Vt Turquoise Hospitality LLC ( 2015 )


Menu:
  •                                    STATE OF VERMONT
    SUPERIOR COURT                                               ENVIRONMENTAL DIVISION
    Vermont Unit                                                   Docket No. 131-8-14 Vtec
    Vt. Turquoise Hospitality, LLC Discharge
    Permit Application (Permit # ID-9-0313)
    DECISION ON MOTION
    Applicant Vermont Turquoise Hospitality, LLC (“Applicant”) seeks an Indirect Discharge
    Permit for the collection, treatment, and discharge of domestic wastewater from the Aeolus
    Mountain Spa, proposed at 5940 Main Street in the Town of Manchester, Vermont. Applicant
    submitted an Indirect Discharge Permit application to the Vermont Agency of Natural
    Resources Department of Environmental Conservation (“DEC”), which the DEC approved on
    August 6, 2014. Neighboring landowner Richard Smith (“Appellant”) timely appealed that
    approval to this Court and filed a 13-question Statement of Questions presenting issues
    generally related to the effect of the discharge of treated domestic wastewater on the water
    quality of the West Branch of the Batten Kill under the Vermont Water Quality Standards
    (“WQS”), Interim Anti-Degradation Implementation Procedure (the “Interim Procedure”),
    Indirect Discharge Rules, and Water Supply and Wastewater Disposal Rules. Applicant now
    moves for summary judgment in its favor on Questions 1 through 11, arguing that it is entitled
    to a judgment as a matter of law. The Vermont Agency of Natural Resources (“ANR”) filed a
    memorandum in support of Applicant’s motion for summary judgment.
    Applicant is represented by Christopher Roy, Esq. Appellant is represented by Paul
    Gillies, Esq. ANR is represented by Leslie A. Weltz, Esq.
    Factual Background
    For the sole purpose of putting the pending motion into context, the Court recites the
    following facts which it understands to be undisputed:
    1.     Applicant Vermont Turquoise sought an Indirect Discharge Permit for the collection,
    treatment, and discharge of domestic wastewater from the Aeolus Mountain Spa, an 80-room
    1
    resort hotel, 160-seat restaurant, and spa proposed at 5940 Main Street in the Town of
    Manchester, Vermont.
    2.       DEC approved the application, issuing Permit #ID-9-0313 (“Permit”) on August 6, 2014.
    3.       The Permit authorizes the discharge of 19,998 gallons per day (“gpd”) of domestic
    wastewater from a dual alternating leachfield system to the groundwater. The receiving
    groundwater ultimately and indirectly flows into the West Branch of the Batten Kill River.
    4.       The disposal fields will be located approximately 800 feet from the West Branch;
    Vermont Route 7A and other several other developments are located on these intervening
    lands.
    5.       On June 12, 1991, the former Vermont Water Resources Board (“Water Board”)
    designated “all portions of the main stem of the Batten Kill and the West Branch of the Batten
    Kill and West Branch” as Outstanding Resource Waters. In Re Battenkill Findings of Fact,
    Conclusions of Law and Order, Docket No. 89-02 (Water Res. Bd. June 12, 1991).
    6.       The West Branch of the Batten Kill potentially affected by the Permit is within the range
    designated as Outstanding Resource Waters.
    7.       Appellant appealed the Permit on August 27, 2014.
    Discussion
    Applicant moves for summary judgment on Questions 1 through 11 of Appellant’s
    Statement of Questions pursuant to Rule 56 of the Vermont Rules of Civil Procedure, asking this
    Court to conclude that no material facts that are relevant to the legal issues presented in this
    appeal are in dispute and that Applicant is entitled to judgment as a matter of law. Although
    Applicant’s motion seeks summary judgment on eleven separate Questions, we have
    determined each of the challenged Questions to be a variation on a single legal issue: whether
    the issuance of an indirect discharge permit for the Project is prohibited because the West
    Branch of the Batten Kill has been designated as an Outstanding Resource Water. In response,
    Appellant alleges a dispute as to material facts and therefore asks the Court to deny Applicant’s
    motion for summary judgment.
    2
    I.      Summary Judgment Standard
    The Court will grant summary judgment to a moving party upon a showing that “there is
    no genuine dispute as to any material fact and the movant is entitled to judgment as a matter
    of law.” V.R.C.P. 56(a). What facts are material in any case is determined by the legal issues
    properly raised in the pending litigation. See Anderson v. Liberty Lobby, Inc., 
    477 U.S. 242
    , 248
    (1986)) (“Only disputes over facts that might affect the outcome of the suit under the governing
    law will properly preclude the entry of summary judgment.”).                   Stated differently, an alleged
    fact may be substantive (for example waters deemed to be Outstanding Resource Waters), but
    such an allegation may only be deemed material if it is pertinent to the legal issues presented.
    
    Id.
    We must “accept as true the [factual] allegations made in opposition to the motion for
    summary judgment” and give the non-moving party the benefit of all reasonable doubts and
    inferences. Robertson v. Mylan Labs., Inc., 
    2004 VT 15
    , ¶ 15, 
    176 Vt. 356
     (internal citation
    omitted); see V.R.C.P. 56(c) (laying out summary judgment procedures). If the responding party
    “fails to properly support an assertion of fact or fails to properly address another party’s
    assertion of fact,” the Court may “consider the fact undisputed for purposes of the motion.”
    V.R.C.P. 56(e)(2). The Court “need consider only the materials cited in the required statements
    of fact, but it may consider other materials in the record.” V.R.C.P. 56(c)(3). With these
    procedural directives in mind, we begin our review of Appellant’s challenged Questions.
    II.     Appellant’s Questions 1-11
    Applicant now seeks summary judgment in their favor on 11 of Appellant’s 13
    Questions; each of the challenged Questions asks a variation of whether the ANR’s Interim Anti-
    Degradation Procedure prohibits the issuance of an indirect discharge permit to Applicant.
    Appellant’s concerns focus on the possibility that treated wastewater1 may be indirectly
    discharged into the West Branch of the Batten Kill, a portion of which has been designated as
    an Outstanding Resource Water by the former Water Board, including the area potentially
    1
    Implicit in Appellant’s concerns is an assumption that the treated wastewater is somehow not fully treated and is
    distinguishable from the groundwater that it becomes, particularly after passing through all proposed treatment
    systems and the sand, gravel, rock and other earthen materials between Applicant’s proposed project and the 800-
    foot distance to the banks of the Batten Kill.
    3
    affected by the Permit. In Re: Batten Kill ORW Designation, Findings of Fact, Conclusions of Law
    and Order, Docket No. 89-02 (1991).2
    Federal regulations require states to develop, adopt, and identify methods for
    implementing an anti-degradation policy. Clean Water Act, 40 CFR 131.12. Vermont’s anti-
    degradation policy was adopted under the authority of 10 V.S.A. Chapter 47 and is set forth in
    § 1-03 of the Vermont Water Quality Standards (“WQS”). Vermont Water Quality Standards
    § 1-03, Code of Vt. Rules 12 030 025, available at http://www.lexisnexis.com/hottopics
    /codeofvtrules (hereinafter WQS)
    It is the primary goal of the anti-degradation policy to maintain and protect the state’s
    water quality and existing and designated uses.                  Vermont Agency of Natural Resources
    Department of Environmental Conservation Interim Anti-Degradation Procedure (“Interim
    Procedure”), § I(A) (filed as Exhibit 1 to Applicant’s Mot. for Summ. J.). To this end, the Anti-
    Degradation Policy establishes three tiers for protecting water, described as existing uses (“Tier
    1”), high quality waters (“Tier 2”), and Outstanding Resource Waters (“Tier 3”). WQS § 1-03.
    Under Tier 1, certain factors must be considered in determining the uses of water to be
    protected and maintained; Tier 2 provides for additional review in order to prevent reduction in
    the high quality of the water; Tier 3 waters must be designated as such by the Secretary
    pursuant to 10 V.S.A. § 1424a, and the existing water quality for designated Tier 3 waters must
    be maintained.          Id.    In October 2010, ANR adopted the Interim Anti-Degradation
    Implementation Procedure to implement the anti-degradation policy in § 1-03 of the WQS,
    including protection of Tier 3 Outstanding Resources Waters.
    Although the Interim Anti-Degradation Implementation Procedure applies to
    applications for new direct discharges, applications for new indirect discharge permits are
    explicitly exempt if the proposed system is subject to ANR’s Indirect Discharge Program, as
    implemented by the Indirect Discharge Rules.3                  Interim Anti-Degradation Implementation
    Procedure, §§ III(B)(2), III(C)(4).       Compliance with 10 V.S.A. Chapter 47 requires that an
    2
    We are directed to provide “[p]rior decisions of the . . . Water Resources Board . . . the same weight and
    consideration as prior decisions” of this Court. 10 V.S.A. § 8504(m).
    3
    Direct discharges include discharges of stormwater from culverts or drainage pipes directly into streams and
    other waters of the State; indirect discharges are not direct; such waters flow into groundwater, once treated, and
    all that ground water may ultimately flow (indirectly) into State waters
    4
    approved discharge be permitted under the Indirect Discharge Rules. Pursuant to the Indirect
    Discharge Rules, all new indirect discharges of wastes over 6,500 gpd are subject to review
    under the Indirect Discharge Program. Indirect Discharge Rules § 14-101(a), Code of Vt. Rules
    12 033 003. New indirect discharges below 6,500 gpd, however, are not subject to review
    under the Indirect Discharge Program. Id.
    Implicit in this procedural structure is that oversight for large indirect discharges
    includes more rigorous oversight and that further oversight via the Interim Anti-Degradation
    Implementation Procedure provides no further protections and is therefore not applicable to
    permitted indirect discharges. ANR followed this procedure during its review of Applicant’s
    wastewater treatment system.
    In interpreting and applying administrative rules or regulations, the Court follows the
    same approach as with statutory interpretation. In re Williston Inn Group, 
    2008 VT 47
    , ¶ 14,
    
    183 Vt. 621
     (citing Conservation Law Found. v. Burke 
    162 Vt. 115
    , 121 (1993)). The Court will
    “reference to the plain meaning of the regulatory language” in order to “discern the intent of
    the drafters.” 
    Id.
     (citing Slocum v. Dep't of Soc. Welfare, 
    154 Vt. 474
    , 478 (1990)). Although the
    Court is not bound by ANR’s determinations or interpretations of the WQS in relation to a
    specific application, “deference is to be given to the interpretation of regulations and to the
    construction of a statute by the agency responsible for its execution.” In re Unified Buddhist
    Church, Inc., No. 253-10-06 Vtec, slip op. at 3 (Vt. Envtl. Ct. Jan. 25, 2008) (Wright, J.) (citing In
    re Electronic Indus. Alliance, 
    2005 VT 111
    , ¶ 7, 
    179 Vt. 539
    ; see also WQS § 1-05 (stating that in
    a de novo appeal from an ANR decision, the Court “is not bound by any determinations or
    interpretations of these rules made by the Secretary relative to an application, provided that
    review of such determinations is within the scope of the appeal”).
    Applicant applied for and received an indirect discharge permit, Permit #ID-9-0313, on
    August 6, 2014 for the discharge of 19,998 gpd of domestic wastewater. The proposed system
    will treat the discharged wastewater before it flows into the proposed alternating leachfields,
    where it is then treated further before indirectly discharging into the surrounding groundwater.
    To reach the West Branch of the Batten Kill, the combined groundwater will then be filtered
    through soil, gravel and rocks during the 800-foot stretch between the proposed leachfields
    5
    and the banks of the West Branch. Appellant Smith disputes none of Applicant’s factual
    representations in this regard.
    The Court understands Appellant’s Questions 1–11 to raise concerns with Applicant’s
    proposed indirect discharge under ANR’s Anti-Degradation Policy, at WQS § 1-03, as
    implemented in the Interim Anti-Degradation Procedure.          Applicant argues that they are
    entitled to summary judgment on these Questions because the Interim Anti-Degradation
    Procedure specifically exempts applications for indirect discharges that require an indirect
    discharge permit.
    Based on the plain language of the Indirect Discharge Rules, new indirect discharges
    greater than 6,500 gpd are subject to the indirect discharge program and require a permit.
    Additionally, as noted above, based on the plain language of the Interim Anti-Degradation
    Procedure, indirect discharges that require an indirect discharge permit are exempt from the
    requirements of the Interim Anti-Degradation Procedure and therefore WQS § 1-03. Thus,
    because permit review is required for Applicant’s indirect discharges, the proposed wastewater
    treatment system is not subject to the duplicative review of the Interim Anti-Degradation
    Procedure under Section III(C)(4).
    Because the Indirect Discharge Rules exempt the proposed system from review under
    the Interim Anti-Degradation Procedure and independent review because of the West Branch’s
    designation as an Outstanding Resource Water, Applicant is entitled to summary judgment as a
    matter of law as to Appellant’s Questions regarding either the Interim Anti-Degradation
    Procedure or Outstanding Resource Waters.           Therefore, Applicant’s motion for summary
    judgment as to Questions 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11 is GRANTED.
    Conclusion
    The Court understands that by his Questions 1 through 11, Appellant seeks to challenge
    Applicant’s proposed indirect discharge of 19,998 gpd of domestic wastewater, pursuant to the
    Interim Anti-Degradation Procedure’s protection of Outstanding Resource Waters. It is the
    Indirect Discharge Rules and standards for considering an indirect discharge permit that govern
    the pending application and not the Anti-Degradation Policy or Interim Anti-Degradation
    Procedure. For the reasons stated above, we GRANT summary judgment in Applicant’s favor
    6
    on Questions 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11 of their Statement of Questions. Questions 1, 2,
    3, 4, 5, 6, 7, 8, 9, 10, and 11 are, therefore, DISMISSED; Questions 12 and 13, related to design
    flow calculations, remain to be resolved at trial. This appeal remains scheduled for a trial that
    will begin on July 14, 2015.
    Electronically signed on June 24, 2015 at Newfane, Vermont, pursuant to V.R.E.F. 7(d).
    ________________________________
    Thomas S. Durkin, Judge
    Environmental Division
    7
    