Holden-mcdaniel Partners v. City Of Arlington ( 2017 )


Menu:
  •       IN THE COURT OF APPEALS FOR THE STATE OF WASHINGTON
    HOLDEN-MCDANIEL PARTNERS,
    LLC,
    No. 73528-4-1
    Appellant,
    DIVISION ONE
    v.
    CITY OF ARLINGTON, a municipal
    corporation; WOODLAND RIDGE, a
    joint venture; KAJIMA DEVELOPMENT
    CORP., A JOINT VENTURE;
    ARLINGTON COUNTRY CLUB, INC.,
    a joint venture; BNSF RAILWAY
    COMPANY, a Delaware corporation,
    Respondents.               UNPUBLISHED OPINION
    HOMESTREET BANK, formerly known
    as CONTINENTAL SAVINGS BANK;
    BANNER CORPORATION, formerly
    known as FIRST SAVINGS BANK OF
    WASHINGTON; VINE STREET FUND,
    LLC; U.S. BANK NATIONAL
    ASSOCIATION, a subsidiary of U.S.
    BANCORP; SEATTLE MORTGAGE
    COMPANY; PBW, LLC; GLENEAGLE
    COUNTRY CLUB ASSOCIATION;
    Petitioners
    FILED: January 9. 2017
    Spearman, J. —Appellant Holden McDaniel Partners, LLC (HM) brought
    claims against the City of Arlington, Burlington Northern Santa Fe (BNSF) Railway
    Company, and the developers of the neighboring property, Gleneagle, for
    designing, developing, operating and maintaining a stormwater management
    No. 73528-4-1/2
    system that caused stormwater runoff and flooding on HM's property. The trial court
    dismissed HM's claims on summary judgment based on a release agreement
    executed by the parties, the statute of limitations, and HM's failure to establish
    damages. Because the trial court erred in dismissing HM's claims based on the
    release agreement and because there are disputed issues of material fact as to
    whether HM established its claimed damages, we reverse the trial court on those
    issues. We otherwise affirm.
    FACTS
    Appellant Holden-McDaniel Partners, LLC ("HM") owns property in Arlington,
    Washington, at 18520 67th Avenue North (Property). HM purchased the Property in
    1986 and manufactured steel under the company name HCI Steel Products, Inc.
    The Property was bordered by a forested hill to the east and by railroad tracks on
    the west. There was a culvert on the Property that carried drainage from the
    eastern slope across the Property and discharged it into a ditch near a right-of-way
    belonging to respondent BNSF. The water then passed through a culvert under the
    right-of-way and flowed to the south.
    Beginning in the 1980s, the area east of the Property was being developed
    into a residential community and golf course known as Gleneagle. In 1989,
    respondents Woodland Ridge, Kajima Development Corp., and Arlington Country
    Club, Inc. (WRJV) purchased the development rights to Gleneagle. Respondent City
    of Arlington (City) and WRJV entered into a rezone contract where WRJV paid the
    City to upgrade the downstream stormwater system to accommodate the increased
    stormwater runoff from the project. The Property flooded in November 1990, when
    No. 73528-4-1/3
    the stormwater retention pond to the east (W-1) overflowed. The same thing
    happened in December 1994, November 1995, and December of 1996.
    In 1994, WRJV enlisted Triad Engineering (Triad) to develop a master
    drainage plan for Gleneagle. Triad determined that the existing facilities were
    insufficient and on February 2, 1995, contacted the City to suggest that an
    enhanced system be constructed on HM's property. At that time, HM had submitted
    plans for a new manufacturing building. It is unclear from the record whether HM
    had agreed to accommodate the runoff from Gleneagle as well as its own
    stormwater issues. Eventually HM agreed to move the existing culvert south and
    installed it "at a steeper slope and with an inlet configuration which allowed for
    greater surcharging at the upstream end. .. ." Clerk's Papers (CP) at 1185. But it
    refused to install a larger pipe because it would protrude above ground and make
    the area unusable.
    The City issued a permit for HM's proposed new building but withheld
    authorization to begin construction because HM would not install a pipe with greater
    carrying capacity. On May 5, 1995, HM filed suit under Snohomish County Superior
    Court cause No. 95-2-03498-3 against the City for damages resulting from the
    delay in permitting and withholding of construction (Permit Lawsuit). HM brought
    statutory claims under RCW 64.40.020, which allows an action "for damages to
    obtain relief from acts of an agency which are arbitrary, capricious, unlawful, or
    exceed lawful authority," and under 
    42 U.S.C. § 1983
     for denial of substantive due
    process, 
    id.
     At the same time HM filed the complaint, it also filed a "Claim for
    Damages" which alleged that the City negligently approved the stormwater
    No. 73528-4-1/4
    collection, retention, and discharge system for Gleneagle, causing damage to the
    Property in the amount of $750,000. CP at 660. The Claim for Damages referenced
    a letter to the City dated March 20, 1995, wherein HM informed the City that it "may
    very well have liability" for the flooding on HM's property. CP at 663.
    A few days later, HM filed suit against WRJV and other developers under
    cause No. 95-2-03599-8 for failing to implement an appropriate stormwater
    collection, retention, and discharge system and causing surface water to be
    discharged onto the Property (Flooding Lawsuit). On July 7, 1995, HM added the
    City as a defendant in the Flooding Lawsuit, in which its claims against the City
    mirrored those contained in the Claim for Damages. On August 31, 1995, the court
    granted the City's motion to consolidate the two lawsuits under cause No. 95-2-
    03599-8.
    In September 1995, the City granted HM's building permit in exchange for a
    prescriptive drainage easement across the Property. On September 26, 1995, HM
    executed a hold harmless agreement in favor of the City "to the extent that a 24" x
    36" drainpipe is inadequate to handle the flow of surface water legally conveyed to
    [HM's] property     " CP at 1364. Also in 1995, WRJV enlisted Higa Engineering to
    design an additional upstream detention facility known as pond W-2. The pond was
    constructed and finished in 1996.
    On November 24, 1998, HM and the City reached a settlement in which HM
    agreed to release certain of its claims against the City (Release). On motion of the
    court clerk, the consolidated lawsuit was dismissed without prejudice for want of
    prosecution in 2000.
    No. 73528-4-1/5
    In 1999 the City installed a second culvert under the railroad tracks to
    alleviate backwatering. In 2001, the City retained Earth Tech to design a 67th
    Avenue improvement project that involved widening the roadway and redirecting
    the outflows from W-1. Earth Tech designed a v-notched weir that would limit the
    flow to HM, and excess water was rerouted to a new facility north of 188th Street
    known as the Triangle pond. As part of the improvements, the City lowered the road
    near HM's north building. The City claims this was done at HM's request. HM
    disputes this claim.
    HM experienced no flooding at all on its property from 2003 until 2009, when
    flooding occurred after a series ofstorms. Also in that year, HM replaced its onsite
    filtration system. In 2007, the business was sold to Bluescope Buildings North
    America, Inc. (BBNA). BBNA leased the Property and facilities from HM until 2012
    when the parties reached an agreement releasing BBNA from the lease in
    exchange for $2.6 million.
    In January 2011, HM filed suit against the City, WRJV and other Gleneagle
    investors, alleging that the developers were negligent in their design and
    maintenance of Gleneagle's stormwater system. HM also claimed that the City was
    negligent in its design, construction, and maintenance of the stormwater facilities
    that receive water from Gleneagle, and for reviewing and approving Gleneagle's
    permit and design. HM also brought an inverse condemnation claim against the
    City.
    HM alleged that the City's negligence had caused increased flooding of the
    Property, which constituted an ongoing nuisance as well as past trespass of surface
    No. 73528-4-1/6
    waters and the threat of future trespass. HM claimed that it had incurred clean up
    and restoration costs for past floods and was facing a loss of over $6 million if it
    were to lose its lease with BBNA due to flooding. In 2012, HM added BNSF as a
    defendant, claiming that BNSF had contributed to the increased flooding by failing
    to maintain its portions of the stormwater system.
    The parties brought multiple motions for summary judgment in early 2015.
    The trial court dismissed each of HM's claims that arose from alleged conduct by
    the City and WRJV that occurred before May 5, 1995, concluding that the Release
    precluded any liability on those claims. The court also found that res judicata barred
    the assertion of HM's claims against the City and WRJV that arose before
    November 24, 1998, the date the Release was signed. The court also dismissed
    HM's claims against the City and WRPV because it found that HM's evidence failed
    to establish an issue of material fact as to its claimed damages. The court
    dismissed HM's intentional tort claims for nuisance and trespass, concluding that
    those claims were subsumed within HM's negligence claims. It also dismissed the
    claims against BNSF, finding that they were precluded by the statute of limitations.
    Finally, the court excluded a letter offered by HM in support of its damages claim,
    concluding that it was inadmissible hearsay. HM appeals these rulings.
    DISCUSSION
    We review a trial court's grant of summary judgment de novo. Camicia v.
    Howard S. Wright Constr. Co.. 
    179 Wn.2d 684
    , 693, 
    317 P.3d 987
     (2014).
    Summary judgment is appropriate only when there is no genuine issue as to any
    material fact and the moving party is entitled to judgment as a matter of law. See
    No. 73528-4-1/7
    CR 56(c); Camicia. 
    179 Wn.2d at 693
    . When making this determination, we
    consider all the facts and make all reasonable, factual inferences in the light most
    favorable to the nonmoving party. Young v. Kev Pharmaceuticals. Inc.. 
    112 Wn.2d 216
    , 226, 
    770 P.2d 182
    (1989).
    The Scope of the Release
    The Release first states that for the sole consideration of $750,000, HM
    discharges:
    The City ... and all other persons ... from any and all claims ...
    relating to all claims set forth in and described in Plaintiff's
    Complaint and Amended Complaints in Snohomish County Cause
    No. 95-2-03599-8 and/or 95-2-03498-3.1
    CP at 1107. Next, the Release explicitly provides that any claims related to future
    flooding on HM's property are excluded from the release, unless they fall within a
    specific exception. It states:
    This Release does not release any future claims which the
    Plaintiff may have... against the City of Arlington, ... or any other
    person, ... relating to flooding on Plaintiffs property, except to the
    extent said claims arise out of the conduct described in the
    Complaint and Amended Complaints in Snohomish County Cause
    No. 95-2-03498-3. jd.
    It is abundantly clear from this language that the Release does not apply to
    any future claims that HM might have regarding flooding on its property, unless the
    claims arise from conduct described in the cause No. 95-2-03498-3 complaint. At
    1 As previously noted, cause No. 95-2-03498-3 was the original cause number of the Permit
    Lawsuit which was consolidated with the Flooding Lawsuit under cause No. 95-2-03599-8. There
    was no amended complaint filed in the Permit Lawsuit, however, there were two amended
    complaints filed in the Flooding Lawsuit.
    No. 73528-4-1/8
    issue is what conduct the parties intended to describe by reference to that
    complaint.
    We interpret settlement agreements the same way as other contracts.
    McGuire v. Bates. 
    169 Wn.2d 185
    , 188, 
    234 P.3d 205
     (2010) (citing Mut. of
    Enumclaw Ins. Co. v. USF Ins. Co.. 
    164 Wn.2d 411
    , 424 n.9, 
    191 P.3d 866
     (2008)).
    We attempt to determine the parties' intent by focusing on their objective
    manifestations as expressed in the agreement. Id at 189. We generally give words
    their ordinary and usual meaning unless the entirety of the agreement clearly
    demonstrates a contrary intent. Hearst Commc'ns. Inc. v. Seattle Times Co., 
    154 Wn.2d 493
    , 504, 
    115 P.3d 262
     (2005). But we interpret only that which was written,
    not what was intended to be written, jd The parties' subjective intent is generally
    irrelevant if "an intention corresponding to the reasonable meaning of the words
    used" can be imputed. ]d
    HM contends that the reference in the Release to the Permit Lawsuit
    complaint is to the conduct described in the complaint, that is, claims for flooding
    damages arising out of the City's alleged wrongful withholding of HM's authorization
    to begin construction. The City and WRJV contend the reference is to the conduct
    described in the complaint and the Claim for Damages that was filed at the same
    time. They contend the Claim for Damages was attached to the complaint when it
    was filed and served on the City. Citing Superior Court Civil Rule (CR) 10(c), they
    argue that as a result, the Claim for Damages became a part of the complaint. The
    City and WRJV also contend that the settlement agreement makes no sense unless
    it is read to include future flooding damages.
    8
    No. 73528-4-1/9
    HM disputes that the Claim for Damages was attached to the complaint. And
    even if it was attached, HM disputes that the document falls within the reach of CR
    10(c). They also contend the Claim for Damages was filed for the sole purpose of
    providing the City with the statutorily required 60-day notice of HM's claims against
    it. (See former RCW 4.96.020 (1995), in effect at the time.)2 HM points out that just
    over 60 days following service of the Claim for Damages, it amended the complaint
    in the Flooding Lawsuit adding the City as a defendant.3 HM further points out that
    had the Claim for Damages actually been part of the Permit Lawsuit, the claims
    would have violated former RCW 4.96.020 and been barred as a result. HM also
    argues that the language of the Release is plain and unambiguous and should be
    given effect as written.
    2 Former RCW 4.96.020 provided as follows:
    (1) The provisions of this section apply to claims for damages
    against all local governmental entities.
    (2) All claims for damages against any such entity for damages shall
    be presented to and filed with the governing body thereof within the
    applicable period of limitations within which an action must be
    commenced.
    (3) All claims for damages arising out of tortious conduct must
    locate and describe the conduct and circumstances which brought about
    the injury or damage, describe the injury or damage, state the time and
    place of the injury or damage occurred, state the names of all persons
    involved, if known, and shall contain the amount of damages claimed,
    together with a statement of the actual residence of the claimant at the
    time of presenting and filing the claim and for a period of six months
    immediately prior to the time the claim arose ....
    (4) No action shall be commenced against any local governmental
    entity for damages arising out of tortious conduct until sixty days have
    elapsed after the claim has first been presented to and filed with the
    governing body thereof....
    3The trial court initially determined that HM filed the Flooding Lawsuit only five days later,
    instead of waiting 60 days. On HM's motion for reconsideration, the court acknowledged its error on
    this point, but it concluded that "the result is the same." CP at 35.
    No. 73528-4-1/10
    We first address the City and WRJV's reliance on CR 10(c) to argue that as
    a matter of law the Claim for Damages was incorporated into the Permit Lawsuit
    complaint. We conclude that their reliance is misplaced. CR 10(c) states:
    Adoption by Reference; Exhibits. Statements in a pleading may
    be adopted by reference in a different part of the same pleading or
    in another pleading or in any motion. A copy of any written
    instrument which is an exhibit to a pleading is a part thereof for all
    purposes.
    Citing P.E. Systems. LLC v. CPI Corp.. 
    176 Wn.2d 198
    , 
    289 P.3d 638
     (2012), the
    City and WRJV argue that our supreme court "made it clear" that a document
    attached to the complaint is part of the complaint. Br. of WRJV at 29, Br. of the City
    at 20. But the holding of the case does not stretch the application of CR 10(c)
    nearly so far as that. At issue in P.E. Systems, was whether a contract attached to
    an answer to a complaint became a part of the pleading. The court noted that the
    rule expressly states that it applies to "written instruments" and that '"[i]nstrument'
    has a specific legal meaning: 'A written legal document that defines rights, duties,
    entitlements, or liabilities, such as a contract, will, promissory note, or share
    certificates.'" ]d at 204 (quoting BLACK'S LAW DICTIONARY 869 (9th ed. 2009)).
    The court easily concluded that the purported contract fell within the meaning ofa
    "written instrument" and held that under CR 10(c) "the contract does become part of
    the pleadings by simply attaching it       " Id The court cautioned, however, that
    "exhibits that stretch the definition of a 'written instrument,' such as affidavits, are
    extrinsic evidence that may not be considered as part of the pleadings." |d at 205
    (citing Rose v. Bartle. 
    871 F.2d 331
    , 339 n.3 (3d Cir. 1989)).
    10
    No. 73528-4-1/11
    The City and WRJV nevertheless argue for an expansive view of the
    definition of "written instrument" as that term is used in CR 10(c), but they cite no
    Washington authority in support of that position. Instead, they rely on a number of
    federal cases citing to the similarly worded Fed. R. Civ. P. 10(c). For example, they
    note that in P.E. Systems. 
    176 Wn.2d at 204
    , our supreme court cited Tiernev v.
    Vahle. 
    304 F.3d 734
    , 738 (7th Cir. 2002) with approval. In that case, the court held
    that "[bjecause the letterwas attached to the complaint, it became a part of it for all
    purposes." Tiernev at 738. But in indicating its approval of the case our supreme
    court noted only that Tiernev held that the "weight of authority permits attachment of
    documents such as contracts to pleadings for federal rule 12(b) or 12(c) purposes."
    P.E. Systems, 
    176 Wn.2d at 204-05
    . (Emphasis added). The court clearly did not
    adopt the view advanced by the City and WRJV that any document attached to a
    pleading becomes a part of the pleading itself.4
    Neither the City nor WRJV explain how the Claim for Damages purportedly
    attached to the Permit Lawsuit complaint falls within the definition of a written
    instrument as expressed by our supreme court in P.E. Systems. Neither suggests
    that it defines rights and duties like a contract, will, promissory note or share
    certificate or that it establishes any entitlements or liabilities. It is a claim for
    4Indeed, following its limited approval ofTiernev's apparently expansive reading ofthe
    federal rule, the P.E. Svstem court cited approvingly the narrow approach taken in Rose, 
    871 F.2d at
    339 n.3. Therethe Rose court noted "[t]he case law demonstrates, however, that the types of
    exhibits incorporated within the pleadings by Rule 10(c) consist largely of documentary evidence,^
    specifically, contracts, notes, and other 'writing[s] on which [a party's] action or defense is based',"
    (citing 5 C. Wright &A. Miller, Federal Practice and Procedure, § 1327, at489). And interestingly,
    although the court in Tiernev spoke in expansive terms about the scope of federal Rule 10(c), the
    letter at issue in that case is actually consistent with the view expressed in Rose. The plaintiffs in
    thatcase claimed the letter was both defamatory and retaliatory against the plaintiffs' exercise of
    their constitutional rights. Thus, the letter was a writing on which the plaintiffs' action was based.
    11
    No. 73528-4-1/12
    damages but it is not by any stretch, documentary evidence that forms the basis for
    the claim. We conclude that the Claim for Damages is more akin to an affidavit and,
    as such, it is extrinsic evidence and not, as a matter of law, a part of the document
    to which it was attached.
    Next, the City and WRJV argue vigorously that we should interpret the
    Release to include the claims in the Flooding Lawsuit because otherwise, in their
    view, "the settlement agreement makes virtually no sense[.]" Br. of the City at 27.
    See Br. of WRJV at 27-28. We turn first to the plain language of the Release. It
    unambiguously states that HM specifically reserved the right to bring future flooding
    claims "except to the extent said claims arise out of the conduct described in the
    Complaint... in Snohomish County Cause No. 95-2-03498-3." CP at 1107. It is
    undisputed that the claims arising out the conduct in the Permit Lawsuit are
    unrelated to the claims alleged in the Flooding Lawsuit. It is also undisputed that the
    Claim for Damages, which does address the claims in the Flooding Lawsuit, is not
    explicitly mentioned anywhere in the Release.
    Despite the unambiguous clarity ofthe language in the Release, the City and
    WRJV argue that we must take into account what, in their view, the settlement
    agreement was intended to accomplish. The City points out that in reaching the
    agreement it intended to "end[] the litigation, including future claims related to
    'permanent or progressive damage' arising out of the litigated subject matter." Br. of
    the City at 30. But to the extent the City believed the Release included all future
    flooding damage on HM's property without exception, that belief is in direct
    contradiction to the plain language in the Release. The Release provides "[tjhis
    12
    No. 73528-4-1/13
    Release does not release any future claims which the Plaintiff may have ... against
    the City of Arlington ... or any other person ... relating to flooding on the Plaintiff's
    property" unless the claims arise out of the Permit Lawsuit. CP at 1107 (emphasis
    added). It is well settled that courts are not at liberty to rewrite contracts to reflect a
    party's unexpressed, subjective intentions. Hearst Commc'ns. 
    154 Wn.2d at 503
    .
    And that is what the City and WRJV ask us to do here.
    Accordingly, we hold the trial court erred in denying HM's motion for
    summary judgment dismissal of the affirmative defense of release and in granting
    dismissal of HM's claims on that ground.
    Res Judicata
    Res judicata prohibits a party from bringing a claim already litigated or a
    claim that could have been litigated in a prior action. Pederson v. Potter. 
    103 Wn. App. 62
    , 67, 
    11 P.3d 833
     (2000). This doctrine prevents repetitive litigation ofthe
    same matter, ensuring integrity and finality in the legal system, id. at 71. A
    threshold requirement of res judicata is a final judgment on the merits in the prior
    suit. Hisle v. Todd Pac. Shipyards Corp., 
    151 Wn.2d 853
    , 865, 
    93 P.3d 108
     (2004).
    Once obtained, a prior judgment has preclusive effect when a second action is
    identical in: (1) persons and parties; (2) cause of action; (3) subject matter; and (4)
    quality of persons for/against whom the claim is made. Yakima County v. Yakima
    County Law Enforcement Officers Guild. 
    157 Wn. App. 304
    , 327-28, 
    237 P.3d 316
    (2010). Whether res judicata bars an action is a question of law we review de novo.
    Kuhlman v. Thomas, 
    78 Wn. App. 115
    , 120, 
    897 P.2d 365
     (1995).
    13
    No. 73528-4-1/14
    The parties do not appear to dispute that there was no judgment on the
    merits entered in this case. After the Release was signed the parties took no further
    action with regard to obtaining a judgment. Instead, the case was dismissed without
    prejudice on the court clerk's motion "for want of prosecution" pursuant to CR
    41(b)(2). It is well settled that a dismissal order entered without prejudice will not
    support a res judicata defense because it is not a final judgment.5 Young v. Kev
    Pharmaceuticals. Inc.. 
    112 Wash.2d 216
    , 223, 
    770 P.2d 182
    (1989)
    Nevertheless, the City and WRJV argue that the prior settlement "ended the
    litigation for all intents and purposes." Br. of City at 37-38. Citing Rasmussen v.
    Allstate. 
    45 Wn. App. 635
    , 
    726 P.2d 1251
     (1986), they contend that even in the
    absence of a final judgment on the merits, the Release triggered res judicata. In
    Rasmussen. following a car accident, a passenger secured partial payment from
    the tortfeasor and then brought suit against Allstate and Farmers seeking
    underinsured motorist (UIM) coverage. Allstate disputed that the policy included
    UIM coverage but the trial court ruled otherwise and Allstate appealed. While the
    appeal was pending, Allstate settled with the passenger, but apparently did not
    dismiss the appeal. Allstate then prevailed in an action seeking contribution from
    Farmers. Farmers appealed and the case was consolidated with Allstate's appeal
    challenging the coverage finding. In considering Allstate's appeal, the court
    reviewed the settlement agreement between Allstate and the passenger. The
    5The City appears to argue that dismissal without prejudice can be a final judgment. Br. of
    the City at 38. It cites Gazin v. Hieber. 
    8 Wn. App. 104
    . 113. 
    504 P.2d 1178
     (1972). for the
    proposition that a "[djetermination of what constitutes a final judgment in the context of res judicata
    has always been a 'matter of substance and not form.'" Br. of the City at 38. But because it cites no
    authority holding that a dismissal without prejudice is a final judgment, we reject the argument.
    14
    No. 73528-4-1/15
    agreement provided that, in consideration for the sum received, the passenger
    agreed to:
    release and forever discharge ALLSTATE INSURANCE
    COMPANY ... from any and all rights, claims, including claims for
    underinsured motorist benefits, or damages of any kind, known or
    unknown, existing or arising in the future, resulting from or related
    to injuries or damages arising from an accident that occurred on or
    about October 6, 1981.
    id at 637. The court concluded that it need not reach Allstate's claim on appeal
    because the
    "compromise agreement constitutes a merger and bar of all existing
    claims and causes of action and is as binding and effective as a final
    judgment itself. Gregory v. Hamilton, 
    77 Cal.App.3d 213
    , 
    142 Cal.Rptr. 563
     (1978); 15A Am.Jur.2d Compromise and Settlement §
    24 (1976). It is res judicata of all matters relating to the subject matter
    of the dispute. Handlev v. Mortland. 
    54 Wash.2d 489
    , 
    342 P.2d 612
    (1959); In re Estate of Phillips. 
    46 Wash.2d 1
    , 
    278 P.2d 627
     (1955).
    Therefore, the scope of the coverage by Allstate is no longer an
    issue." id
    Despite its broad language, the City and WRJV's reliance on Rasmussen for
    the proposition that a settlement agreement is res judicata, in the absence of a
    judgment, is misplaced. First, the two cases cited in support ofthe assertion,
    Handlev and Phillips, both involved settlement agreements that were followed by
    entry ofjudgments. In Handlev. the court, in approving the settlement ofa minor's
    claim entered "findings of fact, conclusions of law, and judgment." id at 491. In
    Phillips, the parties agreed to settle a dispute about the distribution of the
    decedent's estate. The court held that "[a]n order settling the final account of an
    administrator and a decree of distribution entered on the basis of such a
    compromise or settlement are res judicata of all matters relating to the subject
    matter of the controversy." id at 14 (citing McClure v. Calisoell Duck Club. 157
    15
    No. 73528-4-1/
    16 Wash. 136
    , 
    288 Pac. 217
     (1930)). In this case, because the settlement agreement
    was not followed by entry of either a judgment or a decree, we conclude that res
    judicata is inapplicable.6
    Furthermore, regardless of whether res judicata applies, it is well settled that
    the law favors private settlements of disputes and is inclined to view them with
    finality. Stottlemvre v. Reed, 35Wn. App. 169, 173, 
    665 P.2d 1383
     (1983). But the
    finality of the Release at issue here is not in dispute. The parties disagree on the
    scope ofthe Release, specifically whether it includes damages for flooding as
    asserted in the Claim for Damages. That dispute is to be resolved by resorting to
    principles of contract interpretation, not according to the law regarding the
    enforceability of judgments, id at 171. We reverse the order granting the City and
    WRJV summary judgment on this issue.
    HM's Claimed Damages From post-1995 Conduct
    HM argues that the trial court erred when it entered partial summary
    judgment with regard to damages. The trial court concluded that HM could not
    establish any flooding damages because there was no net increase in frequency of
    flooding after 1995. Relying on HM's expert witness, Malcolm Leytham, the court
    found that prior to the development of Gleneagle, HM's property flooded at a rate of
    6We also reject the argument by the City and WRJV that Pederson. 103 Wn. App. at67 is
    controlling That case considered whether the "confession of judgment" at issue in that case could
    qualify as ajudgment on the merits. The court held that it could "because the Pedersons knew of
    their potential claims against the Potters when they settled and signed the confession of judgment.
    They had the opportunity to be heard on these claims, and have them disposed of, but chose not to
    do so" 
    id.
     at 71 But again, in Pederson. unlike this case, a judgment had in fact been entered. In
    addition, the confession of judgment reflected that the Pedersons had abandoned all of their claims
    against the Potters. Here, it is undisputed that HM reserved at least some of its claims.
    16
    No. 73528-4-1/17
    once every 25 years. By 1995, however, after the development of Gleneagle and
    the construction of Pond W-1, HM's property flooded at a rate of once every three
    years. By 1998, following installation of Pond W-2 and the 36" x 24" pipe across
    HM's property, the flood rate was reduced to once every 15 years. But, after
    additional work by the City, including installation of Triangle Pond and lowering 67th
    Avenue, the flooding worsened to once every ten years by 2003 . The court
    concluded, however, that because flooding once every ten years was better than
    once every three years, "no rational trier of fact could find that [HM] suffered
    flooding damage more severe than was negotiated for in the prior litigation." CP at
    24. The City and WRJV adopt this reasoning on appeal.
    HM argues that there are disputed issues of material fact about whether the
    City is responsible for the improvement from every three year flooding to every
    fifteen year flooding. It points to evidence that the improvement was due primarily, if
    not solely, to HM's installation of the larger 36" x 24" pipe and relocating it to a
    steeper slope.7 It further argues that the City's installation ofTriangle Pond and
    7 The City argues that this theory was not argued below by HM until its motion for
    reconsideration. The City and WRJV also argue that Leytham's deposition testimony does not
    support the theory. HM argues thatthe reason for the improvement in flooding conditions from every
    three years in 1995 to every fifteen years in 1998 was not a contested issue until the trial court's
    summary judgment decision. HM contends that until then, the parties were using 1998 as the
    baseline for determining whetherflooding conditions had worsened. The record supports HM's
    argument on this point. See CP at 2576; 2578-79. The City and WRJV are correct that Leytham did
    not specifically testify in support ofthe theory HM argued in the motion for reconsideration, i.e., that
    laying the culvert pipe at a steepergrade accounted for the improvement by 1998. But it isa
    reasonable inference from the evidence that was presented below. Viewing the evidence in the light
    most favorable to HM, as we must, it is sufficient to raise a material issue of fact as to HM's
    damages claim. We also note that in response to HM's motion for reconsideration, the City argued to
    the trial court, and does so here on appeal, that even accepting HM's new theory, the evidence of
    HM's damages claim was insufficient to survive its motion for summary judgment. See Br. of the City
    at 45-47. But these issues were not addressed by the trial court and we do not address them here.
    17
    No. 73528-4-1/18
    lowering 67th Avenue is solely responsible for the increase to every ten-year
    flooding. If a rational factfinder were to credit HM's evidence it could conclude that
    the City and WRJV bore some liability for the five-year increase in flooding
    frequency. Because resolution of the damages issue turns on questions of
    credibility, the trial court erred when it granted summary judgment on this issue.
    HM's Intentional Tort Claims
    HM argues that its claims for trespass should not have been dismissed
    because there is an issue of material fact as to whether WRJV intended to flood the
    Property, stating that WRJV knew it's conduct was "'substantially certain'" to result
    in flooding, or that there was a high probability of increased flooding. Br. of HM at
    41. To establish intentional trespass, a plaintiff must show (1) an invasion of
    property affecting an interest in exclusive possession; (2) an intentional act; (3)
    reasonable foreseeability the act would disturb the plaintiff's possessory interest;
    and (4) actual and substantial damages. Bradley v. Am. Smelting &Refining Co.,
    
    104 Wn.2d 677
    , 692-93, 
    709 P.2d 782
     (1985). Intent requires proof that the actor
    "desires to cause consequences of his act, or that he believes that the
    consequences are substantially certain to result from it." Bradley. 
    104 Wn.2d at 682
    . At a minimum, this consists of proof that the actor has knowledge that the
    consequences are certain, orsubstantially certain, to result from his conduct and
    proceeds in spite of the knowledge, 
    id.
    HM argues that the City and WRJV had "intent" because they knew thattheir
    actions were "'substantially certain'" to result in flooding because the City
    authorized the W2 pond to discharge at a rate greaterthan the known capacity of
    18
    No. 73528-4-1/19
    the culvert located on the Property. HM is essentially arguing that the City and
    WRJV knew that the culvert was insufficient and failed to take that into account
    when it designed and implemented the various elements of a stormwater
    management system. A claim for failure to act sounds in negligence and does not
    support the intentional act needed for trespass. Estate of Price v. City of Seattle.
    
    106 Wn. App. 647
    , 660, 
    24 P.3d 1098
     (2001).
    HM's claims against BNSF
    HM argues that the trial court erred when it found that BNSF had no statutory
    or common law duty to accept water from upstream entities and dismissed its
    negligence claims against BNSF. According to HM, by voluntarily allowing the City
    and Gleneagle to use the ditch as a stormwater disposal facility, BNSF assumed a
    duty to maintain the ditch in good repair. BNSF argues that it has no duty to HM nor
    did it assume one when it allowed the ditch to be used for disposal of surface water.
    In order to bring a claim for negligence, a plaintiff must first establish that a
    legal duty exists. Christensen v. Roval School Dist. No. 160. 
    156 Wn.2d 62
    , 
    124 P.3d 283
     (2005). HM argues that BNSF's duty arises under the Restatement
    (Second) of Torts § 365 (1965), where a possessor of land is liable for physical
    harm caused by the disrepair of a structure or other artificial condition if the
    exercise of reasonable care would have made it safe or disclosed the disrepair.
    BNSF argues that Washington courts have not adopted the Restatement and have
    declined to impose liability for dangerous disrepair.8
    8 Because we affirm the trial courton this ground, we do not reach the issue ofwhether
    HM's claims were also properly dismissed because they were filed outside the statute of limitations.
    19
    No. 73528-4-1/20
    HM cites Phillips v. King County. 
    136 Wn.2d 946
    , 
    968 P.2d 871
     (1998) and
    Rothweiler v. Clark County. 
    108 Wn. App. 91
    , 
    29 P.3d 758
     (2001), as supporting
    the imposition of a duty to maintain a drainage system. But neither case advances
    HM's position; both address the responsibility of municipalities to maintain public
    drainage systems, not obligations of private landowners.
    HM argues that the distinction makes no difference, quoting Phillips. 
    136 Wn.2d at 958
    , "'[g]enerally, municipal rights and liabilities as to surface waters are
    the same as those of private landowners within the city.'" Br. of HM at 47. This is
    not correct. The statement from Phillips pertains to the liability for trespass caused
    by surface water, not a duty to maintain public drainage systems. The Phillips court
    explained that "many municipalities in Washington accept private storm water
    facilities for maintenance or ownership after they are constructed in connection with
    a new development. This occurs because homeowner associations or other private
    owners do not have the funds or motivation to do necessary maintenance to keep
    the drainage facilities operating at their maximum efficiency." id HM cannot
    establish that a private landowner has the same duty as a municipality to maintain
    the stormwater drainage facility that serves its property. We find that the trial court
    did not err when it found that BNSF had no duty.
    The Letter from BBNA's Counsel
    HM argues that the trial court erroneously excluded a letter from BBNA's
    counsel that indicated that it would no longer make payments on its lease and
    notified HM of its potential claims related to flooding. HM argues that the letter falls
    20
    No. 73528-4-1/21
    within the business records exception listed in RCW 5.45.020. The trial court was
    not persuaded that it was a business record.
    We use the de novo standard of review when reviewing all trial court rulings
    made in conjunction with a summary judgment motion. Folsom v. Burger King. 
    135 Wn.2d 658
    , 663, 
    958 P.2d 301
     (1998). Washington's Uniform Business Records as
    Evidence Act "makes evidence that would otherwise be hearsay competent
    evidence." Cantrill v. Amer. Mail Line. 
    42 Wn.2d 590
    , 608, 
    257 P.2d 179
     (1953).
    Under the statute, a record of a relevant act, condition, or event,
    shall... be competent evidence if the custodian or other qualified
    witness testifies to its identity and the mode of its preparation, and
    if itwas made in the regular course of business, at or near the
    time of the act, condition, or event, and if, in the opinion of the
    court, the sources of information, method and time of preparation
    were such as to justify its admission. RCW 5.45.020.
    WRJV argues that the letter was properly excluded as hearsay and does not
    fall within the exception for business records. We agree. There is no statement from
    a records custodian or other qualified witness about its identity or that it had been
    made in the usual course of business at or near the time ofthe act in question.
    Neither the attorney's affidavit, nor the date of the letter, supply the missing pieces
    or provide the inherent reliability necessary to satisfy the exception. The trial court
    properly excluded the evidence as hearsay.
    Fees and Costs
    BNSF asks for an award of costs on appeal; upon submission of a cost bill,
    we award BNSF its costs under RAP 14.2. Because WRJV is not the prevailing
    party its request for fees and costs, pursuant to RAP 18.1 and RAP 14.3 is denied.
    21
    No. 73528-4-1/22
    Reversed in part and remanded for further proceedings consistent with this
    opinion.