Inserso Corporation v. United States ( 2019 )


Menu:
  •            In the United States Court of Federal Claims
    No. 18-1655
    Filed: April 1, 2019
    Reissued: April 22, 20191
    )
    INSERSO CORPORATION,                     )
    )
    Plaintiff,               )
    )
    v.                                       )
    )
    THE UNITED STATES,                       )
    )       Post-Award Bid Protest; Judgment on the
    Defendant,                )       Administrative Record
    )
    and                                 )
    )
    FEDITC, LLC, and                         )
    RIVERSIDE ENGINEERING, LLC,              )
    )
    Defendant-Intervenor.     )
    )
    Richard P. Rector, DLA Piper LLP (US), Washington, DC, for plaintiff.
    Sonia W. Murphy, U.S. Department of Justice, Commercial Litigation Branch, Civil Division,
    Washington, DC, for defendant.
    Jeffery M. Chiow, Rogers Joseph O’Donnell, P.C., Washington, DC, for defendant-intervenor.
    Gary J. Campbell, Womble Bond Dickinson LLP, Washington, DC, for defendant-intervenor.
    OPINION AND ORDER
    SMITH, Senior Judge
    This post-award bid protest comes before the Court on the parties’ Cross-Motions for
    Judgment on the Administrative Record. Plaintiff, Inserso Corporation (“Inserso”), filed its
    Complaint on October 25, 2018, objecting to the United States Defense Information Services
    Agency’s (“Agency”) award of Solicitation No. HC1028-15-R-0030 (“Solicitation”). See
    generally Complaint for Declaratory and Injunctive Relief (hereinafter “Compl.”). Plaintiff asks
    this Court (1) to equalize the competition by providing all offerors access to the unequally
    1
    An unredacted version of this opinion was issued under seal on April 1, 2019. The
    parties were given an opportunity to propose redactions, but no such proposals were made.
    disclosed information; (2) to order the Agency to award a contract to plaintiff; or (3) to remand
    the issue to the Agency to take appropriate actions. Plaintiff’s Motion for Judgment on the
    Administrative Record (hereinafter “Pl.’s MJAR”) at 44–45. For the following reasons,
    plaintiff’s Motion for Judgment on the Administrative Record is denied, and defendant and
    defendant-intervenors’ Cross-Motions for Judgment on the Administrative Record are granted.
    I.      Background
    On March 2, 2016, the Agency issued Solicitation No. HC1028-15-R-0030 for the
    ENCORE III contract to procure information technology (“IT”) services. Administrative Record
    (hereinafter “AR”) 1, 12. The Solicitation sought to meet the Department of Defense’s (“DoD”)
    effort to “achieve information superiority” by providing IT solutions to the military service
    branches, the DoD, and other federal agencies. 
    Id. at 1784.
    The Solicitation contemplated the
    award of Indefinite-Delivery/Indefinite Quantity (“ID/IQ”) contracts under two separate
    “suites”—a full-and-open (“F&O”) suite and a small-business (“SB”) suite. 
    Id. at 1781,
    1891.
    The scope of work for both suites was identical as set forth in the Performance Work Statement
    (“PWS”). 
    Id. at 1784–86.
    Up to twenty awards would be made to offerors under each suite,
    with a maximum value of $17.5 billion for the sum of two suites, spread out over a ten-year
    period. 
    Id. at 1782.
    Awardees were not guaranteed a task order, but instead would be afforded a
    “fair opportunity to be considered for specific task and delivery orders issued against the
    ENCORE III contract.” 
    Id. at 1781.
    Offerors could submit a proposal in both suites but could only receive one award. AR
    1892. The Agency made awards to offerors in both suites on a lowest price, technically
    acceptable basis after consideration of three evaluation factors: (1) technical/management
    approach; (2) past performance; and (3) cost/price. 
    Id. at 1910–19.
    The Agency provided duty
    descriptions and qualification requirements associated with 116 labor categories. See generally
    
    id. at 1902,
    1927–58. Offerors were directed to list Fixed Price (“FP”) labor rates and Cost
    Reimbursable (“CR”) labor rates at both government and contractor sites for each labor category
    on a “pricing template” spreadsheet. 
    Id. at 1902.
    If offerors were awarded the contract, their FP
    labor rates would be incorporated into their contracts, but CR labor rates would not. 
    Id. at 1902,
    1904.
    The Solicitation outlined how the Agency would evaluate proposals in each suite. After
    calculating the rates for each labor category (“LCAT”) and adjusting the rates based on
    pre-established escalation factors for years beyond the first year, Agency evaluators multiplied
    each LCAT rate by the estimated number of hours required to reach the total amount for each
    LCAT per year. 
    Id. at 1902,
    1910. The sum of all LCATs over the lifetime of the contract
    yielded each offeror’s Total Proposed Price (“TPP”). AR 1910. Neither the Solicitation nor the
    post-award debriefing disclosed the estimated number of hours allocated to each LCAT. 
    Id. at 1918.
    The Solicitation directed the Agency to evaluate the CR portion of the TPP through a
    cost-realism analysis and calculate a Most Probable Price for the CR portion for all LCATs. 
    Id. at 1919.
    The Agency then determined the Total Evaluated Price (“TEP”) by adding the TPP for
    the FP portion of the proposal to the Most Probable Cost for the CR portion of the proposal. 
    Id. 2 at
    1920. Proposals were then arranged in order from the lowest TEP to the highest TEP and
    evaluated for “compliance with other terms and conditions” outlined in the Solicitation. 
    Id. at 1910–11,
    1920. The twenty offerors in each suite that presented the lowest-price, technically
    acceptable proposals were to receive contract awards. 
    Id. The Agency
    received initial proposals for the F&O suite on October 21, 2016, and
    awards were issued to the twenty lowest-priced, technically acceptable offerors on October 19,
    2017. See AR 86821–36. In November 2017, debriefings were provided to unsuccessful
    offerors and Qbase, a successful offeror who requested a debriefing. See, e.g., AR 86875–76;
    see also 
    id. at 87975.
    The content of the debriefings included the TPPs, TEPs, technical
    evaluation ratings, and past performance ratings for the twenty lowest-priced proposals, and
    unsuccessful offerors’ Final Consensus Reports. See, e.g., AR 86851; 
    id. at 86840–50.
    The final
    TEPs for awardees of the F&O suite ranged from $5,295,457,319 to $6,906,046,117. 
    Id. at 86851–54.
    Three unsuccessful F&O offerors—NCI, Peerless, and PSI—and Qbase, an awardee who
    participated in the aforementioned debriefings, were also offerors in the SB suite competition,
    through joint venture (“JV”) partnerships with small businesses. 
    Id. at 86837,
    86874, 88848,
    87975; AR 88949 (Innovations JV LLC); AR 88957 (Madian IT Solutions, LLC); AR 88964
    (Superior Government Solutions, LLC); AR 88963 (SierTek-Peerless JV, LLC). Each of those
    offerors was awarded a contract in the SB suite. 
    Id. at 78892.
    The Agency received initial proposals for the SB suite on October 21, 2016, and, after
    several rounds of Evaluation Notices (“EN”) and revised proposals, the Agency issued its awards
    on August 24, 2018. See, e.g., AR 4371; 
    id. at 9105;
    id. at 16654; 
    id. at 24567; 
    id. at 79527. 
    SB
    offerors received their TEPs on April 24, 2018, prior to submitting their first and second final
    proposal revisions. 
    Id. at 67568–625.
    Plaintiff received a Notice of Unsuccessful Offeror on
    September 7, 2018. 
    Id. at 78892.
    Plaintiff was the twenty-third lowest offeror with the TEP of
    $7,760,007,495. 
    Id. at 78897.
    The final TEPs for awardees of the SB suite ranged from
    $5,338,273,636 to $7,745,667,644. 
    Id. at 78892.
    On October 25, 2018, Inserso filed its Complaint. See generally Compl. In its
    Complaint, plaintiff alleges three theories of liability. See 
    id. at 1–2.
    First, the Agency’s release
    of information under the F&O suite created organizational conflicts of interest (“OCI”) and an
    unfair competitive advantage for some SB offerors. See 
    id. at 1.
    Had Inserso received similar
    information, it would have won the SB contract. Second, the Agency should not have awarded a
    contract to Madian IT Solutions, LLC in the SB suite because it is the alter ego of Qbase, LLC.,
    an awardee in the F&O suite. See 
    id. at 2.
    However, during the course of litigation, the plaintiff
    abandoned this claim. Finally, plaintiff alleged in its Complaint that the Agency failed to treat
    offerors equally, which violated regulatory requirements set forth in the Federal Acquisition
    Regulation (“FAR”) and acted arbitrarily and capriciously in awarding SB contracts. See 
    id. at 1–2.
    On December 6, 2018, plaintiff filed its Motion for Judgment on the Administrative Record
    and its Motion to Supplement the Administrative Record. See generally Pl.’s MJAR; Plaintiff’s
    Motion to Supplement the Administrative Record. On January 11, 2019, defendant filed its
    Cross-Motion for Judgment Upon the Administrative Record and Opposition to Plaintiff’s
    Motion for Judgment on the Administrative Record. See generally Defendant’s Motion for
    3
    Judgment Upon the Administrative Record and Opposition to Plaintiff’s Cross-motion for
    Judgment on the Administrative Record (hereinafter “Def.’s CMJAR”). Additionally, on
    January 11, 2019, defendant filed its Response to plaintiff’s Motion to Supplement the
    Administrative Record and its Cross-Motion to Supplement the Administrative Record. See
    generally Defendant’s Response to Plaintiff’s Motion to Supplement the Administrative Record
    and Cross-Motion to Supplement the Administrative Record. On January 4, 2019 and January
    11, 2019, intervenors FEDITC and Riverside filed their respective Cross-Motions for Judgment
    on the Administrative Record. See generally Intervenor’s Opposition to Plaintiff’s Motion for
    Judgment on the Administrative Record and Cross-Motion for Judgment on the Administrative
    Record (hereinafter “FEDITC’s CMJAR”); Defendant-Intervenor Riverside Engineering’s
    Opposition to Plaintiff’s Motion for Judgment on the Administrative Record and Cross-Motion
    for Judgment on the Administrative Record (hereinafter “Riverside’s CMJAR”).
    On January 25, 2019, plaintiff filed its Response to defendant and defendant-intervenors’
    Cross-Motions for Judgment on the Administrative Record and Reply in Support of its Motion
    for Judgment on the Administrative Record. See generally Plaintiff’s Response to Defendant’s
    & Intervenors’ Cross-Motions for Judgment on the Administrative Record & Reply in Support of
    its Motion for Judgment on the Administrative Record (hereinafter “Pl.’s Reply”). On February
    8, 2019, defendant filed its Reply in Support of its Cross-Motion for Judgment Upon the
    Administrative Record. See generally Defendant’s Reply in Support of its Cross-Motion for
    Judgment Upon the Administrative Record (hereinafter “Def.’s Reply”). On February 7, 2019
    and February 8, 2019, intervenors FEDITC and Riverside filed their respective Replies. See
    generally Intervenor’s Reply in Support of its Cross-Motion for Judgment on the Administrative
    Record (hereinafter “FEDITC’s Reply”); Defendant-Intervenor Riverside Engineering’s Reply to
    Plaintiff’s Response to Defendant and Defendant-Intervenor’s Cross-Motions for Judgment on
    the Administrative Record (hereinafter “Riverside’s Reply”). The Court held oral argument on
    this matter on February 26, 2019. The parties’ motions are fully briefed and ripe for review.
    II.     Standard of Review
    This Court’s jurisdictional grant is found primarily in the Tucker Act, which provides the
    Court of Federal Claims with the power “to render any judgment upon any claim against the
    United States founded either upon the Constitution, or any Act of Congress or any regulation of
    an executive department, or upon any express or implied contract with the United States . . . in
    cases not sounding in tort.” 28 U.S.C. § 1491(a)(1) (2012). Although the Tucker Act explicitly
    waives the sovereign immunity of the United States against such claims, it “does not create any
    substantive right enforceable against the United States for money damages.” United States v.
    Testan, 
    424 U.S. 392
    , 398 (1976). Rather, to fall within the scope of the Tucker Act, “a plaintiff
    must identify a separate source of substantive law that creates the right to money damages.”
    Fisher v. United States, 
    402 F.3d 1167
    , 1172 (Fed. Cir. 2005) (en banc in relevant part).
    The Tucker Act also affords this Court with jurisdiction over bid protest actions. 28
    U.S.C. § 1491(b). This Court evaluates bid protests under the Administrative Procedure Act’s
    (“APA”) standard of review for agency actions. See Bannum, Inc. v. United States, 
    404 F.3d 1346
    , 1351 (Fed. Cir. 2005) (citing Impresa Construzioni Geom. Domenico Garufi v. United
    States, 
    238 F.3d 1324
    , 1332 (Fed. Cir. 2001)). Notably, agency procurement actions may be set
    4
    aside only if they are “arbitrary, capricious, an abuse of discretion, or otherwise not in
    accordance with the law.” 28 U.S.C. § 1491(b)(4). Moreover, “[t]he arbitrary and capricious
    standard applicable [in bid protests] is highly deferential.” Advanced Data Concepts v. United
    States, 
    216 F.3d 1054
    , 1058 (Fed. Cir. 2000). Agencies, and contracting officers in particular,
    are “‘entitled to exercise discretion upon a broad range of issues confronting them’ in the
    procurement process.’” Savantage Fin. Servs. v. United States, 
    595 F.3d 1282
    , 1286 (Fed. Cir.
    2010) (quoting 
    Impresa, 238 F.3d at 1332
    ).
    Under Rule 52.1 of the Rules of the Court of Federal Claims (“RCFC”), a party may file
    a motion for judgment upon the administrative record for the Court to assess whether an
    administrative body, given all disputed and undisputed facts in the record, acted in compliance
    with the legal standards governing the decision under review. See Supreme Foodservice GmbH
    v. United States, 
    109 Fed. Cl. 369
    , 382 (2013) (citing Fort Carson Supp. Servs. v. United States,
    
    71 Fed. Cl. 585
    (2006)). On a motion for judgment upon the administrative record, the parties
    are limited to the AR, and the Court makes findings of fact as if it were conducting a trial on a
    paper record. RCFC 52.1; 
    Bannum, 404 F.3d at 1354
    . Looking to the Administrative Record,
    the Court must determine whether a party has met its burden of proof based on the evidence in
    the record. 
    Bannum, 404 F.3d at 1355
    . When a protestor claims that an agency’s decision
    violates a statute, regulation, or procedure, the protestor must show that such alleged violation
    was “clear and prejudicial.” 
    Impresa, 238 F.3d at 1333
    . The Court will “interfere with the
    government procurement process ‘only in extremely limited circumstances.’” EP Prods., Inc. v.
    United States, 
    63 Fed. Cl. 220
    , 223 (2005) (quoting CACI, Inc.-Fed. v. United States, 
    870 F.2d 644
    , 648 (Fed. Cir. 1989)). “If the [C]ourt finds a reasonable basis for [an] agency’s action, the
    [C]ourt should stay its hand even though it might, as an original proposition, have reached a
    different conclusion as to the proper administration and application of the procurement
    regulations.” Honeywell, Inc. v. United States, 
    870 F.2d 644
    , 648 (Fed. Cir. 1989). The Court
    cannot substitute its judgment for that of an agency, even if reasonable minds could reach
    differing conclusions. Bowman Transp., Inc. v. Ark.-Best Freight Sys., Inc., 
    419 U.S. 281
    , 285-
    86 (1974).
    III.    Discussion
    A. OCI and Competitive Advantage
    Plaintiff alleges that the Agency violated FAR 9.504(a) and 9.505(b) by failing to
    identify and evaluate a potential OCI during the acquisition process and by failing to prevent an
    unfair competitive advantage for the four SB/JV offerors competing in both suites. Pl.’s Reply at
    7–8. The government argues that FAR 9.502 only applies to a party performing a Government
    contract. Def.’s Reply at 4. Plaintiff contends that FAR 9.505(b)(2) provides “[i]n addition to
    the other situations described in this subpart,” an unfair competitive advantage exists when a
    contractor possesses certain information and is “competing for award of any Federal contract.”
    Pl.’s Reply at 9–10. Plaintiff argues that “subpart” refers to “Subpart 9.5” and interprets
    9.505(b) as standing “in addition” to 9.502, rather than being limited by 9.502. 
    Id. at 11.
    Based
    on its interpretation of FAR 9.505 and FAR 9.505(b), plaintiff concludes that an OCI can arise
    during the acquisition process. See generally 
    id. at 8–15.
    5
    The government argues that, even if an OCI could arise out of the acquisition process,
    one has not occurred here, because the information at issue was not “source selection
    information” and did not provide a competitive advantage to the four SB/JV offerors. Def.’s
    Reply at 9–10. The government further contends that the F&O TEPs became publicly available
    when F&O contracts were awarded, and, therefore, those TEPs did not qualify as “source
    selection information” under the definition of FAR 2.101. 
    Id. at 11.
    The government continues
    by noting that the two suites were not identical, and the Agency never disclosed the estimated
    number of hours for each LCAT, so offerors could not have adjusted their TEPs based on that
    information alone. 
    Id. at 10–11.
    Plaintiff argues that the TPPs and TEPs are “proposed prices
    and lists of those prices” under the definition of “source selection information” found in FAR
    2.101. Pl.’s Reply at 9. Plaintiff further alleges that the winning F&O TEPs were competitively
    valuable because they were disclosed prior to the SB deadline for final proposed revisions, those
    TEPs provided a target range for offerors to use in revising their SB TEPs, and offerors could
    easily adjust their prices to fall within the target range without significant risk. See 
    id. at 20–29.
    The Court agrees with plaintiff’s position that the nature of a multi-suite solicitation in
    which offerors can bid in multiple suites raises OCI concerns, particularly when the scope of
    work and evaluation factors are nearly identical for each suite. In a multi-suite solicitation,
    agencies can avoid this type of potential OCI by issuing awards and debriefings for all suites
    simultaneously, so competitively advantageous information from one suite cannot be used by
    offerors in subsequent proposals.
    While the Court acknowledges the possibility that an OCI could arise out of the
    circumstances at issue here, the release of TEP information did not prejudice plaintiff. Prejudice
    is presumed once a potentially significant OCI is identified. NetStar-1 Gov’t Consulting, Inc, v.
    United States, 
    101 Fed. Cl. 529
    (2011), aff’d, 473 F. App’x 902 (Fed. Cir. 2012). The
    government can overcome the presumption of prejudice through a showing of compelling
    evidence to the contrary. See 
    id. at 529.
    In the case at bar, even if an OCI existed, defendant and
    defendant-intervenors provided sufficient compelling evidence to rebut the presumption of
    prejudice.
    B. Impartial, Fair, and Equitable Treatment
    Plaintiff alleges that, by sharing competitively sensitive pricing information with some,
    but not all, of the SB offerors, the Agency violated FAR 1.602-2(b) by failing to “[e]nsure that
    the contractors receive impartial, fair, and equitable treatment” throughout the course of the
    procurement. Pl.’s MJAR at 40; Pl.’s Reply at 44. The government responds by noting that
    certain provisions of the FAR required Agency disclosure of specific information once F&O
    awards were issued, but the disclosed information did not provide a significant competitive
    advantage to offerors participating in both suites. Def.’s Reply at 21; Def.’s CMJAR at 42.
    The Court accepts plaintiff’s proposition that potentially unfair and unequal treatment
    could arise under the particular circumstances at issue—the Agency distributed information to a
    limited number of SB offerors that could have provided a slight competitive advantage over
    offerors who did not receive the same information. Plaintiff correctly recognizes that the F&O
    awardees’ TEPs provided a useful comparison tool that SB offerors could utilize as a benchmark
    6
    in revising their price proposals. See Pl.’s Reply at 20–29. However, even if the allegedly
    disparate treatment provided some offerors with a slight competitive advantage, the record
    indicates that plaintiff was not prejudiced by such treatment.
    C. Prejudice
    “A protester must show not simply a significant error in the procurement process, but
    also that the error was prejudicial, if it is to prevail in a bid protest.” Statistica, Inc. v.
    Christopher, 
    102 F.3d 1577
    , 1581 (Fed. Cir. 1996). Plaintiff can establish that prejudice existed
    “when it can show that but for the error, it would have had a substantial chance of securing the
    contract.” Labatt Food Serv., Inc. v. United States, 
    577 F.3d 1375
    , 1378 (Fed. Cir. 2009). In the
    case at bar, even if the Agency’s limited distribution of information resulted in an OCI or
    disparate treatment, there is no evidence that prejudice resulted from such a distribution.
    The offerors who received the allegedly competitive information would still have
    submitted lower bids than the plaintiff, regardless of the Agency’s information disbursement.
    The four SB/JV offerors that received debriefings had TEPs that fell within the winning range
    for the SB suite throughout the entire course of the procurement. AR 78322; AR 78746; AR
    79090; AR 79212. In contrast, plaintiff’s proposed TEP was higher than the winning range
    before the allegedly competitive information was distributed, and plaintiff’s proposed TEP
    remained consistently higher than the winning range throughout every round of revisions. 
    Id. at 78409.
    Defendant-intervenor, FEDITC, argues that, because all four challenged offerors were
    always lower-priced than plaintiff, releasing the information did not impact plaintiff’s
    competitive standing. FEDITC’s CMJAR at 8.
    Plaintiff argues that, were it privy to the same information, it could have easily revised its
    price and submitted a TEP within the winning range. Pl.’s MJAR at 39; Pl.’s Reply at 40.
    Plaintiff argues that it would have adjusted the price downward by shifting its labor to lower-cost
    geographic regions, reducing its FP rates according to FP/CP hour split, and reducing its
    proposed fee percentage. Pl.’s Reply 28–29; Pl.’s MJAR 34–35. The government responds by
    alleging that plaintiff’s TPP dropped by almost $1 billion from its final proposal, and any further
    reductions would have required documented support. Def.’s CMJAR at 37; Def.’s Reply at 20.
    Defendant-intervenor, FEDITC, argues that, if the Agency had released the F&O awardees’
    TEPs to all offerors, the other offerors would also have discounted their prices to meet the
    “target range” along with plaintiff. FEDITC’s CMJAR at 8. FEDITC further argues that,
    because plaintiff merely demonstrated it could have lowered its price to the top edge of the F&O
    winning range, plaintiff could not have sufficiently reduced its price to receive an award if other
    offerors made similar reductions. 
    Id. at 8–9.
    The Court is persuaded by defendant and defendant-intervenors’ arguments that no
    prejudice arose out of the Agency’s actions. The release of the allegedly advantageous
    information did not impact plaintiff’s competitive standing in the SB suite. Moreover, plaintiff
    has failed to establish that, but for those debriefings, it had a substantive chance of receiving an
    award. The only scenario in which the Court can foresee plaintiff successfully adjusting its price
    enough to receive an award, is one in which only the plaintiff, but none of the other SB offerors,
    received the allegedly competitive information, which is not the applicable standard to find
    7
    prejudice. The circumstances surrounding plaintiff’s complaint are too attenuated for the Court
    to conclude that the allegedly competitive information negatively impacted the plaintiff’s chance
    of award, let alone resulted in prejudice of any kind. The Agency’s actions were neither
    arbitrary, capricious, an abuse of discretion, nor contrary to law, and the Court will not set aside
    its award decision.
    IV.     Conclusion
    For the reasons set forth above, plaintiff’s MOTION for Judgment on the Administrative
    Record is DENIED. Defendant and defendant-intervenors’ CROSS-MOTIONS for Judgment
    on the Administrative Record are GRANTED. Additionally, as the Court does not believe the
    information contained therein to be necessary for the effective administration of justice, both
    plaintiff’s MOTION to supplement the Administrative Record and defendant’s
    CROSS-MOTION to supplement the Administrative Record are hereby DENIED. The Clerk is
    directed to enter judgment in favor of defendant and defendant-intervenors, consistent with this
    opinion.
    IT IS SO ORDERED.
    s/   Loren A. Smith
    Loren A. Smith
    Senior Judge
    8