form an
    opinion on the antique status or depreciation applicable to plaintiffs’ antiques. Tr. 1799:9-21
    (Lozos); PX-JC867 at 5 (“[T]he determination of what is or isn’t ‘antique’ is beyond the scope of
    this assignment.”).
    Mr. Holland claims damage to antiques, such as a dining hutch that he valued at $3,000, a
    dining room table and chairs valued at $5,000, a sterling silver set valued at $500, and a sewing
    machine valued at $1,500. PX-JC867 App. II at Holland 4, 6-7, 11. He also claims to have lost
    various specialty items including a Kiss Guitar signed by Paul Stanley valued at $1,000, a World
    Wrestling Entertainment championship belt valued at $450, and an original 1970’s Star Wars
    20
    The page numbering in PX-JC867 Appendix II starts over for each plaintiff.
    “Banker 1” refers to the first page in the section of Appendix II devoted to the Bankers’ personal
    property claims.
    21
    “2019 Tr.” refers to the transcript of the 2019 liability trial in this case.
    19
    collection valued at $15,000. Id. He further claims $1,430 in items described as “Hobby” and
    “Art, Hobbies & Collectibles,” and “Collections.” Holland-JC28 at 155-56.
    Mr. Holland seeks another $11,950 for a 2016 Kia Soul and $800 in repairs to his 1999
    Ford F-150. Holland-JC28 Resp. to Written Dep. 59. These figures reflects the cars’ ages and
    mileage. Id. Mr. Archibald determined the Kia Soul’s retrospective value by speaking with an
    automobile broker, who in turn gathered price information from a dealership. Tr. 2003:12 to
    2004:10 (Archibald). For his truck, Mr. Holland claims $300 for necessary supplies and $500
    for ten hours of his own labor. Holland-JC28 Resp. to Written Dep. 59.
    Mr. Lozos likewise did not apply a depreciation adjustment to the amounts the Bankers’
    claimed for each of their two cars, which were the cars’ purchase prices. PX-JC867, App. II at
    Banker 1. The Bankers seek $38,117.43 for a Cadillac acquired in 2012 and $27,000.00 for a
    Murano acquired in 2010. Id.
    4. Displacement costs.
    The government’s taking of a permanent flowage easement also displaced plaintiffs
    Banker, Burnham, Micu, and Holland from their homes. These plaintiffs lost the ability to
    occupy their homes and incurred costs associated with securing alternate housing. As part of
    their real property appraisals, Mr. Deal and Mr. Archibald estimated the test properties’ monthly
    rental value. Both experts determined the test properties’ monthly rental rate by comparing each
    to comparable rental transactions. Plaintiffs Burnham and Micu also provided lease agreements
    to establish the alternative housing costs they incurred.
    After flooding caused the Bankers to evacuate their home, they lived with Mr. Banker’s
    parents until they could safely return in the “last week of April or first of May.” Tr. 763:2-10 (T.
    Banker). Mr. Deal estimated the monthly rental value of the Bankers’ home to be $3,000, and
    Mr. Archibald estimated it to be $3,300. Pls.’ Post-Trial Br. at 38.
    Ms. Burnham evacuated her home on August 25, 2017 and never lived there again. Tr.
    46:25 to 47:6 (Burnham). Ms. Burnham stayed with her now mother-in-law and in a hotel paid
    for by FEMA until she leased a new apartment on October 28, 2017. Burnham-JC38 at 133.
    She paid $161.29 to rent the unit for the remaining days in October, then $1,266.50 22 per month
    thereafter. Id. at 140. Ms. Burnham determined that she did not have the money to repair her
    home, so she sold it for $80,000 on February 5, 2018. See Burnham-JC94; Tr. 59:19-23
    (Burnham). She moved out of the apartment she was renting and into her new home on April 14,
    2018. See Tr. 58:25 to 59:2, 63:4-12 (Burnham). Mr. Deal estimated the monthly rental value of
    Ms. Burnham’s property subject to the easement to be $1,500, and Mr. Archibald estimated it to
    be $1,700. Pls.’ Post-Trial Br. at 38.
    During Harvey, Ms. Micu sought refuge in a hotel in Dallas. Tr. 102:16-20 (Micu).
    When she returned to her home one to two weeks after Harvey, she realized she and her family
    could not move back in until the property was repaired. Tr. 102:21 to 103:15 (Micu). Ms. Micu
    relocated to a rental apartment from September 6, 2017 to August 31, 2018, when she and her
    22
    This figure represents $1,250 per month in rent plus $15.00 in pet rent and a $1.50
    monthly pest fee.
    20
    family returned to their home. Tr. 106:16 to 107:6, 123:5-8 (Micu). She paid $2,332.50 for the
    remainder of September 2017 and $2,799 for each month thereafter. Micu-JC19 at 4950. Mr.
    Deal estimated the monthly rental value of Ms. Micu’s home to be $1,875 and Mr. Archibald
    estimated it to be $1,900. Pls.’ Post-Trial Br. at 38.
    Mr. Sidhu seeks to recover costs associated with re-leasing the condominium units and
    lost rent after Harvey displaced his tenants. For the upstairs unit, 604, Mr. Sidhu claims $127 in
    lost rent because Harvey displaced the tenant for a few days. JX1172.
    Mr. Sidhu’s claims for the downstairs unit, 603, are higher. Due to flooding caused by
    Harvey and subsequent renovations, the downstairs unit was unoccupied between September 1,
    2017 and July 27, 2018. See Sidhu-JC62. He accordingly accounted for $7,183 (eleven months
    at $653 per month) in lost rent when calculating his damages. From this lost rent, Mr. Sidhu
    subtracts an HOA reimbursement of $1,200 and $129 for an “other adjustment.” Id. To this
    ultimate net rental loss of $5,854, Mr. Sidhu adds $313.43 he paid in electric utilities that
    accrued while the unit was vacant, JX1172; Tr. 1738:11-21 (Sidhu), and $200 in fees he paid an
    agent to show the apartment to obtain a new tenant, Tr. 1739:3-7 (Sidhu). Finally, Mr. Sidhu
    claims $3,001.53 in travel, hotel, and food costs, $1,774.30 of which he incurred in traveling
    from his home in California to testify at the liability trial and the remaining $1,227.23 in
    traveling to Houston to oversee repairs to the unit. Tr. 1739:19 to 1740:22 (Sidhu).
    5. Plaintiffs’ FEMA benefits.
    The federal government administers relief programs that help those affected by federally
    declared disasters. FEMA pays hotels to house individuals who are displaced, see Tr. 2694:12-
    21 (Glasschroeder), and issues direct payments to individuals for home repairs, critical needs
    (i.e., life-sustaining items including food, first aid, and hygiene items), 23 and personal property
    assistance for repairs or replacement. See, e.g., DX1288; DX1977. FEMA assistance is
    available when the President declares that a major disaster has occurred and federal assistance is
    needed to supplement efforts by state and local governments. See 
    42 U.S.C. § 5122
    . Individuals
    within the disaster zone are eligible if they are a U.S. citizen, noncitizen national, or a qualified
    alien, they register within the application period, and FEMA verifies their request for disaster-
    related damages. Tr. 2704:12 to 2705:19 (Glasschroeder). FEMA requires those within a
    special flood hazard area, as designated by FEMA, to obtain and maintain flood insurance on
    their property. See Tr. 2693:18 to 2694:7 (Glasschroeder). FEMA pays for the first three years
    of flood insurance. 
    Id.
    President Trump issued a disaster declaration (No. 4332) for the State of Texas on
    August 25, 2017. Plaintiffs Burnham, Micu, Banker, and Holland each received FEMA benefits.
    Ms. Burnham and her then fiancé received $27,957.65 in direct payments comprised of $4,618 in
    rental assistance, $19,060.06 for home repairs, and $4,279.59 for personal property repair and
    replacement. DX1288. FEMA also paid $7,897.50 directly to a hotel to provide Ms. Burnham
    transitional shelter. 
    Id.
     Ms. Micu and her husband received $30,656.46 in direct payments: $500
    for critical needs, $12,366 in rental assistance, $17,540.47 for home repairs, and $249.99 for a
    dehumidifier. DX1980. FEMA also directly paid a hotel $155.60 to shelter Ms. Micu. 
    Id.
     The
    23
    FEMA, Individual Assistance Program and Policy Guide 148 (January 19, 2019).
    21
    Bankers received $23,992.89 in direct FEMA payments: $21,256.89 for home repairs and $2,666
    for two months of rental assistance. DX1287. Mr. Holland received $9,959.67 in direct
    payments: $500 for critical needs, $3,546 in rental assistance, and $5,913.67 to repair or replace
    personal property. DX1977. FEMA also paid $4,887.09 directly to a hotel to house Mr.
    Holland. 
    Id.
    Dan Leistra-Jones, the government’s expert in economic and financial analysis, testified
    regarding “whether the plaintiffs received payments or benefits from the United States that relate
    directly to the losses they are claiming in this matter.” Tr. 2718:25 to 2719:5 (Leistra-Jones).
    Mr. Leistra-Jones classified home repair assistance and miscellaneous assistance awards as
    offsets to plaintiffs’ home repair costs; personal property assistance and critical needs assistance
    awards as offsets to plaintiffs’ personal property losses; and rental assistance payments as offsets
    to their claimed displacement expenses. Tr. 2728:11-21 (Leistra-Jones).
    C. Post-trial Procedures
    At the conclusion of the just compensation trial, the court established a schedule for post-
    trial briefing and closing arguments, and the parties filed their post-trial briefs accordingly. The
    parties presented closing arguments on September 29, 2022 in Washington, D.C.
    STANDARDS FOR DECISION
    The Takings Clause of the Fifth Amendment provides that “private property [shall not]
    be taken for public use, without just compensation.” U.S. Const. amend. V. A just
    compensation award must be “‘just’ both to an owner whose property is taken and to the public
    that must pay the bill[.]” United States v. Commodities Trading Corp., 
    339 U.S. 121
    , 123
    (1950). The proper measure of just compensation enforces this balance: the property owner “is
    entitled to be put in as good a position pecuniarily as if his property had not been taken. He must
    be made whole but is not entitled to more.” Olson v. United States, 
    292 U.S. 246
    , 255 (1934).
    This measure “derives as much content from the basic equitable principles of fairness as it does
    from technical concepts of property law.” United States v. Fuller, 
    409 U.S. 488
    , 490 (1973)
    (citations omitted). Just compensation is an “objective standard that disregards subjective
    values” ascribed by the owner. United States v. 50 Acres of Land, 
    469 U.S. 24
    , 35 (1984). The
    just compensation award includes interest that accrues from the date of the government’s
    acquisition until the date of compensation. See Tech. Coll. of the Low Country v. United States,
    
    147 Fed. Cl. 364
    , 367 (2020).
    Just compensation is determined according to a before-and-after approach that gauges
    “the difference in the market value of the property taken before and after the taking.” Potts v.
    United States, 
    130 Ct. Cl. 88
    , 91 (1954). In cases involving a partial taking, just compensation
    “may [also] include the diminished value to the remaining portion of land.” Ideker Farms, Inc.
    v. United States, 
    151 Fed. Cl. 560
    , 607 (2020). The plaintiff must show the quantum of damages
    claimed “to a reasonable approximation.” Arkansas Game & Fish Comm'n v. United States, 
    736 F.3d 1364
    , 1379 (Fed. Cir. 2013). Put differently, although damages must be shown “to a
    reasonable certainty,” the plaintiff “need not prove the precise amount of damages.” 
    Id.
    Additionally, plaintiffs’ damage calculation can be approximate if the defendant’s “wrong…
    preclude[s] exact ascertainment of the amount of damages,” but this approximation still must be
    22
    more than speculative. Kestenbaum v. Falstaff Brewing Corp., 
    514 F.2d 690
    , 698 (5th Cir.,
    1975). A court “‘confronted with conflicting evidence and relatively extreme valuations’ from
    the plaintiff and the Government” may form a just compensation award independent from the
    parties’ formulations. Gadsden Indus. Park, LLC v. United States, 
    956 F.3d 1362
    , 1372 (Fed.
    Cir. 2020), cert. denied, 
    141 S. Ct. 2795
     (2021) (quoting Otay Mesa Prop., L.P. v. United States,
    
    779 F.3d 1315
    , 1326 (Fed. Cir. 2015)).
    “[N]ot all losses suffered by the [property] owner are compensable under the Fifth
    Amendment.” United States ex rel. Tennessee Valley Auth. v. Powelson, 
    319 U.S. 266
    , 281
    (1943). Specifically, no compensation is due for damage or destruction that is the “unintended
    incident of the taking of land.” Mitchell v. United States, 
    267 U.S. 341
    , 345 (1925). Whether
    the loss is compensable turns on whether the loss is an “incidental or indirect consequence[] of a
    taking of other property” or a “direct product[] of the actual invasion or taking of the property
    involved.” R.J. Widen Co. v. United States, 
    174 Ct. Cl. 1020
    , 1028 (1966). Accordingly, so long
    as the owner is deprived of a piece of property’s use “not by a negligent act, but as the natural
    consequence of the deliberate, intended exercise of an asserted power,” it makes “no difference”
    whether the property is personal or real property. Causby v. United States, 
    109 Ct. Cl. 768
    , 772
    (1948). So too if a business or its assets are taken as a natural consequence of government
    action. See Kimball Laundry Co. v. United States, 
    338 U.S. 1
    , 14-15 (1949) (holding just
    compensation includes a business’s “demonstrable loss of going-concern value,” the value
    contributed by non-physical assets like management or client development skills); Todd v.
    United States, 
    155 Ct. Cl. 87
    , 98 (1961) (awarding plaintiffs the depreciated value of fishing
    equipment used in a fishing business conducted on property taken by the government).
    Notably, a plaintiff injured by a taking is not entitled to double recovery. See Innovair
    Aviation, Ltd. v. United States, 
    83 Fed. Cl. 498
    , 502 (2008) (adopting one approach to valuing an
    asset because the other would “give Plaintiff a double award”); Adams v. United States, 
    230 Ct. Cl. 628
    , 631-32 (1982) (considering compensation the state government paid for easements on
    the same land that the federal government took “to avoid double recovery by plaintiffs”). “As
    the finding of any such offset results in the reduction of a just compensation award, the
    government bears the burden of proving the applicability of any alleged offsetting benefit and its
    amount.” In re Upstream Addicks & Barker, 
    159 Fed. Cl. 512
    , 526 (2022). The government
    fails to carry this burden, for instance, if it provides only “a listing of the public benefits that
    flow from nearly all flood control projects.” See City of Van Buren v. United States, 
    697 F.2d 1058
    , 1062 (Fed. Cir. 1983). The government must establish that the benefit arose “directly and
    proximately to the remaining land as a result of the public work on the part taken, due to the
    particular relation of the land in question to the public work.” Hendler v. United States, 
    175 F.3d 1374
    , 1380 (Fed. Cir. 1999).
    ANALYSIS
    The court has held that the government’s taking encompassed both “a permanent flowage
    easement” and “plaintiffs’ personal property, fixtures, and improvements damaged or destroyed
    by [flooding attributable to Harvey].” In re Upstream Addicks & Barker, 148 Fed. Cl. at 278.
    Accordingly, the court’s just compensation award accounts for three categories of loss caused by
    the government’s easement: (1) diminution in real property value including damage to attendant
    structures, (2) damage or destruction of personal property, and (3) dislocation costs. The first
    23
    two categories constitute just compensation for the taking itself, the last for dislocation that was
    the direct and natural result of the government’s physical taking.
    In the foregoing analysis, the court first determines the extent to which the government’s
    easement diminished the value of plaintiffs’ real property. This valuation is a factor of the
    easement’s scope, the likelihood of future flooding under the easement, and the cost of repairing
    damage to structures taken by the government. Next, the court calculates the just compensation
    award for the government’s taking of plaintiffs’ personal property. The court identifies and
    applies deductions reflecting plaintiffs’ failure to prove certain items’ value and that items were
    taken. Then, the court concludes that housing and dislocation costs that plaintiffs incurred while
    the properties were uninhabitable are compensable because they were the direct and natural
    result of the government’s takings. To prevent duplicative recovery, the court then reduces the
    above awards to account for compensation plaintiffs have already received from FEMA to repair
    their homes, replace personal property, and obtain substitute housing until their homes were
    repaired. Finally, the court determines the interest necessary to make plaintiffs whole for the
    delay between payment and the government’s taking.
    A. Just Compensation
    1. Real property.
    The government has a “categorical duty to compensate the former owner” for property it
    physically takes. Tahoe-Sierra Pres. Council, Inc. v. Tahoe Reg’l Planning Agency, 
    535 U.S. 302
    , 322 (2002) (citing United States v. Pewee Coal Co., 
    341 U.S. 114
    , 115 (1951)). The
    flowage easement taken here constitutes a physical, permanent partial taking. See United States
    v. Cress, 
    243 U.S. 316
    , 328-29 (1917). Accordingly, the government must pay just
    compensation for the property interest it has taken and the “depreciation which results to the
    remainder in its use and value.” United States v. Grizzard, 
    219 U.S. 180
    , 185 (1911). While the
    Yellow Book binds only the government’s appraiser, 24 the parties agree that the Yellow Book’s
    before and after approach to valuation is proper. Under the before and after approach, the just
    compensation award is the difference between the property’s market value without the easement
    and the property’s market value with the easement plus any diminution to the remainder
    property’s value. Yellow Book at 37, § 1.7.1.
    Market value is the amount for which the property would have sold on the effective date
    from a “willing and reasonably knowledgeable seller to a willing and reasonably knowledgeable
    buyer.” Yellow Book at 95, § 4.2.1 (emphasis omitted). A reasonably knowledgeable buyer or
    seller is not “all-knowing,” but rather has the knowledge possessed by the “typical” willing
    buyer or seller. Fla. Rock Indus., Inc. v. United States, 
    18 F.3d 1560
    , 1566 (Fed. Cir. 1994).
    Regarding easements specifically, market participants can be reasonably informed for the
    purposes of a direct sales comparison appraisal even if the easement’s exact language has not
    been recorded. See Vaizburd v. United States, 
    384 F.3d 1278
    , 1283-85 & n.5 (Fed. Cir. 2004)
    24
    “The Yellow Book applies only to appraisers hired by the federal government for
    condemnation purposes; it is not mandatory with respect to appraisers not hired by the
    government.” Hardy v. United States, 
    141 Fed. Cl. 1
    , 32 (2018).
    24
    (upholding an appraisal notwithstanding the absence of easement language due to the court
    finding an easement and determining just compensation simultaneously).
    While the parties agree that the before and after approach is proper, they disagree on how
    to resolve two issues that arise when applying the approach to determine the test properties’
    after-taking value. First, the parties debate the scope of their rights under the easement, which
    bears on how extensively the easement diminishes property value. Second, they contest whether
    the market is aware that the easement exists, which determines whether a direct comparison of
    actual post-Harvey sales in the flood pool accurately captures the properties’ after-taking value.
    These disagreements explain the parties’ divergent after-taking valuations.
    Concerning the easement’s scope, the court’s prior rulings specify that the easement
    “leave[s] plaintiffs a fee simple interest in their properties which allows them to continue their
    lawful use subject to the risk of occasional flooding caused by the operation of the Addicks and
    Barker Dams.” In re Upstream Addicks & Barker, 148 Fed. Cl. at 278. This leaves at issue only
    the parties’ rights and obligations “in the event of potential future floods.” See id.
    Plaintiffs’ primary contention is that the government and property owners’ rights are
    uncertain because the easement has not been “reduced to express language and recorded.” Pls.’
    Pre-Trial Mem. at 7. Plaintiffs argue that Texas law will determine the parties’ rights under the
    easement, and that under Texas law the government has an “unrestricted right” to use the
    easement and “prohibit[] the property owner from interfering with the government’s use of the
    easement.” Id. at 4-5. Plaintiffs further contend that the Corps will enforce its policies to the
    maximum extent permissible, and that the Corps’ promises to the contrary are inapposite. Id. at
    7; Closing Arg. Tr. 123:8 to 124:3. In plaintiffs’ view, the government must compensate
    plaintiffs for the expansive rights it obtained via this partial taking. Pls.’ Pre-Trial Mem. at 5.
    The government responds that the easement’s scope will be determined by the court’s
    orders, not Texas law. Def.’s Post-Trial Mem. at 43-45. Based on the court’s previous rulings,
    the government argues there is no uncertainty in the easement’s scope. Plaintiffs and their
    successors “retain all development rights and can continue to make all lawful use of these
    properties,” and plaintiffs have not identified state laws that would restrict plaintiffs’ use of their
    properties. Id. at 45. The government maintains that just compensation for the easement should
    therefore reflect these allowances for the property owners and not the expansive view of the
    government’s rights that plaintiffs advance. Id at 43-45. 25
    Next, regarding market awareness of the easement, plaintiffs claim that “without a
    written, recorded, final easement, no comparable [after-taking] sales exist or could be found,” so
    post-Harvey sales in the flood pool do not provide reliable evidence of the test properties’ after-
    taking value. Pls.’ Pre-Trial Mem. at 16. As evidence of the lack of market awareness the
    25
    To resolve and define the easement, the court asked the parties to brief the text of the
    easement, and the parties have done so. See, e.g., Upstream Pls.’ Br. on Easement Language,
    ECF No. 577; Def’s Submission of Proposed Easement Language, ECF No. 578; Upstream Pls.’
    Resp., ECF No. 579; Def.’s Reply, ECF No. 580. The court has taken the parties’ proposals into
    account, along with the trial testimony in the case, in crafting the text of the comment, which text
    is set out in the Appendix, infra.
    25
    plaintiffs point to the absence of public-facing FEMA flood insurance rate maps, see Tr. 726:6 to
    727:11 (Wanhanen), the lack of any response from the title insurance industry, see Tr. 462:15 to
    463:4 (Philo), and recent sellers’ general failure to disclose the existence of an unrecorded
    easement, see PX-JC1025 at 22-23. Therefore, in plaintiffs’ view, literature reviews, case
    studies, sales data for properties outside the flood pool, and other indirect information provide
    the only reliable basis for calculating the properties’ after-taking value. See Pls.’ Pre-Trial Mem.
    at 18-19. Plaintiffs also claim the government’s after-taking comparable sales analysis is invalid
    because the market was ignorant of the easement, so none of those sales transferred the same
    property interest as the subject properties: fee simple ownership subject to the court-ordered
    flowage easement. Id. at 15-17.
    The government counters that the market is aware of the flood risk, and this awareness
    supports its direct sales-comparison analysis. Def.’s Post-Trial Mem. at 33-40. According to the
    government, “market participants’ awareness of the conditions that the [c]ourt found to
    constitute a taking was enough to use actual sales to determine market value even though there is
    no recorded easement.” Id. at 31-32. Put differently, to know the extent of Harvey flooding is to
    know of the easement. The market’s awareness of the flood risk comes from individuals’
    “personal, direct experience” with upstream flooding during Harvey, local and national news and
    social media coverage, public meetings and outreach, and school and road closures. Id. at 33, 36.
    The government criticizes plaintiffs for defining market awareness too narrowly and
    ignoring relevant evidence of market awareness. Specifically, it argues that plaintiffs put form
    over substance by distinguishing knowledge of the easement from knowledge of the flood risk.
    See Def.’s Post-Trial Mem. at 42. Additionally, the government claims that plaintiffs’ focus on
    the lack of a recorded easement and sellers’ general failure to check the disclosure form box for
    unrecorded easements is too narrow. It contends that, in addition to the aforementioned sources
    beyond disclosure forms, other fields on the disclosure forms where sellers disclosed flooding
    due to Harvey and the Addicks and Barker Reservoirs, adequately informed the market of the
    easement’s conditions. Id. at 34-37, 60-61.
    The court’s just compensation award for plaintiffs’ real property is informed by the
    atypical nature of the easement and the fact that the market knows of the flood risk even if the
    precise terms of the easement have not been identified until now. See Appendix, infra. The
    court’s past rulings are explicit that this flowage easement is an atypical one. Unlike standard
    flowage easements that generally prohibit human habitation and structures, see JX1007 at 8-12 to
    8-14, plaintiffs are allowed “to continue their lawful use subject to the risk of occasional flooding
    caused by the operation of the Addicks and Barker Dams.” In re Upstream Addicks & Barker,
    148 Fed. Cl. at 278. Importantly, because this taking involves “a permanent right to inundate the
    property with impounded flood waters,” it has a greater impact on property value than a
    temporary taking would. See In re Addicks & Barker, 146 Fed. Cl. at 250. This permanence
    also means that plaintiffs cannot recover from the government for any damage caused by future
    flooding up to the elevation of the government’s easement. See id. at 253.
    Plaintiffs’ expansive conception of an easement’s scope overlooks the fact that the
    government’s rights under this atypical flowage easement are narrower and more qualified than
    they would be under a standard flowage easement. Plaintiffs identify rights that a standard
    flowage easement imparts to the dominant estate. But the extent to which the easement
    26
    diminishes plaintiffs’ property value largely turns on the atypical scope of the government’s
    rights and how frequently these rights are likely to be invoked, namely how frequently
    meteorological conditions would cause flooding above government-owned land under the Corps’
    operating procedures.
    In short, this easement’s effect on property value is tied to the frequency and extent of
    flooding, i.e., how frequently the government will resort to the easement. See In re Upstream
    Addicks & Barker, 159 Fed. Cl. at 522. Plaintiffs contend that the easement has a greater impact
    on property value than flooding because it gives the government the right to flood homes at any
    time for any reason, 26 and the pool behind the dams is deliberately engineered to flood and could
    cause flooding that is not limited to natural disasters. PX-JC1025 at 7. The court-ordered
    easement, however, does not confer the right to flood homes “at any time for any reason,” id.,
    but only the right to flood “by the operation of the Addicks and Barker Dams,” i.e., when
    meteorological conditions and the Corps’ purpose for the dams so require. In re Upstream
    Addicks & Barker, 148 Fed. Cl. at 278. Admittedly, the Corps’ operating procedures do little to
    limit the frequency of flooding because “the 2012 Water Control Manual, which the Corps
    followed during Harvey, instructs the Corps to operate the dams in a manner consistent with their
    original purpose: to protect downstream property by impounding water in upstream reservoirs.”
    In re Upstream Addicks & Barker, 146 Fed. Cl. at 259. The probability that the meteorological
    conditions necessary for the reservoir pools to exceed government-owned land will occur,
    however, provides a more meaningful limitation on how frequently the government will use its
    easement.
    Neither the parties nor the court can predict for certain how frequently the government
    will use its easement, but the evidence suggests that the frequency of a Harvey-level flooding
    event will be somewhere between the parties’ estimates. Plaintiffs’ experts testified that flooding
    above government land is between a 10- and 20-year recurrence event and flooding to the
    Harvey pool level is between a 35- and 100-year recurrence event. PX-JC873 at 2-3; see also Tr.
    987:5-11 (Beddingfield) (agreeing Harvey is approximately a 20- to 50-year recurrence event).
    But these estimates fail to account for storage capacity information about the reservoirs, Tr.
    2518:18 to 2519:21 (England), and posit recurrence of rain that fell on the reservoirs during the
    observed storms, Tr. 2596:17 to 2597:20 (Keim). In comparison, defendant’s expert
    characterizes Harvey as a 1000-year recurrence event. See Tr. 2045:3-10 (Glaudemans). But
    recent trends suggest that storms and hurricanes on par with Harvey are becoming increasingly
    frequent, and the government fails adequately to account for this increase. See Tr. 2062:16-19
    (Glaudemans) (testifying that two greater-than-thousand-year events occurred within two years);
    JX1013 at II01926565 (stating the need to reduce flood risks within the Buffalo Bayou and
    surrounding areas is driven in part by the “increased frequency of large-scale flooding events”).
    In short, the government understates the frequency of a Harvey-level storm. Similarly large
    storms will likely occur in the future, but it remains uncertain when or how frequently.
    Notwithstanding this uncertainty, the evidence does show that the government will use its
    easement only in the event of a natural disaster. That the President actually declared Harvey and
    Imelda to be major disasters supports this conclusion.
    26
    Plaintiffs list separately the right to store water inside a house, see PX-JC1025 at 7, but
    this right is encompassed by the right to flood homes at any time circumstances warrant.
    27
    Plaintiffs further contend that the easement grants the Corps the rights to prevent new
    construction and to control the plaintiffs’ flood mitigation efforts. PX-JC1025 at 7. But these
    rights are more qualified and narrower than plaintiffs suggest. For one, the court-ordered
    easement preserves the property owners’ rights to continue all lawful uses. In re Upstream
    Addicks & Barker, 148 Fed. Cl. at 278. The Corps understands this to mean property owners can
    inhabit and maintain existing structures on the property. See Tr. 296:7 to 297:9 (Johnson-Muic).
    Moreover, apart from storms, the Corps officials testified that the easement would only be
    enforced if the owners’ actions reduced the storage capacity of the land in question. See Tr.
    164:23 to 165:3 (Johnson-Muic); JX1010 at 3, ¶ 1.5; JX1007 at 8-12, ¶ 8-24. The Corps further
    suggested that the easement’s atypical nature might require it to tolerate even some property
    modifications that would reduce the reservoirs’ storage capacity. See Tr. 211:22 to 214:10
    (Johnson-Muic).
    Plaintiffs also include certain dominant estate rights that they have not shown the Corps
    will exercise. These rights include the Corps’ freedom to post signs and enter plaintiffs’
    property. PX-JC1025 at 7. Plaintiffs presented no evidence that the Corps would post signs or
    that, if the Corps did, posting signs would impact property value. See Tr. 2840:21 to 2841:13
    (Bell). Plaintiffs also have not presented evidence on the likelihood that, absent storms, the
    Corps would access properties, how frequently, or how this access would affect property values.
    See Tr. 2839:23 to 2840:18 (Bell). Accordingly, the easement’s scope is narrower than plaintiffs
    contend, and narrower than the scope plaintiffs’ experts used in appraising the test properties’
    after-taking value. The after-taking value must reflect only those rights that the government
    actually acquired and only to the extent those rights affect the value of plaintiffs’ property.
    Turning to market awareness, the typical buyer and seller in the market are reasonably
    aware of the flood risk but not the easement. Knowledge of a flood risk is not the same as
    knowledge of an easement. While an easement can impress its full effect on property’s value
    without being recorded, a market participant who is reasonably knowledgeable of a flood risk
    will likely behave differently than one who is reasonably knowledgeable of an easement.
    Indeed, the title industry treats easements and flood risks differently. For instance, a title
    insurance company would likely except from its policy any financial loss attributable to an
    easement, which in turn would cause the loan provider either to increase either the mortgage rate,
    the down payment or both, or deny the loan altogether. Tr. 482:1-19, 487:20 to 488:6 (Philo).
    This would price some buyers out of the market unless the owner lowered the sale price. See Tr.
    469:3-7 (Philo). Because title insurance companies will issue policies to properties within 100-
    and 500-year floodplains and lenders will issue mortgages for such properties, an easement’s
    existence negatively affects value independent from and in addition to the property’s flood risk.
    See Tr. 501:12-22 (Philo).
    The market is unaware of the easement but has begun to experience some of the effects
    on property value that will occur once the market learns of the easement. To date, no easement
    has been recorded, title insurers have continued to issue policies for properties sold in the Harvey
    flood pool, see Tr. 462:15 to 463:4 (Philo), and less than one-half percent of people who sold
    homes within the Harvey flood pool after Harvey disclosed the existence of an unrecorded
    easement. PX-JC1025 at 22-23. Although the court has previously indicated that its own prior
    rulings “are sufficient to inform the scope of the easement” even absent the recording of “exact
    easement language,” In re Upstream Addicks & Barker, 159 Fed. Cl. at 524, there is evidence
    28
    that price trends for flood-pool properties did not specifically change after the court’s liability
    ruling, see DX1001 at 11896-11900. 27 Taken together this evidence shows the market remains
    unaware of the easement’s terms.
    Nevertheless, the market’s knowledge of the test properties’ flood risk indicates that post-
    Harvey sales data informs to some extent the test-properties’ after-taking value. Social and news
    media covered and continues to cover Harvey-related flooding and more general flood risks in
    the Houston area. See generally DX1001 at 11790-11878 (cataloguing the effect recent weather
    events and Harvey specifically had on the market’s awareness of flood risk). Moreover,
    although property owners often use FIRMs to gauge flood risk and none shows the Harvey flood
    pool, other sources have provided public-facing maps of the Harvey flood pool, including the
    Harris County Flood Control District’s website and the Texas Tribune. See Tr. 556:22 to 557:14
    (T. Ward); DX 1080 at row 1500; Neena Satija and Kiah Collier, Houston officials let developers
    build homes inside reservoirs. But no one warned buyers., The Texas Tribune (Oct. 12, 2017),
    https://apps.texastribune.org/harvey-reservoirs/. Market participants could also access even
    more site-specific information. Beside the box for disclosing an unrecorded easement, sellers
    used various fields on disclosure forms to notify buyers of the flood risk associated with
    particular properties. For instance, sellers disclosed previous structural and site flooding and
    even specifically mentioned Harvey and the Addicks and Barker Reservoirs. See DX1676 at
    49000; PX-JC1201 at 2-3; PX-JC1189 at 2-3. Similar information was displayed on MLS real
    estate listings. See, e.g., DX1021 at 12800, 12804.
    The court’s real property just compensation award reflects the properties’ value in their
    damaged state, subject to the easement. See In re Upstream Addicks & Barker, 148 Fed. Cl. at
    278. The court’s award takes into consideration the facts that the government’s easement is
    atypical and “a similarly large storm, producing comparable rainfall, remains likely to occur
    again.” See In re Upstream Addicks & Barker, 146 Fed. Cl. at 251-52. The court rejects the
    government’s valuation for the properties in their after-taking repaired state because just
    compensation is measured “at time of the taking.” United States v. 564.54 Acres of Land, 
    441 U.S. 506
    , 511 (1979). Accordingly, the government cannot credit repairs that plaintiffs made
    after the government damaged their property by impounding Category 3 black water on
    plaintiffs’ land and in their homes. In re Upstream Addicks & Barker, 146 Fed. Cl. at 252
    (2019). The awards account for repairs only to the Banker, Burnham, Micu and Sidhu 603
    homes and the Popovici’s garage, and for only those costs the plaintiffs incurred to restore their
    property to their pre-taking state. The numbers exclude costs associated with upgrades,
    remodeling, or other improvements going beyond the repairs that the government’s taking
    necessitated. 28
    27
    The government contends this is evidence that knowledge of the easement “had no
    negative effect on prices.” Def.’s Post-Trial Mem. at 28. But this lack of a market response
    could just as well indicate the court’s liability ruling did not alert the market of the easement.
    28
    The award for the government’s taking of plaintiffs’ real property and improvements is
    reduced by 50% for plaintiffs Burnham, Micu, Popovici, and Sidhu to reflect these plaintiffs’
    proportional ownership interest. Tr. 41:12-18 (Burnham); Tr. 101:18 to 102:7 (Micu); Tr.
    789:11-20 (Popovici); Tr. 1713:11-22 (Sidhu).
    29
    The award for structurally flooded properties reflects both the fact that the easement
    grants the government the permanent right to impound water within the homes on the properties,
    and the structural damage the government caused by taking the easement. The government
    flooded Ms. Burnham’s home with four to five feet of water for at least seven days. In re
    Upstream Addicks & Barker, 146 Fed. Cl. at 242. The damage was so extensive that Ms.
    Burnham had to sell a home that she described as her forever home which she had renovated and
    decorated with her own original artwork. See Tr. 43:12-44:19 (Burnham). The Bankers’
    property was flooded with roughly one foot of water for four days. In re Upstream Addicks &
    Barker, 146 Fed. Cl. at 241. The flooding distributed mucky sludge throughout the first floor of
    their home, requiring a eight-month-long restoration. Tr. 762:14 to 763:25 (Banker); Pls.’ Post-
    Trial Br. at 38. Ms. Micu’s property was flooded with approximately two feet of water for ten
    days. In re Upstream Addicks & Barker, 146 Fed. Cl. at 242-43. The home had to be mucked
    out and remediated to eliminate mold growth and portions of the home’s walls and foundation
    had to be restored, a process that took roughly one year. Tr. 121:10-11 (Micu).
    Damage to Mr. Sidhu’s downstairs unit was even more extensive. The flooding required
    Mr. Sidhu to gut and renovate his property over the course of nearly one year. In re Upstream
    Addicks & Barker, 146 Fed. Cl. at 243. Plaintiffs’ experts opined that the cost of repairing the
    unit far exceeded its market value, PX-JC890 at 83, and that “all value of the unit ha[d] been
    taken,” PX-JC883 at 33. The government’s expert estimated the flooding and necessary repairs
    diminished the property’s value by $40,000. DX1006 at 11670.
    The government did not flood homes on the Popovici and Sidhu 604 properties and the
    Popovici’s garage suffered only limited damage, so the just compensation award for them is
    lower. Tr. 1730:7-9 (Sidhu) (testifying that the upstairs unit did not need repairs because it was
    not flooded); Tr. 791:19-21, 799:17-23 (Popovici) (describing damage to the wooden garage
    door).
    Mr. Holland’s real property interest generates different issues from the fee simple
    plaintiffs. The government argues that his favorable leasehold is a non-compensable
    consequential loss because Mr. Holland’s interest is a contract right, and the government has not
    appropriated his contract right. Def.’s Post-Trial Mem. at 77. This argument fails. Leaseholds
    are compensable property interests under the Fifth Amendment. United States v. Petty Motor
    Co., 
    327 U.S. 372
    , 378 (1946). The government executes a taking by interfering with a contract
    right in a way that affects an underlying property right. See Palmyra Pac. Seafoods, L.L.C. v.
    United States, 
    561 F.3d 1361
    , 1369 (Fed. Cir. 2009). For this reason, although residential leases
    involve contractual rights, “[i]t has long been established that the holder of an unexpired
    leasehold interest in land is entitled, under the Fifth Amendment, to just compensation for the
    value of that interest.” Alamo Land & Cattle Co. v. Arizona, 
    424 U.S. 295
    , 303 (1976).
    Just compensation for a leasehold interest is the value of the government’s use and
    occupancy for the remainder of the lease as determined either by the amount specified in the
    lease or the fair rental value plus the value of the tenant’s renewal right. Alamo Land & Cattle
    Co., 
    424 U.S. at 304
    . Mr. Holland had a leasehold interest in the property that would have
    extended for six months after Harvey. But Mr. Holland’s landlord indicated he did not intend to
    restore the property, and because Mr. Holland could not afford to both restore the property and
    pay his rent, the landlord terminated the lease. See Holland-JC28 Resp. to Written Dep. 48-50.
    30
    By flooding the property such that Mr. Holland could not safely return, the government
    effectively terminated Mr. Holland’s leasehold. Because he paid for no repairs to his leased
    property, he is entitled to compensation only for his leasehold advantage. 
    Id.
    Based on these considerations, plaintiffs are entitled to just compensation for their real
    property in the following amounts:
    Plaintiff(s)                                         Gross Just Compensation Award 29
    Mr. and Ms. Banker                                   $200,279.34
    Ms. Burnham                                          $57,237.81
    Mr. Holland                                          $3,300
    Ms. Micu                                             $64,988.90
    Ms. Popovici                                         $1,401.49
    Mr. Sidhu, for unit 603                              $25,000
    Mr. Sidhu, for unit 604                              $534.00
    2. Personal property.
    Plaintiffs are entitled to compensation for “personal property, fixtures, and improvements
    damaged or destroyed by the flood” that attended the government’s taking of the flowage
    easement. In re Upstream Addicks & Barker, 148 Fed. Cl. at 278. This prior ruling comports
    with precedent that establishes plaintiffs whose personal property the government appropriates
    are entitled to just compensation. Horne v. Dep't of Agric., 
    576 U.S. 350
    , 359-361 (2015). The
    plaintiffs nonetheless must take reasonable steps to mitigate damages. See Heydt v. United
    States, 
    38 Fed. Cl. 286
    , 310 (1997).
    The government argues that plaintiffs’ personal property losses are non-compensable
    results of the taking, that such losses overlap with their real property claims, and that plaintiffs
    have failed to establish the value of their personal property and that Harvey caused loss or
    damage to various items. See Def.’s Post-Trial Mem. at 77-90. The government first argues that
    “[p]laintiffs’ claims relating to personal property are consequential damages, which are not
    compensable under the Fifth Amendment.” Id. at 78. More specifically, it asserts that these
    losses are non-compensable because in taking the flowage easement the government neither
    “appropriate[d] [p]laintiffs’ personal property for public use . . . nor . . . intend[ed] to damage
    any personal property.” Id. This argument ignores the court’s ruling that plaintiffs’ personal
    property was not merely damaged by the government’s taking of plaintiffs’ real property.
    Rather, the personal property itself was taken by the government. Just as when it takes real
    29
    These amounts for award do not account for offsets discussed infra, section B.
    31
    property, the government must pay just compensation when it takes personal property. Horne,
    576 U.S. at 359-61.
    The government’s argument also falters because, even had the court held the government
    only took real property, the personal property losses would nonetheless be compensable because
    they were directly and naturally caused by the government’s real property taking. To be specific,
    whether a loss caused by a taking is compensable hinges not on whether it is a consequence of
    the government’s taking but on whether it is an “incidental or indirect consequence[] of a
    taking.” R.J. Widen Co., 174 Ct. Cl. at 1028. Accordingly, a loss that is the “direct product[] of
    the actual invasion or taking of the property involved” is compensable. Id. This distinction,
    further defined by cases surveyed below, also explains that the plaintiffs’ personal property
    losses are compensable even if the government did not intend to cause such damage and did not
    acquire the personal property for public use.
    A loss is incidental and non-compensable when its connection to the taking is too
    attenuated. For example, an injury that results from the government’s taking of another’s
    property is not compensable under the Fifth Amendment. Air Pegasus of DC, Inc. v. United
    States, 
    424 F.3d 1206
     (Fed. Cir. 2005); United States ex rel. Tennessee Valley Authority v.
    Powelson, 
    319 U.S. 266
     (1943). In Air Pegasus, a plaintiff heliport business sought to recover
    its leasehold interest for a building when the government prohibited the operation of helicopters
    in the area where the heliport was located. 
    424 F.3d at 1209-10
    . The Federal Circuit noted that
    “Air Pegasus does not actually own or operate any helicopters,” and that the injury was non-
    compensable because it resulted not from the government taking Air Pegasus’s property but was
    “the more attenuated result of the government’s purported taking of other people’s property.” 
    Id. at 1215
    . Similarly, the plaintiff in Tennessee Valley Authority argued the value of land the
    government had taken should reflect the land’s potential future use for a hydroelectric project.
    
    319 U.S. at 274
    . But the plaintiff had not yet built the project and could not do so without
    combining the land in question with other tracts it had not yet acquired through eminent domain.
    
    Id. at 284
    . The Court held the plaintiff was not entitled to “compensation for the loss of a
    business opportunity based on the unexercised privilege to use the power of eminent domain,”
    
    id.,
     because the opportunity was “too remote and speculative.” 
    Id. at 275-76
     (quoting McGovern
    v. New York, 
    229 U.S. 363
    , 372 (1913)).
    Similarly, the government need not compensate a party for a reduction in profit caused by
    factors outside the governments’ control. Yuba Nat. Res., Inc. v. United States, 
    904 F.2d 1577
    (Fed. Cir. 1990). The government temporarily took land that Yuba had agreed to lease to a third
    party in exchange for rent and a percentage of mineral royalties. 
    Id. at 1578-81
    . The trial court
    awarded Yuba its minimum rent and royalty payments but declined, however, to award royalty
    losses that occurred because gold had a lower value after the temporary taking. 
    Id.
     The Federal
    Circuit affirmed because “any attempt to determine how much gold would have been extracted
    during the taking period, and what its net sales price would have been, would involve the very
    kind of conjectural and speculative analysis the courts consistently reject as a basis for
    determining just compensation under the Fifth Amendment.” 
    Id. at 1582-83
    .
    Property losses, including personal property losses, are compensable when they are
    directly caused by the government’s taking. In Causby v. United States, the court held the
    government had taken an easement over plaintiffs’ property by flying airplanes 83 feet above the
    32
    land. 109 Ct. Cl. at 769-70. At the time of the taking the Causby plaintiffs had used the land to
    raise chickens. 
    104 Ct. Cl. 342
    , 349 (1945), rev'd, 
    328 U.S. 256
     (1946). 30 By using its
    easement, the government caused “as many as 6 to 10 chickens a day [to be] killed by flying into
    the walls from fright caused by the planes.” 
    Id.
     The Claims Court ultimately awarded plaintiffs
    just compensation for the lost personal property. 109 Ct. Cl. at 772. It reasoned that there was
    “no difference in the destruction of personal property and real property” if the owner is deprived
    of its use “not by a negligent act, but as the natural consequence of the deliberate, intended
    exercise of an asserted power.” Id. Similarly in Todd v. United States, the court ordered the
    government to compensate plaintiffs for both real and personal property losses. 
    155 Ct. Cl. 87
    .
    In Todd the government took plaintiffs’ fishing rights under their state fishing licenses. Id. at 91.
    In addition to the value of the fishing licenses, the court held that plaintiffs were entitled to
    compensation for nets and poles rendered useless by the taking. Id. at 91, 98.
    Here, unlike in Yuba Natural Resources, the personal property damage plaintiffs claim
    they suffered is neither speculative nor conjectural. This case does not include the sale of a
    commodity subject to rapid fluctuations in value. Instead, plaintiffs’ loss was directly caused by
    factors within the government’s control, namely the operation of the Addicks and Barker Dams.
    See In re Upstream Addicks & Barker, 146 Fed. Cl. at 254 (“The damage to plaintiffs' properties
    was the direct result of the government's construction, modification, and operation of the
    Addicks and Barker Dams.”). Plaintiffs’ claims are also not attenuated as those were in
    Powelson and Air Pegasus because at the time of the taking plaintiffs actually owned the
    personal property for which they seek compensation. Moreover, the damage to this personal
    property was a direct result of the government’s taking the easement, like the losses suffered by
    plaintiffs in Todd and Causby. The flowage easement gives the government the right to impound
    water on plaintiffs’ property, and the personal property was damaged when the government did
    just that. The Corps was “well aware that storms capable of overflowing government-owned
    land were likely to occur.” In re Upstream Addicks & Barker, 146 Fed. Cl. at 260. It also knew
    that the at-risk land contained residences. See id. at 256 (describing Corps surveys of properties
    “in the reservoirs located beyond government land”). Accordingly, plaintiffs are entitled to the
    personal property lost when the government flooded their properties on August 30, 2017.
    Also at issue is whether plaintiffs’ have met their burden of proof in establishing the
    value of personal property and that it was damaged or destroyed as a direct result of the taking.
    The government specifically contests the value plaintiffs ascribe to particular items and whether
    certain personal property damage was caused by Harvey. Def.’s Post-Trial Mem. at 78-80, 82-
    90.
    The property owner “must show actual damages ‘with reasonable certainty,’ which
    requires ‘more than a guess, but less than absolute exactness.’” Otay Mesa Prop., L.P., 779 F.3d
    at 1323 (quoting Precision Pine & Timber Inc. v. United States, 
    596 F.3d 817
    , 833 (Fed. Cir.
    2010)). And, “all costs claimed must have supporting documentation.” Chevron U.S.A., Inc. v.
    United States, 
    116 Fed. Cl. 202
    , 227 (2014); Tyger Const. Co. v. United States, 
    31 Fed. Cl. 177
    ,
    30
    Upon appeal, the Supreme Court affirmed the Claims Court’s holding that there had
    been a taking and remanded for the Claims Court to determine the “precise nature of the
    easement taken.” Causby, 109 Ct. Cl. at 769. The description of the property damage is
    included in the Claims Court’s first opinion: Causby, 
    104 Ct. Cl. 342
    33
    260 (1994) (“Because [plaintiff] presented no documentary evidence, proof of damages is
    insufficient with respect to this claim.”). Absent documentary support, even a claim for damages
    that is supported by testimony from a plaintiff’s expert may fail for lack of proof. See
    Transtechnology Corp., Space Ordnance Sys. Div. v. United States, 
    22 Cl. Ct. 349
    , 384 (1990).
    Similarly, a plaintiff fails to carry its burden if its damages claims are so vague that the court
    “cannot ascertain whether they are viable.” Bowman Constr. Co. v. United States, 
    154 Fed. Cl. 127
    , 142 (2021).
    Mr. Holland claims substantial dollar values for antiques and specialty items but provides
    no documentation to establish the items’ status or value as antiques or collectables. Instead, Mr.
    Holland provides only general descriptions such as “Dining hutch – antique” and “Dining room
    table and chairs – antique” to support his claimed losses. See PX-JC867 App. II at Holland 7.
    His valuation of collectors’ items also rests on sparse evidence. For instance, he requests
    compensation for “an [o]riginal 1970’s Star Wars Collection” and a “WWE championship belt.”
    Id. at 7, 11. Still other listed entries provide categorical descriptions without describing what
    particular items comprise the loss, namely his claim for $1,430 in lost “Art Hobbies &
    Collectibles.” Holland-JC28 at 155-56. These descriptions are too vague for the court to
    determine their accuracy. Additionally, plaintiffs’ expert on personal property valuations
    admitted that he did not verify Mr. Holland’s claims for antiques and collectibles even though
    such items typically must have their value confirmed with supporting documentation. PX-JC867
    at 5. In short, Mr. Holland has provided inadequate evidence of the value of the antique dining
    hutch, sterling silver set, and table and chairs as well as his signed Kiss Guitar, WWE
    championship belt, Star Wars action figures, and general losses to art hobbies and collectibles.
    Mr. Holland’s valuation of these items exceeds the value of non-antique or non-collectible items
    of the same kind to the point that the items’ value requires independent documentation. His just
    compensation award is reduced by $13,940 to reflect this inadequacy. Aside from the above
    items, Mr. Holland has provided sufficient proof to support the loss of $63,957.52 in personal
    property. Thus, Mr. Holland is awarded $77,897.52 for his loss of personal property.
    The Bankers similarly provide insufficient evidence of their cars’ value at the time of the
    taking and that certain personalty and fixtures were damaged by Harvey. The Bankers identified
    the amount they initially paid for the cars but did not provide evidence—such as vehicle repair
    histories, their mileage, or the extent to which they were damaged—to establish the value of the
    cars at the time of the taking. See Tr. 772:11-14 (Banker). The Bankers claim will also be
    reduced by $285 attributable to a beverage refrigerator that they acquired after Harvey and
    $162.50 for a microwave that they admitted “was probably not damaged” because it was above
    the flood line. PX-JC867 App. II at Banker 1-2; Tr. 775:173 to 776:4 (Banker). The Bankers
    also mischaracterize the cost of yard landscaping, sod, and refinishing their front door as
    personal property losses. PX-JC867 App. II at Banker 1. Plaintiffs have failed to establish that
    these costs are distinct from the amounts they claim for repairs to their real property.
    Compensation for these losses is addressed by the court’s award for repairs to the Bankers’ real
    property. Accordingly, the Bankers’ award is reduced by $74,064.93 to account for their failure
    of proof with respect to damage to their two vehicles, microwave, refrigerator, and landscaping
    and door repair costs. The Bankers have submitted sufficient evidence to support their claim for
    $16,527.41 in personal property losses. See generally Banker-JC6 (invoice listing appliances);
    PX-JC867 App. II at Banker 1-2 (personal property inventory); PX-JX1128; Tr. 771:5 to 773:11
    (Banker) (describing personal property losses).
    34
    Ms. Popovici likewise claimed amounts for landscaping services and personalty and
    fixtures that allegedly were damaged by the government’s taking. JX1170-71. Ms. Popovici
    failed to prove that landscape-related damages were proximately caused by the government’s
    taking. The landscaping invoices are dated September 29 and October 2, 2020, more than two
    years after the government’s taking. Id. Similar deficiencies undermine Ms. Popovici’s claim
    for service and repair costs associated with her car and home HVAC system. The HVAC system
    was cleaned over a year after the government’s taking once Ms. Popovici noticed “vents in the
    ceiling that were dirty.” Tr. 796:24 to 797:12 (Popovici). The flood water did not enter the
    Popovici residence, Tr. 814:4-8 (Popovici), and the HVAC units themselves were not damaged
    by flooding, 2019 Tr. 1252:2-7 (Popovici). Ms. Popovici fails to show that these repairs were
    necessitated by the government’s taking rather than routine servicing. Next, Ms. Popovici
    testified that her vehicle was damaged not when the government flooded her property, but when
    her husband drove the car off the flooded property. Tr. 824:13-24 (Popovici). Accordingly, Ms.
    Popovici has failed to establish that she suffered any personal property damage because of the
    government’s easement. The $1,401.49 Ms. Popovici claims in repairs to her garage is included
    in her just compensation award for real property. JX1165; JX1167.
    Ms. Micu’s claims for mutilated currency and the depreciated value of a piggy bank
    containing damaged currency falter as well. Ms. Micu was obligated to mitigate her damages.
    The Bureau of Engraving and Printing allows people to redeem mutilated currency for up to its
    face value. 
    31 C.F.R. § 100.5
    (a). Because Ms. Micu provides no evidence that she sought to
    mitigate these losses, her personal property award is reduced by $1,800. Ms. Micu is entitled to
    recover $42,184.85 for the government’s taking of her personal property. See generally Micu-
    JC246 (personal property inventory); Micu-JC55 (photographs of damaged personal property);
    Micu-JC143 (photographs); Micu-JC192 (photographs).
    Ms. Burnham carried her burden of proof for establishing her personal property damages
    claim for $21,088.63. Ms. Burnham submitted numerous images depicting damage to personal
    property that supports the losses she claimed in her personal property inventory. See generally
    Burnham-JC92 (photographs); Burnham-JC96 (inventory).
    Mr. Sidhu also seeks compensation for personal property, namely a range, range hood,
    refrigerator, and dishwasher to replace damaged appliances in the downstairs unit. Sidhu-JC52;
    Sidhu-JC89. These costs are not included in the court’s just compensation award for damage to
    Mr. Sidhu’s downstairs unit, so Mr. Sidhu is entitled to $1,900.40 for these losses.
    3. Displacement.
    Plaintiffs also claim damages for their temporary displacement from their properties.
    Plaintiffs base their claim for dislocation on their properties’ fair rental value. See Pls.’ Post-
    Trial Br. at 37-38. The government argues that the plaintiffs are not entitled to any just
    compensation for the temporary displacement caused by the government’s taking. See Def.’s
    Post-Trial Br. at 91. It contends that the just compensation for the taking of real property
    includes just compensation for temporary displacement because the after-taking valuation
    measures the value of the properties in their “unrepaired, flood damaged condition,” and a
    reasonable buyer and seller would factor into the purchase price the time it takes to restore the
    property to a livable condition. 
    Id.
    35
    The court agrees that using the monthly rental value of the properties would duplicate the
    court’s real property just compensation award. See Yellow Book at 172, § 4.6.5.2. That award
    compensates plaintiffs for the cost of restoring the home to a livable condition including the cost
    of materials. The plaintiffs are nonetheless entitled to just compensation for the dislocation costs
    they incurred as a direct result of the government’s taking.
    A just compensation award may take into consideration displacement costs imposed on
    the plaintiff as a direct and natural result of the taking. Cf. United States v. Gen. Motors Corp.,
    
    323 U.S. 373
    , 383 (1945); see also Nat’l Lab'y & Supply Co. v. United States, 
    275 F. 218
    , 220-
    21 (E.D. Pa. 1921) (indicating just compensation can include either the cost and expense of
    equipping the location taken by the government or the cost and expense of equipping the
    plaintiff’s substitute location but not both and awarding the plaintiff the latter). For instance, in
    General Motors the Supreme Court explained that a plaintiff may be entitled to just
    compensation for “the reasonable cost of moving out the property stored and preparing the space
    for occupancy,” including the cost of storing goods or returning them to the leased premises.
    
    323 U.S. at 383
    . In that case the Court stated such costs could be considered along with the
    market rental value of the temporary occupancy taken but “not as independent items of damage.”
    
    Id.
    Accordingly, the court takes into consideration dislocation costs including the costs of
    securing substitute housing actually and necessarily incurred by plaintiffs here in determining the
    just compensation award. These displacements extended from the time the homes were rendered
    uninhabitable until the homes were repaired and safe to occupy once again. Ms. Burnham and
    Ms. Micu both established the length of time they were displaced from their homes and had to
    secure alternative housing. Ms. Burnham paid $7,043 in rent for alternative housing, 31 and Ms.
    Micu paid $33,122. 32 See Burnham-JC38 at 140; Micu-JC19 at 4950. These awards are reduced
    by half to reflect each plaintiff’s co-tenancy.
    Mr. Sidhu also suffered costs when the government used its easement and displaced his
    tenants. Specifically, Mr. Sidhu claims $5,854 in lost income and $313.43 in utility payments he
    made while unit 603 was vacant. See JX1172. He further claims $127 in lost rent for Unit 604
    to reflect the discount he provided the tenant because they were displaced during Harvey. Id.;
    Tr. 1737:15-24 (Sidhu). Structural flooding caused by the government’s easement rendered Unit
    603 uninhabitable between September 1, 2017 and July 27, 2018. Sidhu-JC62. The government
    contends these losses are non-compensable as “normal business expenses incurred anytime a unit
    is vacant.” Def.’s Post-Trial Br. at 75. But this argument ignores that Unit 603 was vacant
    because the government used its flowage easement and flooded the property. Lost profit and
    damage caused to business assets are compensable if they are the direct and natural consequence
    of the government’s taking. See Kimball Laundry Co., 
    338 U.S. at 16-19
     (holding the
    government “must pay compensation” for a laundry business’s trade routes and suggesting “the
    record of its past earnings” and expenditures building up the routes provide evidence of their
    value); see also Causby, 109 Ct. Cl. at 772 (awarding just compensation for destroyed business
    31
    This reflects $161.29 for the month of October, $6,332.5 for November-March, and
    $548.82 prorated for April 1-13, 2018.
    32
    This reflects $2,332.50 for September 2017, and $2,799 per month from October 2017-
    August 2018.
    36
    assets). These figures are reduced by half to reflect Mr. Sidhu’s proportional ownership of the
    property.
    Mr. Sidhu also claimed $3,001.53 for costs, prorated for unit 603, incurred in traveling
    from his home in California to Texas to oversee the repair of his properties and testify during the
    liability trial. Tr. 1739:19 to 1740:22 (Sidhu). These expenses are incidental and therefore non-
    compensable. In Georgia-Pacific Corp. v. United States, the plaintiff also requested additional
    management costs, including travel costs, made necessary by the taking. 
    226 Ct. Cl. 95
    , 151-53
    (1980). Unlike business assets that are taken, such costs represent how the taking may frustrate
    business operations, and “business frustrations and readjustments have been held
    noncompensable.” Id. at 153. Impounding floodwaters directly displaced Mr. Sidhu’s tenants,
    but travel costs he incurred because he lives in a different state and elected to travel to oversee
    the unit’s renovation have too attenuated a connection with the government’s taking.
    B. Offsets
    The government seeks to offset just compensation awards by the amount of money
    plaintiffs have already received in the form of direct payments from FEMA. 33 The rule against
    awarding a plaintiff duplicate recovery is attributable to just compensation’s guiding principle
    that the property owner “must be made whole but is not entitled to more.” Olson, 
    292 U.S. at 255
    ; Recovery, Black's Law Dictionary (11th ed. 2019); see also Innovair Aviation, Ltd., 
    83 Fed. Cl. at 502
    ; Pettro v. United States, 
    47 Fed. Cl. 136
    , 151 (2000) (refusing to grant plaintiff lost
    profits for an asset that plaintiff retained, to prevent double recovery); Adams v. United States,
    
    230 Ct. Cl. 628
    , 631-32 (1982) (considering compensation the state of Utah paid for easements
    on the same land that the federal government took to “avoid double recovery by plaintiffs”).
    Plaintiffs contend that FEMA payments must not be offset. They rely on cases applying
    the relative-benefits doctrine. See Ideker Farms Inc. v. United States, 
    146 Fed. Cl. 413
    , 415
    (2020). Under this doctrine, the court may offset only “direct and special benefits “which arise
    directly due to the particular relation of the land in question to the public work and proximately
    to the remaining land as a result of the public work on the part taken.” Hendler, 
    175 F.3d at 1380
    . Plaintiffs contend that FEMA payments do not qualify because they do not arise directly
    and proximately from the taking. Pls.’ Post-Trial Resp. at 31. Instead, the FEMA payments
    apply to “anyone who suffered from a declared disaster regardless of any connection to any
    taking or benefit . . . to the remainder property.” Id. at 33 (emphasis omitted).
    The facts of this case do not fall neatly within the relative-benefit doctrine. Where that
    doctrine applies, the taking itself causes some benefit to the remainder property. 34 The relative-
    33
    FEMA cannot claw back the funds it has disbursed because it can only do so within
    three years of awarding the funds, and each plaintiff who was granted FEMA relief was awarded
    relief more than three years ago. Tr. 2701:5-10 (Glasschroeder).
    34
    See, e.g., Hendler, 
    175 F.3d at 1383
     (affirming the lower court’s holding that the
    government’s taking of an easement to sink wells for the purpose of monitoring water migration
    conferred special benefits in the form of groundwater testing and remediation associated with
    installing the wells); Laughlin v. United States, 
    22 Cl. Ct. 85
    , 114 (1990) (applying the relative–
    benefits doctrine in holding that any increase in groundwater levels was offset by the special
    37
    benefit doctrine is a specific application of the general principle guiding the proper measure of
    just compensation: the person whose property is taken “must be made whole but is not entitled to
    more.” Olson, 
    292 U.S. at 255
    . Failing to deduct FEMA payments would constitute duplicate
    recovery. The government reimbursed for some losses of property once by issuing FEMA relief
    and should not be compelled to pay again for the damage to the property by the same flood
    pursuant to the court’s just compensation award. That the government made funds available to
    some others whose homes were flooded during Harvey but not because of a government taking is
    inapposite. Cf. United States v. River Rouge Improvement Co., 
    269 U.S. 411
    , 415-16 (1926)
    (discussing authority establishing that a benefit can be special even if adjacent lands are
    “similarly benefited” by the government action). The government issued payments through
    FEMA to compensate plaintiffs for the very same property losses and damages that they seek to
    recover here. In sum, the government has established that the cash payments from FEMA were
    related to the same flood damage that the plaintiffs seek to recover. Def.’s Pre-Trial Mem. at 37.
    FEMA relief was provided as a direct result of the government’s taking an easement on
    plaintiffs’ land. Indeed, the plaintiffs were only eligible because FEMA verified their claims for
    Harvey-related damages. See Tr. 2705:10-19 (Glasschroeder).
    Offsets also are relevant to plaintiffs’ costs for displacement, property loss, and repairs to
    structures flooded by Harvey. Plaintiffs Burnham, Micu, Banker, and Holland each received
    direct payments from FEMA, and if these amounts are not offset from the just compensation
    award these plaintiffs would receive an award greater than the loss they sustained. The Bankers
    received $21,256.89 in home repair assistance and $2,666 in direct rental assistance payments.
    DX1287. Ms. Burnham received $4,618 in direct rental assistance payments, $19,060.06 in
    home repair assistance, and $4,279.59 in personal property assistance. DX1288. Mr. Holland
    received $6,413.67 in critical needs assistance and personal property assistance and $3,546 in
    direct rental assistance payments. DX1977. Ms. Micu and her husband received $17,540.47 in
    home repair assistance, $12,366 in direct rental assistance payments, and $500 in critical needs
    assistance. DX1980. Accordingly, the Bankers’ total award will be reduced by $21,256.89, Ms.
    Burnham’s by $16,118.62, 35 Ms. Micu’s by $15,203.24, 36 and Mr. Holland’s by $6,413.67.
    These offset amounts exclude money paid directly to hotels that housed the plaintiffs.
    benefit the government’s flood control system provided by making the property in question
    suitable for farming).
    35
    Ms. Burnham’s offset is reduced by $2,309, 50% of the total direct payments for rental
    assistance, because her fiancé is a co-applicant for FEMA relief and co-signed the lease
    agreement for the property she moved into after selling her home. DX1288; Burnham-JC38. It
    is further reduced by $9,530.03, 50% of the total direct payments for real property repairs,
    because Ms. Burnham had only a 50% interest in the property and any increase in the sale value
    attributable to these repairs would be split with her mother. JX121. No reduction for personal
    property is made because Ms. Burnham indicates all the personal property in the home was hers.
    Tr. 91:17-18 (Burnham).
    36
    Ms. Micu’s offset is reduced by 50% because Ms. Micu’s husband was listed as a co-
    applicant on the FEMA award. DX1980. Direct assistance in the form of a dehumidifier, valued
    at $249.99, is also not deducted because it does not offset a loss Ms. Micu claimed.
    38
    Banker         Burnham        Holland       Micu           Popovici       Sidhu
    Gross just   $216,806.75 $81,847.94            $81,197.52 $102,642.33 $1,401.49            $29,631.42
    compensation
    award
    FEMA         $21,256.89 $16,118.62             $6,413.67     $15,203.24     $0             $0
    offsets
    Net just     $195,549.86 $65,729.32            $74,783.85 $87,439.09        $1,401.49      $29,631.42
    compensation
    C. Interest
    To make the landowner whole, the government may be required to pay interest for the
    delay between the date of the taking and the date of compensation. Tech. Coll. of the Low
    Country, 147 Fed. Cl. at 367. The court has held the taking occurred on August 30, 2017, and
    the parties disagree only on the appropriate rate and how frequently that interest should be
    compounded. Plaintiffs request an interest award of 3.62%, compounded quarterly, based on
    Moody’s Aaa Corporate Bond Index. Pls.’ Post-Trial Br. at 39-40. Defendants argue the rate
    awarded should be that set by the Declarations of Takings Act, compounded annually. Def.’s
    Post-Trial Mem. at 100.
    Under the Prudent Investor Rule, the appropriate interest rate is based on “how ‘a
    reasonably prudent person’ would have invested the funds to ‘produce a reasonable return while
    maintaining safety of principal.’” Tulare Lake Basin Water Storage Dist. v. United States, 
    61 Fed. Cl. 624
    , 627 (2004) (quoting United States v. 429.59 Acres of Land, 
    612 F.2d 459
    , 464-65
    (9th Cir.1980)). The Moody’s Aaa Corporate Bond Index rate has been held to satisfy the
    prudent investor rule without over-compensating the plaintiff. Jackson v. United States, 
    155 Fed. Cl. 689
    , 720 (2021), appeal dismissed, No. 2022-1276, 
    2022 WL 2163785
     (Fed. Cir. Jan.
    25, 2022); Tech. Coll. of the Low Country, 147 Fed. Cl. at 368-70; Hardy v. United States, 
    138 Fed. Cl. 344
    , 356 (2018); Sears v. United States, 
    124 Fed. Cl. 730
    , 733-37 (2016). It adequately
    protects plaintiffs’ principle against loss and provides a reasonable return for the liquidity risk
    borne by plaintiffs without over-compensating them. PX-JC872 at 8-9. The prudent investor
    rule also requires interest to be compounded. Tech. Coll. of the Low Country, 147 Fed. Cl. at
    370.
    Because it is the rate a reasonably prudent investor would seek, the court concludes that
    an interest rate of 3.62%, reflecting the Moody’s Aaa Corporate Bond Index, compounded semi-
    annually, comports with the prudent-investor rule in this case.
    CONCLUSION
    For the reasons stated, the plaintiffs are entitled to just compensation for the permanent
    flowage easement the government took through its construction, maintenance, and operation of
    the Addicks and Barker Dams. This award compensates plaintiffs for the taking of plaintiffs’
    real property as well as the taking of their personal property, fixtures, and improvements as a
    result of the flowage easement. Thus, the government is liable to plaintiffs in the following
    39
    amounts, plus interest at the rate of 3.62% compounded semi-annually from August 30, 2017
    until the date of payment:
    To Mr. and Ms. Banker $195,549.86
    To Ms. Burnham $65,729.32
    To Mr. Holland $74,783.85
    To Ms. Micu $87,439.09
    To Ms. Popovici $1,401.49
    To Mr. Sidhu $29,631.42
    Pursuant to Rule 54(b), there being no just reason for delay, the Clerk is directed to enter final
    judgment for the test plaintiffs as specified.
    Costs are deferred.
    Additionally, the court delineates and defines the flowage easement taken by the
    government as set out in the Addendum to this opinion. The government is directed to file the
    flowage easement in the title records of the private properties affected by the flooding that
    occurred at the end of August 2017.
    It is so ORDERED.
    s/ Charles F. Lettow
    Charles F. Lettow
    Senior Judge
    40
    ADDENDUM
    In the United States Court of Federal Claims
    Sub-Master Docket No. 17-9001L
    (Dated: October 28, 2022)
    **********************************             )
    IN RE UPSTREAM ADDICKS AND                     )
    BARKER (TEXAS) FLOOD-                          )
    CONTROL RESERVOIRS                             )
    )
    **********************************             )
    THIS DOCUMENT APPLIES TO:                      )
    )
    ALL UPSTREAM CASES                             )
    )
    **********************************             )
    Flowage Easement
    Pursuant to the court’s opinions and orders in the above-captioned case, which are
    incorporated by reference, IT IS ORDERED that the United States, through its construction,
    maintenance, and operation of the Addicks and Barker Dams, has taken a permanent flowage
    easement on the properties identified in Exhibit A. 37 This taking occurred on August 30, 2017.
    This flowage easement grants the government the right to flood the properties identified
    in Exhibit A if meteorological conditions and the authorized operation and maintenance of the
    Addicks and Barker Dams so require. The easement’s geographic limits are derived from the
    Harvey flood pool elevations as of August 30, 2017: 101.6 feet (NAVD 1988, 2001 adjustment)
    behind Barker Reservoir and 109.1 feet (NAVD 1988, 2001 adjustment) behind Addicks
    Reservoir. Future flooding is not expected to occur regularly or frequently but is instead subject
    to particular meteorological conditions under which the operation of the dams may result in
    temporary flood pools that extend beyond government-owned land.
    The owners of the properties subject to this flowage easement retain a fee simple interest
    in their properties. The fee simple owners and their successors in interest (the “owners”) retain
    (1) the right to continue their lawful residential uses of the properties; (2) all development rights,
    including the rights to build new, and maintain existing, structures, fixtures, and improvements;
    and (3) the right to make any other lawful use of their properties. Provided, however, that absent
    prior approval from any authority governing the operation or maintenance of the dams, the
    owners may not exercise these rights in a way that interferes with the government’s easement by
    37
    The relevant prior opinions and orders are In re Upstream Addicks & Barker (Texas)
    Flood-Control Reservoirs, 
    146 Fed. Cl. 219
    , 250 (2019); In re Upstream Addicks & Barker
    (Texas) Flood-Control Reservoirs, 
    148 Fed. Cl. 274
    , 278 (2020); Order of June 11, 2021, ECF
    No. 381.
    1
    reducing the water storage capacity of the property, or portion of the property, that is subject to
    the easement.
    This order does not alter any otherwise applicable local, state, or federal laws that may
    affect or restrict the present or future use of the properties.
    Following the entry of a final, non-appealable judgment requiring the payment of just
    compensation for this flowage easement, this order shall be recorded by the United States in the
    Fort Bend County and Harris County land records for the properties identified in Exhibit A.
    2
    

Document Info

Docket Number: 17-9001

Filed Date: 10/28/2022

Precedential Status: Precedential

Modified Date: 11/1/2022

Authorities (32)

United States v. River Rouge Improvement Co. , 46 S. Ct. 144 ( 1926 )

United States Ex Rel. Tennessee Valley Authority v. Powelson , 63 S. Ct. 1047 ( 1943 )

United States v. 564.54 Acres of Monroe and Pike County Land , 99 S. Ct. 1854 ( 1979 )

Linda Vaizburd and Arkady Vaizburd v. United States , 384 F.3d 1278 ( 2004 )

Palmyra Pacific Seafoods, L.L.C. v. United States , 561 F.3d 1361 ( 2009 )

The City of Van Buren, Arkansas v. The United States , 697 F.2d 1058 ( 1983 )

Henry Hendler, Paul Garrett and Tillie Goldring as Trustees ... , 175 F.3d 1374 ( 1999 )

United States v. Cress , 37 S. Ct. 380 ( 1917 )

United States v. 50 Acres of Land , 105 S. Ct. 451 ( 1984 )

Florida Rock Industries, Inc. v. United States , 18 F.3d 1560 ( 1994 )

Tahoe-Sierra Preservation Council, Inc. v. Tahoe Regional ... , 122 S. Ct. 1465 ( 2002 )

Yuba Natural Resources, Inc. v. The United States, ... , 904 F.2d 1577 ( 1990 )

United States v. The Fisher-Otis Company, Inc., and Roy ... , 496 F.2d 1146 ( 1974 )

Dana I. Kestenbaum v. Falstaff Brewing Corporation , 514 F.2d 690 ( 1975 )

Air Pegasus of d.c., Inc. v. United States , 424 F.3d 1206 ( 2005 )

Olson v. United States , 54 S. Ct. 704 ( 1934 )

Precision Pine & Timber, Inc. v. United States , 596 F.3d 817 ( 2010 )

Tyger Construction Co. v. United States , 1994 U.S. Claims LEXIS 236 ( 1994 )

United States v. Commodities Trading Corp. , 70 S. Ct. 547 ( 1950 )

Heydt v. United States , 1997 U.S. Claims LEXIS 139 ( 1997 )

View All Authorities »