  •     IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON
    LIND BROTHERS CONSTRUCTION,
    LLC, a Washington limited liability              No. 67877-9-1
    company,                                        (consolidated with No. 67973-2-1)
    Respondent,                 DIVISION ONE
    v.                                  UNPUBLISHED OPINION
    CITY OF BELLINGHAM, a Washington
    municipal corporation,
    IN)
    o
    Appellant,                                                     <=•   wo
    PI        '
    and
    ~*1           -
    I
    CO
    RESPONSIBLE DEVELOPMENT, a
    :o    corn—.
    <«
    Washington nonprofit corporation,
    "     —i —i
    Intervenor,                                                    CO    o-~
    r\3   r,z-<
    and PETER FRYE, an individual,
    FILED: April 8, 2013
    Appellant.
    Grosse, J. — The city of Bellingham's (City) denial of a lot line adjustment is
    proper when the proposed adjustment fails to meet the four criteria required for a lot line
    adjustment approval under Bellingham Municipal Code (BMC) 18.10.020(B). Here, the
    record supports the Hearing Examiner's determination that a builder's lot line
    adjustment proposal did not meet three of these requirements because it did not meet
    minimum density requirements, further infringed on the City's Land Use Development
    Ordinance's setback requirements, and did not improve the function and utility of the
    existing lots. Thus, the Hearing Examiner's decision to affirm the City's denial of the lot
    line adjustment was proper and the superior court's reversal of the Hearing Examiner's
    ruling was error. Accordingly, we reverse the superior court.
    No. 67877-9-1
    FACTS
    Lind Brothers Construction, LLC (Lind) sought to develop property it owns in
    Bellingham. The property consists of two lots located between two streets, Star Court
    to the north and Harrison Street to the south. The boundary between the lots runs north
    to south with both lots abutting Star Court and Harrison Street.         Both streets are
    unimproved rights-of-way.
    The lots are in an area zoned as single family residential with a 20,000-foot
    minimum lot size. One lot was approximately 8368 square feet and the other was 5578
    square feet.    Because the lots did not meet the 20,000-foot minimum zoning
    requirement, Lind applied for lot line adjustments permit to obtain approval for the
    development of two single-family residences on the property. The permit application
    proposed to alter the boundary to an east/west orientation, with one lot (proposed Lot A)
    abutting only Harrison Street to the south and the other lot (proposed Lot B) abutting
    Star Court to the north with a 20-foot wide pipestem along the easterly side of Lot A that
    extends to Harrison Street.
    The lots and abutting rights-of-way contained regulated wetlands. Because the
    development proposed by Lind included impacts to the wetlands and required buffer
    areas, Lind also applied for wetland/stream permit.       Lind's proposal located septic
    drainfields within the wetland and buffer areas and in the access portion of one lot within
    the wetland. The permit application proposed onsite and offsite mitigation for these
    impacts.
    Lind filed the lot line adjustment and wetland/stream permit applications with the
    City on December 5, 2005, in compliance with the City's Wetland Stream Ordinance,
    No. 67877-9-1
    former chapter 16.50 BMC. The next day, December 6, 2005, the City's Critical Areas
    Ordinance, chapter 16.55 BMC, took effect and replaced the Wetland Stream
    Ordinance.   The City processed Lind's wetland/stream permit application under the
    former ordinance.
    The City determined that Lind's applications lacked adequate information to
    evaluate the proposal for its consistency with the City's development standards and its
    potential environmental impacts. The City noted that Lind's applications did not include
    any requests for variances from the City's development or subdivision standards. As a
    result, the City made repeated requests of Lind for more information.
    On January 10, 2006, the City notified Lind that its applications did not contain
    enough information to prepare a Notice of Application or a State Environmental Policy
    Act (SEPA) determination and requested that it "[pjrovide a detailed SEPA checklist for
    the entire project, including road construction, lot development, utilities, and stormwater
    management (if required by the Public Works Dept.)" On February 16, 2006, the City
    notified Lind that it would review the wetland/stream permit application concurrently with
    the lot line adjustment application and that further review of the lot line adjustment
    application would continue after staff completed a preliminary environmental review.
    On October 10, 2006, City Planners Kim Weil and Kathy Bell met with Lind's
    owner, John Lind, and its wetland consultant, biologist Vikki Jackson. They discussed
    zoning and wetland setbacks, and siting of the septic system.              The City staff
    recommended that Jackson and a qualified engineer work on a potential variance
    package.
    On March 29, 2007, the City made a second request for the SEPA checklist and
    No. 67877-9-1
    also requested verification of the Harrison Street right-of-way width and center line, a
    copy of the Whatcom County Health Department septic permit allowing two septic
    systems or a plan to connect to the City sewer service, an engineering analysis showing
    construction feasibility of the road, a preliminary stormwater plan, a fire truck turnaround
    plan, and plans for fully abutting public water and sewer, and a minimum standard
    street.
    On December 5, 2008, Lind's engineer provided the City with a complete SEPA
    checklist and detailed information about Lind's development proposal.             Lind also
    provided a new wetland mitigation plan. On February 27, 2009, the City requested that
    Lind provide a SEPA mailing list and fees for the SEPA checklist. On May 8, 2009, Lind
    supplied a SEPA mailing list to the City and paid its SEPA fee. On May 22, 2009, a
    Notice of Application for the wetland/stream permit was sent to those on the mailing list
    and the City received back comments on the application.
    On June 12, 2009, City Planner Weil sent Lind a letter stating that the City had
    completed the project and environmental analysis of the lot line adjustment and
    wetland/stream permit applications and prepared a list of conditions for a SEPA
    Mitigated Determination of Non-Significance (MDNS) as required by WAC 197-11-350.
    The letter further requested that Lind meet with Weil and Bell to discuss the conditions,
    which required better protection of the wetlands, verification that development setbacks
    will be met, and other conditions that address impacts they believed had not been
    mitigated adequately. Lind did not respond to this request to meet.
    On June 27, 2009, the City issued the MDNS for Lind's proposal, which was
    subject to a 14-day public comment period.           During this time, the City accepted
    No. 67877-9-1
    comments from the public raising the issue of whether the wetland on the property was
    a mature forested wetland that would be classified as a Category I wetland requiring a
    100-foot buffer.      On August 7, 2009, Weil e-mailed John Lind about the citizens'
    concerns and advised that he could have a field analysis done to determine if the area
    met the criteria for a mature forested wetland or the City could revise the MDNS to add
    a condition for a tree assessment to be done. Lind did not respond. On August 28,
    2009, the City issued a revised MDNS that addressed the categorization of the wetland
    as a mature forested wetland. On January 13, 2010, the City denied Lind's applications
    for lot line adjustment and wetland/stream permit.
    Lind appealed both the initial MDNS and the revised MDNS and the City's
    denials of the lot adjustment and wetland/stream permits to the City Hearing Examiner.
    The Hearing Examiner affirmed the City's decisions denying the permits. Lind then filed
    an appeal in Whatcom Superior Court under the Land Use Protection Act (LUPA),
    seeking reversal of the Hearing Examiner's decision. On October 10, 2011, the trial
    court reversed the Hearing Examiner's decision and ordered that the City grant the lot
    line adjustment. The trial court further ordered that the wetland/stream permit and
    revised MDNS be remanded, and the City staff issue a wetland/stream permit
    consistent with the court's decision. The court also remanded to the Hearing Examiner
    to issue a decision regarding Lind's appeal of the conditions in the revised MDNS. The
    City appeals from that reversal. Also joining the appeal is Peter Frye, a neighbor of the
    property at issue.1
    1Frye essentially repeats the same arguments raised in the City's appeal.
    5
    No. 67877-9-1
    ANALYSIS
    In reviewing the superior court's decision on a LUPA appeal, this court stands in
    the shoes of the superior court and reviews the Hearing Examiner's decision on the
    record before the Hearing Examiner. The party who filed the LUPA appeal bears the
    burden of proof and must establish:
    (a) The body or officer that made the land use decision engaged in
    unlawful procedure or failed to follow a prescribed process, unless the error
    was harmless;
    (b) The land use decision is an erroneous interpretation of the law, after
    allowing for such deference as is due the construction of a law by a local
    jurisdiction with expertise;
    (c) The land use decision is not supported by evidence that is substantial
    when viewed in light of the whole record before the court;
    (d) The land use decision is a clearly erroneous application of the law to
    the facts;
    (e) The land use decision is outside the authority or jurisdiction of the body
    or officer making the decision; or
    (f) The land use decision violates the constitutional rights of the party
    seeking relief.*21
    Standards (a), (b), (e) and (f) present questions of law that are reviewed de novo,
    but under (b) the reviewing court also gives deference to the Hearing Examiner's
    construction of local land use regulations based on her specialized knowledge and
    expertise.3     Standard (c) involves factual determinations that are reviewed for
    2RCW36.70C.130(1).
    3 Cinoular Wireless. LLC v. Thurston County. 
    131 Wn. App. 756
    , 768, 
    129 P.3d 300
    (2006); Citv of Federal Way v. Town &Country Real Estate, LLC, 
    161 Wn. App. 17
    , 37,
    
    252 P.3d 382
     (2011).
    6
    No. 67877-9-1
    supporting substantial evidence.4 The reviewing court considers all ofthe evidence and
    reasonable inferences in the light most favorable to the party who prevailed in the
    highest forum that exercised fact-finding authority.5
    The Bellingham Municipal Code (BMC) contains provisions governing the
    approval of lot line adjustments. BMC 18.08.265 defines a lot line adjustment as:
    [A] revision made for the purpose of adjusting boundary lines which does
    not create any additional lot, tract, parcel, site or division nor create any
    lot, tract, parcel, site or division which contains insufficient area and
    dimension to meet minimum requirements for width and area for a building
    site.
    BMC 18.10.020(B) provides that in order for the City to approve a lot line adjustment,
    the following must be established:
    1. No new lots are created;
    2. Each parcel as proposed meets minimum lot standards as specified in
    Chapter 18.36, or that each parcel if already less than the required
    minimum is not further reduced as a result of the proposed lot line
    adjustment;
    3. The lot line adjustment does not further infringe on any applicable
    section of the Land Use Development Ordinance; and
    4. The lot line adjustment improves the overall function and utility of the
    existing lots.
    The City denied the lot line adjustment permit based on the failure to comply with
    three out of these four criteria (2, 3, and 4). The decision was issued by the Director of
    the City's Department of Planning and further concluded that the wetland/stream permit
    was denied because it relied on a specific layout that does not meet the minimum
    requirements of chapter 18.10 BMC.
    The Hearing Examiner affirmed this decision, concluding that the lot line
    adjustment proposal failed to meet three of the four criteria specified in BMC
    4 Cinaular Wireless. 131 Wn. App. at 768.
    5 Cinaular Wireless, 131 Wn. App. at 768.
    No. 67877-9-1
    18.10.020(B), noting that all four requirements must be met for approval of a lot line
    adjustment.     She concluded that it did not meet the requirement of BMC
    18.10.020(B)(2) because the proposed lots were less than the minimum site area of
    20,000 square feet required by the zoning designation for that area and the line
    adjustment proposal further reduces the site area of each of the lots than currently
    exists, noting that the pipestem portion of one of the lots must be excluded in
    determining the area under BMC 18.08.245. The Hearing Examiner further concluded
    that she lacked authority to consider additional options submitted by Lind because they
    were not included in any of the applications before its denial and all proposals must be
    first be submitted for administrative approval by the Department Director.
    The Hearing Examiner also concluded that Lind's lot line adjustment proposal
    did not meet the requirement of BMC 18.10.020(B)(3) that it not infringe on the Land
    Use Development Ordinance because it "seeks to modify an existing lot that has
    sufficient dimensions to comply with the front yard setback requirements of the Land
    Use Development Ordinance, BMC 20.30.040(F), creating a lot that cannot comply with
    these requirements." The Hearing Examiner further concluded that the proposal did not
    meet the requirement of BMC 18.10.020(B)(4) that it improve the overall function and
    utility of the existing lots because dedication of additional right-of-way to provide a
    standard 60-foot right-of-way reduces the functional size of proposed Lot A by up to 30
    feet in depth and that this, combined with the application of setback requirements to Lot
    A, leaves it without function and utility. The Hearing Examiner also concluded that
    function and utility was diminished because the proposal creates one unbuildable lot
    and another that will require substantial impacts to a wetland and buffer area for
    8
    No. 67877-9-1
    development.
    The trial court reversed, issuing only the following ruling without entering any
    findings and conclusions:
    ORDERED that the Hearing Examiner's decision denying the lot line
    adjustment is reversed, and the City shall therefore grant the lot line
    adjustment.
    ORDERED that the wetland/stream permit and revised MDNS is
    remanded, and the City staff shall issue a wetland/stream permit
    consistent with the court's decision and the Hearing Examiner shall issue
    a decision regarding Petitioner's appeal of the conditions in the revised
    MDNS.
    A. Minimum Density Requirement
    The City first contends that the superior court erred by reversing the Hearing
    Examiner's ruling because Lind's proposal failed to meet the minimum density
    requirement of BMC 18.10.020(B)(2).       The City argues that the Hearing Examiner
    correctly excluded the pipestem area from the area calculation, resulting in a lot size
    that did not meet the minimum density requirement. Lind argues that the pipestem area
    is not excluded from the lot area for purposes of satisfying the minimum density
    requirement of BMC 18.10.020. We disagree.
    The City relies on the definition of "lot area" provided in BMC 18.08.245:
    "Lot area" means the total horizontal area within the boundary of the lot
    lines of a parcel and expressed in terms of square feet or acres. For
    purposes of determining the area in a "pipestem lot," the area shall be
    defined as the square footage of the lot exclusive of the pipestem portion
    of the lot.
    Lind argues that the term "lot area" is specified in other sections of BMC Title 18, but it
    is not referenced in the applicable ordinance, BMC 18.10.020(B)(2), which only
    references "parcel," stating that "each parcel" may not be further reduced as a result of
    No. 67877-9-1
    the lot line adjustment. Thus, Lind contends this provision must be interpreted to mean
    only that the adjusted lots cannot be reduced from the original size without regard to
    whether there is a pipestem.
    But as the City counters, using the definition of "lot area" to determine whether a
    parcel's area is further reduced as a result of a proposed lot line adjustment is
    consistent with the lot line adjustment provisions. "Lot line adjustment" is defined as
    a revision made for the purpose of adjusting boundary lines which does
    not create any additional lot, tract, parcel, site or division nor create any
    lot, tract, parcel, site or division which contains insufficient area and
    dimension to meet minimum requirements for width and area for a building
    site.[6]
    "Lot" is defined as
    a fractional part of subdivided lands having fixed boundaries being of
    sufficient area and dimension to meet minimum zoning requirements for
    width and area. "Lot" includes tracts or parcels of land.1^
    Accordingly, for purposes of meeting the minimum density requirement of BMC
    18.10.020(B)(2), the area calculation excludes the pipestem area.
    Lind further contends that BMC 18.36.020 exempts smaller non-conforming lots
    from any site area requirements. Lind cites BMC 18.36.020(A), which provides:
    All lots shall be of sufficient size to meet the site area requirements
    specified within the area's land use designation under "density" found
    within the applicable Neighborhood Plan in which the property is located;
    provided, however, that this minimum shall not be required in the following
    instances:
    3. Lot line adjustments pursuant to Section 18.10.010 for lots
    presently having less site area than the required minimum lot size.
    The City agrees that existing lots that are smaller than the minimum site area
    6 BMC 18.08.265.
    7 BMC 18.08.240
    10
    No. 67877-9-1
    requirements are not subject to the area requirements of BMC 18.36.020, but correctly
    notes that such lots are addressed by BMC 18.10.020(B)(2), which requires that such
    lots are not further reduced in size by a lot line adjustment proposal. Here, excluding
    the proposed pipestem area, the lots are further reduced in size.
    Thus, Lind has failed to show that the lot line adjustment proposal meets the
    minimum density requirement of BMC 18.10.020(B)(2).              Because the ordinance
    provides that all four requirements must be met for approval of a lot line adjustment, the
    Hearing Examiner properly affirmed the City's decision to deny the lot line adjustment
    permit based on failure to comply with this requirement alone. Accordingly, the superior
    court erred by reversing the Hearing Examiner's decision.        Although we need only
    determine that one requirement of BMC 18.10.020(B) was not met to warrant denial of a
    permit, we also conclude that the other requirements were met.
    B. Further Infringement of Land Use Development Ordinance
    The Hearing Examiner concluded that Lind's proposal fails to satisfy the criteria
    of BMC 18.10.020(B)(3) because it creates a lot that cannot comply with the Land Use
    Development Ordinance's setback requirements. As stated in Conclusion of Law 6:
    The proposed lot line adjustment would result in further infringement of the
    provisions of the Land Use Development Ordinance. As currently
    configured the existing lots have a depth of approximately 110 feet. As
    proposed Lot A has a depth of approximately 50 feet. Because Harrison
    Street has a right-of-way width of approximately 33 feet, less than the
    required standard of 60 feet, BMC 20.10.080E provides that the centerline
    for setback purposes is the farthest edge of the existing right-of-way that
    was dedicated by the subject property. Harrison Street was dedicated
    entirely by the Happy Valley plat. None of the right-of-way was dedicated
    from the subject property so the centerline for setback purposes is the
    southern property line of the lots. BMC 20.30.040F requires a minimum
    front yard setback of 50 feet from the centerline of the abutting street.
    Application of the front yard setback requirement leaves no buildable area
    on proposed Lot A. Application of the front and side yard (five feet on
    11
    No. 67877-9-1
    each side) setback requirements to the existing smaller lot leaves a
    buildable area of approximately 40 feet by 40 feet. The proposal seeks to
    modify an existing lot that has sufficient dimensions to comply with the
    front yard setback requirements of the Land Use Development Ordinance,
    BMC 20.30.040F, creating a lot that cannot comply with these
    requirements.
    While Lind contends Harrison Street was not intended to be the principal means
    of access to the abutting property and therefore was not a through lot or a street
    requiring setbacks, the Hearing Examiner's findings of fact that stated otherwise are
    unchallenged and therefore verities on appeal.         Finding of Fact 9 states: "The
    applications for lot line adjustment and a wetland/stream permit were submitted to
    obtain approval for the development of two single-family residences on the properties
    with street access from Harrison Street." Finding of Fact 54 states:
    The Harrison Street right-of-way is approximately 33.6 feet in width. It is
    unimproved abutting the Lind Bros, property. A gravel driveway and
    private structure encroachments are located within the right-of-way to the
    east of the property. Harrison Street is a non-arterial, residential access
    street. BMC 18.08.420 defines a "street" as a right-of-way having a width
    of 30 feet or more which provides the principal means of access to the
    property.
    These findings are also supported by the record. The Lind proposal shows Lot A
    abutting Harrison Street to the south. Additionally, testimony from Bruce Ayers, who
    helped Lind prepare the application, concedes that Harrison Street was considered the
    access road to avoid wetland impacts:
    [Gjiven the impacts of improving Star Court, because that would go right
    through the middle of the wetland and the buffers and cause greater
    impact to develop Star Court road for access we then looked to the option
    of accessing from Harrison Street because the wetland didn't encumber
    Harrison Street as much as it does Star Court. So the decision to access
    off Harrison Street was a legitimate and good faith effort to minimize our
    impacts and not build a road on Star Court because we didn't want those
    greater impacts.
    12
    No. 67877-9-1
    Accordingly, the Hearing Examiner did not err by concluding that Lind's proposal further
    infringes on the Land Use Development Ordinance by failing to comply with its setback
    requirements.   While Lind argues that the alternative would equally infringe on City
    ordinances by having a greater impact on wetlands and buffers, the City correctly notes
    that the requirement of BMC 18.10.020(B)(3) that the proposal not "further infringe"
    applies to the City Land Use Ordinance, codified in Title 20 BMC, not the City's wetland
    regulations which are codified in former chapter 16.50 BMC, the Wetland Stream
    Ordinance.
    C. Improvement of Function and Utility of Existing Lots
    The Hearing Examiner concluded that Lind's proposal does not improve the
    function and utility of the existing lots because dedication of an additional right-of-way to
    provide a standard 60-foot right-of-way width, combined with the setback requirements,
    reduces the functional size of the property. The Hearing Examiner further concluded:
    The proposal locates septic drainfields within the wetland buffer area. It
    locates the access portion of Lot B within the wetland. Although the
    existing configuration of the larger lot may not be ideal with respect to
    avoidance of wetland and buffer impacts, the determination of the Director
    that the proposal does not improve the overall function and utility of the
    existing lots due to the wetland and buffer impacts is not erroneous. The
    proposal does not improve the function and utility of the existing smaller
    lot which is currently located almost entirely outside the wetland and buffer
    areas that are shown on the site plan.          Because of the deficiencies
    previously noted with respect to proposed Lot A the proposal creates one
    unbuildable lot and another that will require substantial impacts to a
    wetland and buffer area for development. This does not appear to be an
    improvement to the function and utility of the existing lots.
    This conclusion is supported by the record. The exhibit showing the site plan
    layout of the existing lots locates the smaller lot almost entirely outside of the wetland
    and buffer areas, while the layout for the proposed lots shows that access and onsite
    13
    No. 67877-9-1
    septic systems are located almost entirely within the wetland buffer.     But Lind points
    out that as the lots currently exist, only one house could be constructed without
    impacting the wetland, whereas the proposed lot adjustment would result in having two
    buildable lots outside of the wetland.       Thus, at most, the record shows that both
    configurations have equal impact on the function and utility on the land, but it cannot be
    said with certainty that one is in fact an improvement over the other. Lind has therefore
    failed to show that the Hearing Examiner erred by concluding that the proposal did not
    improve the function and utility of the existing lots.
    Because Lind's proposal fails to meet the four criteria required for a lot line
    adjustment approval, Lind has failed to show that the Hearing Examiner's denial of the
    lot line adjustment was error. Accordingly, the superior court's reversal of this decision
    was in error and we reverse the superior court and affirm the Hearing Examiner's ruling.
    Because Lind cannot proceed without approval of the lot line adjustment, a
    determination    on the    issuance of the wetland/stream       permit is   unnecessary.
    Accordingly, we reverse the superior court's order requiring that the City issue a
    wetland/stream permit and that the Hearing Examiner issue a decision on Lind's appeal
    of the conditions in the revised MDNS.
    WE CONCUR:
    S"c^AfJ                                          —SX*y
    14
    

Document Info

Docket Number: 67877-9

Filed Date: 4/8/2013

Precedential Status: Non-Precedential

Modified Date: 4/18/2021