Town of Green Grove v. Town of Colby ( 2024 )


Menu:
  •        COURT OF APPEALS
    DECISION                                              NOTICE
    DATED AND FILED                          This opinion is subject to further editing. If
    published, the official version will appear in
    the bound volume of the Official Reports.
    May 2, 2024
    A party may file with the Supreme Court a
    Samuel A. Christensen             petition to review an adverse decision by the
    Clerk of Court of Appeals          Court of Appeals. See WIS. STAT. § 808.10
    and RULE 809.62.
    Appeal No.           2022AP1611                                                Cir. Ct. No. 2021CV57
    STATE OF WISCONSIN                                           IN COURT OF APPEALS
    DISTRICT IV
    TOWN OF GREEN GROVE,
    PLAINTIFF-APPELLANT,
    V.
    TOWN OF COLBY,
    DEFENDANT-RESPONDENT.
    APPEAL from an order of the circuit court for Clark County:
    LYNDSEY A. B. BRUNETTE, Judge. Affirmed.
    Before Kloppenburg, P.J., Graham, and Nashold, JJ.
    ¶1         NASHOLD, J. The Town of Green Grove (“Green Grove”) appeals
    a circuit court order granting summary judgment in favor of the Town of Colby
    (“Colby”) (collectively, “the Towns”). For the reasons stated below, we affirm.
    No. 2022AP1611
    BACKGROUND
    ¶2     The following facts are derived from the parties’ summary judgment
    materials and are undisputed for purposes of summary judgment unless otherwise
    noted.
    ¶3     Meridian Avenue is a town line highway1 that runs north to south on
    the border between Green Grove and Colby in Clark County. Green Grove lies to
    the west, Colby to the east. There is a bridge where Meridian Avenue crosses the
    East Fork of the Popple River.
    ¶4     Green Grove replaced the bridge in 2019, and Colby refused to share
    the replacement costs.        Green Grove then filed suit, alleging that Colby was
    obligated to share the costs pursuant to WIS. STAT. § 82.23 (2021-22).2 The
    parties filed cross-motions for summary judgment, which the circuit court denied.
    After Green Grove discovered an agreement between the Towns from 1929 (“the
    1929 agreement”3), which stated that the Towns were jointly responsible for
    maintaining the bridge, Green Grove again filed for summary judgment. The
    court denied Green Grove’s motion, and instead granted summary judgment in
    “‘Town line highway’ means a highway that runs on or across the boundary line
    1
    between a town and another town, a village, or a city.” WIS. STAT. § 82.01(9). All references to
    the Wisconsin Statutes are to the 2021-22 version unless otherwise noted.
    2
    WISCONSIN STAT. § 82.23 states, “Unless otherwise provided by statute or agreement,
    every highway bridge on a city, village, or town boundary shall be repaired and maintained by
    any adjoining municipality in which the bridge is located. The cost of repairs and maintenance
    shall be paid by the adjoining municipalities in proportion to the last equalized valuation of the
    property in the adjoining municipalities.”
    3
    As we later explain, the parties dispute how this agreement should be characterized.
    We refer to it as “the 1929 agreement,” which is consistent with our analysis below.
    2
    No. 2022AP1611
    favor of Colby.4 The court concluded that, pursuant to a “Road Maintenance
    Agreement for Meridian Avenue” between the Towns from 2010 (“the
    2010 agreement”), Green Grove is entirely responsible for the bridge’s
    replacement costs. Green Grove appeals.5
    STANDARD OF REVIEW
    ¶5      We review summary judgment de novo, using the same
    methodology as the circuit court. Bauer v. Wisconsin Energy Corp., 
    2022 WI 11
    ,
    ¶11, 
    400 Wis. 2d 592
    , 
    970 N.W.2d 243
    . Summary judgment is appropriate when
    the summary judgment materials “show that there is no genuine issue as to any
    material fact and that the moving party is entitled to a judgment as a matter of
    law.” WIS. STAT. § 802.08(2).
    ¶6      This appeal also requires us to interpret contracts.                        “The
    interpretation of an unambiguous contract presents a question of law” that we
    review de novo. Town Bank v. City Real Est. Dev., LLC, 
    2010 WI 134
    , ¶32, 
    330 Wis. 2d 340
    , 
    793 N.W.2d 476
    . “Only when the contract is ambiguous, meaning it
    is susceptible to more than one reasonable interpretation, may the court look
    4
    The circuit court did so pursuant to WIS. STAT. § 802.08(6), which states, “If it shall
    appear to the court that the party against whom a motion for summary judgment is asserted is
    entitled to a summary judgment, the summary judgment may be awarded to such party even
    though the party has not moved therefor.”
    5
    Colby’s brief does not comply with WIS. STAT. RULE 809.19(8)(bm), which addresses
    the pagination of appellate briefs. See RULE 809.19(8)(bm) (providing that, when paginating
    briefs, parties should use “Arabic numerals with sequential numbering starting at ‘1’ on the
    cover”). This rule was amended in 2021, see S. CT. ORDER 20-07, 
    2021 WI 37
    , 
    397 Wis. 2d xiii
    (eff. July 1, 2021), because briefs are now electronically filed in PDF format and electronically
    stamped with page numbers when they are accepted for e-filing. As our supreme court explained
    when it amended the rule, the pagination requirement ensures that the numbers on each page of
    the brief “will match … the page header applied by the eFiling system, avoiding the confusion of
    having two different page numbers” on every page of a brief. S. CT. ORDER 20-07 cmt. at x1.
    3
    No. 2022AP1611
    beyond the face of the contract and consider extrinsic evidence to resolve the
    parties’ intent.”   Id., ¶33.   When a contract is ambiguous and the extrinsic
    evidence “is undisputed and but one inference can be reasonably drawn therefrom,
    a question of law is presented.” Cutler-Hammer, Inc. v. Industrial Comm’n, 
    13 Wis. 2d 618
    , 632, 
    109 N.W.2d 468
     (1961).
    ¶7     This appeal further involves statutory interpretation, which we
    review de novo. Marx v. Morris, 
    2019 WI 34
    , ¶21, 
    386 Wis. 2d 122
    , 
    925 N.W.2d 112
    .
    DISCUSSION
    ¶8     As stated, Green Grove brought this action under WIS. STAT.
    § 82.23, alleging that Colby is required to share the costs of replacing the bridge
    pursuant to that provision. Section 82.23 states:
    Unless otherwise provided by statute or agreement, every
    highway bridge on a city, village, or town boundary shall
    be repaired and maintained by any adjoining municipality
    in which the bridge is located. The cost of repairs and
    maintenance shall be paid by the adjoining municipalities
    in proportion to the last equalized valuation of the property
    in the adjoining municipalities.
    The issue on appeal is whether an agreement “provide[s]” “otherwise,” rendering
    § 82.23’s default apportionment of costs inapplicable. As we explain below, we
    conclude that the 2010 agreement provides otherwise—specifically, that Green
    Grove is solely responsible for the costs of replacing the bridge—and we reject
    Green Grove’s arguments to the contrary. We further conclude that Green Grove
    fails to show that the 1929 agreement mandates a different result.
    4
    No. 2022AP1611
    I. The 2010 agreement controls.
    ¶9      In 2010, Green Grove and Colby entered into a “Road Maintenance
    Agreement for Meridian Avenue.” It states that “an agreement was reached by
    both Town Boards whereby the Town of Colby will maintain one mile of
    Meridian Avenue from Cloverdale Road to Popple River Road. The Town of
    Green Grove will maintain 1.64 miles of Meridian Avenue from Cloverdale Road
    to County Road N.” In other words, under the 2010 agreement, Colby is to
    maintain the part of Meridian Avenue south of where it intersects with Cloverdale
    Road, and Green Grove is to maintain the part of Meridian Avenue north of the
    Cloverdale Road intersection. The parties do not dispute that the bridge is located
    on the part of Meridian Avenue that Green Grove is responsible for maintaining
    under the 2010 agreement.
    ¶10     Under the 2010 agreement, Green Grove and Colby also agreed that
    Green Grove will “bill … Colby for .32 miles of road maintenance,” to account for
    the fact that Green Grove is responsible for maintaining more than half of
    Meridian Avenue along the Towns’ shared border. The 2010 agreement reflects
    an intent to make the Towns’ respective road maintenance obligations consistent
    with how they are designated on the “Wisconsin Department of Transportation
    Mileage Maps” (“Mileage Maps”), according to which “[t]he southern 1.32 miles
    belong to the Town of Colby and the northern 1.32 miles belong to the Town of
    Green Grove.”6
    6
    The parties do not explain what Mileage Maps are, but it appears that these maps refer
    to the plats that are filed by municipalities and used by the Department of Transportation to
    determine the amount of transportation aids provided to the municipalities. See WIS. STAT.
    § 86.302 (“[T]he board of every town … shall file with the [D]epartment [of Transportation] …
    every year, a certified plat of the municipality … showing the highways under its jurisdiction and
    (continued)
    5
    No. 2022AP1611
    ¶11     Before the 2010 agreement, the Towns’ respective road maintenance
    obligations were reversed:           Colby maintained Meridian Avenue north of
    Cloverdale Road, Green Grove maintained Meridian Avenue south of Cloverdale
    Road, and Green Grove reimbursed Colby for maintaining .32 miles of Meridian
    Avenue north of the Cloverdale Road intersection.
    ¶12     Colby argues that because the bridge is on the part of Meridian
    Avenue     that    Green     Grove     is   responsible for       maintaining      under     the
    2010 agreement, Green Grove is responsible for the costs of replacing the bridge
    pursuant to that agreement. As support, Colby relies on our supreme court’s
    holding in Town of Pella v. Town of Larabee, 
    164 Wis. 403
    , 
    160 N.W. 161
    (1916).
    ¶13     Pella similarly involved a dispute between neighboring towns
    regarding who would bear the costs of replacing a bridge on a town line road. 
    Id.
    An agreement between the towns of Pella and Larabee stated that Pella was
    responsible for maintaining the stretch of road that contained the bridge, but the
    agreement did not specifically allocate the responsibility for maintaining the
    bridge. 
    Id. at 404
    . Pella maintained the bridge for 16 years, but when the bridge
    had to be replaced following a flood, Pella sued Larabee to recover half the
    replacement costs. 
    Id.
     Our supreme court concluded that Pella was responsible
    for the bridge replacement costs, reasoning that such costs must be borne by the
    the mileage thereof to be open and used for travel …. The [D]epartment [of Transportation] may
    use the plats in making computations of transportation aids. One-half of the mileage of highways
    on boundary lines shall be considered as lying in each municipality or county.”). The parties do
    not dispute that the bridge is located on the part of Meridian Avenue that belongs to Green Grove
    according to the Mileage Maps—that is, the bridge is not located on the .32-mile portion of
    Meridian Avenue north of the Cloverdale Road intersection that, under the 2010 agreement,
    “belongs” to Colby but is maintained by Green Grove.
    6
    No. 2022AP1611
    town that maintains the portion of the road that contains the bridge. 
    Id. at 405
    . In
    so concluding, our supreme court adopted the reasoning of the circuit court, the
    latter of which concluded:
    The bridge as it was in 1897 must have been in the minds
    of the supervisors of the two towns when the highway was
    divided, though it was not mentioned. If it then had been
    deemed of importance enough to mention, the supervisors
    could have apportioned the expense of maintaining it ….
    That the bridge was not then mentioned and no provision
    made for its joint maintenance at least tends to warrant the
    conclusion that it was included in the first 120 rods of the
    highway which Pella was to maintain, because of the small
    cost of maintaining it.
    
    Id.
    ¶14    Colby argues that under Pella, Green Grove is solely responsible for
    replacing the bridge because, pursuant to the 2010 agreement, Green Grove is
    responsible for maintaining the portion of Meridian Avenue on which the bridge is
    located.       Thus, Colby contends that WIS. STAT. § 82.23’s default joint
    apportionment does not apply because the 2010 agreement provides otherwise.7
    We agree, and conclude that Green Grove’s attempts to distinguish Pella lack
    merit.
    7
    Colby also relies on attorney general opinions from 1926 and 1927, which are
    consistent with Town of Pella v. Town of Larabee, 
    164 Wis. 403
    , 
    160 N.W.2d 161
     (1916). See
    Milwaukee J. Sentinel v. City of Milwaukee, 
    2012 WI 65
    , ¶41, 
    341 Wis. 2d 607
    , 
    815 N.W.2d 367
     (“The opinions of the Attorney General are not binding on the courts but may be given
    persuasive effect.”). The attorney general opinions that Colby cites address facts similar to those
    here: two neighboring towns entered into an agreement regarding the maintenance of a town line
    highway, whereby they were each responsible for maintaining different sections of the highway.
    15 Wis. Op. Att’y Gen. 182-83 (1926); 16 Wis. Op. Att’y Gen. 646-47 (1927). The agreement
    was silent regarding the bridge. 16 Wis. Op. Att’y Gen. 646 (1927). The attorney general
    opinions conclude that the town that was responsible for maintaining the part of the highway on
    which the bridge was located was responsible for repairing and reconstructing the bridge.
    15 Wis. Op. Att’y Gen. 182-83 (1926); 16 Wis. Op. Att’y Gen. 647 (1927).
    7
    No. 2022AP1611
    ¶15    Green Grove argues that Pella is “a highway order case” that does
    not bear on the interpretation of the 2010 agreement, which is a contract.
    Although the circuit court in Pella referred to “the order dividing the highway,”
    our supreme court consistently referred to the “agreement” between the two towns.
    Pella, 
    164 Wis. at 404-05
    . Additionally, Green Grove does not argue why this
    distinction would matter for purposes of applying the holding from Pella on which
    Colby relies—namely, that, unless otherwise stated in an agreement, the town
    responsible in the agreement for maintaining a part of a highway containing a
    bridge is also responsible for maintaining and replacing that bridge.
    ¶16    Green Grove also argues that Pella is distinguishable because in
    Pella, the town of Pella had historically maintained the bridge on the stretch of
    road that was allocated to it in the agreement. Green Grove asserts that the parties
    here, pursuant to the 1929 agreement, have a history of jointly maintaining the
    bridge. However, the Pella court looked at the parties’ conduct after they entered
    into the agreement. 
    Id.
     As discussed in greater detail below, after the parties in
    this case entered into the 2010 agreement, Green Grove solely maintained the
    bridge. As to the parties’ conduct before the 2010 agreement, Green Grove’s
    assertion of a history of joint maintenance of the bridge is not supported by the
    summary judgment materials. Those materials show that prior to entering the
    2010 agreement, going back to at least 1985, Colby solely maintained the bridge.
    The facts here are thus consistent with those in Pella: in both instances, the town
    that was responsible for maintaining the part of the highway that contained the
    bridge also maintained the bridge. 
    Id.
    ¶17    Thus, Green Grove does not persuasively argue that Pella is
    distinguishable.    Furthermore, as we next explain, even if Pella were
    distinguishable as a “highway order case,” under ordinary principles of contract
    8
    No. 2022AP1611
    law, we would reach the same result—namely, that, under the 2010 agreement,
    Green Grove is responsible for the costs of maintaining the bridge.
    ¶18     As mentioned earlier, we consider extrinsic evidence when a
    contract is ambiguous, Town Bank, 
    330 Wis. 2d 340
    , ¶33, and the parties appear
    to agree that the 2010 agreement is ambiguous: Green Grove explicitly argues
    that the 2010 agreement’s “silence as to bridges is ambiguous,” and Colby argues
    that the circuit court properly considered extrinsic evidence when interpreting the
    2010 agreement.8 As set forth below, the summary judgment materials contain
    undisputed extrinsic evidence showing that the parties intended for Green Grove
    to be responsible for the costs of maintaining and replacing the bridge under the
    2010 agreement.
    ¶19     The summary judgment materials establish the following undisputed
    facts. Before entering the 2010 agreement, when Colby maintained the part of
    Meridian Avenue that includes the bridge, Colby maintained the bridge and did
    not seek contributions from Green Grove for the costs of doing so. The Towns
    intended for the 2010 agreement to flip their maintenance obligations regarding
    Meridian Avenue, and, consistent with this mutual intent, before entering the
    2010 agreement, Green Grove asked Colby for copies of bridge reports for the
    prior several years.
    8
    Green Grove argues that the circuit court should not have considered extrinsic evidence
    without first determining whether the 2010 agreement is ambiguous, but that is an argument that
    we need not address because our review on summary judgment is de novo. See Bauer v.
    Wisconsin Energy Corp., 
    2022 WI 11
    , ¶11, 
    400 Wis. 2d 592
    , 
    970 N.W.2d 243
    . On our de novo
    review, and for purposes of addressing Green Grove’s argument that the holding in Pella does not
    apply here, we accept the parties’ apparent positions that the 2010 agreement is ambiguous.
    9
    No. 2022AP1611
    ¶20    After entering the 2010 agreement, Green Grove’s town clerk
    emailed the office manager at the Highway Department of Clark County to obtain
    information regarding the bridge and when it might need to be replaced, saying
    that “the bridge on Meridian Avenue seems to be in a state that needs watching for
    possible replacement, now that we know it belongs to the Town of Green Grove.”
    Green Grove also began paying for the annual inspection of the bridge, including
    all labor and equipment, and did not ask Colby to contribute.
    ¶21    In addition, Mark Klein, who served as Green Grove’s town board
    chairperson from 2007 or 2009 until 2019, testified at a deposition to the
    following. When Green Grove first began seeking federal aid for the replacement
    of the bridge in 2013, he did not consult with Colby’s town board chairperson
    about the decision to replace the bridge. The replacement of the bridge was a
    topic at multiple Green Grove town meetings around this time, during those
    meetings there was no discussion about Colby contributing to the bridge
    replacement costs, and Green Grove assumed that Green Grove was entirely
    responsible for replacing the bridge. While Klein was Green Grove’s town board
    chairperson, up until April 2019, he had no discussions with any members of
    Colby’s town board regarding the bridge, and to his knowledge no one from Green
    Grove’s town board had ever contacted Colby town board members to express an
    understanding that Colby would contribute to the costs of replacing the bridge.
    ¶22    Also, according to the minutes from a Green Grove town meeting in
    2015, Green Grove’s town board approved an agreement regarding the funding for
    the bridge’s replacement, under which Green Grove would pay for the
    replacement costs of the bridge: “The state put together an agreement to help with
    funding for the Meridian Ave bridge that needs replacing, with the state paying
    80% and the town paying the rest.” The minutes do not reflect that any mention
    10
    No. 2022AP1611
    was made of Colby sharing the costs of replacing the bridge. Green Grove first
    sought to obtain from Colby a contribution to the costs of replacing the bridge in
    August 2019, after a new town board chairperson, David Frederick, was elected.
    ¶23     None of these facts are disputed, and they demonstrate an
    understanding between Green Grove and Colby that, under the 2010 agreement,
    Green Grove is responsible for maintaining and replacing the bridge.
    ¶24     Green Grove makes a number of arguments to the contrary, all of
    which we reject. First, Green Grove argues that there is a factual dispute about
    when Colby first learned that the bridge was being replaced. Frederick avers in an
    affidavit that he told Colby’s town board chairperson in 2016 which engineering
    firm Green Grove had hired for the bridge project, a conversation that Colby’s
    town board chairperson avers in an affidavit never occurred. But whether this
    conversation actually occurred is not a material fact. Viewing this in the light
    most favorable to Green Grove, as we must on summary judgment, even if we
    assume that Colby’s town board chairperson was aware in 2016 of which
    engineering firm Green Grove hired, that does not show that Green Grove and
    Colby intended to share the replacement costs of the bridge.
    ¶25     Second, Green Grove argues that to conclude that Green Grove is
    entirely responsible for maintaining the bridge under the 2010 agreement requires
    us, in effect, to improperly rewrite the 2010 agreement by inserting a bridge
    provision.   We disagree.   The 2010 agreement allocates to Green Grove the
    responsibility for maintaining the portion of Meridian Avenue that includes the
    bridge, which, consistent with all of the uncontested extrinsic evidence discussed
    above, allocates to Green Grove the responsibility for maintaining and replacing
    the bridge as part of the allocated portion of Meridian Avenue.
    11
    No. 2022AP1611
    ¶26    Third, Green Grove argues that it is not solely responsible for the
    costs of replacing the bridge because of language in the 2010 agreement that
    states, “This contract does not include any major road upgrades or culvert
    replacement. If major upgrades need to be undertaken, it will be the responsibility
    of the Town of Colby to provide those upgrades or culvert replacement, and
    inform the Town of Green Grove of such work in progress.” It is clear from
    context, however, that this language applies specifically to the Towns’ agreement
    regarding the .32 miles of Meridian Avenue north of the intersection with
    Cloverdale Road. The 2010 agreement first explains why the parties entered into
    the agreement—so that the Towns’ maintenance responsibilities for Meridian
    Avenue are consistent with the Wisconsin Department of Transportation’s
    Mileage Maps—and then states that Colby will maintain the southern 1 mile of
    Meridian Avenue and that Green Grove will maintain the northern 1.64 miles.
    After that, the 2010 agreement states:
    The Town of Green Grove will bill the Town of
    Colby for .32 miles of road maintenance, based on the
    appropriate yearly road aid formulas.
    Now therefore, the parties hereby agree, effective
    July 1[,] 2010, to the following:
    1. Town of Colby agrees to pay the Town of Green
    Grove for maintenance of Meridian Avenue from
    the corner of Cloverdale Road north, .32 miles
    subject to the following conditions:
    a. Addition of road granite and grading as
    needed.
    b. Clearing of brush in ditches to maintain
    visibility and proper drainage.
    c. Clearing of snow and ice during winter
    months.
    12
    No. 2022AP1611
    2. The Town of Green Grove agrees to provide
    their services to the best of their ability, and to
    abide by this contract between the two parties.
    3. This contract does not include any major road
    upgrades or culvert replacement.     If major
    upgrades need to be undertaken, it will be the
    responsibility of the Town of Colby to provide
    those upgrades or culvert replacement, and
    inform the Town of Green Grove of such work in
    progress.
    The language that Green Grove quotes is the last of three numbered items that
    apply specifically to the agreement between the two Towns that Green Grove will
    maintain the .32 miles north of the Cloverdale Road intersection, for which Colby
    will reimburse Green Grove. The three numbered items immediately follow the
    language stating that Green Grove will bill Colby for .32 miles of road
    maintenance.
    ¶27      These numbered items also state that Green Grove will provide
    maintenance to the best of its ability, and they make Colby responsible for major
    upgrades and culvert replacement.        Although this makes sense regarding the
    parties’ agreement as to the .32 mile stretch of Meridian Avenue that Green Grove
    will maintain, for which Colby will reimburse Green Grove, this would not make
    sense regarding the parties’ larger maintenance agreement for the rest of Meridian
    Avenue. For example, under Green Grove’s reading, Colby would be responsible
    for major road upgrades anywhere on Meridian Avenue, even on the northern
    1.32 miles that Green Grove was otherwise supposed to maintain and that the
    Mileage Maps show belong to Green Grove.              In addition, whereas the 2010
    agreement generally refers to “this agreement,” the three numbered list items
    regarding the maintenance of the .32-mile part of Meridian Avenue refer to “this
    contract,” thereby distinguishing between the larger “agreement” regarding the
    Towns’ respective responsibilities for all of Meridian Avenue, and the more
    13
    No. 2022AP1611
    specific “contract” regarding the .32-mile part of Meridian Avenue north of the
    intersection with Cloverdale Road.9
    ¶28     Fourth, Green Grove argues that “[s]ome of [the extrinsic evidence]
    is innocuous; some of it does not necessarily speak on behalf of the party, Green
    Grove; and some of this is out of Green Grove’s hands.” However, Green Grove
    does not develop this argument—that is, Green Grove does not identify which
    evidence cannot be considered and for which reason, and it provides no supporting
    legal authority. Accordingly, we do not address this argument. See State v. Pettit,
    
    171 Wis. 2d 627
    , 646, 
    492 N.W.2d 633
     (Ct. App. 1992) (stating that we need not
    address undeveloped arguments or arguments that are unsupported by references
    to legal authority).
    ¶29     Finally, Green Grove argues that the administrative paperwork for
    the Wisconsin Department of Transportation’s Local Bridge Program “is not
    legally relevant.” Green Grove appears to argue that the circuit court erred by
    considering: (1) the fact that Green Grove listed itself as the owner of the bridge
    when it submitted its application to replace the bridge, and (2) the fact that Green
    Grove did not demand that Colby pay for a share of the bridge until after the
    9
    We observe that Frederick—who, before becoming Green Grove’s town board
    chairperson, served as a member of Green Grove’s town board, and who signed the
    2010 agreement in that capacity—avers in an affidavit submitted with Green Grove’s second
    motion for summary judgment that he “ha[s] never understood the [2010] [a]greement to mean
    that Green Grove would replace the bridge at Green Grove’s expense without any contribution
    from Colby.” Instead, he avers that he “ha[s] always understood that the [a]greement is for Colby
    to pay Green Grove for performing basic road maintenance such as adding and grading gravel,
    brushing, and snow removal on a 0.32 mile length of Meridian Avenue.” However, as explained
    above, this understanding of the 2010 agreement is inconsistent with the terms of the agreement,
    and in any event, we do not consider conclusions of law asserted in affidavits. Bilda v.
    Milwaukee County, 
    2006 WI App 159
    , ¶48, 
    295 Wis. 2d 673
    , 
    722 N.W.2d 116
     (“Affidavits
    which contain … conclusions of law must be disregarded.”).
    14
    No. 2022AP1611
    bridge was completed, which Green Grove argues is attributable to how the Local
    Bridge Program is administered. That the circuit court considered these facts is
    inconsequential because our review is de novo, and we do not rely on them on
    appeal.
    II. The 1929 agreement does not control.
    ¶30    Green Grove argues that, as a result of the 1929 agreement, Green
    Grove and Colby are jointly responsible for the costs of replacing the bridge. We
    disagree.
    ¶31    As mentioned above, after the circuit court denied the parties’ initial
    cross-motions for summary judgment, Green Grove discovered an entry in its
    official record book from 1929. The entry states:
    [W]e the undersigned town boards of the towns of
    Green Grove and Colby at a meeting of said towns held in
    the town hall in the town of Green Grove on June 19[,]
    1929[,] do agree and order that the town line road between
    said towns be divided as follows in regards to maintenance
    and upkeep beginning at the South East corner of the town
    of Green Grove and the South West corner of the town of
    Colby thence running North on said line we allot to the
    town of Green Grove the first mile on said line to maintain
    and the next mile to the town of Colby to maintain[,] the
    Bridges still be maintain[ed] as before jointly of both
    towns[.]
    This agreement to take effect immediately[.]
    (Emphasis added.)
    ¶32    Green Grove argues that this entry is a type of “highway order”
    under WIS. STAT. § 82.21 and its predecessor WIS. STAT. § 80.11 (1929) that can
    only be modified under that statute, and that it thus could not be modified by the
    15
    No. 2022AP1611
    subsequent 2010 agreement.10 Alternatively, Green Grove argues that even if the
    1929 entry is an agreement rather than a highway order, the agreement’s allocation
    of responsibility for maintaining the bridge still controls because the
    2010 agreement is silent regarding maintenance of the bridge specifically. We
    address, and reject, each argument in turn.11
    A. The 1929 agreement is not an order issued pursuant to WIS.
    STAT. § 80.11.
    ¶33     Green Grove argues that the 1929 agreement is what Green Grove
    alternatively labels “a highway order,” an “apportionment order,” or “an
    apportionment highway order,” issued pursuant to WIS. STAT. § 80.11 (1929). As
    a result, Green Grove argues, the 1929 agreement can only be modified by that
    statute, meaning that it could not be modified by the 2010 agreement. In contrast,
    Colby characterizes the 1929 entry in Green Grove’s official record book for 1929
    as “at best, nothing more than an ‘agreement’ that ‘divided’ responsibilities” for
    Meridian Avenue. We conclude that Green Grove has not shown on summary
    judgment that the 1929 agreement is an order under § 80.11 (1929).
    ¶34     In 1929, town boards issued highway orders to lay out, alter, widen,
    or discontinue highways. See WIS. STAT. § 80.07 (1929) (“Whenever the [town]
    supervisors shall lay out, alter, widen or discontinue any highway they shall make
    10
    The parties do not dispute that WIS. STAT. § 82.21 and WIS. STAT. § 80.11 (1929) are
    substantively similar.
    11
    Green Grove also argues that the 1929 order “cannot be challenged as evidence.”
    Because Colby does not “challenge[]” the 1929 agreement “as evidence,” we do not address this
    argument.
    16
    No. 2022AP1611
    and sign an order therefor ….”).12 Besides being laid out in highway orders,
    highways may also be established by “user.” See Town of Muskego v. Town of
    Vernon, 
    19 Wis. 2d 159
    , 
    119 N.W.2d 474
     (1963) (referring to highways not laid
    out in highway orders as having their “origins in user”); WIS. STAT. § 80.01(2)
    (1929) (“All roads not recorded which shall have been or shall be used and worked
    as public highways ten years or more shall be deemed public highways ….”).
    Highway orders for town line highways could designate which town was
    responsible for which part of the town line highway.             WIS. STAT. § 80.11(3)
    (1929) (“[The town supervisors], upon laying out, altering or widening [a town
    line] highway may determine, in the [highway] order, what part of such highway
    shall be made and kept in repair by each town ….”). Under certain circumstances,
    maintenance responsibilities for town line highways could be reapportioned after
    the highway order for the town line highway had been issued. In 1929, § 80.11(4)
    stated:
    If by any change of the boundaries of either or both such
    towns the territory of either shall be increased or
    diminished, or in the event a portion of said town line
    highway is or has been taken over by the state or county
    under the state or county highway system, or if a new town
    or village be formed out of a part of the territory of either
    or both of said towns, having a portion of such town line
    highway within its borders, that part of such order fixing
    their liabilities shall be deemed vacated, and a majority of
    the supervisors of each such town shall, before the time for
    making the next tax roll, meet together with a majority of
    the supervisors of such new town or, with the president of
    such village, and all of them when so convened shall, if
    they can agree, make a new order apportioning the
    liabilities on account of such highway ….
    A “highway order” is currently defined as “an order laying out, altering, or
    12
    discontinuing a highway or a part of a highway.” WIS. STAT. § 82.01(3).
    17
    No. 2022AP1611
    See also Town of Whitewater v. Town of Richmond, 
    204 Wis. 388
    , 392, 
    235 N.W. 773
    , 774 (1931) (“[T]he law at all times did, and now does, empower the
    [town] supervisors to make [an] apportionment [of a town line highway] only in
    and by their order laying out the highway.”).
    ¶35      There are thus a limited number of circumstances under which
    Green Grove and Colby could have, in 1929, apportioned maintenance
    responsibilities for Meridian Avenue pursuant to WIS. STAT. §80.11 (1929). As
    stated, they could have apportioned the maintenance responsibilities for Meridian
    Avenue in a highway order laying out, altering, widening, or discontinuing
    Meridian Avenue. See § 80.11(3) (1929). However, the 1929 agreement does not
    purport to lay out, alter, widen, or discontinue Meridian Avenue. Indeed, the
    parties do not dispute that Meridian Avenue existed as far back as 1892, and
    Green Grove concedes that Meridian Avenue has never been altered or
    discontinued.
    ¶36      Otherwise, if Green Grove and Colby had earlier issued a highway
    order that apportioned maintenance responsibilities, they could have reapportioned
    those responsibilities if the boundaries of Green Grove or Colby changed, if a
    portion of Meridian Avenue became a state or county highway, or if a new town or
    village formed within Green Grove or Colby that contained a part of Meridian
    Avenue. See WIS. STAT. § 80.11(4) (1929). However, Green Grove does not
    identify any evidence in the summary judgment materials showing that Meridian
    Avenue was ever initially apportioned in a highway order, nor does Green Grove
    identify evidence showing that any of the circumstances that would allow
    Meridian Avenue to be reapportioned pursuant to § 80.11(4) (1929) preceded the
    1929 agreement. Indeed, Green Grove concedes that “there is no record of what
    scenario occurred in 1929,” and instead argues that it does not matter.
    18
    No. 2022AP1611
    ¶37    Green Grove argues that it does not matter because “[t]here was no
    other legal authority in existence in 1929 for the creation of the 1929 Order other
    than [WIS. STAT.] § 80.11 (1929).” As a result, Green Grove argues, “the only
    possible conclusion” is that the 1929 agreement is an apportionment order that was
    issued pursuant to § 80.11 (1929).
    ¶38    In support of this argument, Green Grove cites Whitewater. There,
    the towns of Whitewater and Richmond entered into an agreement in 1842 that
    apportioned parts of a town line highway for each town to maintain. Whitewater,
    
    204 Wis. 2d 388
    . The towns then entered into a subsequent agreement in 1923
    that reapportioned the town line highway. 
    Id.
     When Whitewater sued to enforce
    the 1923 agreement, our supreme court concluded that the town line highway
    could only be apportioned “in and by [the] order laying out the highway,” and that
    the 1923 agreement, which did not do so, was thus void. Id. at 392. Whitewater
    does not support Green Grove’s argument. Even if the 1929 agreement could have
    only lawfully been created pursuant to WIS. STAT. § 80.11 (1929), the 1929
    agreement here, like the agreement in Whitewater, would have been made without
    legal authority, rendering it void.
    ¶39    More importantly, we disagree that WIS. STAT. § 80.11 (1929)
    provided the only lawful means through which the Towns could have apportioned
    the maintenance of Meridian Avenue. In response to Green Grove’s argument that
    a highway order or apportionment order is the only means to apportion
    maintenance responsibilities of a town line highway, Colby argues that towns have
    freedom to contract with one another regarding maintenance, citing Town of Eau
    Galle v. Town of Waterville, 
    207 Wis. 389
    , 
    241 N.W. 377
     (1932). Green Grove
    does not address Eau Galle in its reply brief, which we take as a concession that
    Colby is correct. See United Coop. v. Frontier FS Coop., 
    2007 WI App 197
    , ¶39,
    19
    No. 2022AP1611
    
    304 Wis. 2d 750
    , 
    738 N.W.2d 578
     (failure by appellant to respond in reply brief to
    an argument made in respondent’s brief may be taken as a concession).
    ¶40    In Eau Galle, our supreme court concluded that “towns have implied
    or inherent power to arrange for the convenient maintenance of [a town line
    highway that has its origins in user],” and that “the natural and reasonable
    arrangement under such circumstances is for each town, by agreement with the
    other town, to take over or assume the repair of a specific portion of the highway.”
    Eau Galle, 
    207 Wis. at 394
    . The Eau Galle court explained that “[t]he power of
    the towns to divide the highway was implied, and quite apart from the express
    power conferred upon the supervisors at the time of laying out the highway.” 
    Id. at 395
    . In Eau Galle, the court specifically rejected an argument similar to the
    one Green Grove raises here:
    The premise that the commissioners had no authority to act
    is based upon the provision that no one acting for the town
    has authority to make a division of a town line highway
    except the supervisors, and they, formerly, were required to
    act at the time of laying out the highway. However, this is
    not a legally laid out town line highway. This highway
    came into existence as a legal highway by user. The power
    of the towns to divide the highway was implied, and quite
    apart from the express power conferred upon the
    supervisors at the time of laying out the highway.
    
    Id.
     Here, there is no evidence in the summary judgment materials that Meridian
    Avenue was ever laid out in a highway order. Indeed, the parties do not dispute
    that there is no evidence explaining how Meridian Avenue was established. Green
    Grove has thus failed to establish on summary judgment that the 1929 order must
    necessarily be an apportionment order under WIS. STAT. § 80.11 (1929).
    ¶41    Green Grove also appears to argue that even if the 1929 agreement is
    an agreement rather than an apportionment order, it was “protected by” and
    20
    No. 2022AP1611
    “covered by” WIS. STAT. § 82.21(4)(d), which states:        “Any written order or
    agreement made before August 27, 1947, by a majority of the supervisors of each
    town concerned, acting together, apportioning, or reapportioning a town line
    highway has the same effect as though made on or after August 27, 1947.” Green
    Grove does not otherwise develop this argument, but appears to assert that under
    § 82.21(4)(d), pre-1947 maintenance agreements are equivalent to apportionment
    orders. This assertion is unsupported by the text of § 82.21(4)(d), and Green
    Grove provides no additional authority to support it. We reject it on that basis.
    See Pettit, 171 Wis. 2d at 646.
    B. The 2010 agreement does not leave intact the 1929 agreement’s
    bridge provision.
    ¶42    Alternatively, Green Grove argues that if the 1929 agreement is not
    a highway order, but is instead an agreement or contract, then “the
    2010 [a]greement fails because its silence as to the Bridge means that the
    2010 [a]greement did not modify the terms specific to bridges in the 1929 Order.”
    Colby responds that Green Grove and Colby were unaware of the 1929 agreement
    when they entered the 2010 agreement, and that as a result they could not have
    intended for the 2010 agreement to leave intact the bridge provision from the
    1929 agreement.
    ¶43    “The primary goal in interpreting a contract is to determine and give
    effect to the parties’ intention.” Wisconsin Label Corp. v. Northbrook Prop. &
    Cas. Ins. Co., 
    2000 WI 26
    , ¶23, 
    233 Wis. 2d 314
    , 
    607 N.W.2d 276
    ; see also
    Estreen v. Bluhm, 
    79 Wis. 2d 142
    , 152, 
    255 N.W.2d 473
     (1977) (“[A] modified
    agreement should be construed in connection with the original contract in order to
    ascertain the intent of the parties.”). The parties do not dispute that neither Green
    Grove nor Colby knew that the 1929 agreement existed until after Green Grove
    21
    No. 2022AP1611
    discovered the agreement during litigation. For example, in Green Grove’s reply
    brief supporting its first motion for summary judgment, which it submitted before
    it knew of the 1929 agreement, it argued that “[t]he [2010] [a]greement was a new
    agreement and it is not apparent that there was anything previously in writing.”
    Consistent with this, the 2010 agreement does not mention or otherwise reflect an
    intent to modify an earlier agreement. And, as discussed above, the undisputed
    extrinsic evidence shows that, contrary to the 1929 agreement’s bridge provision,
    the parties intended that Green Grove will be responsible for maintaining the
    bridge under the 2010 agreement. See Estreen, 
    79 Wis. 2d at 153-54
     (considering
    extrinsic evidence as to the parties’ intent to determine whether a contract
    abrogated the terms of prior contracts).
    ¶44    Green Grove argues that there is evidence that Colby and Green
    Grove adhered to the 1929 agreement. Specifically, Green Grove argues that
    before the 2010 agreement, and consistent with the 1929 agreement, Green Grove
    was responsible for maintaining the southern portion of Meridian Avenue, while
    Colby was responsible for maintaining the northern portion.          However, the
    undisputed evidence in the summary judgment materials shows that the parties
    were not, from at least 1985 until 2010, complying with the 1929 agreement as it
    related to the Towns’ maintenance responsibilities for the bridge. In his affidavit,
    Colby’s town board chairperson avers that before 2010, Colby maintained and
    repaired the bridge at its own expense, as part of the stretch of Meridian Avenue
    for which it was responsible. Similarly, in response to an interrogatory from
    Green Grove asking for a description of Colby’s maintenance of Meridian Avenue
    prior to the 2010 agreement, Colby’s town board chairperson stated that Colby’s
    maintenance included “work to the bridge.” That Colby, prior to 2010 and going
    back at least as far as 1985, maintained and repaired the bridge at its own expense
    22
    No. 2022AP1611
    is undisputed, and it is inconsistent with the 1929 agreement as it relates to
    bridges.
    ¶45     Green Grove also argues that the 1929 agreement’s bridge provision
    is still in effect because the 2010 agreement’s “silence as to bridges is ambiguous
    and not unequivocal.” As support, Green Grove cites Carnes Co. v. Stone Creek
    Mechanical, Inc., 
    412 F.3d 845
    , 853 (7th Cir. 2005), which states that “[t]he acts
    relied upon to modify a prior contract must be unequivocal” and not ambiguous.
    However, as apparent from the quoted language, this case law discusses what is
    required to show an implied modification of an agreement through the parties’
    conduct, and thus does not support Green Grove’s argument.
    ¶46     For these reasons, we conclude, based on the undisputed evidence,
    that when the parties entered the 2010 agreement, they did not do so intending to
    leave intact the 1929 agreement’s bridge provision. As explained above, the
    undisputed extrinsic evidence shows that the parties intended for Green Grove to
    assume responsibility for maintenance of the bridge under the 2010 agreement.13
    13
    Green Grove makes a number of additional arguments, all of which we reject. First,
    Green Grove points to maintenance agreements between Green Grove and other neighboring
    towns, which Green Grove argues are similar to the 1929 agreement. However, Green Grove
    does not explain the circumstances or the legal significance of these other agreements, and we
    thus do not consider them. See State v. Pettit, 
    171 Wis. 2d 627
    , 646, 
    492 N.W.2d 633
     (Ct. App.
    1992).
    Green Grove also argues that it is “entitled to its reasonable expenses incurred in proving
    the issue of the 1929 Order” pursuant to WIS. STAT. § 804.12(3), apparently asking that we make
    such an award. However, § 804.12(3) does not support making such an award on appeal, and
    Green Grove does not otherwise cite any authority to support this argument. On that basis, we
    need not consider it. See Pettit, 
    171 Wis. 2d 627
    , 646 (we need not consider arguments that are
    undeveloped and unsupported by legal authority).
    Green Grove further argues that Colby submitted improperly pled facts on summary
    judgment. Specifically, Green Grove points to averments in an affidavit from Colby’s
    chairperson that he knew when the Towns were created from “review[ing] Colby’s historical
    (continued)
    23
    No. 2022AP1611
    CONCLUSION
    ¶47     For the reasons stated, we affirm the circuit court’s order granting
    summary judgment in favor of Colby.
    By the Court.—Order affirmed.
    Not recommended for publication in the official reports.
    records as well as the history of the townships in Clark County.” Green Grove argues that Colby
    violated WIS. STAT. § 802.08(3) because the records relied on were not attached to the affidavit
    and had not already been shared in discovery, and that as a result we should disregard those
    averments in the affidavit relating to when the Towns were created. However, Green Grove does
    not explain why these averments are consequential, and even if we assume that Green Grove is
    correct and we disregard them, our analysis remains unchanged.
    24
    

Document Info

Docket Number: 2022AP001611

Filed Date: 5/2/2024

Precedential Status: Non-Precedential

Modified Date: 9/9/2024