  •       In the United States Court of Federal Claims
    No. 19-1696C
    (Filed: January 10, 2020)
    ************************************ *
    *
    W&G MACHINE COMPANY, INC.,              *
    *
    *
    Plaintiff,             *
    *     Bid Protest; Standing; Prejudice;
    v.                                      *     “Substantial Chance”; Direct Economic
    *     Interest; Subject-Matter Jurisdiction;
    THE UNITED STATES,                      *     Motion to Dismiss; RCFC 12(b)(1);
    *     RCFC 12(b)(6); Small Business
    Defendant,            *     Administration; Bundling; Cancellation
    and                                     *     of Solicitation; Sole-Source Award.
    *
    THE BOEING COMPANY,                     *
    *
    Defendant-Intervenor. *
    *
    ************************************ *
    James M. White, with whom were William Pannier and Barbara Fiero, Marshall & White,
    PC, Washington, D.C., for Plaintiff W&G Machine Company, Inc.
    Amanda L. Tantum, Senior Trial Counsel, with whom were Joseph H. Hunt, Assistant
    Attorney General, Robert E. Kirschman, Jr., Director, Douglas K. Mickle, Assistant
    Director, Commercial Litigation Branch, Civil Division, U.S. Department of Justice,
    Washington, D.C., Linwood I. Rogers, Deputy Chief Counsel, DLA Counsel Aviation,
    United States Department of Defense, Washington, D.C., and Karen Hunter, Trial
    Attorney, United States Small Business Association, Washington, D.C., for Defendant.
    Scott M. McCaleb with whom were Tracye W. Howard and George E. Petel, Wiley Rein
    LLP, Washington, D.C., for Intervenor The Boeing Company.
    OPINION AND ORDER ON MOTIONS TO DISMISS
    WHEELER, Judge.
    This bid protest involves bundled solicitations to supply helicopter parts to the
    Defense Logistics Agency (“DLA” or “the Agency”). W&G Machine Company, Inc.
    (“W&G”), an incumbent small business that has provided helicopter parts to DLA,
    challenges three of DLA’s solicitations. After W&G filed its complaint, DLA announced
    it was cancelling its solicitation relating to its H-53E (Super Stallion) helicopter program,
    one of the solicitations at issue. W&G opposes DLA’s decision to bundle material and
    supply chain integration services for its Apache (“AH-64”) and Chinook (“CH-47”)
    helicopter programs, and its Federal Supply Group 53.
    First, W&G challenges the agency’s decision to bundle the requirements for spare
    parts for the Chinook and Apache helicopters into a sole source award, the “AH-64/CH-47
    bundled procurement.” W&G argues that the AH-64/CH-47 bundled procurement is
    unlawful because it consolidates national stock numbers (“NSNs”) without justification,
    thereby favoring Original Equipment Manufacturers at the expense of small businesses.
    Second, W&G disputes DLA’s decision to combine approximately 221,099 national
    stock numbers relating to “Federal Supply Class 53 – Hardware and Abrasives,” into a
    single solicitation. Compl. ¶ 1. W&G contends that DLA’s decision to bundle these
    national stock numbers “marginalizes” W&G and “fundamentally alter[s] and diminish[es]
    the agency’s competitive procurement landscape.” Dkt. No. 18 at 7.
    The Government and Defendant-Intervenor moved to dismiss W&G’s complaint
    pursuant to the Rules of the Court of Federal Claims (“RCFC”) 12(b)(1) for lack of subject
    matter jurisdiction and, in the alternative, RCFC 12(b)(6) for failure to state a claim upon
    which relief can be granted. Ultimately, W&G fails to establish that it is an “interest party”
    as defined under the Tucker Act, 28 U.S.C. § 1491(b)(1). The Court, therefore, lacks
    subject-matter jurisdiction to consider any of W&G’s claims.
    Background
    I.    Solicitation No. SPE4A2-17-R-0032
    On November 1, 2019, DLA cancelled the third solicitation originally included in
    W&G’s complaint. This solicitation related to the procurement of parts for the H-53E
    (Super Stallion) helicopter program, Solicitation No. SPE4A2-17-R-0032, rendering this
    portion of W&G’s complaint moot.1 See H-53E Sustainment Support Initiative, GOVTRIBE
    1
    W&G does not contest dismissing the portion of its protest relating to the H-53E procurement.
    Dkt. No. 18 at 5 n.1.
    2
    (Nov. 1, 2019, 10:57 AM), https://govtribe.com/opportunity/federal-contract-opportunity
    /h-53e-sustainment-support-initiative-spe4a217r0032; see also Dkt. No. 14 at app. 1.
    II.    Solicitation No. SPAPR1-18-R-002U (the “AH-64/CH-47 Solicitation”)
    On December 7, 2017, DLA issued a “Potential Sources Sought” notice on
    FedBizOpps (“FBO”) explaining that “the Defense Logistics Agency (DLA) intends to
    contract on a sole source basis with the Boeing Company [(“Boeing”)] . . . to execute a
    comprehensive and holistic performance based supply chain management program.”
    Compl., Ex. 8 at 1–2. DLA posted the notice to “gauge potential interest in subcontracting
    opportunities.” 
    Id. at 2.
    The Potential Sources Sought notice asked those interested in
    being a prime or subcontractor to respond by December 21, 2017. Only Boeing responded
    to the December 7 notice. Compl. ¶ 49; Dkt. No. 14 at 8.
    On December 22, 2017, DLA issued its second notice, a Presolicitation Notice,
    announcing the agency’s intent to award Boeing the contract. Compl., Ex. 5. The notice
    identified the parts that the solicitation would cover and included a response date of January
    5, 2018. On January 18, 2018, DLA sent a letter with this information to small business
    contractors, including W&G, who had previously supplied the national item identification
    numbers that would be bundled under the new contract. Compl. Ex. 9; Dkt. No. 13 at 9.
    W&G did not respond to DLA’s December 22, 2017 notice or January 2018 letter. Compl.
    ¶ 92; Dkt. No. 13 at 9; Dkt. No. 14 at 8.
    On January 19, 2018, DLA issued a third FBO notice of its intent to bundle its spare
    parts requirements for the Apache and Chinook helicopter programs. Compl. Ex. 3. The
    notice included the results of the agency’s market research, bundling analysis, expected
    cost savings, impact on small businesses, historical acquisition, and a small business action
    plan. 
    Id. The notice
    stated that on October 31, 2019, DLA anticipated awarding “[a] nine
    (9) (5 year price base period and a 4 year unpriced option period) year Firm Fixed Price
    Incentive Fee proposal for the acquisition of a comprehensive and holistic performance
    based supply chain management program in support of the AH-64 and CH-47 aircraft parts
    with The Boeing Company (cage: 1PXV4), estimated at $450 million.” 
    Id. On October
    31, 2019, W&G filed its complaint with the Court. On November 13,
    2019, DLA notified the Court that it intended to award the contract on November 19, 2019,
    to Boeing. Dkt. No. 15 at 1.
    III.   Solicitation No. SPE4A6-19-R-FG53 (the “FSG 53 Solicitation”)
    DLA posted a Sources Sought Notice on August 27, 2018, announcing its intent to
    conduct market research to find sources to supply inventory and capabilities for all national
    stock numbers under Federal Supply Class 53. Dkt. No. 14 at app. 21. The notice stated
    that it anticipated awarding a ten-year term, single award contract covering 14,584 national
    3
    stock numbers from “Federal Supply Class 53 – Hardware and Abrasives.” 
    Id. at app.
    22.
    DLA included a Request for Information (“RFI”) “to allow industry to provide input
    regarding not only your capabilities relative to the proposed requirement, but also to
    provide input of your experience and best practices that will allow the Government to
    develop an acquisition/solicitation strategy.” 
    Id. at app.
    24. The notice tentatively set an
    industry day with a question and answer session for September 25, 2018. 
    Id. W&G did
    not answer the RFI or attend the industry day. 
    Id. at app.
    26.
    After the close of its research, DLA, on August 13, 2019, issued a notice of intent
    to bundle “approximately 221,099 national stock numbers (NSNs) into a procurement for
    Federal Stock Group 53 (FSG 53) performance based supply chain management support.”
    Compl. Ex. 2 at 1. Almost a month later, on September 6, 2019, DLA issued a
    presolicitation notice for Solicitation No. SPE4A5-19-R-FG53. Compl. Ex. 22.
    By letter dated September 24, 2019, the Small Business Administration (“SBA”)
    recommended that DLA unbundle the FSG 53 solicitation. Dkt. No. 14 at app. 6–8. On
    October 1, 2019, contracting officer Randall Dortch detailed the agency’s rationale for
    rejecting SBA’s recommendation. 
    Id. at app.
    6. Shortly thereafter, on October 3, 2019,
    SBA appealed to the head of contracting authority, Cathy Contreras. 
    Id. at app.
    9–11. Ms.
    Contreras subsequently rejected SBA’s appeal on October 8, 2019, concluding that “the
    bundled solicitation will achieve measurably substantial benefits for the Defense Logistics
    Agency and the Department of Defense.” 
    Id. at app.
    12–13. SBA then appealed this
    decision to the Secretary of Defense, DLA’s agency head, and asked the agency to suspend
    further actions pending the outcome of SBA’s appeal. 
    Id. at app.
    14–20; see also FAR
    19.505.
    On December 13, 2019, the Director of DLA Acquisition rejected SBA’s appeal and
    announced that the solicitation would remain bundled. Dkt. No. 22 at 1. DLA also noted
    that an award was imminent.2 Dkt. No. 22 at 1.
    Procedural History
    On October 31, 2019, W&G filed its complaint. Dkt. No. 1. The next day, Boeing
    filed a motion to intervene. Dkt. No. 6. The Court granted Boeing’s motion to intervene
    on November 5, 2019, after hearing arguments at the initial scheduling conference. Dkt.
    No. 10–11. On November 5, 2019, Boeing filed a motion to dismiss. Dkt. No. 13. The
    Government also filed a motion to dismiss on November 7, 2019. Dkt. No. 14.
    2
    Citing an award’s imminency, the Government withdrew its argument in Section IV.A of its
    motion to dismiss that W&G’s claims relating to the FSG 53 solicitation were not ripe. Dkt. No.
    22 at 1.
    4
    On November 13, 2019, the Government filed a notice indicating that DLA intended
    to award the AH-64/CH-47 bundled procurement for the Apache/Chinook Global Support
    Program to Boeing on November 19, 2019. Dkt. No. 15. This procurement, the
    Government explained, covers both “NSNs previously obtained through transactional
    support, including from the protestor, W&G…, and NSNs that were previously supplied
    by [Boeing]….” 
    Id. at 1.
    The Government noted that a delay in Boeing’s procurement
    would affect the availability of national stock numbers unrelated to this protest. 
    Id. Discussion I.
        Standard of Review
    A.     Bid Protest Jurisdiction
    The Tucker Act grants this Court subject matter jurisdiction over bid protests. 28
    U.S.C. § 1491(b)(1) (2012). In a bid protest, the Court reviews an agency’s decision
    pursuant to the standards set out in the Administrative Procedure Act (“APA”). 28 U.S.C.
    § 1491(b)(4) (2012); 5 U.S.C. § 706 (2012). Under the APA, this Court shall set aside an
    agency action if it is “arbitrary, capricious, an abuse of discretion, or otherwise not in
    accordance with law.” 5 U.S.C. § 706(2)(A); see Banknote Corp. of Am., Inc. v. United
    States, 
    365 F.3d 1345
    , 1350–51 (Fed. Cir. 2004).
    An agency’s decision does not violate the APA if the agency “provide[s] a coherent
    and reasonable explanation of its exercise of discretion.” Impresa Construzioni Geom.
    Domenico Garufi v. United States, 
    238 F.3d 1324
    , 1332–33 (Fed. Cir. 2001). An agency
    cannot “entirely fail[] to consider an important aspect” of a problem. Motor Vehicle Mfrs.
    Ass’n of U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 
    463 U.S. 29
    , 43 (1983). Rather, an
    agency must articulate a “rational connection between the facts found and the [policy]
    choice made.” 
    Id. (citation omitted).
    Furthermore, when an agency alters a past policy, it
    must “supply a reasoned analysis for the change beyond” what may be required if the
    agency had not acted in the first instance. 
    Id. at 42.
    The Court’s review is “highly deferential” to the agency as long as the agency has
    rationally explained its decision. Bannum, Inc. v. United States, 
    91 Fed. Cl. 160
    , 169–70
    (2009). But the Court will “not supply a reasoned basis for the agency’s action that the
    agency itself has not given.” Motor Vehicle Mfrs. Ass’n of U.S., 
    Inc., 463 U.S. at 43
    (citation omitted).
    B.     Motion to Dismiss
    When a defendant moves to dismiss a complaint under RCFC 12(b)(1), the Court
    must “assume all factual allegations to be true and…draw all reasonable inferences in
    plaintiff's favor.” Wurst v. United States, 
    111 Fed. Cl. 683
    , 685 (2013) (quoting Henke v.
    5
    United States, 
    60 F.3d 795
    , 797 (Fed. Cir. 1995)). However, when the defendant
    challenges the Court's jurisdiction, the plaintiff must support its jurisdictional allegations
    with “competent proof.” McNutt v. Gen. Motors Acceptance Corp. of Indiana, 
    298 U.S. 178
    (1936). Accordingly, a plaintiff must establish that jurisdiction exists “by a
    preponderance of the evidence.” 
    Wurst, 111 Fed. Cl. at 685
    (citing Reynolds v. Army &
    Air Force Exch. Serv., 
    846 F.2d 746
    , 748 (Fed. Cir. 1988)).
    For a Rule 12(b)(6) motion, a plaintiff need only assert “sufficient factual matter,
    accepted as true, to ‘state a claim to relief that is plausible on its face.’” Ashcroft v. Iqbal,
    
    556 U.S. 662
    , 678 (2009). A claim is plausible on its face when “the plaintiff pleads factual
    content that allows the court to draw the reasonable inference that the defendant is liable
    for the misconduct alleged.” 
    Id. Granting a
    motion under Rule 12(b)(6) is “appropriate
    only when it is beyond doubt that the plaintiff can prove no set of facts in support of his
    claim [that] would entitle[ ] him to relief.” Fireman v. United States, 
    44 Fed. Cl. 528
    , 537
    (1999) (quoting Ponder v. United States, 
    117 F.3d 549
    , 552–53 (Fed. Cir. 1997)).
    II.    W&G Lacks Standing to Bring This Bid Protest
    Only an “interested party” has standing to challenge a contract award. See Rex
    Serv. Corp. v. United States, 
    448 F.3d 1305
    , 1307 (Fed. Cir. 2006). An interested party is
    (1) an actual or prospective bidder who (2) has a direct economic interest that the contract
    award would affect. See 28 U.S.C. § 1491(b)(1); Veteran Tech. Integrators, LLC v. United
    States, 
    143 Fed. Cl. 794
    , 803 (2019); Banknote Corp. of America, 
    Inc., 365 F.3d at 1352
    .
    To have standing, a party “who has not actually submitted an offer must be expecting to
    submit an offer prior to the closing date of the solicitation.” Digitalis Educ. Sols., Inc. v.
    United States, 
    664 F.3d 1380
    , 1385 (Fed. Cir. 2012) (quoting Rex 
    Serv., 448 F.3d at 1308
    )).
    Moreover, a party loses the opportunity to qualify as an actual or prospective bidder once
    the proposal period ends. Rex 
    Serv., 448 F.3d at 1308
    .
    To prove a direct economic interest, an interested party must demonstrate that it had
    a “substantial chance” of winning the contract. See Orion Tech., Inc. v. United States, 
    704 F.3d 1344
    , 1348 (Fed. Cir. 2013); Myers Investigative & Sec. Serv., v. United States, 
    275 F.3d 1366
    , 1378 (Fed. Cir. 2002) (“When a party contends that the procurement procedure
    in a sole-source case involved a violation of a statute, regulation, or procedure, it
    must…show [ ] that it would have had a substantial chance of receiving the award.”).
    “[B]ecause the question of prejudice goes directly to the question of standing, the prejudice
    issue must be reached before addressing the merits.” Labatt Food Serv., Inc. v. United
    States, 
    577 F.3d 1375
    , 1378 (Fed. Cir. 2009).
    The Government moved to dismiss this matter upon the grounds that W&G waived
    its right to challenge the bundled procurements. Dkt. No. 14 at 15. The Government argues
    that W&G has no standing because it “failed to make any response [ ] to DLA’s notices
    posted on FedBizOpps” and waited nearly two years after the notices to bring this protest.
    6
    
    Id. The Government
    further contends that W&G is not a qualified bidder that could have
    competed for the contract to provide the consolidated parts under the AH-64/CH-47 sole-
    source procurement or the bundled FSG 53 contract. Dkt. No. 14 at 8–9, 14–15. Therefore,
    the Government concludes that, because W&G did not submit a proposal or respond to the
    agency’s notices, it is not an actual or prospective bidder. 
    Id. W&G responds
    that it has not waived its claims because it is a prospective offeror
    and the agency has deprived W&G of the opportunity to compete for the consolidated
    contracts. Dkt. No. 18 at 13. However, “to qualify as an actual or prospective offeror, a
    party that disagrees with a procuring agency’s decision not to conduct a competitive
    procurement must so advise the agency, either by responding to one of the agency’s notices
    concerning the procurement or by submitting a proposal.” Proxtronics Dosimetry, LLC v.
    United States, 
    128 Fed. Cl. 656
    , 675–76 (2016).
    To be an actual or prospective bidder, W&G needed to respond to at least one of the
    agency’s notices. See Digitalis Educ. Solutions, 
    Inc., 664 F.3d at 1385
    ; Rex 
    Serv., 448 F.3d at 1307
    –08. Here, W&G did not submit a proposal and waited until the anticipated
    award date to file this protest. W&G was not prevented from responding to the agency’s
    notices or submitting a proposal. Yet, W&G failed to respond to the agency’s December
    7, 2017 “Potential Sources Sought” notice, its December 22, 2017 “Presolicitaiton Notice,”
    and the agency’s January 9, 2018 notice of its “Intent to Bundle Requirements,” which
    included an anticipated award date of October 31, 2019 to Boeing. Dkt. No. 13 at 4–5.
    Moreover, DLA sent W&G a letter explaining that the agency “intends to transition away
    from the traditional LTC [long-term contract] and/or purchase orders that we have or may
    have had with your company for the items identified in the attached list.” Compl., Ex. 9.
    Both the notices and the letter should have alerted W&G that the proposed solicitations
    would likely affect the products W&G provides. However, W&G waited almost two years
    to protest the solicitations. Therefore, W&G is not an actual or prospective bidder.
    The Government further argues that even if W&G is an interested party or an actual
    or prospective bidder, it does not have a “direct economic interest.” The Government
    highlights W&G’s failure to establish that it could perform the types of work required by
    either the AH-64/CH-47 contract or the FSG 53 contract. Dkt. No. 13 at 15–20.
    Here, W&G’s failure to respond during this almost two-year period means it is
    unlikely that the Government was even aware that W&G was interested in the solicitations,
    making it difficult for W&G to show it has a “substantial chance” of being awarded the
    contract. Digitalis Educ. Sols., 
    Inc., 664 F.3d at 1385
    . W&G, by its own admission,
    presented no evidence that it was qualified to secure the awards. Although W&G has
    provided at least four of the helicopter parts in the past five years to DLA, the evidence
    before the Court shows that W&G could not have competed for the planned AH-64/CH-
    47 solicitation to procure and maintain the approximately 1,200 consolidated national stock
    numbers or the FSG 53 solicitation bundling approximately 221,099 national stock
    7
    numbers. Dkt. No. 13 at 6; Dkt. No. 21 at 16. Specifically, W&G has not shown that it
    has experience providing such comprehensive services. Although there is no dispute that
    W&G has performed government contracts to supply aircraft parts to DLA, W&G has
    provided no evidence to demonstrate that it has experience performing under a government
    contract of comparable value to the solicitations at issue in this case. In fact, W&G
    concedes it does not have the capability to perform the AH-64/CH-47 or the FSG 53
    solicitations. Compl. ¶ 73. Thus, W&G does not have a direct economic interest.
    As a result, W&G fails both prongs of the “interested party” test. Accordingly,
    W&G’s protest is dismissed for lack of standing and the Court need not reach the additional
    issues raised in this case.
    Conclusion
    For the reasons set forth above, the Court GRANTS the Government’s motion to
    dismiss. The Clerk of the Court is directed to dismiss Plaintiff’s complaint. No costs.
    IT IS SO ORDERED.
    s/Thomas C. Wheeler
    THOMAS C. WHEELER
    Judge
    8