  • FRICK, C. J.

    The plaintiff, hereinafter called appellant, commenced this action against the Columbus Extension Mining Company, the Rexall Silver & Copper Mining Company, the Columbus Rex-all Consolidated Mines Company, and Alexander H. Cowie to condemn a right to use a certain mining tunnel in common with the defendant the Columbus Rexall Consolidated Mines Company, a corporation, hereinafter, designated respondent. The defendants other than the respondent, for reasons appearing in the record, may be excluded from consideration on this appeal, and we shall not refer to them again.

    The complaint is very long, and we shall, in the briefest possible terms, refer to those portions which are deemed material.

    The appellant alleges that it is a mining corporation; that *416its business is to own, acquire, work, and develop mining property; that the respondent is a corporation engaged in a similar business; that the appellant is the owner of a certain mining claim known as the “Haskel,” which is marked “H” on the following plat:

    It is further alleged that said mining claim contains gold, silver, copper, and other precious metals, and that for that reason it is a valuable mining claim, and that the same has been developed only in part; that a certain mining tunnel, marked “T T” on the plat, was constructed, and of which respondent is a part owner as hereinafter stated; that said tunnel, from its portal, marked “P” on the plat, to .the south side line of appellant’s said mining claim, marked “H,” is approximately 3,078 feet in length, of which respondent owns all except 1,888 feet, which is that portion lying immediately south of the point marked “e” on the plat; that the whole length of said tunnel, from its portal to the end thereof, which is some distance north of the northerly side line of appellant’s said mining claim, is approximately 4,700 feet; that the distance involved in this action, however, is that portion only which lies between the south side line of appellant’s said mining claim and the point marked “e” on the plat, being a *417distance of approximately 1,190 feet; that said tunnel passes through appellant’s said mining claim about lj200 feet below the surface of said claim; that the appellant has an agreement with the defendants, other than the respondent, whereby it is given the right to use said tunnel for said distance of 1,888 feet, together with the track and appliances therein, for the purpose of transporting the ores containing the precious metals aforesaid, and the waste material that may be produced in working and developing appellant’s said mining claim, to the outer surface of said tunnel; that the respondent constructed said tunnel through appellant’s said mining claim without authority therefor and without its consent, and in doing so uncovered and exposed large quantities of ores, much of which are being wasted for reasons fully set forth in the complaint; that the appellant desires to condemn the right to a temporary use of the 1,190 feet aforesaid, and the track or tramway therein, such use to be a use in common or joint use with respondent, and to be for the purpose of transporting the ores containing the precious metals aforesaid to the surface, and also to transport the waste material that may be developed in further developing the ores of said mining claim to the surface, and to take into appellant’s said mining claim the tools and appliances necessary to work, and to develop the mineral deposits therein; that the appellant seeks to condemn the use of said tunnel, tracks, etc., as aforesaid for a limited period of time only, to wit, for a time sufficient to permit the appellant to mine and remove the ores containing such precious metals from its said mining claim; that said tunnel is not being used to its full capacity, and appellant avers that it is practicable to make arrangements so as to permit the appellant to use said tunnel, tracks, etc., to transport its said ores, etc., through said tunnel, “without materially injuring or damaging” the respondent. The complaint contains numerous other allegations of similar import, but, in view of what follows, we deem it unnecessary to go further into detail. The appellant prayed for the relief outlined in the complaint.

    The respondent alone answered the complaint, and the hearing was limited to the appellant and respondent.

    *418The answer is -very long, containing twenty-five paragraphs. While many of appellant’s allegations are denied in the answer, yet the principal purpose is to challenge the right of appellant to condemn the tunnel, tracks, etc., for the purposes aforesaid, or for any purpose.

    The appellant produced evidence in support of the allegations of its complaint. The evidence is without dispute that the tunnel is not being used or operated to its full capacity, and that it is feasible and practicable to operate said tunnel so as to permit both the said respondent and the appellant to develop their respective mining claims and the mineral deposits therein, and to transport the ores developed and the waste material resulting from such development through said tunnel over a single track; that, if necessary, turnouts can be constructed at reasonable intervals and at reasonable expense in said tunnel, and side tracks can be laid in such turnouts so as to permit the transportation of the ores and waste material of both appellant .and respondent without inconvenience or interruption; that the capacity of said tunnel is variously estimated at from 500 to 1,500 tons for two shifts each day, or even more, depending on the motive power by which the ores would be transported; and that said tunnel, at the time of the trial, was used to transport only a very small fraction of that amount. Indeed, the evidence is to the effect that the capacity of the tunnel is sufficient to develop an.d to transport the ores and waste material for at least three or four of the best mines in that vicinity.

    We remark that the foregoing plat is not intended as correctly indicating the numerous courses of said tunnel. All that is attempted is to give the correct distances in feet and the general direction of the tunnel.

    The theory of respondent’s counsel, and upon which they tried the ease, is-best illustrated by what they said after the appellant had produced its evidence and rested its ease. Counsel said that they did not desire to present any evidence “for the reason that the defendant (respondent here) is of the opinion and states with confidence that the law is that no right to condemn a right of way or easement through that tunnel has been or can be shown.” Counsel therefore took *419the position, and they insist npon it in this court, that regardless of the evidence that could be produced by the appellant the law would, nevertheless, always stand in the way of its right to condemn an easement in the tunnel for the purposes desired by it. It seems the district court entertained the same view, which, to some extent at least, is reflected in what are called the findings, which .are as follows:

    “The court heard the testimony introduced by the parties and arguments of counsel, and thereupon took the matter under advisement. And now, having fully considered the same, the court finds that the evidence in the cause is manifestly insufficient to support the allegations of the said complaint, and that the plaintiff is not entitled to recover against the defendant. ’ ’

    Upon those so-called findings the court entered judgment dismissing the action, and appellant insists that the court erred in its findings, conclusions of law, and judgment.

    1, 2 No one, we think, will seriously contend that the foregoing constitutes a finding of facts. It is a mere conclusion that the evidence is insufficient to authorize any relief without finding any fact or facts. The so-called findings, and the judgment based thereon, therefore, reflect the views of the court and of respondent’s counsel, and,- in legal effect, are the same as though the court had sustained a general demurrer to the complaint and had dismissed the action. We shall so treat the matter here.

    We remark that the mining claim in question is an old patented claim located under the law of 1866, and is but 200 feet in width. The question to be determined on this appeal, therefore, is one of law merely, which may be stated thus: Can appellant, under our statute authorizing the exercise of eminent domain, condemn an easement in or the right to use the tunnel in question for the purposes desired by it?

    Comp. Laws 1907, section 3588, as amended by chapter 47, Laws Utah 1909, p. 50, is divided into 13 subdivisions, in which are enumerated the specific purposes for which the right of eminent domain may be exercised. It is not necessary to set forth all of the purposes enumerated in the statute. So far as material here, the section referred to provides:

    *420“Subject to the provisions of this chapter, the right of eminent domain may be exercised in behalf of the following public uses: * * * (6) Roads, railroads, tramways, tunnels, ditches, flumes, pipes, and dumping places to facilitate the milling, smelting, or other reduction of ores, or the working of mines, quarries, coal mines, or mineral deposits; outlets, natural or otherwise, for the deposit or conduct of tailings, refuse, or water from mills, smelters, or other works.for the reduction of ores, or from mines, quarries, coal mines, or mineral deposits; milldams; natural gas or oil (pipe) lines, tanks, or reservoirs; also any occupancy in common by the owners or possessors of different mines, quarries, coal mines, mineral deposits, mills, smelters, or other places for the reduction of ores, or any place for the flow, deposit, or conduct of tailings or refuse matter.”

    Appellant contends that the right to condemn an easement in or through said tunnel for the purposes contemplated in this action is granted in the foregoing subdivision. Upon the other hand, respondent contends that the right is not granted.

    Comp. Laws 1907, section 3590, subd. 3, also provides:

    “Property appropriated to public use; provided, that such property shall not be taken unless for a more necessary public use than that to which it has been already appropriated.”

    Subdivision 5 of the section last referred to reads:

    “All rights of way for any and all purposes mentioned in section 3588, and any and all structures and improvements thereon, and the lands held or used in connection therewith, shall be subject to be connected with, crossed, or intersected by any other right of way or improvement or structure thereon; they shall also be subject to a limited use in common with the owners thereof, when necessary; but such uses of crossings, intersections, and connections shall be made in the manner most compatible with the greatest public benefit and the least private injury. ’ ’

    And subdivision 6 is as follows:

    “All classes of private property not enumerated may be taken for public use when such taking is authorized by law.”

    At the hearing of the cause in this court some contention was made that that portion of section 3588, supra, Avhich we *421have copied is not correctly printed in chapter 47, Laws Utah 1909, by which chapter said section was amended. We have carefully compared the language of subdivision 6 of the act as printed in chapter 47 aforesaid with the original act on file in the office of the Secretary of State, and we find that the only change is that in printing chapter 47 the word "pipe” is omitted between the words "oil” and "lines.” The original-act as passed reads "oil pipe lines,” while the printed act reads ‘1 oil lines. ’ ’ There is no other difference between the original act as passed and the printed act. The question therefore is, Is the right sought to be exercised by appellant granted in any one or more of the foregoing provisions ?

    3 If the right is granted, the court has but one duty to perform, and that is to enforce it and make it effective. Upon the other hand, if the right is not granted, either in terms or by necessary implication, then the courts are powerless to grant the relief appellant seeks. In examining all of the subdivisions of section 3588 and of section 3590, one becomes convinced that it was the intention of the legislative power of this state to declare mining generally and the development of mines and mineral deposits a public use, in furtherance of which the right of the exercise of eminent domain was applied with full force and effect. This is apparent from the first enactment of the law of eminent domain as found in Laws Utah 1884, tit. 7r p. 348. Section 3588 has been amended and extended in some particulars ever since title 7 of 1884 was enacted. The intention of the Legislature to extend the right of eminent domain to mines and mining being clear and unequivocal, what is the rule respecting the construction and application that should be given to the acts of the Legislature in granting the right of eminent domain for the uses and purposes contemplated in the act?

    4 If appellant’s application merely involved the exercise of the right of eminent domain to construct a tunnel through, or a road or passageway over, respondent’s mining claims, or the right to the use. in common with respondent, of any part of the latter’s ground for dumping purposes, etc., no one would either question or doubt appellant’s right *422to condemn the right for such purposes. In view, however, that appellant seeks to obtain an easement merely in a tunnel owned by respondent, it is earnestly contended that no such right exists. By a careful reading and comparison of the several subdivisions aforesaid, it seems clear to us that the right of eminent domain may be exercised to condemn an easement in or through respondent’s tunnel as contemplated by the appellant. A use in common is clearly contemplated for some purpose, and we think the purpose for which the appellant seeks to exercise the right in this case is included. That certainly is so if all of the provisions of our statute are given a fair and reasonable application and effect. In subdivision 6 of section 3588, which we have set forth, the power to condemn rights of way for tunnels is expressly granted; and in section 3590, subd. 5: “All rights of way for any and all purposes mentioned in section 3588 * * * shall also be subject to a limited use in common with the owners thereof, when necessary, ’ ’ etc. Tunnels, when necessary, are therefore subject to a limited use in common, precisely as are all other “lights of way” or easements mentioned in the statute. In view of the foregoing, what is the rule of construction applicable here ?

    We think it is generally agreed that where the right of eminent domain is granted for a particular purpose, then the statute must be given a liberal construction in furtherance of such purpose. Our statute, in clear and explicit terms, grants the right of eminent domain for the purpose of developing the mining industry and for the purpose of developing the'mineral resources of the state, regardless of ownership. Under those circumstances, therefore, the rule of construction that is applied by Mr. Justice Hawley in the case of Douglas v. Byrnes (C. C.) 59 Fed. 28, should be applied. Mr. Justice Hawley, in passing upon the eminent domain act of the state of Nevada respecting the development of mines (C. C.) 59 Fed. at page 31, says:

    "The power of the Legislature having been fully recognized and sanctioned, the purpose of the act should not be hampered by any narrow or technical objections. The importance of encouraging the mining industry of this state must be kept in view. This was the object, *423intent, and purpose of the Legislature in passing the act, and its wisdom, policy, and expediency was thereby determined. A reasonable, fair, just, broad, and liberal view should be taken by the court in interpreting its provisions.”

    To the same effect is Butte A. & P. R. Co. v. Montana U. R. Co., 16 Mont. 504, 41 Pac. 232, 31 L. R. A. 298, 50 Am. St. Rep. 508.

    Mr. Lindley, in discussing the right of eminent domain as applied to mining, in his excellent work on Mines, in volume 1 (3d Ed.) p. 612, says:

    "It is manifest, however, that there is a marked tendency, evolutionary in its nature, to break away from the old rigid rules on the subject of ‘public use,’ and to enlarge the definition of the term, so as to make it synonymous with ‘public welfare.’ This tendency is no doubt influenced to some extent by the growth and spread of sociological ideas which seek to influence the construction of constitutions and statutes in the interest of the group instead of the individual, and to authorize the condemnation of private property for any use which stimulates or encourages .the development of the natural resources of the country. As to what uses will accomplish this purpose, each state must determine for itself. As there exist marked differences in environment and economic conditions, it is. hardly likely that uniform decisions in all the states will ever be reached. But the test of ‘public welfare,’ instead of the old doctrine of ‘public use,’ is being gradually extended, with the promise of its becoming the prevailing doctrine in most jurisdictions.”

    6 It is contended that under Comp. Laws 1907, section 3590, subd. 3, property devoted to a public use can only be taken under the eminent domain statute “for a more necessary public use” than the one for which it is appropriated. That' no doubt is the law, and, so far as we know, is generally enforced in this country. It must also be conceded that the use appellant seeks to make of the tunnel in question is not a more necessary use than the one respondent is. making of it. Appellant, therefore, cannot succeed under the clause of the statute last referred to. What appellant seeks is not to appropriate respondent’s tunnel and to dispossess the latter of its property rights therein or of its use, but what appellant seeks is to condemn the right to use the tunnel in common with the respondent; that is, to con*424demn the unused capacity of the tunnel. Where property is condemned for a more necessary use, the original condemner is deprived of his ownership and use. Such is not the case, however, where a second right to use the property or right of way is one in common with the present owner thereof. This distinction must be clearly kept in mind, and, if it is, no confusion can arise. In condemning the right to a joint use or a use in common, all that the condemner gets, or can get, is the right to use that which the present possessor or owner does not or cannot use. For example. If in this case respondent uses the tunnel in question to its full capacity, then there is nothing left to condemn, and, as a matter of course, appellant cannot prevail. Where, however, as clearly appears from the evidence in this case, a tunnel is not used by the owner and possessor thereof to its full capacity, and it is reasonably clear that a joint use or a use in common is practicable, then why may not the unused portion of the tunnel be condemned upon proper compensation being made to the owner and possessor thereof? In doing that the owner’s property is not taken from him. Indeed, he is not even dispossessed of it nor deprived of its use or control, but the only thing that is done is that the owner must yield his exclusive dominion over it for what Mr. Lindley calls the “public welfare.”

    7, 8 Counsel, however, state that there is no way to determine what the compensation shall be to the owner. It is, however, well settled that, where property may be condemned for the purpose of a joint use or a use in common, the whole matter of determining what is a reasonable compensation under all the circumstances, as well as the regulations respecting the use of the property, is determined and regulated according to the rules of equity. 2 Lewis, Eminent Domain (3d Ed.) section 423. When it is once settled and understood that the unused portion of a mining tunnel may be condemned and may be used to develop the mineral deposits in an adjoining mine, the respective mine owners will generally find no difficulty in arriving at some understanding respecting the character and extent of the compensation that shall be made for the use of the tunnel. Moreover, as a general rule, the respective owners will agree upon the manner *425and extent of tbe use. If, however, the parties cannot agree the courts have full power to determine and fix the character and extent of the compensation, and to regulate the use of the tunnel between the parties. All this may be done after the court has heard the evidence and is in possession of all the facts and circumstances.

    In view that the business of mining is necessarily highly speculative; that the prices of most metals are fluctuating so that to mine a certain grade of ore may be profitable this year while the price may be so much lower the next that it would be ruinous to attempt to mine it; that the contemplated ore bodies may be much smaller in extent than was expected; and numerous other things that might be mentioned — the joint use of a mining tunnel of necessity must be temporary only. It is for that reason that some equitable method of determining and fixing the compensation for the joint use must be devised which must be based upon all the known facts and circumstances, and must be such as to reflect justice in each case. To fix the compensation in a lump sum might defeat the very end in view. Some just method of compensation is all the law contemplates, and that is all that can be required in each case. It is manifest that in this case no effort whatever was made by appellant and respondent to arrive at an understanding regarding either the character or extent of compensation, nor with regard to the nature and extent of the use of the tunnel by appellant; and it is equally manifest that so long as the respondent can treat the tunnel in question as its own private affair, to which no one may gain access except by its consent, no such an understanding or agreement is possible.

    Respondent’s counsel, however, insist that it has been decided by respectable courts that the use of the tunnel contemplated by the appellant cannot be condemned under statutes similar to our own. The case of Amador-Queen M. Co. v. Dewitt, 73 Cal. 482, 15 Pac. 74, is cited and relied on. In that case the right to a joint use of the mining tunnel was denied upon the sole ground that the joint use which was sought was for a private and not for a public use. In view that the right of condemnation in cases of rights of way for *426tunnels must be based upon the claim that the use of mining tunnels is a public use, it is not easy to see bow the California court arrived at the conclusion aforesaid. It would seem that if the right of way for a tunnel may be condemned because such right contemplates a public use, then it must also follow that the operation of the tunnel would likewise constitute a public use. How, then, can it be said that a joint use is a private usé ? It would seem that no further comment is necessary.

    It is, however, further contended that the decision of Headrick v. Larson, 152 Fed. 93, 81 C. C. A. 317, is decisive of the question involved here. It is contended that in that case it is squarely held that the joint use of a mining tunnel may not be condemned under an eminent domain statute similar to' ours. It may be that the court which rendered the decision in that case may ultimately arrive at the conclusion contended for by counsel, but it is manifest that it did not do so in that case, all of which is demonstrated by having recourse to the language used by the court in deciding that case. After discussing the questions involved in that case at some length, Mr. Justice Gilbert, United States Circuit Judge, closes the opinion thus:

    “But the present suit is not a suit to condemn a right of way over the tunnel. It is a suit in equity to compel thé joint use of a right- of way already condemned by another, and to obtain the right to participate in the benefits thereof, on the theory that the condemnation has been made for a public use, and that the applicants are members of the public for whom such condemnation has been adjudged. There is no allegation showing the necessity of such common use, and nothing to show that the appellants cannot proceed and condemn a right of way for a. tunnel, as was done by the appellees.”

    9,10 . It may safely be asserted, therefore, that all that is or could be decided in that case is that the plaintiffs had selected the wrong remedy. Upon the other hand, it has often been held by the courts of the highest respectability that one easement may be superimposed, so to speak, upon another. This is the doctrine of this court. Salt Lake City v. Salt Lake Water, etc., Co., 24 Utah, 249. In that *427case, at page 264, 67 Pac. at page 677 (61 L. R. A. 648), it is said:

    “Under the statute of eminent domain the law seems to be well settled that, where two public uses can stand together without material impairment or impediment of one by the other, they must so stand.”

    That is the conclusion also of Mr. Chief. Justice Shaw in the case of Boston, etc., Co. v. Boston, etc., Co., 23 Pick. (Mass.) 360-398, where, in referring to the two uses there in question, the Chief Justice said:

    “Both uses may well stand together, with some interference of the latter with the earlier, which may be compensated for by damages. ’

    In principle is there, can there be, any difference between superimposing one public, easement or úse upon another public easement or use, as was done in the case last above cited, and in the cases of Nash v. Clark, 27 Utah, 158, 75 Pac. 371, 1 L. R. A. (N. S.) 208, 101 Am. St. Rep. 953, 1 Ann. Cas. 300, Tanner v. Canal & Irr. Co., 40 Utah, 105, 121 Pac. 584, and Salt Lake City v. East Jordan Irr. Co., 40 Utah, 126, 121 Pac. 592, and a case like that one at bar? The mere fact that in this case the tunnel in question is owned by respondent in no way affects the principle of law announced in the foregoing eases. In those, as in all other cases where it is sought to acquire property or rights other than by the exercise of the power of eminent domain, the burden of proof rests upon the eondemner to show that the use is a public use, and that its exercise is necessary in the particular case. Both of those questions in this state must be determined by the court and both must be determined in favor of the eondemner, as preliminary questions before the'property or the right to an easement therein can be condemned. In view that the appropriation of property and the acquiring of an easement therein for the purposes of developing the mineral resources of this state have always been considered as being public uses, we cannot see any escape from the conclusion that the right that appellant seeks to acquire is clearly for the public use. Neither the allegations of the complaint nor the evidence produced in support thereof leave any room for doubt on that question.

    *42811 The only other question, therefore, is, did the appellant show any necessity for the exercise of the right? As to that we are of the opinion that if the right to a joint use of the mining tunnel may be obtained at all by condemnation proceedings — and we are fully convinced that it may be — then the evidence is also, prima facie at least, sufficient to show that it is necessary for the appellant to have the joint use of the tunnel in question in order to develop and mine the ores in the Haskel mining claim. It seems that, if appellant cannot reach the mineral deposits in said claim through respondent’s tunnel, the great cost of constructing a tunnel of its own will prevent it from ever successfully developing and removing said mineral deposits. What would be true in the case of appellant would be equally true with respect to any person to whom it might sell the mining claim, except possibly the respondent. It is too late now to insist that the people of both the state and nation are not interested in and benefited by the development of the mineral resources and wealth of both the state and the nation. The people are likewise interested in having the mineral resources developed at as little cost and expense as possible, since in no other way can the ores of the lower grades be developed and mined. As we view it, every element is present in this case which is required by our statute to authorize the exercise of the right of eminent domain. The district court therefore erred in making the so-called finding, in making the conclusion of law, and in entering judgment dismissing the action.

    In conclusion'we desire to state that there are many allegations in the complaint which to our minds seem unnecessary, while there are others that might well be more specific and certain. The same may be said of the answer. The defects in the pleadings are no doubt due to the fact that.the law upon this question had never been settled by this court, and that both parties, if we may say so, were merely feeling their way.

    For the reasons stated the judgment is reversed and the cause is remanded to the district court, with directions to grant the appellant a new trial, and to proceed with the case *429in accordance with tbe views herein expressed. Appellant to recover costs on appeal.

    THURMAN and GIDEON, JJ., concur.

Document Info

Docket Number: No. 3142

Citation Numbers: 53 Utah 413, 174 P. 172, 1918 Utah LEXIS 22

Judges: Corfman, Frick, Gideon, Mecarty, Reached, Reasoning, Thurman

Filed Date: 3/11/1918

Precedential Status: Precedential

Modified Date: 10/19/2024