Snelgrove Permit Amendment ( 2008 )


Menu:
  •                                 STATE OF VERMONT
    ENVIRONMENTAL COURT
    }
    In re: Snelgrove Permit Amendment        }       Docket No. 25-1-07 Vtec
    (Appeal of LeBlanc, et al.)       }
    }
    Decision and Order
    Appellants David LeBlanc, Christine Fortin, James LeBlanc and Herman LeBlanc
    (Appellants) appealed from a decision of the Zoning Board of Adjustment (ZBA) of the
    Town of Newport granting a zoning permit amendment to Appellee-Applicant Robert
    Snelgrove for an as-built boathouse.     Appellants are represented by Duncan Frey
    Kilmartin, Esq.; Appellee-Applicant (Applicant) is represented by Christopher D. Roy,
    Esq; and the Town of Newport is represented by William Boyd Davies, Esq.
    This Court’s decision and order of July 18, 2008, resolved Questions 2, 3, 4, 6, and
    7 of the Statement of Questions. By that decision and order, Question 3 was dismissed
    as moot, and Questions 4 and 6 were resolved in favor of Applicant that the issues
    raised by those questions had not been before the ZBA and therefore were not before
    the Court in the present proceeding.
    Question 7 was resolved in favor of Applicant that the 2005 Permit had become
    final without appeal and could not be challenged in the present appeal, that is, that
    Applicant remains entitled to have what was applied for and approved in the 2005
    Permit: a 15’ x 35’ single-story boathouse located five feet northerly of the former
    boathouse. See, e.g., In re Appeal of Adams, No. 145-9-03 Vtec, slip op. at 3 (Vt. Envtl.
    Ct. Mar. 21, 2005) (Wright, J.) (citing Town of Bennington v. Hanson-Walbridge Funeral
    Home, Inc., 
    139 Vt. 288
    , 292–93 (1981)). The construction allowed by the 2005 Permit
    continues to qualify as a nonconforming structure (as defined in 24 V.S.A. § 4303(14)
    1
    and § 602 of the Zoning Bylaws) as having been improperly authorized as a result of
    error of the Zoning Administrator, because the new construction was proposed to be
    located within the side setback and should have been referred to the ZBA under
    § 404(2) of the Zoning Bylaws.
    Because, under the unappealed 2005 Permit, all that Applicant was authorized to
    construct was a replacement 15’ x 35’ single-story boathouse, located five feet farther
    north than the existing boathouse, Question 2 was resolved in favor of Appellants that
    the as-built boathouse represents an expansion within the setback area that is far larger
    than that authorized by the 2005 Permit.        The remainder of Question 2 was also
    resolved in favor of Appellants that the as-built boathouse increases the volume of
    noncomplying structure occupying the required setback area beyond that of the former
    boathouse, and therefore does not qualify to apply for conditional use approval as a
    permissible alteration or expansion of a nonconforming structure under § 404(2) of the
    Zoning Bylaws. However, material facts as to the specific measurements of the former
    boathouse remained for trial; that is, the Court was unable to rule on summary
    judgment as to how much larger the as-built boathouse was, as compared with the
    former boathouse.
    After the decision on summary judgment, Questions 1 and 5 of the Statement of
    Questions remained for trial, as well as the facts relating to the size of the former
    boathouse. Applicant also moved for reconsideration or clarification of the summary
    judgment order; by agreement of the parties that motion was postponed to be
    considered after the trial, together with any post-trial memoranda.
    An evidentiary hearing was held in this matter before Merideth Wright,
    Environmental Judge. A site visit was taken on the hearing day with the parties and
    their representatives.   The parties were given the opportunity to submit written
    memoranda and requests for findings, in addition to their memoranda on the motion
    for reconsideration or clarification. Upon consideration of the evidence as illustrated by
    2
    the site visit, and of the written memoranda and requests for findings filed by the
    parties, the Court finds and concludes as follows. The parties provided the Zoning
    Bylaws last amended in February of 2006 (the 2006 Bylaws) as the version of the Zoning
    Bylaws applicable to this appeal.1
    The 2006 Bylaws define the entire Town of Newport as a single zoning district.
    § 201.    Section 206 establishes dimensional requirements for lots and structures
    according to each general use category. For dwelling uses, the side yard setback and
    rear yard setbacks are 25 feet, and the building height maximum is 35 feet. § 206.1. The
    only structures for which a reduced setback is provided are utility sheds not exceeding
    200 square feet in area, for which all yard setbacks are five feet, and for which the
    maximum height is eight feet. § 206.4. The 2006 Bylaws do not establish any separate
    lakeshore setback requirement or boathouse exemption.
    Applicant’s property is located at 5706 Lake Road on the westerly shore of Lake
    Memphremagog in the Town of Newport. When Applicant acquired the property in
    1976, it included an existing single-family house and a then-existing boathouse (the
    former boathouse2) located near the lake shore. A small stream entered the back of the
    former boathouse, dropping four to five feet in elevation to its outlet at the lake level at
    the front of the former boathouse.
    1 The parties have not provided any earlier zoning ordinance from which the Court
    could determine when the boathouse became nonconforming; for the purposes of this
    decision the Court will assume that the regulations in effect in October of 2005, when
    the first application was filed, also contained the 25-foot side setback requirement. The
    2006 Bylaws also do not appear to contain any new waiver provisions as allowed by 24
    V.S.A. § 4414(8).
    2
    The boathouse was originally built in 1931, and was in place as of Applicant’s
    purchase of the property in 1976; the superstructure above the foundation was
    renovated in 1992, but not changed in size or shape. All references to the “former”
    boathouse dimensions in this decision refer to the structure as renovated in 1992.
    3
    Under the 2006 Bylaws the house is categorized as a permitted single-family
    dwelling use and the former boathouse is categorized as a permitted accessory use.
    § 206, Permitted Uses (1), (8).
    Appellants’ property is the adjacent lakeshore property to the south. The deeds
    in evidence suggest that the deeded LeBlanc-Snelgrove property line runs from the lake
    westwards along what was the south side of the former boathouse, and then
    northwards along or near the back or west side of the former boathouse, before
    proceeding from there towards the west. However, any dispute as to the location of the
    property line or as to the parties’ respective property rights, including whether any of
    the construction related to the boathouse encroaches on Appellants’ property, is not
    before this Court in this appeal; it must be raised, if at all, in Superior Court. See 4
    V.S.A. § 1001(b); e.g., In re Leiter Subdivision Permit, No. 85-4-07 Vtec, slip op. at 4 (Vt.
    Envtl. Ct. July 25, 2008) (Durkin, J.) (citing Appeal of Monty, Nos. 7-1-04 Vtec and 47-3-
    04 Vtec (Vt. Envtl. Ct. Jan. 24, 2006) (Durkin, J.)).
    Because the former boathouse was located at or near the LeBlanc-Snelgrove
    property line, it was entirely within the twenty-five-foot-wide side yard setback area.
    Under Article IV of the 2006 Bylaws, the former boathouse was therefore a
    nonconforming structure that was entitled to continue, provided that the conditions of
    § 4043 are met.
    The former boathouse had a low concrete foundation or concrete footings,
    extending approximately two-and-a-half to three feet above the surrounding ground
    level at the lake end of the building, and extending approximately three feet above the
    surrounding ground level at the northwest corner of the building adjacent to the
    opening through which the stream entered the back of the building. A single-story
    clapboard structure was built on the concrete footings; the structure opened onto the
    3Article IV only contains § 404, which has three subsections; there is no § 401, § 402, or
    § 403.
    4
    lake and provided access and storage for a single boat. The exposed width of each
    clapboard was 5¼ inches, making it possible to estimate the height of the former
    structure above its concrete foundations, from photographs in evidence. The structure
    had a shallow peaked roof with the gable ends facing east and west (towards and away
    from the lake); the attic area was used for storage. The roof of the former boathouse
    extended approximately one foot beyond its side walls on all four sides of the building.
    The concrete footings or foundation blocks sloped outwards at about a twenty degree
    angle from their top edges down to the ground, so that the foundation at ground level4
    also extended beyond the side walls of the building.
    Whether measured where the footings met the ground or at the full extent of the
    roof, the former boathouse occupied a footprint of approximately 21’ 3” in width and
    approximately 32’ 3” in length, with the walls of the structure having a width of
    approximately 18’ 3” and a length of approximately 30’ 3”. The wooden structure of the
    former boathouse extended above the foundation approximately 11 feet to the peak of
    the roof, so that the peak of the roof was approximately 14 feet above the surrounding
    ground level (regardless of the lake level or the level of water within the stream or
    within the boathouse). Although it may technically be possible to establish an elevation
    above sea level for the peak of the roof of the former boathouse, by comparing
    photographs that contain the former boathouse together with other known features that
    still exist, determining the elevation of the still-existing features, and correcting for the
    angle at which the photographs were taken, no expert surveyor or other expert
    4
    Applicant argues that the Court should consider the size of the former boathouse as
    having extended underground to the bottom of the footings. However, nothing in the
    Zoning Bylaws or the state statute supports extending the open space required in a yard
    setback below the ground. Cf. In re Edgar Northshore Dr. Variance Application, No.
    292-12-07 Vtec, slip op. at 7 (Vt. Envtl. Ct. Feb 5, 2009) (Wright, J.); In re Fenoff
    Accessory Dwelling Application, No. 280-12-06 Vtec, slip op. at 6–7 (Vt. Envtl. Ct. Mar.
    19, 2008) (Wright, J.).
    5
    evidence was presented to provide that elevation evidence in the present case.
    (Similarly, while it is technically possible for a surveyor to establish an elevation above
    sea level for the peak of the roof of the as-built boathouse, no such actual measured
    elevation evidence was presented in evidence.) In any event, for the reasons discussed
    below, a finding as to the elevation above sea level of the peak of the former boathouse
    is not essential to the resolution of the present appeal.
    In October of 2005, Applicant submitted an application for a zoning permit,
    proposing to reconstruct the boathouse northerly of the stream, about five feet northerly
    of its pre-existing location.     The application stated both the “existing use and
    occupancy” and the “proposed use and occupancy” as “BOATHOUSE.”                        The
    application stated the building length as “35 [feet],” the width as “15 [feet],” and the
    number of stories as “1.” The application noted that it was for the “DEMOLITION &
    REBUILDING OF SAME SIZE BOATHOUSE 5 FT NORTH OF EXISTING.” Whether
    the width of the boathouse had been 15 feet as stated in the application, or was actually
    18 (or 21) feet in width, moving it five feet to the north meant that it (or all but the
    northernmost foot) would still be located within the twenty-five-foot-wide side setback.
    However, the application stated the side setback as “N/A [not applicable].”
    Despite proposing construction within the side setback area, which should have
    been treated as an alteration of or expansion to a nonconforming structure under
    whatever version of § 404 of the Zoning Bylaws was in effect at that time,5 the 2005
    application was acted on by the Zoning Administrative Officer rather than being
    referred to the ZBA. The Zoning Administrative Officer approved it on November 17,
    2005 and it became final without appeal.
    The project had also received a letter dated September 27, 2005 from the state
    Agency of Natural Resources (ANR) regarding the requirements of state law for the
    5   See footnote 1, above.
    6
    project. That letter, based on a site visit taken on August 8, 2005 by an ANR employee,
    described the former boathouse as having been located “landward of” the lake, stated
    that the reconstructed boathouse was also proposed to be located landward of the lake,
    and stated that the existing alignment of the stream would be retained, with the
    reconstructed boathouse being placed northerly of the stream. Condition 2 of the ANR
    letter required that “[t]he reconstructed boathouse shall be landward of the existing
    shoreline.” The ANR letter stated that “[t]he streambed will be stabilized with existing
    stone and stone from an existing stone jetty, located north of the boathouse, which will
    be removed from the lake;” and that “[t]he removal of the existing jetty will provide
    access between the lake and the reconstructed boathouse.” No issues relating to the
    compliance of the current construction with the ANR letter or with any ANR
    regulations are before the Court in the present appeal.
    Applicant demolished the former boathouse and, in 2006, constructed the
    boathouse in its current location (the as-built boathouse). In addition to completing
    work on the as-built boathouse, Applicant constructed a 60-foot-long concrete retaining
    wall at the property boundary in approximately the same location as the southerly wall
    of the former boathouse, but much longer and taller than the foundation or footings of
    the former boathouse. Applicant constructed an extension of the southerly wall of the
    as-built boathouse towards the west, on the northerly bank of the stream. Applicant
    also constructed a concrete base or floor within the streambed, between the southerly
    retaining wall and the southerly wall of the as-built boathouse, and extending
    westwards almost the full length of the retaining wall, forming what Appellants refer to
    as a “sluiceway” for the stream outlet, conducting the stream between the southerly
    retaining wall and the as-built boathouse.
    The as-built boathouse has two-and-a-half stories: a lower story open to the lake
    and an upper story-and-a-half including the open space within the sloped roof. It has
    concrete foundation walls that are much higher above ground than the foundation or
    7
    footings of the former boathouse, so that they form the walls of the full lake-level story.
    The upper story-and-a-half is built over the lake-level story, with doors and windows
    facing onto a roofed deck area facing east towards the lake, and with an exit door on the
    westerly end that will require a short flight of steps down to ground level. Three
    dormers with windows are located in the north-facing slope of the roof. The upper
    story-and-a-half is a finished open room that is served by electricity, but has no
    plumbing, heating or other utilities; the lake-level story has a water supply.
    The poured concrete foundation of the as-built boathouse extends approximately
    five feet above the current surrounding ground level at the northeastern (lake) end of
    the building, and tapers to approximately two feet above the current surrounding
    ground level at the northwesterly corner.
    A one-and-a-half story clapboard structure is built on the concrete foundation of
    the as-built boathouse, forming the ceiling of the lake-level boathouse story of the
    structure. The roof of the as-built boathouse extends two feet beyond its end walls on
    the east and the west sides of the building, and extends a foot-and-a-half beyond its side
    walls on the north and the south sides.
    The as-built boathouse occupies a footprint of approximately 21’ 8½” in width
    and approximately 38’ 6” in length, with the walls of the structure having a width of
    approximately 18’ 8½” and a length of approximately 34’ 6”. The footprint of the as-
    built boathouse is approximately four feet longer than the former boathouse, and only a
    few inches wider. The wooden structure of the as-built boathouse extends above the
    foundation approximately 15 feet to the peak of the roof. As both the height of the
    foundation of the as-built boathouse and the height of the wooden superstructure are
    greater than the corresponding features of the former boathouse, the peak of the roof of
    the as-built boathouse is therefore approximately at least five to eight feet higher above
    the surrounding ground than was the peak of the roof of the former boathouse,
    although it is difficult to determine the change in elevation of that surrounding ground.
    8
    The as-built boathouse occupies a larger above-ground volume of the side setback area
    than did the former boathouse, as well as a larger lateral extent. Because of the steeper
    roof and the higher elevation of the roof peak, the upper story of the as-built boathouse
    also obstructs more of the view from Appellants’ deck towards the northerly end of the
    lake than did the former boathouse.
    In 2007, Applicant sought to amend the 2005 zoning permit to obtain approval
    for the as-built boathouse. Applicant did not apply for any permit for the additional
    concrete work that became the southerly boundary wall, the extension of the southerly
    wall of the as-built boathouse, or the concrete base for the stream. The application was
    filled out at the January 2, 2007 ZBA meeting, and then was ruled on by the ZBA at the
    same hearing. No separate decision was issued, and the undated, unsigned minutes for
    this hearing were not subsequently approved by vote of the ZBA.
    The 2007 application stated the “existing use and occupancy” of the building as
    “BOATHOUSE – AMENDMENT OF EXISTING PERMIT” and stated the “proposed
    use and occupancy” of the building as “BOATHOUSE & SLEEPING QUARTERS.” The
    2007 application stated the building length as “34 [feet],” stated the width as “16” [feet],
    and stated the number of stories as “2.” Although the 2007 application stated the
    building footprint as 34’ x 16’, it also stated the square footage as 600 square feet,
    although that length multiplied by that width yields an area of 544 square feet.
    Motion for Reconsideration, and Remaining Merits
    Relief pursuant to a motion to reconsider is “an extraordinary remedy that
    should be used sparingly.” In re Bouldin Camp – Noble Road, No. 278-11-06 Vtec, slip
    op. at 1 (Vt. Envtl. Ct. Sept. 13, 2007) (Wright, J.). The limited functions of a motion for
    reconsideration are “‘to correct manifest errors of law or fact’ on which the decision was
    based, to allow the moving party to present newly discovered or previously unavailable
    evidence, to prevent manifest injustice, or to respond to an intervening change in the
    9
    controlling law.” In re Vanishing Brook Subdivision, No. 223-10-07 Vtec, slip op. at 4
    (Vt. Envtl. Ct. July 10, 2008) (Wright, J.) (quoting 11 Wright, Miller, & Kane, Federal
    Practice and Procedure: Civil 2d § 2810.0). Because of these narrow purposes, motions
    to reconsider are usually denied. In re South Village Communities, LLC, No. 74-4-05
    Vtec, slip op. at 2 (Vt. Envtl. Ct. Sept. 14, 2006) (Durkin, J.) (citing 11 Wright, Miller, &
    Kane, supra, § 2810.0).
    However, as the parties agreed that the motion for reconsideration would be
    considered together with the remaining merits for trial, the Court has fully considered
    the issues raised by the motion for reconsideration and its response, in light of the
    evidence at trial, as illustrated by the site visit. The Court declines to change the result
    of the summary judgment decision.
    First, subsection 1 of § 404, governing nonconforming uses, does not apply to the
    present application, as the single-family dwelling use and its accessory boathouse use
    are conforming, permitted uses. § 206, Permitted Uses (1), (8). Rather, the former
    boathouse was a nonconforming structure, due to its failure to meet the side setback
    dimensional requirements, although it housed a permitted use. Compare 24 V.S.A.
    § 4303(14), and § 602 of the Zoning Bylaws (definition of “nonconforming structure”),
    with 24 V.S.A. § 4303(15), and § 602 of the Zoning Bylaws (definition of
    “nonconforming use”). Under the present statute, municipalities are required to define
    in their zoning bylaws how all three types of nonconformities (nonconforming uses,
    structures, and lots) are to be addressed, including the extent to which a nonconformity
    may change or expand. 24 V.S.A. § 4412(7).6 Section 404(2) of the 2006 Zoning Bylaws,
    6 In re Miserocchi, 
    170 Vt. 320
     (2000), was decided under an earlier version of the state
    statute, and does not require a different result. It was decided at a time during which
    the statutory language authorizing towns to regulate noncomplying structures had for a
    time been repealed, leaving only the language authorizing towns to regulate
    nonconforming uses, even though many zoning bylaws had retained older provisions
    that continued to regulate noncomplying structures. That anomaly was cured by the
    10
    adopted after that statutory authority was enacted, allows the alteration or expansion of
    a nonconforming structure, but only “providing such action does not increase the
    degree of nonconformance.”
    The state statute also authorizes municipalities to provide in their zoning bylaws
    for waivers to reduce dimensional requirements in defined circumstances. 24 V.S.A.
    § 4414(8). The 2006 Zoning Bylaws do not provide for waivers of the side setback
    dimensional requirement.
    The as-built boathouse increases the “degree of nonconformance” with the side
    setback requirement, as compared with the smaller former boathouse, even though it
    itself is located five feet farther from the boundary line, because it is a larger structure
    and occupies a larger volume of the setback area. The Zoning Bylaws require that the
    required yard or setback area be entirely free of structures or parts of structures; that is,
    they “shall not project into a required yard.” See § 312. The enlargement of the existing
    boathouse within the side setback area therefore is not eligible for conditional use
    approval under the terms of § 404(2) of the Zoning Bylaws, because the proposal would
    increase the degree of nonconformance. E.g., In re Dunnett, 
    172 Vt. 196
    , 202–03 (2001)
    (affirming denial of enlargement of portion of building within side setback area under
    nonconforming structure provisions of bylaw); In re Appeal of Tucker, No. 123-7-98
    Vtec (Vt. Envtl. Ct. Aug. 2, 1999) (Wright, J.) (permit allowing construction of one-story
    building extending into side setbacks does not authorize expansion to two stories
    within the setbacks, even though two-story building would not violate height
    limitations or extend laterally any farther into setbacks), aff’d, No. 1999-399 (Vt. Mar. 10,
    extensive statutory amendments enacted in 2004, prior to the adoption of the 2006
    Zoning Bylaws. Zoning ordinances are interpreted according to the same rules as
    statutes. In re Trahan, 
    2008 VT 90
    , ¶ 19 (citing In re Gregoire, 
    170 Vt. 556
    , 559 (1999)
    (mem.)). In interpreting the 2006 Zoning Bylaws, therefore, the Court will presume that
    the drafters were mindful of relevant existing laws. In re Grievance of Danforth, 
    174 Vt. 231
    , 238 (2002) (citing State v. Read, 
    165 Vt. 141
    , 147 (1996)).
    11
    2000) (unpublished mem.); see also In re Curry Variance Application, No. 222-10-07
    Vtec, slip op. at 7 (Vt. Envtl. Ct. Feb. 5, 2009) (Wright, J.) (extension of roof overhangs
    into side setback area enlarged or expanded nonconformity); In re Edgar Northshore
    Dr. Variance Application, No. 292-12-07 Vtec, slip op. at 5–7 (Vt. Envtl. Ct. Feb 5, 2009)
    (Wright, J.) (additional height added to pre-existing nonconforming structure within
    setback area enlarged nonconformity); In re Rouleau Property Appeals, Nos. 231-12-04
    Vtec, 28-2-05 Vtec, 29-2-05 Vtec, 192-9-05 Vtec, 28-2-05 Vtec, and 193-9-05 Vtec (Vt.
    Envtl. Ct. Nov. 17, 2006) (Wright, J.) (denying application to relocate building within
    shoreline setback because it would occupy a formerly clear area within shoreline
    setback); Appeal of Barnes, No. 154-8-04 Vtec, slip op. at 6–7 (Vt. Envtl. Ct. May 18,
    2005) (Wright, J.) (additional height added to pre-existing nonconforming structure
    within setback area increased nonconformity).
    Moreover, all that Applicant was authorized to construct by the 2005 Permit was
    a new 15’ x 35’ single-story boathouse, located five feet farther north than the former
    boathouse. The as-built boathouse represents an expansion within the setback area that
    is larger than that authorized by the 2005 Permit, regardless of whether it is larger than
    the former boathouse. As the 2006 Zoning Bylaws do not provide for conditional use
    approval for such an expansion, and do not provide for a waiver of the side setback
    dimensional requirement, the 2007 application now before the Court cannot be
    approved.
    Similarly, all that is before the Court in the present proceeding is what was
    before the ZBA as proposed by the 2007 application: a two-story, 34’ x 16’ boathouse,
    five feet northerly of the former boathouse. The wall-to-wall dimensions of the as-built
    boathouse building are larger than 34’ x 16’, and the building has an additional three
    feet of width and four feet of length due to the roof overhangs, which would require a
    further amendment to the 2007 application, even if construction within the side setback
    area could have been approved in this proceeding.
    12
    Applicant also argues that the southerly retaining wall and the concrete base to
    the streambed were “necessary” to the construction authorized in the 2005 permit, and
    therefore should not require a separate zoning permit. If the additional concrete work
    had been listed on the application for the 2005 permit as part of the project, it would
    have been covered by the 2005 permit. It was not covered by the 2005 permit; so that if
    field conditions during construction had necessitated7 changes to the project as
    approved in the 2005 permit, Applicant or his engineer should have sought
    amendments to the permit to reflect those changes. On the other hand, if the additional
    concrete features are considered to be part of the boathouse structure, rather than to be
    separate structures, they increase the nonconformity of the as-built boathouse even
    more than does the boathouse structure itself.
    At present, neither the southerly retaining wall, the westerly extension of the
    southerly wall of the as-built boathouse, nor the concrete base to the streambed, has a
    zoning permit. A zoning permit is required because each falls within the definition of a
    structure, and the 2006 Zoning Bylaws do not exempt boundary walls or retaining
    walls, except on operating farms. § 602, “Structure.” The absence of a permit for those
    structures is not otherwise before the Court in the present appeal, as this is not an
    enforcement case. Similarly, if any of those structures also require any ANR approval
    regarding their effect on the stream, that question is not before the Court in the present
    appeal.
    Because the upper story of the as-built boathouse obstructs more of the view
    from Appellants’ deck towards the northerly end of the lake than did the former
    boathouse, Appellants understandably focused on this obstruction at trial and
    7
    This decision makes no findings or conclusions as to the necessity for the retaining
    wall, whether the southerly footings for the former boathouse could have been left in
    place, or whether there have been intervening changes to the contours of either party’s
    property or to the shoreline.
    13
    demonstrated it during the site visit. However, in the 2006 Zoning Bylaws, only the site
    plan approval standards address the compatibility of a project with adjacent properties,
    and those standards do not apply to a residential accessory building. See §§ 205(A), (D).
    That is, if the upper story-and-a-half of the boathouse had been built to its current
    elevation but closer to the house, outside the side setback, the fact that it obstructs
    Appellants’ formerly open view is not regulated by the 2006 Zoning Bylaws.
    Question 5 of the Statement of Questions
    Because the present application for conditional use approval was filled out as
    well as ruled on at the January 2, 2007 meeting of the ZBA, the notice or warning
    required for conditional use review by 24 V.S.A. § 4464(a)(1) did not occur.         No
    evidence was presented at trial to show that reasonable efforts were made to provide
    adequate posting and notice. 24 V.S.A. § 4464(a)(5). Therefore, even if the as-built
    location and size of the new boathouse had been eligible to be considered for
    conditional use approval under § 404, the ZBA’s procedure did not meet the
    requirements of 24 V.S.A. §§ 4464(a)(1) or (5). Question 5 of the Statement of Questions
    is therefore resolved in favor of Appellants.
    Question 1 of the Statement of Questions
    No evidence was presented at trial to show that the January 2, 2007 meeting
    minutes were ever adopted by the ZBA so as to constitute the written decision of the
    ZBA under 24 V.S.A. § 4464(b)(1), even though the appeal was allowed to be filed from
    the oral decision made at the meeting. Therefore, even if the as-built location and size
    of the new boathouse had been eligible to be considered for conditional use approval
    under § 404, the ZBA’s minutes did not constitute a decision meeting the requirements
    of 24 V.S.A. § 4464(b)(1). Question 1 of the Statement of Questions is therefore resolved
    in favor of Appellants.
    14
    Accordingly, based on the foregoing, it is hereby ORDERED and ADJUDGED
    that the as-built boathouse does not qualify to be considered for conditional use
    approval under § 404 of the 2006 Zoning Bylaws and the application for conditional use
    approval is therefore DENIED, concluding this appeal.
    Done at Berlin, Vermont, this 23rd day of April, 2009.
    _________________________________________________
    Merideth Wright
    Environmental Judge
    15
    

Document Info

Docket Number: 25-1-07 Vtec

Filed Date: 7/18/2008

Precedential Status: Precedential

Modified Date: 4/24/2018