John C. Abajian, M.D. and Margaret C. Abajian v. TruexCullins, Inc. and Thermal Efficiency Construction, Ltd. , 176 A.3d 524 ( 2017 )


Menu:
  • NOTICE: This opinion is subject to motions for reargument under V.R.A.P. 40 as well as formal
    revision before publication in the Vermont Reports. Readers are requested to notify the Reporter
    of Decisions by email at: JUD.Reporter@vermont.gov or by mail at: Vermont Supreme Court, 109
    State Street, Montpelier, Vermont 05609-0801, of any errors in order that corrections may be made
    before this opinion goes to press.
    
    2017 VT 74
    No. 2016-317
    John C. Abajian, M.D. and Margaret C. Abajian                     Supreme Court
    On Appeal from
    v.                                                             Superior Court, Chittenden Unit,
    Civil Division
    TruexCullins, Inc. and                                            January Term, 2017
    Thermal Efficiency Construction, Ltd.
    Helen M. Toor, J.
    David Bond of Strouse & Bond, PLLC, Burlington, for Plaintiffs-Appellants.
    Evan A. Foxx and Christopher D. Ekman of Heilmann, Ekman, Cooley & Gagnon, Burlington,
    for Defendant-Appellee TruexCullins, Inc.
    Pietro J. Lynn and Sean M. Toohey of Lynn, Lynn, Blackman & Manitsky, P.C., Burlington, for
    Defendant-Appellee Thermal Efficiency Construction, Ltd.
    PRESENT: Reiber, C.J., Dooley,1 Skoglund, Robinson and Eaton, JJ.
    ¶ 1.     EATON, J. Plaintiffs had a new roof installed on their home in 2001. In 2014,
    after the roof turned out to be defective, plaintiffs sued the architecture and construction firms that
    designed and installed the roof for negligence and breach of contract. The trial court granted
    summary judgment to defendants on the ground that the action was barred by the statute of
    limitations. We now affirm.
    1
    Justice Dooley was present for oral argument, but did not participate in this decision.
    ¶ 2.    The following facts are undisputed.2 In 2001, plaintiffs Margaret and John Abajian
    hired architectural firm TruexCullins, Inc., to design additions to both ends of their home in
    Williston, Vermont. Plaintiffs hired Thermal Efficiency Construction, Ltd. (TEC) to serve as the
    general contractor for the project. As part of the project, a new metal standing seam roof was
    installed on the entire house. TEC contracted with Murphy’s Metals, Inc. to do the roofing work.
    The roof was installed during the winter of 2001-2002.
    ¶ 3.    Plaintiffs had experienced problems with ice damming on their old roof, which was
    shingled. Defendants recommended that plaintiffs install a metal roof to alleviate the problem. 3
    Plaintiffs accepted the suggestion, hoping that the metal roof would result in fewer ice dams. Mr.
    Abajian4 testified in his deposition that he “thought that the metal roof was going to eliminate” the
    ice damming.
    ¶ 4.    Very soon after the new roof was complete, plaintiffs noticed that ice dams were
    continuing to occur at the eaves and that the problem was worse than before. Plaintiff John Abajian
    called third-party defendant Murphy’s to shovel the roof shortly after it was installed. Mr. Abajian
    also hired a different company to install snow guards on the roof to prevent snow from sliding
    down the roof toward the eaves. It was Mr. Abajian’s idea to install the snow guards; he did not
    discuss this idea with defendants. In 2004, Mr. Abajian had the snow guard installer return to
    move the guards higher up the roof because he thought they had been installed too low. Mrs.
    Abajian testified that the snow guards made the ice damming worse.
    2
    Plaintiffs concede that there are no material facts in dispute. The only dispute is the
    timing of accrual of their claims.
    3
    TruexCullins denies that it included a metal roof in its design or recommended a metal
    roof. This fact is not material for purposes of summary judgment.
    4
    Plaintiff John Abajian is retired from the medical profession and asked to be referred to
    as “Mr.” for purposes of this case.
    2
    ¶ 5.    During the winter of 2002-2003, water leaked through the roof and caused damage
    to the interior of plaintiffs’ home. Plaintiffs’ master bedroom and bathroom, office, dining room,
    living room, and kitchen were damaged. According to Mrs. Abajian, the walls “bubbled up, and
    everything peeled off.” Although plaintiffs had experienced ice dams on the roof since the 1970s,
    the leaking was unprecedented, according to Mr. Abajian.5 Plaintiffs filed an insurance claim to
    cover the cost of repainting.6
    ¶ 6.    Plaintiffs believed the damage they experienced in 2002 and 2003 was due to ice
    damming that resulted in water coming through the roof. Mr. Abajian believed that the water was
    penetrating the roof “because these seams weren’t good enough.” In the summer of 2003, Mr.
    Abajian had one of his sons apply caulking along the standing seams in an attempt to address what
    he thought was the source of the problem. Besides the leaking which resulted in the insurance
    claim, plaintiffs noticed leaks at least two other times between 2002 and 2012. Neither of these
    leaks required interior repairs.
    ¶ 7.    Within a few years after the metal roof was installed, rust spots began to appear on
    the roof’s surface. Plaintiffs first noticed the rust spots in 2005. Mr. Abajian believed rust was
    eating through the galvanized metal from above, which struck him as unusual. He and his sons
    painted over the rust spots when they appeared, hoping that it would eliminate the problem. Mrs.
    5
    Mrs. Abajian’s testimony on this point was unclear. When asked by counsel whether the
    2002 leaking event was the first time plaintiffs had leaking in the original portion of the house, she
    said “No. No. I can’t remember. I am getting very confused.” Later, she testified that there was
    leaking in a downstairs room and that “this happened before we had the new roof on; it was early.”
    It is unclear whether she is referring to the new roof that was installed after the defect was
    discovered in 2014 or the roof that was installed in 2001. This testimony is too vague to create a
    genuine dispute of material fact. Even if plaintiffs did experience leaks with their old roof, a
    reasonable person would expect a brand-new roof to perform better—particularly since plaintiffs
    were allegedly told that the ice damming problem would improve with the metal roof.
    6
    As the trial court noted, the record shows that the insurance claim was filed in February
    2002, which suggests that the leaking began in the winter of 2001-2002, right after the new roof
    was installed, rather than the winter of 2002-2003 as Mr. Abajian testified.
    3
    Abajian was concerned about the rust spots on the roof panels because “[t]hey were disintegrating,
    I believe. Oxidizing.” Plaintiffs painted over rust spots approximately every other year starting
    in 2005.
    ¶ 8.    By 2005, Mr. Abajian understood that the metal roof was not performing consistent
    with his expectations. Mrs. Abajian knew in 2005 that the roof was “failing” because it was
    rusting.7
    ¶ 9.    During the winter of 2012-2013, plaintiffs experienced major roof leaks that caused
    damage throughout the interior of the house. They hired a builder, Polli Construction, Inc., to
    investigate the cause. When Polli removed the roof panels in the summer of 2014, it found
    widespread rusting on the underside of the panels. Portions of the underlayment were also rotted.
    Polli opined that the corrosion was due to inadequate insulation.
    ¶ 10.   On November 6, 2014, plaintiffs filed a complaint alleging negligence and breach
    of contract against defendants TruexCullins and TEC. TEC asserted a third-party claim against
    Murphy’s. Following discovery, TruexCullins and TEC moved for summary judgment on the
    ground that the six-year statute of limitations applicable to civil actions barred plaintiffs’ claims.
    The trial court granted the motion. It ruled that no reasonable jury could find that plaintiffs “were
    not on inquiry notice of some roof defect by 2005,” and therefore plaintiffs’ action was untimely.
    ¶ 11.   We review summary judgment rulings de novo, using the same standard as the trial
    court. Gallipo v. City of Rutland, 
    2005 VT 83
    , ¶ 13, 
    178 Vt. 244
    , 
    882 A.2d 1177
    . We will affirm
    if, “viewing the evidence in the light most favorable to the nonmoving party, there is no genuine
    dispute as to any material fact and the moving party is entitled to judgment as a matter of law.”
    7
    Mr. Abajian testified that he contacted TruexCullins and TEC to come look at the roof
    at some point between 2003 and 2008, “at a time when the ice damming was really bad,” but it
    does not appear that anything came of this meeting. Neither party has argued that this meeting
    affected the running of the limitations period. If anything, it suggests that plaintiffs suspected a
    connection between the ice damming and the design or installation of the roof.
    4
    Glassford v. Dufresne & Assocs., P.C., 
    2015 VT 77
    , ¶ 10, 
    199 Vt. 422
    , 
    124 A.3d 822
    (quotation
    omitted); V.R.C.P. 56(a).
    ¶ 12.   A civil action must “be commenced within six years after the cause of action
    accrues.” 12 V.S.A. § 511. A cause of action accrues upon “discovery of facts constituting the
    basis of the cause of action or the existence of facts sufficient to put a person of ordinary
    intelligence and prudence on inquiry which, if pursued, would lead to the discovery.” Union Sch.
    Dist. No. 20 v. Lench, 
    134 Vt. 424
    , 427, 
    365 A.2d 508
    , 511 (1976) (quotation omitted); see also
    Univ. of Vt. v. W.R. Grace & Co., 
    152 Vt. 287
    , 290, 
    565 A.2d 1354
    , 1357 (1989) (holding that
    discovery rule applies to § 511). At that point, the limitation period begins to run, “and the plaintiff
    is ultimately chargeable with notice of all the facts that could have been obtained by the exercise
    of reasonable diligence in prosecuting the inquiry.” Agency of Nat. Res. v. Towns, 
    168 Vt. 449
    ,
    452, 
    724 A.2d 1022
    , 1024 (1998) (quotation and alteration omitted).
    ¶ 13.   Plaintiffs contend that the issue of when their claims accrued was a question of fact
    that was for the jury rather than the trial court to decide. They argue that they do not have any
    expertise in roofing design or construction and thus had no way of knowing that the roof was
    defective until Polli removed the roof panels in 2014 and discovered the corrosion underneath.
    According to plaintiffs, there was nothing to put them on inquiry notice regarding the condition of
    the roof until they experienced major leaks during the winter of 2012-13.
    ¶ 14.   Plaintiffs are correct that the determination of when a claim accrues is usually
    reserved for the trier of fact. 
    Towns, 168 Vt. at 454
    , 724 A.2d at 1025. However, “it is appropriate
    for a court to determine the issue when there is no legally sufficient evidentiary basis for a
    reasonable jury to find for the nonmoving party on that issue.” Turner v. Roman Catholic Diocese
    of Burlington, 
    2009 VT 101
    , ¶ 48, 
    186 Vt. 396
    , 
    987 A.2d 960
    . This is such a case.
    ¶ 15.   The undisputed facts show that plaintiffs’ brand-new roof began to leak almost
    immediately after it was installed, resulting in such extensive interior damage that they filed an
    5
    insurance claim to cover the cost of repainting. Plaintiffs had experienced ice damming before,
    but there is no evidence that the previous ice dams caused extensive leaking and interior water
    damage. They installed a metal roof in 2001-2002 with the hope that it would reduce ice damming.
    Plaintiffs recognized that the new roof had a problem because they attempted to address it by
    caulking the seams. However, they did not contact TruexCullins or TEC or anyone else to
    investigate the source of the problem. “New roofs do not leak; they do not require a period to
    ‘settle’ before they become watertight.” Bernard Schoninger Shopping Ctrs., Ltd. v. J.P.S.
    Elastomerics, Corp., 
    102 F.3d 1173
    , 1179 (11th Cir. 1997). In Vermont, like anywhere else, a
    brand-new roof is expected to keep water out of the building it covers. A reasonable homeowner
    who had just paid to have his or her entire roof replaced would likely investigate the condition of
    the roof if he or she experienced significant, unprecedented leaking.
    ¶ 16.   Even if reasonable minds could differ as to whether the first leak was enough to put
    plaintiffs on notice of a roof defect, see A.J. Aberman, Inc. v. Funk Bldg. Corp., 
    420 A.2d 594
    ,
    601 (Pa. Super. Ct. 1980), we agree with the trial court that by 2005, plaintiffs were aware of facts
    sufficient to lead any reasonable homeowner to investigate the condition of the roof. At that point,
    they had already experienced a major, unprecedented leak that was severe enough for them to file
    an insurance claim. Rust spots had begun to appear. The ice damming problem, which the metal
    roof was supposed to mitigate, was worse than ever. Plaintiffs themselves stated that by 2005, the
    roof was not living up to their expectations and was “failing.” They clearly recognized that the
    roof had problems because they attempted various repairs, including caulking the seams, installing
    snow guards, and painting the rust spots. There is no genuine dispute regarding these facts, which
    were sufficient to place a reasonable person on notice that something was wrong with the roof. At
    that point, it was up to plaintiffs to exercise due diligence and investigate the cause of the problem.
    ¶ 17.   We addressed a similar situation in 
    Lench, 134 Vt. at 427
    , 365 A.2d at 511. After
    discovering that its new school building had a defective roof, a school district sued the architects
    6
    who designed the roof. The parties had entered into the design contract in 1965, and the design
    work was finished by January 1966. The building was completed and occupied by September
    1966. The roof began to leak almost immediately. The school district attempted without success
    to address the problem on its own. It finally sought professional advice in January 1972, and
    learned that the roof was latently defective due to negligent design. It filed suit in December 1972.
    ¶ 18.    We affirmed the trial court’s grant of summary judgment to the defendants on the
    ground that the action was time-barred. 
    Id. We rejected
    the plaintiff’s argument that the statute
    of limitations did not begin to run until they discovered the precise cause of the injury in January
    1972:
    [I]t is not the actual discovery of the reason for the injury which is
    the criteria. . . . [D]iscovery means discovery of facts constituting
    the basis of the cause of action or the existence of facts sufficient to
    put a person of ordinary intelligence and prudence on inquiry which,
    if pursued, would lead to the discovery.
    Id. at 
    427, 365 A.2d at 511
    (quotation omitted). Although we declined to determine exactly when
    the statute began to run, we implicitly agreed with the defendants that the latest possible date
    triggering the limitations period was when the roof began to leak following occupancy in
    September 1966.
    ¶ 19.    As in Lench, the question here is not when plaintiffs discovered the true nature of
    the roof defect, but when sufficient facts existed that would have led a reasonable person to begin
    the investigation that would lead to the discovery. In this case, that date was 2005 at the latest.
    Although plaintiffs did not yet understand the precise source of the problems by then, sufficient
    facts existed to put them on notice that something was wrong with the roof generally, requiring
    further investigation. “The plaintiff need not have an airtight case before the limitations period
    begins to run. Fleshing out the facts will occur during investigation of the matter or during
    discovery after the lawsuit is filed.” Rodrigue v. VALCO Enters., Inc., 
    169 Vt. 539
    , 541, 
    726 A.2d 61
    , 63 (1999).
    7
    ¶ 20.   Plaintiffs contend that the ice damming, the initial leak, and the rust spots that began
    to appear in 2005 were minor defects that were distinguishable from the extensive corrosion
    discovered in 2014 and that this creates a dispute of material fact regarding the date of accrual.
    We disagree. Plaintiffs’ claims against defendants are based on the allegedly defective roof.
    Although they may not have known the extent of the defect in the roof, it was apparent by 2005
    that it was defective. “The fact that further damage which plaintiff did not expect was discovered
    does not bring about a new cause of action, it merely aggravates the original injury.” Pembee Mfg.
    Corp. v. Cape Fear Const. Co., 
    329 S.E.2d 350
    , 354 (N.C. 1985) (affirming summary judgment
    where undisputed facts showed that plaintiffs were aware of defective roof but took no legal action
    until statute of limitations had run).
    ¶ 21.   The cases cited by plaintiffs to support their argument that the trial court should not
    have decided when their claims accrued are inapplicable here, as they involve either an incorrect
    application of law by a lower court or a genuine dispute as to when the plaintiffs became aware of
    damage that should have alerted them to problems with their roofs. See Wildridge Venture v.
    Ranco Roofing, Inc., 
    971 P.2d 282
    , 283 (Colo. App. 1998) (holding that issue of whether
    knowledge of leaks in eight of forty-one buildings should have led plaintiff to investigate possible
    defects in remaining thirty-three buildings was one of fact); Habig v. Bruning, 
    613 N.E.2d 61
    , 63
    (Ind. Ct. App. 1993) (reversing summary judgment where trial court failed to apply discovery rule
    and record showed genuine dispute regarding whether leaks around skylight were sufficient to put
    homeowners on notice regarding structural defects with addition as a whole); Birdsong v.
    Christians, 
    6 S.W.3d 218
    , 229 (Mo. Ct. App. 1999) (finding genuine dispute as to when
    homeowners noticed damage that would have led them to discover defects in house, “particularly
    latent defects such as wet rot, slow leaking beneath the surface of the roof or located within difficult
    to access walls, and structural repairs made to the roof”); State v. Holland Plastics Co., 
    331 N.W.2d 320
    , 325 (Wis. 1983) (reversing summary judgment where trial court applied wrong statute of
    8
    limitations and did not consider discovery rule); Kohl v. F.J.A. Christiansen Roofing Co., 
    289 N.W.2d 329
    , 335 (Wis. Ct. App. 1980) (finding genuine dispute about whether damage to 12,000
    square feet of 300,000 square foot roof was significant enough to alert owner to problem, where
    owner denied knowing about damage to roof caused by wind and denied that he or agent read
    report that would have made him aware of problem). Here, the trial court properly applied the
    discovery rule, and there is no dispute that plaintiffs noticed problems with the roof as a whole by
    2005.
    ¶ 22.   Courts have not hesitated to grant summary judgment where the undisputed facts
    show that plaintiffs were aware of sufficient facts to put them on inquiry notice of a roof defect,
    even if they did not yet understand the full extent of the problem. See, e.g., Pembee Mfg. 
    Corp., 329 S.E.2d at 354
    ; see also John Q. Hammons Hotels, Inc. v. Acorn Window Sys., Inc., 
    394 F.3d 607
    , 611 (8th Cir. 2005) (affirming summary judgment because no reasonable jury could find that
    owner’s knowledge of water intrusion through windows, combined with repairs to windows, were
    insufficient to put owners on inquiry notice of defect in windows); Town of Mansfield v. GAF
    Corp., 
    364 N.E.2d 1292
    , 1295 (Mass. Ct. App. 1977) (“In this case there is no dispute that the
    plaintiff learned that the roof was defective no later than November or December of 1969. The
    fact that it did not appreciate the extent of the damage until later is immaterial.”); Day Masonry v.
    Indep. Sch. Dist. 347, 
    781 N.W.2d 321
    , 333-34 (Minn. 2010) (affirming summary judgment for
    defendant contractor under Minnesota’s two-year statute of limitations where there was no dispute
    that plaintiff had knowledge of roof leaks more than two years before it filed its arbitration demand,
    even if plaintiff did not know full extent of injury by then); A.J. Aberman, 
    Inc., 420 A.2d at 601
    (affirming summary judgment that mall owners’ December 1973 action against contractor for
    failure to properly install roof was barred by Pennsylvania’s six-year statute of limitations, where
    undisputed facts showed that mall owners experienced leaks in multiple locations since roof was
    installed in 1965, putting them on notice of defect well before December 1967).
    9
    ¶ 23.   In this case, there is no dispute regarding what material facts plaintiffs knew in
    2005. These facts were sufficient as a matter of law for plaintiffs’ claims against defendants to
    accrue at that time. Therefore, the trial court did not err by deciding the issue. See 
    Rodrigue, 169 Vt. at 541
    , 726 A.2d at 63. The court was correct that the statute of limitations had run before this
    action was filed.
    Affirmed.
    FOR THE COURT:
    Associate Justice
    10