Glebe Mountain Wind Energy, LLC ( 2006 )


Menu:
  •                                 STATE OF VERMONT
    ENVIRONMENTAL COURT
    }
    Glebe Mountain Wind Energy, LLC            }                     Docket No. 234‐11‐05 Vtec
    (Appeal of JO #2‐227)                }
    }
    Revised
    Decision on Cross‐Motions for Summary Judgment
    Glebe  Mountain  Wind  Energy,  LLC  (“Appellant”  or  “GMWE”)  appealed  from
    Jurisdictional Opinion (JO) #2‐227 of the Acting District 2 Environmental Coordinator,
    issued  on  October  6,  2005,  concluding  that  a  “proposed  wind  energy  project
    represent[s]  material  and  substantial  changes  to  existing  Act  250  permits  and  thus
    require[s]  an  [Act  250  permit]  amendment.”    Appellant  is  represented  by  Christopher
    D. Roy, Esq.; Interested Person Glebe Mountain Group, Inc. (GMGI) is represented by
    Robert E. Woolmington, Esq.; Interested Person Vermont Electric Power Co. (VELCO) is
    represented  by  Stephen  A.  Reynes,  Esq.;  Interested  Person  Central  Vermont  Public
    Service  (CVPS)  is  represented  by  Carolyn  Brown  Anderson,  Esq.;  Interested  Person
    Town of  Windham  and  Intervenor Town of Windham  Planning Commission are  both
    represented  by  David  Grayck,  Esq.;  Intervenor  Department  of  Public  Service  (DPS)  is
    represented  by  Aaron  Adler,  Esq.;  Intervenor  Natural  Resources  Board  is  represented
    by  Melanie  Kehne,  Esq.;  and  Intervenor  Windham  Regional  Planning  Commission  is
    represented by Richard D. Perra, Esq.
    Now  pending  before  this  Court  are  cross‐motions  for  summary  judgment  filed
    by  Appellant,  by  Interested  Person  Glebe  Mountain  Group,  Inc.,  and  jointly  by
    Interested  Person  Town  of  Windham  and  Intervenor  Town  of  Windham  Planning
    Commission.    Intervenor  Windham  Regional  Commission  also  filed  a  motion  for
    summary  judgment,  advising  that  it  joined  in  the  motion  filed  on  behalf  of  Glebe
    1
    Mountain  Group,  Inc.    Memoranda  in  support  of  Appellant’s  motion  for  summary
    judgment have been filed on behalf of VELCO and DPS.
    Factual Background
    The parties have stipulated to the material facts in this case, which are as follows:
    1.      Appellant  is  developing  plans  for  a  wind  power  generation  facility  on
    Glebe Mountain in the Towns of Londonderry and Windham (the “Project”).
    2.      The Project includes the construction of up to twenty‐seven wind turbines
    and associated roads and accessory structures.
    3.      The Project is proposed to be located on two parcels of land (the “Tract”)
    owned  by  the  McGraw  Family  Partnership  and  Magic  Mountain,  LLC.    The  Tract,  or
    portions  of  it,  is  encumbered  by  a  number  of  Act  250  permits  and  amendments
    previously issued to other projects on the same parcels.   There are five sets of permits
    and amendments thereto, dating back to 1971.  The various permits are referenced in JO
    #2‐227, at ¶¶ 12–36.
    4.      Appellant  has  installed  one  temporary  wind  measurement  tower  on  the
    Project  site.    This  tower  was  approved  by  the  Vermont  Public  Service  Board  (PSB)
    pursuant  to  30  V.S.A.  § 248(j)  on  January  29,  2004,  in  PSB  Docket  No.  6786.    In  that
    proceeding, on October 8, 2004, the PSB also approved the installation of two additional
    temporary wind measurement towers on the Project site.  These two additional towers
    have not yet been installed.
    5.      The Project is an “electric generation facility” subject to review by the PSB
    pursuant to 30 V.S.A. § 248.
    6.      Appellant  has  not  finalized  the  project’s  design,  and  has  not  yet  filed  a
    petition for a certificate of public good with the PSB pursuant to 30 V.S.A. § 248.
    7.      Appellant  sent  the  Windham  Regional  Planning  Commission  and  the
    Towns  of  Londonderry  and  Windham  a  formal  notice  of  intent  to  file  a  petition  for  a
    certificate of public good with the PSB pursuant to 30 V.S.A. § 248.
    2
    8.       The  Parties  have  agreed  by  stipulation,  for  the  purposes  of  this  appeal
    only, that if the analysis typically employed under Environmental Board Rule 34 were
    to  apply to the Project as currently planned, it can be assumed that the  Project  would
    constitute  a  material  and/or  substantial  change  to  the  previously  approved
    development on the Project site under one or more Act 250 criteria found in 10 V.S.A. §
    6086.
    Discussion
    At issue in this appeal is a jurisdictional conflict between Act 250 review under a
    concept known as “amendment jurisdiction,” see former Environmental Board Rule 341
    (EBR  34),  and  PSB  jurisdiction  over  power  generation  facilities  under  30  V.S.A.  § 248.
    The conflict arises because a power generation facility is being proposed on lands that
    are  already  encumbered  by  multiple  Act  250  permits,  amendments  thereto  and  the
    many conditions contained therein.2
    It is undisputed that if the wind power generation facility were proposed on land
    unencumbered  by  Act  250  permit  conditions,  then  jurisdiction  over  the  proposed
    facility would rest solely with the PSB.  Electric generation or transmission facilities that
    require  a  certificate  of  public  good  under  30  V.S.A.  § 248  are  defined  out  of  the  term
    1  The former Environmental Board Rules have been supplanted by the Act 250 Rules promulgated by the
    Natural  Resources  Board,  effective  May  1,  2006.    We  look  to  the  former  Environmental  Board  Rules  as
    they  existed  on  October  6,  2005,  because  we  are  required  to  apply  the  substantive  standards  that  were
    applicable  before  the  tribunal  appealed  from,  pursuant  to  10  V.S.A.  § 8504(h).    The  Legislature  ratified
    former  EBR  34,  along  with  all  other  Environmental  Board  rules  pertaining  to  the  administration  of  Act
    250, by Public Act 52, § 5 (1985), and the Rule therefore “has the same effect as would any law passed by
    the Legislature in the first instance.”  In re Spencer, 
    152 Vt. 330
    , 336 (1989).
    See Vermont Commission on Wind Energy Regulatory Policy: Findings and Conclusions, Attach. A to
    2
    Appellant’s Mot. for Summ. J., at § 4.2.1(7):
    There are conflicting opinions and there is currently no definitive answer for how to deal
    with the potential for overlapping jurisdiction between Section 248 and Act 250 (e.g., on
    land  that  already  falls  under  an  existing  Act  250  permit).  For  example,  some  wind
    turbines may be proposed on lands that are already subject to the jurisdiction of Act 250
    with  permit  conditions  that  may  be  difficult  to  resolve  without  going  through  two
    regulatory processes. Section 248 should have jurisdiction in these cases but provide for
    consideration of the existing Act 250 permit conditions.
    3
    “development”  by  10  V.S.A.  § 6001(3)(D)(ii),  and  therefore  do  not  trigger  Act  250
    jurisdiction.
    The  question  before  the  Court  is  not  whether  the  Project  constitutes
    “development” under Act 250 (as it clearly does not), but whether the Project will cause
    material or substantial changes to previously permitted development, and thus require
    the holders of the pre‐existing permits to seek a permit amendment under EBR 34.  EBR
    34(A),  effective  January  12,  2004,  required  a  permit  amendment  “for  any  material  or
    substantial change in a permitted project.”
    Appellant argues that, although EBR 34 would require a permit amendment “if
    the  analysis  typically  employed  .  .  .  were  to  apply,”  Stipulation  of  Facts  at  2,  that
    requirement  would  be  at  odds  with  the  Legislature’s  grant  to  the  PSB  of  exclusive
    jurisdiction over § 248 projects.  Appellant reasons that since power generation facilities
    do  not  constitute  development  in  the  context  of  Act  250,  the  construction  of  such
    facilities  cannot  trigger  amendment  jurisdiction  under  EBR  34  because  “material  or
    substantial change,” as that term is used in EBR 34, is a subset of “development.”  See
    EBR 2(A)(1)(e) (“‘Development’ means . . . (e) Any construction of improvements which
    will  be  a  substantial  change  of  a  pre‐existing  development,  and  any  material  or
    substantial  change  to  an  existing  development  over  which  the  board  or  a  district
    commission  has  jurisdiction”).    Intervenor  DPS  offered  its  concurrence  at  the  motion
    hearing  by  asserting  that  amendment  jurisdiction  is  a  derivative  of  development
    jurisdiction and not an independent source of jurisdiction.
    The consequence of the argument expounded by Appellant and the DPS is that if
    the District Commission is deprived of development jurisdiction over power generation
    facilities,  then  the  Commission  is  likewise  deprived  of  amendment  jurisdiction  over
    those facilities.
    Interested  Person  GMGI  opposes  Appellant’s  interpretation.    GMGI  agrees  that
    Act  250  jurisdiction  is  not  triggered  by  the  construction  of  power  generation  facilities,
    4
    but argues that when the construction of those facilities creates a material or substantial
    change  to  an  existing  development  encumbered  by  an  Act  250  permit,  then  Act  250
    review of the changes to the pre‐existing development is required.
    The  plain  language  of  EBR  34  and  § 248  do  not  provide  an  answer.    Neither
    statutory provision specifically addresses the situation at bar: that is, construction of a
    § 248 project on lands already encumbered by Act 250 permit conditions.  In resolving
    this  jurisdictional  conflict,  our  task  is  to  “discern  and  implement  the  intent  of  the
    Legislature.”    In  re  MacIntyre  Fuels,  Inc.,  
    2003  VT  59
    ,  ¶  7.    District  Commission
    jurisdiction over development and PSB jurisdiction over power generation facilities are
    both in derogation of common law property rights, and therefore both must be strictly
    construed.    See  Committee  to  Save  Bishop’s  House,  Inc.,  
    137  Vt.  142
    ,  152  (1979)  (“The
    court’s true function is to give effect to the legislative intent, and in this endeavor, we
    are  guided  by  rules  of general  applicability, evolved through long judicial  experience.
    One  of  these  is  that  legislation  in  derogation  of  common  law  property  rights  will  be
    strictly construed.”).
    We  conclude  that  EBR  34  represents  an  explanation  of  and  not  an  expansion
    from  the  statutory  jurisdiction  granted  to  District  Commissions.    The  “amendment
    jurisdiction”  set  out  in  EBR  34  is  the  lawful  interpretation  of  existing  Act  250
    jurisdiction, which does not extend to the “construction of improvements for an electric
    generation  or  transmission  facility  that  requires  a  certificate  of  public  good  under
    section 30 V.S.A. § 248.”  10 V.S.A. § 6001(3)(D)(ii).
    Interested Person the Town of Windham and Intervenor the Town of Windham
    Planning  Commission  argue  in  their  joint  motion  for  summary  judgment  that  “where
    land is subject to an Act 250 permit, a permit amendment is required under Board Rule
    34 for otherwise exempt activity—such as logging3 or farming—where such activity is a
    The site preparation and construction for the proposed facility would involve tree‐cutting on the top of
    3
    Glebe Mountain.
    5
    substantial or material change to the permit or permitted project,” This argument by the
    Town and its Planning Commission relies upon the Environmental Board’s analysis in
    Re: Keith Van Buskirk d/b/a/ American Wilderness Resources, Inc., Declaratory Ruling
    No.  302,  Findings  of  Fact,  Conclusions  of  Law,  and  Order  (Aug.  15,  1995).4    In  Van
    Buskirk, the Environmental Board, noting that logging activities below the elevation of
    2,500  feet  are  excluded  from  the  definition  of  development,  went  on  to  state  that  the
    “[a]pplication    of  the  logging  exclusion  to  Van  Buskirk’s  operations  does  not  end  the
    jurisdictional inquiry.  The logging exclusion does not absolutely prohibit the assertion
    of  Act  250  jurisdiction  over  the  cutting  of  trees  [below  2,500  feet]  .  .  .  .    A  competing
    consideration  is  the  Board’s  (or  district  commission’s)  authority  to  impose  conditions
    when granting Act 250 permits.”  Id. at 8.  The Environmental Board found an exception
    to the logging exclusion, ruling that:
    Where findings of fact or conditions regarding tree cutting or logging are
    included  in  a  permit,  or  a  representation  is  made  that  no  tree  cutting  or
    logging  will  take  place,  tree  cutting  or  logging  which  constitutes  a
    material  or  substantial  change  to  that  permitted  development  or
    subdivision  will  only  be  allowed  if  the  permit  holder  applies  for  a[n
    amendment to their] permit under EBR 34.
    Id. at 9.5
    The situation in Van Buskirk is distinguished from the case before this Court by
    the  fact  that  in  Van  Buskirk,  the  timber  harvesting  would  come  under  Act  250
    amendment  jurisdiction,  or  under  no  jurisdiction  whatsoever.    The  Board  stated  that
    “[t]he  policy  behind  the  exception  to  the  logging  exclusion  is  that  logging  and  tree
    cutting associated with a development or subdivision has adverse effects with respect to
    4
    In a recent decision, In re Green Crow Corp., 
    2006 VT 14
    , our Supreme Court stressed the “specialized
    expertise  of  the  Environmental  Board  in  determining  whether  it  has  jurisdiction  over  a  particular
    development proposal.”  Id. at ¶ 7 (internal quotation omitted), citing In re Denio, 
    158 Vt. 230
    , 235 (1992).
    5  The Board did not order that Van Buskirk apply for a permit under EBR 34, but only because it found
    that no such findings, conditions, or representations were present in the case.
    6
    the  ten  criteria  of  10  V.S.A.  § 6086(a).”    Id.    An  absolute  exclusion  for  logging,  then,
    could cause harm to the very values sought to be protected by Act 250.  Here, however,
    it  is  not  a  question  of  “Act  250  jurisdiction  or  nothing.”    The  excluded  activity,
    construction  of  an  electric  generation  facility,  is  subject  to  the  jurisdiction  of  the  PSB,
    which  is  required  to  conduct  an  environmental  review,  with  due  consideration  to  the
    applicable Act 250 criteria, pursuant to 30 V.S.A. § 248.
    Section 248(a)(2) states that “(A) no company . . . and no person . . . may begin
    site  preparation  for  or  construction  of  an  electric  generation  facility  or  electric
    transmission  facility  within  the  state  which  is  designed  for  immediate  or  eventual
    operation at any voltage, . . . (B)  . . . unless the public service board first finds that the
    same will promote the general good of the state and issues a certificate to that effect.”
    30  V.S.A.  § 248(a)(2).    When  a  petitioner  files  an  application  for  a  certificate  of  public
    good with the PSB, the PSB “shall hold a nontechnical public hearing” under 30 V.S.A.
    § 248(a)(4)(A), and one or more technical hearings under 30  V.S.A.  § 248(a)(4)(B).   The
    statute requires further that copies of the application:
    shall be given by the petitioner to the attorney general and the department
    of  public  service,  and,  with  respect  to  facilities  within  the  state,  the
    department  of  health,  agency  of  natural  resources,  historic  preservation
    division,  scenery  preservation  council,  state  planning  office,  agency  of
    transportation,  the  agency  of  agriculture,  food  and  markets  and  to  the
    chairperson  or  director  of  the  municipal  and  regional  planning
    commissions and the municipal legislative body for each town and city in
    which the proposed facility will be located.
    30 V.S.A. § 248(a)(4)(C).
    Pursuant to 30 V.S.A. § 248(a)(4)(E), the Agency of Natural Resources:
    shall  appear  as  a  party  in  any  proceedings  held  under  this  subsection,
    shall provide evidence and recommendations concerning any findings to
    be  made  under  subdivision  (b)(5)  of  this  section,  and  may  provide
    evidence  and  recommendations  concerning  any  other  matters  to  be
    determined by the board in such a proceeding.
    7
    Section  248(b)(5)  provides  the  basis  for  Appellant’s  claim  here  that  the  PSB  has
    exclusive jurisdiction over all electric power generation projects.  Section 248(b) requires
    the PSB to make a number of findings before issuing a certificate of public good.
    Prior to 1987, § 248(b)(5) required the PSB to find that the construction of an in‐
    state  electric  power  generation  facility  “will  not  have  an  undue  adverse  effect  on
    aesthetics,  historic sites, air and water purity, the natural environment and the public
    health and safety.”  In 1987, the Legislature amended § 248(b)(5)6 by adding the phrase
    “with  due  consideration  having  been  given  to  the  criteria  specified  in  10  V.S.A.
    § 1424a(d).”7   In 1988, the Legislature again amended § 248(b)(5)8 by adding the phrase
    “and § 6086(a)(1) through (8) and (9)(K).”
    As  it  exists  now,  and  at  the  time  of  the  appealed‐from  JO,  § 248(b)(5)  reads  as
    follows:
    Before  the  public  service  board  issues  a  certificate  of  public  good  as
    required  under  subsection  (a)  of  this  section,  it  shall  find  that  the
    purchase,  investment  or  construction:  .  .  .  with  respect  to  an  in‐state
    facility,  will  not  have  an  undue  adverse  effect  on  esthetics,  historic  sites,
    air  and  water  purity,  the  natural  environment  and  the  public  health  and
    safety, with due consideration having been given to the criteria specified
    in 10 V.S.A. § 1424a(d) and § 6086(a)(1) through (8) and (9)(K)[.]
    The  phrase  “due  consideration”  also  appears  in  § 248(b)(1),  requiring  that  due
    consideration  be  given  to  the  recommendations  of  municipal  and  regional  planning
    commissions,  recommendations  of  municipal  legislative  bodies,  and  the  land
    conservation measures contained in Town Plans.
    6   1987, No. 67 (Adj. Sess.), An Act Relating to Establishing a Comprehensive State Rivers Policy (H. 339).
    7  Section 1424a(d) provides a non‐exclusive list of fourteen criteria that may be considered by the water
    resources panel (at that time the water resources board) when deciding whether particular waters should
    be designated as outstanding resource waters.
    8    1988,  No.  273,  An  Act  Relating  to  Act  250  Jurisdiction  over  Waste‐Burning  Electricity  Generating
    Facilities (H. 681).
    8
    The “due consideration” language of § 248(b)(1) was interpreted by our Supreme
    Court  to  mean  that  those  recommendations  and  land  conservation  measures  were
    “advisory rather than controlling.”  City of South Burlington v. Vermont Electric Power
    Co., 
    133 Vt. 438
    , 447 (1975) (“‘Due consideration’ for municipal legislative bodies . . . at
    least impliedly postulates that municipal enactments, in the specific area, are advisory
    rather than controlling . . . .  Any attempt at municipal regulation is pre‐empted.”).
    The  Legislature  was  presumably  aware  of  the  meaning  ascribed  to  the  phrase
    “due  consideration”  when  it  added  that  phrase  to  § 248(b)(5)  in  1987  and  1988,  see
    Heffernan v. Harbeson, 
    2004 VT 98
    , ¶9 (“When we interpret statutes, we presume that
    the  Legislature  was  mindful  of  relevant  precedents  and  prior  legislation.”).    It  is
    abundantly clear that the Legislature intended that the PSB have exclusive jurisdiction
    over  electric  generation  facilities  proposed  on  previously  unencumbered  land,  as
    evidenced by the language excluding electric generation facilities from the definition of
    development, combined with the language empowering the PSB to grant certificates of
    public good “with due consideration” to Act 250 Criteria 1–8 and 9(K).  It is less clear,
    however,  that  the  Legislature  intended  that  pre‐existing  Act  250  jurisdiction  would
    disappear when an electric generation facility is proposed on land encumbered by Act
    250 permit conditions.
    Where  the  plain  statutory  language  is  not  clear,  the  Court  endeavors  to  give
    effect  to  the  legislative  intent  underlying  the  statute  by  looking  at  “the  legislative
    history and circumstances surrounding its enactment, and the legislative policy it was
    designed  to  implement.”    MacIntyre  at  ¶  7  (internal  quotation  and  citation  omitted).
    The pertinent legislative history includes a meeting of the Senate Natural Resources and
    Energy  Committee  held  on  March  13,  1988,  at  which  the  Committee  heard  testimony
    relating to H. 681, which was enacted later that year as 1988, No. 273, An Act Relating to
    9
    Act 250 Jurisdiction over Waste‐Burning Electricity Generating Facilities (H. 681).9  This
    Act added the phrase “and § 6086(a)(1) through (8) and (9)(K)” at the end of § 248(b)(5).
    The  hearing  began  with  the  testimony  of  Representative  Emmons,  who
    explained  that  questions  regarding  environmental  review  of  waste‐to‐energy  plants,
    wood‐fired plants, and gas pipelines were raised during discussions on H. 681:
    Rep. Emmons:       When  we  started  working  on  this,  we  were  dealing
    with the Act 250 and the Environmental Board and also the Public
    Service Board . . . .  Environmental issues would be covered under
    the  Environmental  Board  in  their  Act  250  review.    We  had  the
    chairman of the Environmental Board, Lon Wilson, and the Public
    Service  Board,  Rich  Cowart,  in  our  committee  discussing  this,
    and  they  worked  out  a  compromise  which  seemed  to  be  more
    workable,  that  under  Public  Service  Board  review—the  248
    process—the  environmental  aspects  of  that  would  be expanded  to
    include Act 250 criteria 1–9.
    Appellant’s Attach. D at 2–3.  Representative Emmons then outlined the structure of the
    House  bill,  and  answered  questions  posed  by  Senator  Racine,  the  Chairman  of  the
    Natural Resources and Energy Committee:
    Rep. Emmons:         [Subsection 5] on page 5 is where we include the Act
    250 review.  10 V.S.A. Section 1424[a] and Section 6086, 1–8 and 9,
    that’s  your  criteria  1–10  of  Act  250  and  that’s  where  .  .  .  .  the
    compromise was between the Environmental Board and the Public
    Service Board—to include Act 250 review and 248 review. . . .
    Sen. Racine:               Would they need an Act 250 permit?
    Rep. Emmons:        No.    The  certificate  of  public  good  is  what
    they’re going for and that’s exactly the reason, Mr. Chairman, that
    we  did  incorporate  the  Act  250  process  for  our  248  review  so  it
    would not be duplicative.
    9
    A transcript of the hearing was provided to the Court as Attach. D to Appellant’s Mot. for Summ. J.
    10
    Sen. Racine:        I  don’t  understand  what  you’re  saying,  you’re
    incorporating  the  process.    You  aren’t  requiring  a  250  permit,  but
    you’re requiring a 250 review?  How will that work?
    At this point there is a gap in the transcript with the notation “break to turn tape
    over.”  Some testimony, including Rep. Emmons’ answer, appears to be missing.  When
    the  transcript  resumes,  PSB  Chair  Rich  Cowart  and  Senator  Carter  have  joined  in  the
    dialog:
    . . .
    Mr. Cowart:         It10  would  apply  to  any  Section  248  permit  which
    would  include  electric  transmission  lines  as  well—electric
    generating  station,  electric  transmission  lines,  gas  line,  anything
    that needed Section 248 review.
    . . .
    Sen. Carter:         Can  I  go  back  and  ask  a  question  which  ties  in?    I
    notice  that  you’ve  got  NEPA  involved  here  as  well.    Why  do  we
    exclude Criterion 10 on laterals which deals with compliance with
    local and regional plans?
    Mr. Cowart:         I’ll  be  glad  to  answer  that.    There’s  already  a  section
    in 248  which  requires  the  [Public  Service]  Board  to  give  due
    consideration to local and regional plans.
    Sen. Carter:       I realize you have to give due consideration to it, but
    you don’t have to make a finding that it complies.
    Mr. Cowart:            Correct.
    Sen. Carter:         I guess I’m asking the question still why you phrased
    it that  way.
    Mr. Cowart:         Why  did  we  choose  to  go  with  due  consideration
    rather than compliance with local plans?
    Sen. Carter:           Yes.
    Mr. Cowart:           The chief reason for doing that is that—first of all, the
    history of it in 248 was that  the  facilities  that provide those  utility
    services  to  the  state  are  an  integrated  network,  and  it  has  always
    Presumably, the compromise by which the PSB would undertake the environmental review normally
    10
    conducted by the Environmental Board.
    11
    been thought to be unwise to allow a single jurisdiction (inaudible)
    to put up a roadblock as part of a network.
    Sen. Carter:        I understand that. Is this a sign that the state, in fact,
    is  pre‐empting  local  and  regional  jurisdiction  with  respect  to
    control of the location of these pipelines?
    Mr. Cowart:                 That has always been the case.
    Sen. Carter:                Does this extend to secondary impacts?
    Mr. Cowart:                 No.
    Appellant’s Attach. D at 4–8.
    It  is  not  absolutely  clear  what  Senator  Carter  meant  by  “secondary  impacts,”11
    but it is at least plausible that he was referring to situations like that discussed one year
    later by our Supreme Court in In re Southview Associates, 
    153 Vt. 171
     (1989), where the
    Court  upheld  the  Environmental  Board’s  denial  of  a  permit  application  to  build  a
    residential development in a deeryard, stating that the “proposed project would destroy
    ten acres of critical habitat and, through the secondary impacts of people living in the
    homes,  imperil  the  remaining  34  acres.”  Id.  at  178.    It  is  also  not  clear  whether  Mr.
    Cowart was stating that PSB § 248(b) jurisdiction did not extend to secondary impacts
    prior  to  the  proposed  amendment,  but  would  so  extend  if  H.  681  were  enacted,  or
    11  There  is  some  evidence  that  the  Legislature  intended  that  the  PSB  have  exclusive  jurisdiction  over
    secondary impacts.  Mr. Cowart testified that a “fact of life we have to deal with is that we  don’t have
    statewide  or  regional  comprehensive  land  use  planning  to  reassure  us  that  we  have  the  capability  to
    manage the secondary effects of infrastructure as significant as the pipeline.  So what can we do?  Well,
    this  bill  attempts  to  do  the  best  we  can  with  what  we’ve  got  right  now.”    Appellant’s  Attach.  D  at  23.
    More  to  the  point,  the  testimony  of  Mr.  Parenteau,  then  the  Commissioner  of  the  Department  of
    Environmental Conservation, includes this statement: “The logic of [the shift in control to the PSB] is that
    you  will  have  an  expert  board  who  will  understand  the  full  picture  of  the  pipeline,  the  laterals,  the
    mainline, secondary impacts, environmental concerns, growth concerns and all the rest.  But I do want to
    stress  that  I  have  not  looked  at  this  language  or  these  criteria  with  a  view  towards  could  they  be
    improved from the standpoint of secondary impacts.  It may well be that they could.  I don’t know if the
    language needs to be changed, though.”  Id. at 40. The legislative record presented to the Court in this
    appeal does not reveal an adoption or a rejection by House and Senate members of the witness testimony
    offered by Messrs. Cowart and Parenteau.
    12
    whether  he  was  stating  that  PSB  jurisdiction  would  not  extend  even  if  H.  681  were
    enacted.
    Later  in  the  hearing  on  H.  681,  the  testimony  turns  to  the  concept  of  “one‐stop
    shopping” for permit approval.  Mr. Cowart continues his testimony as follows:
    Question: where should review lie?  And this goes back to the beginning
    of Act 250, and as you all know, the Legislature determined—and I think
    it was a good decision—that electric generating facilities and transmission
    facilities would not be subject to Act 250 review because the Public Service
    Board  was  going  to  review,  and  they  did  not  want  two‐stop  shopping.
    They  wanted  one‐stop  shopping.  And  everybody  knew  that  the  Public
    Service Board was going to have to review the financing of the facility, the
    way it’s located and connected to the network, the system reliability issues
    that  are  related  to  the  location  of  the  network,  whether  transmission
    facilities  are  adequate  to  service  a  generating  station,  whether  the
    company is going to have adequate catch [sic “cash”] flow and its effect on
    rates.    The  Public  Service  Board  is  going  to  be  reviewing  all  of  those
    things,  and  it  didn’t  make  any  sense  to  the  Legislature  to  have  the
    Environmental  Board  or  the  district  environmental  commission  on  a
    different  track  doing  environmental  review.    Consequently,  there  was
    language  added  to  Section  248—very  broad  language—that  required  the
    Public  Service  Board  to  conduct  an  environmental  review  of  those
    facilities at the same time that they were conducting these other reviews,
    the financial and system reviews.
    Appellant’s Attach. D at 16–17.
    The “broad language” to which Mr. Cowart was referring is the first portion of
    § 248(b)(5), which establishes the following standard of review: “with respect to an in‐
    state  facility,  [the  project]  will  not  have  an  undue  adverse  effect  on  esthetics,  historic
    sites,  air  and  water  purity,  the  natural  environment  and  the  public  health  and
    safety . . . .”  Mr. Cowart went on to state that the PSB viewed this language as giving it
    an environmental mandate “as broad and more flexible” than the mandate in Act 250,
    and that the PSB “looked at the criteria of Act 250 in order to be informed as to what the
    broad language of Section 248 meant.”  Appellant’s Attach. D at 17.  Mr. Cowart then
    13
    noted that the phrase “due consideration having been given to the criteria specified in
    10 V.S.A. § 1424a(d)” had been added in the previous year (1987), and stated that “we
    proposed [the language in the House bill] adding specifically the cross references to the
    appropriate sections of Act 250.”  Id.  at 18.
    It appears from the record presented to us that Mr. Cowart viewed the addition
    of the phrase “and § 6086(a)(1) through (8) and (9)(K)” as merely codifying the existing
    practice  of  the  PSB,  as  he  stated  that  “I  view  this  as  an  improvement  because  it  will
    codify  what  has  been  the  unspoken  practice  in  most  cases  that  come  before  the  PSB,
    which  is  that  the  PSB  will  look  at  Act  250  in  order  to  determine  whether  the  general
    umbrella language about the natural environment and the public health and safety has
    been met.”  Id. at 20.
    Mr.  Cowart  then  returned  to  the  concept  of  one‐stop  as  opposed  to  two‐stop
    permit shopping:
    At  one  point  I  was  discussing  one‐stop  versus  two‐stop  shopping  and
    why I think that it is preferable to keep this review at the PSB rather than
    having an Environmental Board review and a PSB review.  First, as I said,
    all on the system stability and economic factors, we’re going to have that
    review  in  any  event  so  you  would  have  a  dual  track.    You’d  have  the
    environmental review going off over here and the financial review going
    on  over  here.    Now  that  raises  an  immediate  coordination  problem,  not
    just in timing.  It’s a burden on everybody.  It’s a burden on citizens who
    want  to  oppose  a  facility.    It’s  a  burden  on  local  select  boards  and
    planning commissions who have got to go to two sets of hearings.  It’s a
    burden on the applicant.  It takes longer.  I don’t think it’s worth it.  But
    there’s an even more fundamental problem.  As you’ve seen with Vicon,
    over  on  the  environmental  side  every  time  you  change  the  litigation  [sic
    “mitigation”] requirement, you change the economics of the project.  You
    better  install  a  new  scrubber.    You’ve  got  to  change  your  ash  disposal
    methods;  you’ve  got  to  do  something  over  here.    All  of  a  sudden  your
    finances are different, and the terms of any contract that you’ve got for the
    sale  of  your  power  is  going  to  be  different.    So  the  idea  that  you  can
    somehow  segregate  these  things  in  their  two  different  worlds  is  just  not
    reality.  I think it’s a lot more sensible to keep them in the same place.
    14
    Id. at 20–21.
    Interested  Person  VELCO  asserts  that  “[b]ecause  [10  V.S.A.]  § 6001(3)(D)(ii)
    excludes  electric  generation  and  transmission  facilities  that  require  a  [certificate  of
    public good], Act 250 jurisdiction does not apply to such facilities regardless of whether
    they  would  constitute  a  material  or  substantial  change  to  existing  development.”
    VELCO  Mem.  in  Support  of  Appellant’s  Mot.  for  Summ.  J.  at  11.    We  agree.    Such
    facilities  are  carved  out  of  Act  250  jurisdiction  by  the  plain  language  of  the  statute.
    There  are  strong  policy  arguments,  upon  which  the  record  establishes  that  the
    Legislature relied, supporting the sole jurisdiction of the PSB over such facilities, chief
    among them is the wisdom of having one statewide board handle the integrated electric
    generation  and  transmission  network,  so  that  no  single  local  body  can  put  up  a
    roadblock.    Also,  the  PSB  has  an  institutional  memory  and  an  ever‐growing  body  of
    knowledge regarding the cases it oversees, in contrast to local or regional boards which
    would have to reinvent the wheel with every case.
    We would like to minimize any confusion or misinterpretation that our decision
    here may create, but are concerned that any further comments on “secondary impacts,”
    would  cause  this  Court  to  breach  its  jurisdictional  limits.    We  therefore  leave  the
    consideration of possible future scenarios to a future proceeding, as they are not a case
    or controversy before us here.
    Accordingly,  based  on  the  foregoing,  it  is  hereby  ORDERED  and  ADJUDGED
    that  Appellant’s  motion  for  summary  judgment  is  GRANTED  as  to  Question  1  in
    Appellant’s  Revised  Statement  of  Questions.    In  so  ruling,  we  conclude  that  Act  250
    jurisdiction under ERB 34 does not attach to electric generation facilities that are located
    on  lands  encumbered  by  pre‐existing  Act  250  permits.    For  these  same  reasons,
    Interested Person GMGI’s motion for summary judgment is DENIED as to Question 1
    in Appellant’s Revised Statement of Questions.
    15
    As  to  Question  2  in  Appellant’s  Revised  Statement  of  Questions,  Appellant’s
    motion is GRANTED to the extent that it refers to the PSB’s exclusive jurisdiction over
    all impacts within the boundaries of the subject facility.  However, Appellant’s motion
    is  DENIED  to  the  extent  that  it  refers  to  secondary  impacts  beyond  the  established
    boundaries of the proposed § 248 facility.  We deny that part of Appellant’s motion for
    the  reason  that  such  impacts  are  not  properly  before  this  court  and  therefore  do  not
    constitute a case or controversy for which this court has authority to rule.  See Cupola
    Golf  Course,  Inc.  v.  Dooley,  
    2006  VT  25
    ,  ¶  11  (stating  that  “the  judiciary  is  not
    empowered  to  render  advisory  opinions.  Courts  are  not  permitted  to  dispose  of  the
    merely  hypothetical.”).    For  these  same  reasons,  the  various  summary  judgment
    motions  filed  on  behalf  of  Interested  Persons  GMGI  and  Town  of  Windham  and
    Intervenors Town of Windham Planning Commission and Windham Regional Planning
    Commission are also DENIED as to Question 2.
    Because we have adjudicated all of Question 1, and that part of Question 2 that
    presents  an  actual  case  or  controversy  to  us,  and  because  no  other  Questions  are
    contained  in  Appellant’s  Statement  of  Questions,  this  decision  concludes  the
    proceedings  before  this  Court  in  this  appeal.    A  Judgment  Order  accompanies  this
    decision.
    Done at Berlin, Vermont this 3rd day of August, 2006.
    __________________________________________
    Thomas S. Durkin, Environmental Judge
    16
    

Document Info

Docket Number: 234-11-05 Vtec

Filed Date: 8/3/2006

Precedential Status: Precedential

Modified Date: 4/24/2018