  • IN THE SUPREME COURT OF APPEALS OF WEST VIRGINIA
    September 2015 Term
    FILED
    November 10, 2015
    released at 3:00 p.m.
    RORY L. PERRY II, CLERK
    SUPREME COURT OF APPEALS
    No. 15-0635                      OF WEST VIRGINIA
    WISEMAN CONSTRUCTION COMPANY, INC.,
    Defendant Below, Petitioner
    v.
    MAYNARD C. SMITH CONSTRUCTION COMPANY, INC.,
    Plaintiff Below, Respondent,
    DAVID TINCHER, DIRECTOR OF THE PURCHASING
    DIVISION OF THE DEPARTMENT OF ADMINISTRATION;
    THE WEST VIRGINIA LOTTERY COMMISSION;
    JOHN C. MUSGRAVE, DIRECTOR OF THE WEST VIRGINIA
    LOTTERY; JASON PIZATELLA, CABINET SECRETARY
    OF THE DEPARTMENT OF ADMINISTRATION;
    AND ROBERT S. KISS, CABINET SECRETARY
    OF THE DEPARTMENT OF REVENUE,
    Defendants Below, Respondents
    Appeal from the Circuit Court of Kanawha County
    The Honorable Jennifer F. Bailey, Judge
    Civil Action No. 15-P-157
    AFFIRMED
    Submitted: October 14, 2015
    Filed: November 10, 2015
    James M. Cagle, Esq.                                  John Philip Melick, Esq.
    Charleston, West Virginia                             Nicklaus A. Presley, Esq.
    Attorney for Petitioner                               JACKSON KELLY PLLC
    Wiseman Construction Company, Inc.                  Charleston, West Virginia
    Attorneys for Respondent
    Patrick Morrisey, Esq.                                  Maynard C. Smith Construction
    Attorney General                                        Company, Inc.
    Kelli D. Talbott, Esq.
    Senior Deputy Attorney General
    Greg S. Foster, Esq.
    Assistant Attorney General
    Charleston, West Virginia
    Attorneys for State Respondents
    CHIEF JUSTICE WORKMAN delivered the Opinion of the Court.
    JUSTICE DAVIS, deeming herself disqualified, did not participate in the decision in this
    case.
    JUDGE JAMES H. YOUNG, JR., sitting by temporary assignment.
    SYLLABUS BY THE COURT
    1.     “An unsuccessful bidder, who has been unlawfully deprived of a
    contract by agency action under the State purchasing statutes, W.Va. Code, 5A-3-1 et
    seq., has standing to prosecute an action in mandamus to require that the contract be
    awarded to him or for an injunction to enjoin violation of the requirement that contracts
    be awarded to the lowest responsible bidder. Syllabus pt. 2 of Pioneer Co. v. Hutchinson,
    [159] W.Va. [276], 
    220 S.E.2d 894
    (1975) is overruled.” Syl. Pt. 1, State ex rel. E. D. S.
    Fed. Corp. v. Ginsberg, 
    163 W. Va. 647
    , 
    259 S.E.2d 618
    (1979).
    2.     “A de novo standard of review applies to a circuit court’s decision to
    grant or deny a writ of mandamus.” Syl. Pt. 1, Harrison Cty. Comm’n v. Harrison Cty.
    Assessor, 
    222 W. Va. 25
    , 
    658 S.E.2d 555
    (2008).
    3.     “‘“Mandamus lies to require the discharge by a public officer of a
    nondiscretionary duty.” Point 3 Syllabus, State ex rel. Greenbrier County Airport
    Authority v. Hanna, 151 W.Va. 479[, 
    153 S.E.2d 284
    (1967)].’ Syllabus point 1, State ex
    rel. West Virginia Housing Development Fund v. Copenhaver, 153 W.Va. 636, 
    171 S.E.2d 545
    (1969).” Syl. Pt. 1, State ex rel. Williams v. Dep’t of Military Affairs, 212
    W.Va. 407, 
    573 S.E.2d 1
    (2002).
    4.     The Director of Purchasing may waive minor irregularities in bids or
    specifications pursuant to West Virginia Code of State Rules § 148-1-4 (2015) as part of
    i
    the decision to award a government construction contract to the “lowest qualified
    responsible bidder,” as defined by West Virginia Code § 5-22-1(b)(1) (2015), so that the
    purchasing value of public funds is maximized to the fullest extent practicable. However,
    he or she may not treat substantive requirements of the public procurement laws, the
    advertisement for bids, or the bid forms as mere informalities in order to justify the
    decision to waive a deviation in a bid.
    5.     A state agency which awards a public contract to the lowest
    qualified responsible bidder under the West Virginia Fairness In Competitive Bidding
    Act, West Virginia Code §§ 5-22-1 to -2 (2015), is clothed with the presumption that it
    has properly discharged its duties. Accordingly, the burden of proof in an action
    challenging the award of a contract by an unsuccessful bidder or a taxpayer is upon the
    challenger, who must show the agency’s actions were arbitrary, capricious, or an abuse of
    discretion. In conducting a review of the competitive bidding process, courts should
    consider whether there is a rational basis for the administrative decision. This standard
    requires courts to examine the bidding procedures utilized to ensure they provided a fair
    process and incorporated sufficient controls to safeguard against abuses.
    ii
    Workman, Chief Justice:
    Respondent Maynard C. Smith Construction Company, Inc. (hereinafter
    “MCS”), the low bidder on a government construction contract, filed suit to rescind the
    contract awarded to the next low bidder, Petitioner Wiseman Construction Company, Inc.
    (hereinafter “Wiseman”). Following an evidentiary hearing, the Circuit Court of
    Kanawha County, West Virginia, made detailed findings of fact and conclusions of law
    finding that the determination to disqualify MCS “was not rational” and “was based upon
    an ambiguous ‘requirement’ set forth in the bid documents that was of no consequence”
    to the goal of the State to ensure the work was performed by the lowest qualified
    responsible bidder. The circuit court granted MCS’s petition for writ of mandamus and
    ordered that the contract be awarded to MCS. Wiseman appealed.
    The question before this Court is whether the public officials with the
    Purchasing Division of the Department of Administration and the Lottery Commission
    (hereinafter collectively the “Agency”)1 exercised reasonable discretion in determining
    Wiseman was the lowest qualified responsible bidder on the project. For the reasons that
    follow, we find the Agency did not, and we affirm the judgment of the circuit court.
    1
    Respondents David Tincher, Director of the Purchasing Division of the
    Department of Administration, the West Virginia Lottery Commission, John C.
    Musgrave, Director of the West Virginia Lottery, Jason Pizatella, Cabinet Secretary of
    the Department of Administration, and Robert S. Kiss, Cabinet Secretary of the
    Department of Revenue, filed a joint summary response.
    1
    I. FACTUAL AND PROCEDURAL HISTORY
    The Agency initiated the competitive bidding process to procure
    construction work on the Lottery’s existing headquarters in Charleston, West Virginia.
    The Agency’s instructions to bidders stated that “Bidders shall use complete sets of
    Bidding documents in preparing Bids.” Six companies submitted bids on the approved
    bid form. MCS submitted the lowest bid at $7,630,800. Wiseman’s bid was second-
    lowest at $7,786,000. The Agency initially recommended that the project be awarded to
    MCS; by letter dated March 10, 2015, the Agency informed MCS that it was “the
    apparent successful bidder” on the contract.2
    On March 19, 2015, Wiseman e-mailed the Agency and requested that
    MCS’s bid be disqualified because MCS did not submit a “qualification statement” as set
    forth in the bid documents; bidders were directed to include at least three references from
    other projects consisting of door replacement and other related construction operations
    similar to those required on the project.3 The bid documents erroneously provided that
    2
    In this letter, the Agency requested MCS provide performance, maintenance, and
    payment bonds, insurances, and a current contractor’s license. MCS submitted all of the
    items requested by the Agency.
    3
    Specifically, the instructions to bidders provided:
    1.07 Qualification Statement
    A.	 The qualified Contractor shall have completed a minimum
    of three (3) projects consisting in part or in whole of
    building entrance and door replacement including
    (continued . . .)
    2
    “[t]he Proposal Form includes a section in which the references should be listed.”
    However, neither “Section I” nor “Section II” of the Agency’s bid form included a
    section in which the references could be listed. Furthermore, no information concerning
    references was among the specified “Required Documents” or was otherwise addressed
    in the Agency’s published requests for bids. Nevertheless, three of the six bidders
    (including Wiseman) submitted references on documents which were not part of the
    mandatory bid form.4 The three other bidders (including MCS) submitted their proposals
    on the bid form without attaching any documentation concerning references.
    After receiving Wiseman’s protest, employees of the Lottery Commission
    reviewed the bidding documents and consulted with employees of the Purchasing
    Division. The employees believed they did not have the discretion to waive the
    qualification statement; they determined it was a mandatory requirement because the
    selective demolition, carpentry, installation of replacement
    door frames, door and door hardware, remedial room
    finishing, and other related construction operations similar
    to those required on this project. All bidders shall include
    at least three (3) references indicating their having
    completed the three projects as detailed above. References
    should include the name, location, ownership, and use of
    the building in addition to the name, address and
    telephone number of a contact person with the building’s
    owner familiar with the work completed by the
    Contractor. The Proposal Form includes a section in
    which the references should be listed.
    4
    Wiseman included a list of references on a form not familiar to the Director of
    Purchasing but apparently taken from “page 6” of some other bid package. The other two
    contractors provided references on their own stationery.
    3
    directions provided that bidders “shall include” a list of references on the proposal form.
    Ultimately, Respondent David Tincher, the Director of Purchasing, awarded the contract
    to Wiseman after disqualifying MCS for failure to include the references. MCS protested
    this decision and Mr. Tincher denied the protest without a hearing on April 21, 2015.
    On April 22, 2015, MCS filed a petition for writ of mandamus and
    complaint for declaratory and injunctive relief. At the April 30, 2015, hearing before the
    circuit court, the Agency called two witnesses, Mr. Tincher and Danielle Boyd, the
    Lottery’s general counsel. Mr. Tincher testified that the Agency did not believe it had the
    authority to waive the qualification statement: “We felt like our hands were tied.” Ms.
    Boyd testified that the Agency never contacted the references provided by Wiseman. She
    stated the architect on the project had experience working with both MCS and Wiseman
    and felt they were qualified bidders. The witnesses could not explain who specifically
    requested that the bidders list references or why references were requested for this
    project.
    By order entered June 22, 2015, the circuit court granted MCS’s petition for
    writ of mandamus and ordered the Agency to award the contract to MCS. The circuit
    court found that the Agency’s decision to disqualify MCS’s bid was not “rational”
    because the requirement that bidders submit references was ambiguous and served no
    purpose. The circuit court cited West Virginia Code of State Rules § 148-1-4.6 (2015),
    which permits the Purchasing Director to “[w]aive minor irregularities in bids or
    4
    specifications when the Director determines such action to be appropriate[.]” The circuit
    court concluded, in part, that
    [i]t is fundamentally unfair for State agencies to pit qualified,
    sophisticated well-established businesses against one another
    to argue about the purpose of language in bid documents that
    no one in charge can explain where the language came from
    or why it was there or how vendors were supposed to furnish
    it, and even upon review of the bids, was never utilized or
    relied upon. It is indeed this conduct that is shocking to the
    conscience of the [c]ourt.
    Wiseman timely appealed this order.
    II. STANDARD OF REVIEW
    We are asked to review the circuit court’s order granting MCS’s petition for
    writ of mandamus. As a preliminary matter, we note that a disappointed bidder has
    standing to judicially challenge the award of a public contract to another bidder. In
    syllabus point one of State ex rel. E. D. S. Fed. Corp. v. Ginsberg, 
    163 W. Va. 647
    , 
    259 S.E.2d 618
    (1979), this Court held:
    An unsuccessful bidder, who has been unlawfully
    deprived of a contract by agency action under the State
    purchasing statutes, W.Va. Code, 5A-3-1 et seq., has standing
    to prosecute an action in mandamus to require that the
    contract be awarded to him or for an injunction to enjoin
    violation of the requirement that contracts be awarded to the
    lowest responsible bidder. Syllabus pt. 2 of Pioneer Co. v.
    Hutchinson, W.Va., 
    220 S.E.2d 894
    (1975) is overruled.
    On appeal, our standard of review is de novo. In syllabus point one of
    Harrison County Commission v. Harrison County Assessor, 
    222 W. Va. 25
    , 
    658 S.E.2d 5
    555 (2008), this Court held: “A de novo standard of review applies to a circuit court’s
    decision to grant or deny a writ of mandamus.” Under this standard, “‘we consider de
    novo whether the legal prerequisites for mandamus relief are present.’” McComas v. Bd.
    of Educ. of Fayette Cty., 197 W.Va. 188, 193, 
    475 S.E.2d 280
    , 285 (1996) (quoting State
    ex rel. Cooper v. Caperton, 196 W.Va. 208, 214, 
    470 S.E.2d 162
    , 168 (1996)). Therefore,
    we take note that
    “‘[m]andamus lies to require the discharge by a public officer
    of a nondiscretionary duty.’ Point 3 Syllabus, State ex rel.
    Greenbrier County Airport Authority v. Hanna, 151 W.Va.
    479[, 
    153 S.E.2d 284
    (1967)].” Syllabus point 1, State ex rel.
    West Virginia Housing Development Fund v. Copenhaver,
    153 W.Va. 636, 
    171 S.E.2d 545
    (1969).
    Syl. Pt. 1, State ex rel. Williams v. Dep’t of Military Affairs, 212 W.Va. 407, 
    573 S.E.2d 1
    (2002). With these principles in mind, we consider the merits of the parties’ arguments.
    III. DISCUSSION
    Wiseman seeks our reversal of the circuit court’s order granting MCS’s
    petition for writ of mandamus and directing the Agency to award the contract to MCS.
    Wiseman argues that the circuit court misapplied the standard of review articulated in
    Ginsberg and instead substituted its judgment for that of the Agency’s. MCS responds
    that the circuit court exercised its proper authority to correct the “irrational”
    disqualification of MCS and saved more than a hundred thousand dollars of scarce public
    funds.
    6
    The Agency filed a summary response and conceded that the request for
    proposals used to solicit bids for the project contained a number of errors and those errors
    created confusion among the bidders. Although it argued below that it had no discretion
    to waive the qualification statement, the Agency has retreated from that position; it stated
    in its brief before this Court that it exercised appropriate discretion by not waiving that
    requirement. During oral argument, the Agency explained that it did not appeal the circuit
    court’s ruling, not because it agreed with the ruling, but because it needed to commence
    the renovation project immediately. The Agency acknowledged “the taxpayers of the
    State of West Virginia are best served” by allowing the circuit court’s order to stand.5
    5
    Although it filed no motion to dismiss Wiseman’s appeal as moot, the Agency
    contends that the relief requested by Wiseman (to be awarded the contract) has been
    rendered moot considering MCS’s substantial completion of the construction project.
    Given the resolution of this case, it is not necessary for this Court to address what remedy
    would be available to Wiseman had it prevailed on appeal. Nonetheless, we address the
    legal issues raised by the parties herein consistent with the principles set forth in syllabus
    point one of Israel by Israel v. West Virginia Secondary School Activities Commission,
    
    182 W. Va. 454
    , 455, 
    388 S.E.2d 480
    , 481 (1989):
    Three factors to be considered in deciding whether to
    address technically moot issues are as follows: first, the court
    will determine whether sufficient collateral consequences will
    result from determination of the questions presented so as to
    justify relief; second, while technically moot in the immediate
    context, questions of great public interest may nevertheless be
    addressed for the future guidance of the bar and of the public;
    and third, issues which may be repeatedly presented to the
    trial court, yet escape review at the appellate level because of
    their fleeting and determinate nature, may appropriately be
    decided.
    7
    This case involves two questions. We first address whether the Agency had
    the discretion to waive the qualification statement set forth in the bid specifications. We
    then address the appropriate standard of review courts should employ when examining
    challenges to an agency’s process in selecting the lowest qualified responsible bidder.
    Our analysis begins with a brief overview of our public procurement laws.
    A. West Virginia Public Procurement Laws
    The Purchasing Division within the Department of Administration
    oversees and provides purchasing services to the various State agencies. W.Va. Code §
    5A-3-1 (2015). The goal is to “ensure the fair and equitable treatment of all persons”
    who deal with the procurement system of the State of West Virginia. W.Va. Code § 5A­
    3-1(a)(6). Public procurement laws protect the citizens and businesses of this State by
    safeguarding the purchasing system to “obtain in a cost-effective and responsive manner
    the commodities and services required[.]” W.Va. Code § 5A-3-1(a)(10). These laws were
    enacted to ensure that tax dollars for public works are spent wisely and to guard against
    public officials entering into contracts because of favoritism. See generally SE/Z Constr.,
    L.L.C. v. Idaho State Univ., 
    89 P.3d 848
    , 853 (Idaho 2004) (holding purpose of
    competitive bidding statutes is to safeguard public funds and prevent favoritism, fraud
    and extravagance in their expenditure). One of the overriding purposes of our
    procurement laws is “to maximize to the fullest extent practicable the purchasing value of
    public funds[.]” W.Va. Code § 5A-3-1(a)(7). The essential safeguard of competitive
    8
    bidding is to maintain quality and integrity in the procurement system. W.Va. Code § 5A­
    3-1(a)(9).
    With respect to government construction contracts, the Legislature has
    specifically prescribed the conditions upon which it will permit such work to be done in
    the West Virginia Fairness In Competitive Bidding Act. W.Va. Code §§ 5-22-1 to -2
    (2015). The State must solicit competitive bids for every construction project exceeding
    $25,000 in total cost. 
    Id. § 5-22-1(c).
    6 All bids shall be open in accordance with the
    provisions set forth in West Virginia Code § 5-22-2, except design-build projects which
    are governed by West Virginia Code § 5-22A-1 to -16.7 “Following the solicitation of
    6
    West Virginia Code § 5-22-1 provides four exceptions not applicable here.
    7
    The Design-Build Procurement Act, West Virginia Code 5-22A-2, provides the
    following definitions:
    (3) “Design-build” is defined as providing
    responsibility within a single contract for design, construction
    or alteration of a building or buildings, together with
    incidental approaches, structures and facilities to be
    constructed, in which services within the scope of the practice
    of professional engineering or architecture, as defined by the
    laws of the State of West Virginia, are performed by an
    engineer or architect duly licensed in the State of West
    Virginia and in which services within the scope of
    construction contracting, as defined by the laws of the State
    of West Virginia, are performed by a contractor qualified and
    licensed under the applicable statutes. The design-build
    method of construction may not be used for any other
    construction projects, such as highway, water or sewer
    projects.
    9
    bids, the construction contract shall be awarded to the lowest qualified responsible
    bidder who shall furnish a sufficient performance and payment bond.” W.Va. Code § 5­
    22-1(d) (emphasis added). However, the State “may reject all bids and solicit new bids on
    the project.” 
    Id. Under the
    plain language of the statute, an agency has two options
    following the solicitation of bids; it may reject all bids and solicit new bids on the project
    or award the construction contract to the lowest qualified responsible bidder. The “lowest
    qualified responsible bidder” is the bidder that bids the lowest price and meets the
    requirements in connection with the bid solicitation. W.Va. Code § 5-22-1(b)(1).8 When
    awarding the contract, the Director of Purchasing may “[w]aive minor irregularities in
    bids or specifications” when he or she “determines such action to be appropriate[.]” W.
    Va. Code R. § 148-1-4.6.
    In this case, the Agency elected to award the contract based on the bids
    submitted even after it learned of the defect in the bid form because it wanted to move
    8
    West Virginia Code § 5-22-1(b)(1) further provides that:
    The bidder must certify that it:
    (A) Is ready, able and willing to timely furnish the
    labor and materials required to complete the contract;
    (B) Is in compliance with all applicable laws of the
    State of West Virginia; and
    (C) Has supplied a valid bid bond or other surety
    authorized or approved by the contracting public entity.
    10
    forward with the renovation project. Therefore, the pivotal question before it was whether
    MCS was the lowest qualified responsible bidder. Had the bid form contained a section
    for the contractors to list appropriate references, the Agency would have considerable
    leeway to determine whether a bidder was the best contractor for the job. The Agency
    had the prerogative to establish objective prequalification standards premised upon a
    contractor’s technical competence and experience constructing similar facilities in order
    to determine if the bidder was qualified and responsible.
    We therefore reject MCS’s argument that when specified construction
    services are sought from licensed, bonded contractors, an agency must make the award to
    the low cost bidder pursuant to West Virginia Code § 5-22-1(d). We agree that a bidder
    holding the requisite contractors’ license is “qualified.” However, the statute has the
    phrase “lowest qualified responsible bidder.” 
    Id. If MCS’s
    argument were adopted, then
    the word “responsible” would be read out of the statute. 9 See Syl. Pt. 4, Osborne v.
    United States, 
    211 W. Va. 667
    , 668, 
    567 S.E.2d 677
    , 678 (2002) (stating each word of
    statute should be given some effect and undefined words will be given their common,
    ordinary and accepted meaning). Given the common meaning of the word, “responsible”
    relates to more than a showing that the bidder holds the requisite license. A “responsible
    9
    MCS questions the efficacy of any reference requirement because it could tilt the
    playing field against startup construction companies even when they are properly
    licensed and bonded. We do not question the wisdom of this legislative enactment
    especially when both contractors in this case are experienced. This Court does not issue
    advisory opinions. See State ex rel. Morrisey v. W.Va. Office of Disciplinary Counsel,
    
    234 W. Va. 238
    , 246, 
    764 S.E.2d 769
    , 777 (2014).
    11
    bidder” is a contractor “who possesses the requisite skill, judgment, and integrity
    necessary to perform the contract requested, and who has the financial resources and
    ability to carry the task to completion.” Black’s Law Dictionary 1506 (10th ed. 2014).
    We now return to the Agency’s decision to award the contract to Wiseman.
    The witnesses stated they had no choice but to disqualify MCS because they could not
    waive the qualification statement because it was a material requirement in their eyes.
    However, the Agency’s behavior contradicts this position; it did not rely upon the
    qualification statement at all. Furthermore, the Agency offers no legal support for its
    argument that it could not waive this irregularity. As discussed above, the Director of
    Purchasing may waive minor irregularities in bids or specifications pursuant to West
    Virginia Code of State Rules § 148-1-4 (2015) as part of the decision to award a
    government construction contract to the “lowest qualified responsible bidder,” as defined
    by West Virginia Code § 5-22-1(b)(1) (2015), so that the purchasing value of public
    funds is maximized to the fullest extent practicable. However, he or she may not treat
    substantive requirements of the public procurement laws, the advertisement for bids, or
    the bid forms as mere informalities in order to justify the decision to waive a deviation in
    a bid.10
    10
    It is well settled that an agency cannot waive substantive requirements and is
    required to reject bids which vary materially from the specifications set forth in the
    published request for proposal. W.Va. Code §§ 5-22-1(g) and 5-22-2(b); see e.g., Entech
    (continued . . .)
    12
    In the present case, the irregularity in the bids was caused by the Agency’s
    error. The bid documents mistakenly provided that the form included a section in which
    the qualification statement should be listed. Technically, no bidder could meet that
    requirement without going outside the bid form. In fact, the bid solicitation was so flawed
    that half of the contractors who responded ignored the instruction as an obvious mistake.
    We therefore find that the Agency had the discretion to waive the bid requirement of a
    qualification statement. Importantly, Wiseman does not assert its bid would be any
    different or that MCS could not provide a list of references. Therefore, MCS would not
    gain any competitive advantage if the requirement was waived. Moreover, any such
    waiver would work no prejudice to the rights of the public for whom the Agency serves.
    B. Judicial Review of an Agency’s Decision to Award a Contract
    Corp. v. City of Newark, 
    798 A.2d 681
    , 691 (N.J. Super.Ct. Ch. Div. 2002) (“To be
    accepted, bid proposals must not materially deviate from the specifications set forth by
    the contracting agency.”); accord Gunderson v. Univ. of Alaska, Fairbanks, 
    922 P.2d 229
    , 235 (Alaska 1996). “A variance is material if it gives the bidder a substantial
    advantage over other bidders and thereby restricts or stifles competition.” Chris Berg, Inc.
    v. State, Dep’t of Transp. & Pub. Facilities, 
    680 P.2d 93
    , 94 (Alaska 1984).
    In a bid for a construction project, not every variation
    from the instructions or specifications will destroy the
    competitive character of the bid. . . . To have that effect, the
    variation from the instructions or specifications must be
    substantial, and to be substantial, it must affect the amount of
    the bid and must give the bidder an advantage or benefit not
    allowed to other bidders.
    Wilson Bennett, Inc. v. Greater Cleveland Reg’l Transit Auth., 
    588 N.E.2d 920
    , 925
    (Ohio Ct.App. 1990).
    13
    In Ginsberg, we discussed the breadth of discretion that courts should give
    an agency when awarding a government contract to the lowest qualified responsible
    bidder. See Syl. Pt. 3, Ginsberg, 163 W.Va. at 
    647, 259 S.E.2d at 620
    (“A State agency
    which awards a public contract upon criteria other than price is clothed with a heavy
    presumption that the contracting agency has properly discharged its duties and exercised
    discretionary powers in a proper and lawful manner; accordingly, the burden of proof in
    any action challenging the award of a contract by an unsuccessful bidder or a taxpayer is
    upon the challenger who must show fraud, collusion, or such an abuse of discretion that it
    is shocking to the conscience.”).
    We are cognizant that Ginsberg involved the challenge of an unsuccessful
    bidder to an agency’s decision to award a design-build contract for a new computer
    system.11 In Ginsberg, we declined to second guess the agency’s decision considering the
    complexity and subjective nature of that assessment. Important to our analysis herein, this
    Court distinguished between court intervention into the substantive, as opposed to the
    11
    West Virginia Code 5-22A-2, provides:
    (4) “Design-build contract” means the contract
    between an agency and a design-builder to furnish the
    architecture, engineering, and related services as required, for
    a given public project, and to furnish the labor, materials and
    other construction of services for the same public project. A
    design-build contract may be conditional upon subsequent
    refinements in scope and price, and may permit the agency to
    make changes in the scope of the project without invalidating
    the design-build contract.
    14
    procedural, parts of a government body’s decision making process. As recognized by the
    United States District Court in Mid Atlantic Storage System, Inc. v. City of Milton, 
    903 F. Supp. 995
    (S.D. W.Va. 1995), Ginsberg admonishes courts to “not substitute their
    judgment” for that of the agency in cases in which subjective factors beyond price come
    into play.” 
    Id. at 997
    (emphasis added). Therefore, when evaluating bids on design-build
    contracts, agencies “are not required to accept the lowest price where service, delivery
    dates, continuity in supply, and other factors not directly related to cost are involved,
    particularly where these elements have a far greater impact upon the efficiency of State
    government than minor differences in price.” Ginsberg, 163 W.Va. at 
    659, 259 S.E.2d at 626
    .
    The Lottery building renovation at issue in this case was not a design-build
    project. Rather, the Lottery hired its own architect to design and specify the renovation.
    Contractors submitted fixed-price bids to complete the work after reviewing the 700-page
    project manual prepared by the architect and the 70-page bid solicitation documents.
    MCS did not file suit to challenge the substantive aspect of the Agency’s decision making
    process; the parties agree that both contractors are well respected in the construction
    industry and could do the work required for the project. MCS challenged the rationality
    of the Agency’s bid process and alleged its low bid was disqualified for an
    inconsequential reason.
    15
    Therefore, in this appeal we are asked to review the Agency’s decision-
    making process that lead to the disqualification of MCS’s bid when the Agency
    acknowledged procedural defects in the bid solicitation. In Ginsberg, we emphasized that
    an agency’s process of making decisions should be rational. “There is no question that a
    bidder who goes to the expense of preparing a complex proposal has the right to rely
    upon both the contracting authority’s integrity and intelligent use of discretion.” 
    Id. at 657,
    259 S.E.2d at 625. It is clear from Ginsberg that West Virginia follows the general
    rule of vesting an agency with discretion subject to judicial review and this tenet applies
    to fixed-price government construction contracts. See generally, Rochester City Lines,
    Co. v. City of Rochester, 
    868 N.W.2d 655
    , 660 (Minn. 2015) (applying unreasonable,
    arbitrary, or capricious standard of review to competitive bidding process requires courts
    to examine bidding procedures to ensure they provide fair process and incorporate
    sufficient controls to safeguard against abuses”); Chris Berg, 
    Inc., 680 P.2d at 94
    (stating
    determination by public agency of responsiveness of bid is within agency’s discretion,
    subject, on judicial review, to ascertainment there was reasonable basis for decision).
    In the area of government contracts, federal courts have developed
    standards to guide the exercise of judicial review over procurement decisions by federal
    agencies. See, e.g., Impresa Construzioni Geom. Domenico Garufi v. U.S., 
    238 F.3d 1324
    , 1332-33 (Fed. Cir. 2001) (recognizing bid award may be set aside if procurement
    official’s decision lacked rational basis; reviewing courts must determine whether
    contracting agency provided coherent and reasonable explanation of its exercise of
    16
    discretion and disappointed bidder bears heavy burden of showing award decision had no
    rational basis). Because the federal standards have the same basic objectives of
    eliminating favoritism and fraud in procurement decisions and ensuring the good-faith
    conduct of agency officials in securing public contracts, they are instructive in
    determining whether the decision of an agency was unreasonable, arbitrary, or capricious.
    We hereby hold that a state agency which awards a public contract to the
    lowest qualified responsible bidder under the West Virginia Fairness In Competitive
    Bidding Act, West Virginia Code §§ 5-22-1 to -2 (2015), is clothed with the presumption
    that it has properly discharged its duties. Accordingly, the burden of proof in an action
    challenging the award of a contract by an unsuccessful bidder or a taxpayer is upon the
    challenger, who must show the agency’s actions were arbitrary, capricious, or an abuse of
    discretion. In conducting a review of the competitive bidding process, courts should
    consider whether there is a rational basis for the administrative decision. This standard
    requires courts to examine the bidding procedures utilized to ensure they provided a fair
    process and incorporated sufficient controls to safeguard against abuses.
    To properly analyze whether there was a rational basis for an agency’s
    determination, courts should weigh two important principles. When an agency acts in a
    fair and legal manner and within the reasonable exercise of a sound discretion, then
    courts should not interfere with its decision to award a contract. “Public administration
    would be hamstrung if courts were free to second-guess reasonable administrative
    17
    decisions.” Hous. Auth. of City of Opelousas, La. v. Pittman Const. Co., 
    264 F.2d 695
    ,
    697-98 (5th Cir. 1959). On the other hand, and no less important, “is the public interest of
    the state in securing honest competition and in protecting taxpayers from the evils of
    favoritism and high prices in the letting of contracts for public works.” 
    Id. Our decision
    depends on accommodating these two principles.
    On the unique facts presented in this case, we find the public interest of
    ensuring that tax dollars for public works are spent wisely predominates over the
    Agency’s stringent adherence to faulty bid specifications. See Boh Bros. Const. Co. v.
    Dep’t of Transp. & Dev., 
    698 So. 2d 675
    , 678 (La. Ct. App. 1997) (“To deny a public
    entity the power to waive insignificant deviations in order to select a low bid on every
    public works project is contrary to the interests of the taxpaying citizens of this state.”). It
    is difficult for this Court to avoid the conclusion that the Agency showed a complete lack
    of intelligent use of its discretion. Employing the agency’s analysis, MCS’s failure to
    attach a separate sheet of references to the bid form was fatally dispositive yet, at the
    same time, utterly meaningless; this factor was the sole basis to disqualify MCS’s bid
    even though the Agency readily admitted that it would not have contacted those
    references because the architect knew the contractors. Not only was the Agency’s
    decision nonsensical, it was contrary to the underlying policy of the public procurement
    laws. By any reasonable standards, such action offends one’s sense of fair play and was
    an arbitrary abuse of discretion inconsistent with the letter and the spirit of our public
    procurement laws. Therefore, this Court rejects the argument that the Agency
    18
    appropriately exercised its discretion when it awarded the construction contract to
    Wiseman.
    IV. CONCLUSION
    For the reasons explained above, we find no error in the June 22, 2015,
    order of the Circuit Court of Kanawha County granting MCS’s petition for writ of
    mandamus. Accordingly, we affirm that order.
    Affirmed.
    19
    

Document Info

Docket Number: 15-0635

Citation Numbers: 236 W. Va. 351, 779 S.E.2d 893, 2015 W. Va. LEXIS 1108

Judges: Workman

Filed Date: 11/10/2015

Precedential Status: Precedential

Modified Date: 11/16/2024

Authorities (17)

Chris Berg, Inc. v. State, Department of Transportation & ... , 1984 Alas. LEXIS 280 ( 1984 )

Boh Bros. Const. v. DOTD , 698 So. 2d 675 ( 1997 )

State Ex Rel. Williams v. Department of Military Affairs & ... , 212 W. Va. 407 ( 2002 )

State Ex Rel. Greenbrier County Airport Authority v. Hanna , 151 W. Va. 479 ( 1967 )

State Ex Rel. West Virginia Housing Development Fund v. ... , 153 W. Va. 636 ( 1969 )

Impresa Construzioni Geom. Domenico Garufi v. United States , 238 F.3d 1324 ( 2001 )

SE/Z Construction, L.L.C. v. Idaho State University , 140 Idaho 8 ( 2004 )

housing-authority-of-the-city-of-opelousas-louisiana-v-pittman , 264 F.2d 695 ( 1959 )

Gunderson v. University of Alaska, Fairbanks , 1996 Alas. LEXIS 85 ( 1996 )

State Ex Rel. E.D.S. Federal Corp. v. Ginsberg , 163 W. Va. 647 ( 1979 )

Harrison County Commission v. Harrison County Assessor , 222 W. Va. 25 ( 2008 )

Osborne v. United States , 211 W. Va. 667 ( 2002 )

Pioneer Co. v. Hutchinson , 159 W. Va. 276 ( 1975 )

Entech Corp. v. City of Newark , 351 N.J. Super. 440 ( 2002 )

State Ex Rel. Cooper v. Caperton , 196 W. Va. 208 ( 1996 )

McComas v. Bd. of Educ. of Fayette County , 197 W. Va. 188 ( 1996 )

Israel Ex Rel. Israel v. West Virginia Secondary Schools ... , 182 W. Va. 454 ( 1989 )

View All Authorities »