In re: Appeal of Ira and Martha Jackson Town of Waitsfield v. Ira and Martha Jackson ( 2001 )


Menu:
  •                                       STATE OF VERMONT
    ENVIRONMENTAL COURT
    In re: Appeal of Ira and Martha    }
    Jackson                            }
    } Docket No. 186-9-00 Vtec
    }
    }
    Town of Waitsfield, Plaintiff,
    }
    }
    v
    } Docket No. 125-8-01 Vtec
    }
    Ira and Martha Jackson,
    }
    Defendants.
    Decision and Order on Motions for Summary Judgment
    In Docket No. 186-9-00 Vtec Appellants Ira and Martha Jackson appealed from a decision of the
    Zoning Board of Adjustment (ZBA) of the Town of Waitsfield upholding the Zoning
    Administrator= s Notice of Violation and decision disapproving Appellants= as-built application,
    dismissing Appellants= application under ' V(9) of the Zoning Ordinance, and denying
    Appellants= applications under ' ' IV(4) and IV(5) of the Zoning Ordinance. In Docket No. 125-
    8-01 Vtec, the Town brought an enforcement action against Appellants. The two matters have
    been consolidated. Appellants are represented by Carl H. Lisman, Esq., Christina A. Jensen, Esq.
    and Peter S. Sidel; the Town is represented by Steven F. Stitzel, Esq. and Amanda S.E. Lafferty,
    Esq. The parties have filed cross-motions for summary judgment; the hearing on the merits of
    this matter was postponed to October 30 and 31, 2001, to allow for the briefing of these motions.
    The following facts are undisputed unless otherwise noted.
    Appellants own property, including a single-family residence and what was an existing 18' x 30'
    shed or barn1, at 914 Main Street in the Agricultural/Residential zoning district of the Town of
    Waitsfield. In the past,, a watercourse2 traversed the property at a distance of from 12 to 26 feet
    from the existing barn, to serve an operating water-powered mill. At that time, a pond on the
    property was fed from Shepard= s Brook; the pond impounded water to power the mill, from
    which the water returned to Shepard= s Brook through the watercourse. The mill no longer exists.
    Material facts are in dispute as to the current status of the pond; the current source of water to the
    pond; the current connection, if any, from the pond to the watercourse; the current condition of
    the watercourse; how frequently and how far water flows in it; and whether it makes any
    connection back to Shepard= s Brook. Material facts are also in dispute as to the definitions of A
    stream@ used in the fields of hydrology, geography, or stream protection.
    On August 31, 1998, Appellants applied to the Town to disassemble, reconstruct and enlarge the
    barn. The application proposed to disassemble the existing barn, to salvage and reuse its material
    as much as possible, and to construct a 30' x 30' barn, using the same rear and side wall
    locations. The permit application refers to the proposed structure as a A barn/garage@ and to the
    use of the property as A residential.@ The maximum height of the proposed structure is described
    as A 24'.@ The application included a sketch plan showing the existing structure= s placement in
    relation to the watercourse, designated as A flume location@ on the sketch plan, with distances of
    12' and 26' shown from the rear corners of the existing barn, and a distance of 44' shown from
    the front side corner of the existing barn. The application included a front elevation and a side
    elevation of the proposed structure, showing its height as 24', its footprint as 30' x 30', a roof
    overhang of 1' on each side, and a 5' x 6' central shuttered opening in the gable end, with an
    apparent but unlabeled attic floor line at 9 feet above the finished floor elevation. The application
    was referred by the Zoning Administrator for a A variance for construction within setback of 50
    ft. from a stream.@
    The stream setback > variance= application, filed the same day, contains a rougher sketch plan
    showing the 12' to 26' existing rear setbacks to what is labeled A stream.@ The cover letter for
    both applications states: A The existing structure does not conform to current set back
    requirements from a stream.@
    The ZBA considered the stream setback application at a hearing held on October 20, 1998, after
    three members of the ZBA had made a site visit. The hearing included a brief discussion
    distinguishing between the ' V(9) stream setback provisions3 and the ordinary variance
    provisions of the Zoning Ordinance. The hearing was recessed to November 3, 1998, and
    Appellants were requested to submit an erosion control plan. On October 26, 1998 Appellants
    submitted a letter and diagram describing the following precautions to be taken: bales of hay
    along the bank, silt fencing where needed along the bank, and landscape fabric where needed.
    The diagram was a copy of the original sketch plan showing A flume location@ with a line of hay
    bales added.
    Section V(9)(A) of the Zoning Ordinance allows the ZBA to reduce the setback from rivers and
    streams upon a finding that a lesser setback will not adversely affect water quality or scenic
    beauty. By notice of decision dated November 25, 1998, the ZBA approved Appellants=
    application for the stream setback variance A as indicated on the applicant= s plans (September 29,
    1998),@ with certain conditions. This decision was specifically issued under the authority of '
    V(9) of the Zoning Ordinance and not under ' IV(4) governing ordinary variances. This decision
    was not appealed and became final. Based on the issuance of the stream setback decision, the
    Zoning Administrator then granted the zoning permit for the 30' x 30' barn on November 28,
    1998. The zoning permit was not appealed and became final.
    After obtaining these approvals and before construction, Appellants decided to alter the design
    originally proposed. Appellant= s brother, a Connecticut architect, discussed the proposed
    modifications by telephone with the Zoning Administrator. The parties dispute the content of that
    discussion, and specifically whether the Zoning Administrator orally advised the architect that
    the modified building would be approved upon submission of as-built plans and payment of an
    additional fee following construction.
    Appellants then constructed4 a structure in the 30' x 30' footprint, but with two full stories and a
    balcony, changing the height to approximately 34 feet 6 inches. Appellants added a bathroom
    with plumbing but no floor drain, plumbed into the existing septic system. The construction used
    all new materials.
    In October of 1999, Appellants applied to the Zoning Administrator for a zoning permit for the
    as-built structure5. The Zoning Administrator denied that application on November 4, 1999,
    stating that A [n]o amended > variance= approval has been granted by the Zoning Board of
    Adjustment for the extension and expansion of the barn therefore, no extension may be allowed.@
    With the denial, the Zoning Administrator also issued a notice of violation regarding the
    construction and the asserted change of use of the structure. On November 12, 1999, Appellants
    appealed to the ZBA the Zoning Administrator= s denial of the as-built application and the notice
    of violation, and also applied to the ZBA6 for a stream setback variance under ' V(9). By letter
    dated February 22, 20007, the ZBA informed Appellants that they instead should submit an
    application for a variance under the ordinary variance provisions of ' IV(4) and also should
    submit an application to the ZBA for approval of the structure as a conditional use under ' IV(5).
    On April 24, 2000, Appellants applied A under protest@ for a ' IV(4) variance and for ' IV(5)
    conditional use approval.8 By decision dated August 1, 2000, the ZBA denied these applications,
    affirmed the notice of violation and the Zoning Administrator= s decision to deny Appellant= s
    October 1999 zoning permit application, and dismissed Appellants= November 1999 application
    for ' V(9) stream setback approval. All issues in the ZBA= s August 1, 2000 decision are on
    appeal in the present case.
    The Town= s complaint, filed in August 2001 in Docket No. 125-8-01 Vtec, requests injunctive
    relief requiring Appellants to remove the second story and the balcony of the structure, and to
    remove the A portion of the structure that intrudes into the setback of the stream further@ than
    permitted by the November 1998 ZBA approval, and to A use the structure only in accordance
    with Town approvals and permits.@
    Appellants have moved for summary judgment that the watercourse is not a A stream@ under the
    Zoning Ordinance and therefore that the stream setback does not apply to the structure, and that
    Appellants needed no further permits or variances after obtaining the reduced stream setback
    ruling in November of 1998. The Town has moved for summary judgment that Appellants are
    precluded from contesting the existence of a stream on their property, that Appellants are
    precluded from contesting that the barn is a non-complying structure, and that Appellants must
    apply for and obtain all three of the following approvals: a variance in accordance with '
    V(11)(B) and ' IV(4); conditional use approval in accordance with ' V(11)(A) and ' IV(5); and
    a reduced stream setback under ' V(9).
    Appellants first argue that the Town may only A regulate@ streams found on the Official Zoning
    Map under ' II(2). They argue that as the watercourse at issue in this appeal does not appear on
    that map, the Town may not regulate their structure= s setback from it.
    Section II(2) only addresses the locations and boundaries of the various zoning districts
    established by the Zoning Ordinance, as follows:
    The location and boundaries of Zoning Districts are established as shown on the Official Zoning
    Map. . . . Regardless of the existence of copies of the Official Zoning Map, which may from time
    to time be made or published, the Official Zoning Map, which shall be located in the office of the
    Clerk of the municipality, shall be the final authority as to the current zoning status of land and
    water areas.
    The Official Zoning Map thus is conclusive as to which district applies to a particular land or
    water area. It does not otherwise exempt from regulation any land, water or structural features
    not located on the Official Zoning Map. Accordingly, Appellants= Motion for Summary
    Judgment is DENIED on this issue and Summary Judgment is GRANTED in favor of the Town
    on this issue: the watercourse need not appear on the Official Zoning Map to be subject to the
    Zoning Ordinance.
    Appellants also argue that the watercourse is not a A stream@ but is instead a A ditch@ not subject
    to the ' V(9) stream setback requirements. The Town argues that Appellants are precluded from
    making this challenge by the finality of their 1998 application for and approval of a reduced
    stream setback, and the associated zoning permit. However, the question of whether the
    watercourse was in fact a stream was never decided in the 1998 proceedings. Appellants remain
    bound by the terms of their 1998 approvals, but may still challenge whether those approvals were
    necessary, and therefore whether any subsequent amendments to those approvals are required.
    Accordingly, the Town= s Motion for Summary Judgment is DENIED on this issue; Appellants
    are not precluded from challenging the Town= s jurisdiction to apply ' V(9) to the watercourse at
    issue in this appeal. However, Appellant= s Motion for Summary Judgment on whether the
    watercourse is a A stream@ is also DENIED, as material facts are in dispute.
    Appellants also argue that once they obtained the ' V(9) reduction in the required stream
    setback, the barn was no longer a noncomplying structure. They argue that they were then free to
    alter that structure so long as they did so within other applicable zoning requirements, and that
    they did not need an additional variance or conditional use approval for the as-built structure.
    The Town argues that the ' V(9) reduction in the required stream setback is a provision in
    addition to the other requirements imposed on pre-existing non-complying structures. That is, the
    Town argues that even if such a reduction is obtained, it does not relieve a pre-existing non-
    complying structure from also having to obtain a variance under ' V(11)(B) and ' IV(4) and
    conditional use approval under ' V(11)(A) and ' IV(5). The Town argues that the variance
    criteria imposed by 24 V.S.A. ' 4468 apply to the ' V(9) reduction in the required stream
    setback, as well as to the ordinary variance provisions of ' IV(4).
    The Town fails to distinguish between the zoning technique well-understood as a A variance@ and
    the less well-known type of zoning technique called a A special exception.@ Section V(9)(A) of
    the Waitsfield Zoning Ordinance is designed as a valid A special exception@ from the stream
    setback requirement, distinct from the ordinary variance provided in ' IV(4).
    A Variances@ and A special exceptions@ are distinct zoning concepts. A variance is given to a
    project which fails to comply with some aspect of the zoning ordinance, but which must
    nevertheless be allowed so that the landowner can make a reasonable use of his property. That is,
    the landowner would suffer a hardship as described in 24 V.S.A. ' 4468 or ' IV(4) if the
    variance were not granted. A pre-existing structure which is granted a variance to expand
    ordinarily remains a non-complying structure or non-conforming use, merely one which is
    authorized to expand under the terms of the variance.
    On the other hand, a special exception may be thought of as an alternative set of standards for
    approval, written into the zoning ordinance. If a project fails to meet the standards for approval
    which ordinarily would be applicable to the project, but meets the threshold for qualifying for the
    special exception, then it may be approved under those alternative standards, and does not need
    to apply for a variance. Once the proposal has obtained the special exception, it complies with
    the ordinance, because it conforms to the alternative standards written into the ordinance. Once a
    pre-existing structure or new proposal is granted a reduction in an otherwise-required setback, it
    thereafter is a complying structure as to the setback, because the setback requirement has been
    reduced and the structure now complies with it. Thereafter, the provisions for abandonment or
    expansion of non-complying structures do not apply, because the structure is now a complying
    one. See In re Appeal of Gilberg, et al., Docket No. 179-10-99 Vtec (Vt. Envtl. Ct., October 4,
    2001) (slip op. at 1-2); and see, also, K. Young, Anderson= s American Law of Zoning ' 20.03: A
    Special Permit and Exception Distinguished [from Variance]@ (4th ed. 1996).9
    The Town also argues that Vermont= s zoning enabling statute does not allow a Town to adopt a
    provision such as ' V(9) providing a special exception. However, although the zoning enabling
    act does provide specific authorization for conditional uses and variances, 24 V.S.A. ' 4407
    provides is very general terms that A [a]ny municipality may adopt zoning regulations that may
    include, but shall not be limited to, any of the following provisions: . . . .@ (Emphasis added).
    There is no prohibition against special exceptions in the zoning enabling act. The very authority
    allowing a municipality to establish a setback at all, or to establish one setback for residential
    uses and another setback for commercial uses, allows the municipality to write into its ordinance
    provisions for appropriately reducing or enlarging those setbacks. Zoning ordinances often
    incorporate such special exceptions, although hardly any use that label for the provisions. For
    example, ordinances may provide for a specified front setback, but allow a reduced setback if the
    existing houses on either side of the proposed lot have a smaller setback. Other ordinances may
    allow expansion of a nonconforming use up to a certain percentage, upon approval by the ZBA.
    To be upheld, such special exceptions must, of course, provide a standard for the ZBA to apply.
    In the present case, the ordinance= s requirement that the reduced setback A be accomplished in a
    manner which will not adversely affect water quality or scenic beauty@ is an adequate standard
    for the ZBA to apply.
    If Appellants had constructed the barn as represented in their 1998 applications and as approved
    by the ZBA in 1998, it would have been a complying structure, that is, complying with the
    reduced stream setback. Instead, Appellants altered the project without obtaining prior approval
    of the changed design. Although they did not have to apply for an ordinary variance or
    conditional use approval, they should have applied for an amendment to their zoning permit.
    Because the stream setback reduction was granted A as shown on@ their 1998 plans, the changed
    plan also required an amendment to the stream setback approval. That is, the amendment would
    have had to show that the larger building in the same footprint also would A not adversely affect
    water quality or scenic beauty.@ Both of those approvals should have been obtained10 before
    construction, and must be obtained as-built.
    Accordingly, Appellants= Motion for Summary Judgment is GRANTED and the Town= s Motion
    for Summary Judgment is DENIED on the following issue. As of and after the ZBA= s November
    1998 ruling reducing the stream setback required for the structure, under ' V(9), the structure as
    proposed and approved in the 1998 permit was a complying structure as to stream setback.
    Therefore, ' V(11) did not apply to it11, and neither a variance in accordance with ' V(11)(B)
    and ' IV(4) nor conditional use approval in accordance with ' V(11)(A) and ' IV(5) was or is
    required for the structure.
    However, under the 1998 approvals, Appellants only held a zoning permit for a 24-foot-high
    structure, on a 30' x 30' footprint, with a one-foot roof overhang, for use as a barn/garage, in
    connection with the residential use of the property. Any changes to that permit require an
    application for an amendment to the 1998 zoning permit and an amendment to the 1998 stream
    setback reduction, which was originally approved A as indicated on [Appellants= ] plans [dated]
    September 29, 1998.@ Accordingly, the Town= s Motion for Summary Judgment is GRANTED
    and Appellants= Motion for Summary Judgment is also GRANTED, that the as-built project
    requires approval of an amendment to the 1998 stream setback reduction order, as well as
    approval of an amendment to the 1998 zoning permit. The ZBA should have acted on the
    application under ' V(9)(A) rather than dismissing it, and the Zoning Administrator should have
    waited for the ZBA= s ' V(9)(A) ruling before acting on the zoning permit amendment
    application.
    Although ordinarily a matter such as this would be remanded to the ZBA for action on the '
    V(9)(A) application, it appears to the Court that we should first proceed with the hearing on the
    merits of whether the watercourse is a stream, because if Appellants prevail on the merits of that
    issue, then ' V(9) does not apply to this project at all and the remand is unnecessary.
    Accordingly, we will hold a telephone conference on Tuesday, October 16, 2001 at 4:15 p.m. to
    discuss the hearing now scheduled for October 30 and 31, 2001. It appears to the court that this
    limited aspect of the hearing can easily be concluded on October 30, 2001, unless a necessary
    witness is only available on October 31; please be prepared to address holding the hearing on a
    single day or half day, and whether any pre-filed testimony or trial memoranda should be
    presented on this issue.
    Done at Barre, Vermont, this 10th day of October, 2001.
    ___________________
    Merideth Wright
    Environmental Judge
    Footnotes
    1.    This barn may have been in use as a garage; the use of the existing or the new barn
    structure as a residential garage accessory to the house is not at issue.
    2. This term is used for the purposes of discussion, as one contested issue in this case is
    whether this watercourse qualifies as a “stream” for the purposes of §V(9) of the Zoning
    Ordinance. Other terms referring to a watercourse constructed to power a mill are a „flume‟ or
    „millrace.‟
    3.     Setback From Rivers or Streams. To protect water quality and maintain the scenic beauty
    of the Town‟s rivers and streams, structures including septic systems shall be setback a minimum
    of 50 feet from the top of the bank or 75 feet from the edge of the stream where there is no
    identifiable bank. This requirement may be varied by the Board of Adjustment as follows:
    A. If the applicant can demonstrate that setback of the structure less than the above standard will
    be accomplished in a manner which will not adversely affect water quality or scenic beauty.
    B. If, in the judgment of the Planning Commission, a setback greater than the above standard
    will be required to accomplish the purpose of this Section.
    4.   Neither party has submitted the as-built plans.
    5.   Neither party has submitted this application or the Zoning Administrator‟s ruling on it.
    6.   Neither party has submitted this application for a stream setback variance.
    7.   Neither party has submitted a copy of this letter.
    8. Neither party has submitted the applications for a §IV(4) variance and for conditional use
    approval.
    9.    “The variance contemplates a departure from the terms of the ordinance in order to
    preclude confiscation of property, while the exception contemplates a permitted use when under
    the terms of the ordinance the prescribed conditions [for it] are met. The decisive difference
    between these forms of relief is that a variance is authority extended to a property owner to use
    his property in a manner forbidden by the zoning enactment, while an exception allows him to
    put his property to a use which the enactment expressly permits.” (Citations, footnotes, and
    internal quotations omitted.)
    10. Material facts remain in dispute as to whether the Town should be estopped from
    enforcement based upon representations of the Zoning Administrator in the period between
    issuance of the 1998 permit and the construction of the changed project.
    11. Unless the 1998 approved structure was a non-complying structure or a non-conforming
    use in any other respect, which has not been suggested by either party.
    

Document Info

Docket Number: 186-9-00 Vtec

Filed Date: 10/10/2001

Precedential Status: Precedential

Modified Date: 4/24/2018