Jobie Howard v. Eaton Corporation ( 2016 )


Menu:
  •                              STATE OF WEST VIRGINIA
    SUPREME COURT OF APPEALS
    Jobie Howard,
    Plaintiff Below, Petitioner                                                       FILED
    November 10, 2016
    vs) No. 16-0055 (Mingo County 12-C-37)                                           RORY L. PERRY II, CLERK
    SUPREME COURT OF APPEALS
    OF WEST VIRGINIA
    Eaton Corporation,
    Defendant Below, Respondent
    MEMORANDUM DECISION
    Petitioner and plaintiff below Jobie Howard, by counsel Roger A. Decanio, appeals the
    December 22, 2015, order of the Circuit Court of Mingo County that granted the motion for
    summary judgment filed by Eaton Corporation (“Eaton”).1 Eaton, by counsel Jonathan T. Barton,
    Ancil G. Ramey, and James J.A. Mulhall, filed a response.
    This Court has considered the parties’ briefs and the record on appeal. The facts and legal
    arguments are adequately presented, and the decisional process would not be significantly aided
    by oral argument. Upon consideration of the standard of review, the briefs, and the record
    presented, the Court finds no substantial question of law and no prejudicial error. For these
    reasons, a memorandum decision affirming the circuit court’s order is appropriate under Rule 21
    of the Rules of Appellate Procedure.
    On May 12, 2010, petitioner, while working for Arch Coal (“Arch”) as a qualified mine
    electrical worker, removed several protective barriers to gain access to the internal components
    of an energized 480-volt Motor Control Center (“MCC”) unit manufactured by Eaton. After
    removing the barriers, petitioner routed a de-energized ground wire from the top compartment of
    the energized MCC through a wireway to a lower compartment where a neutral bar was located.
    To affix the grounding wire to the neutral bar, petitioner placed two uninsulated metal wrenches
    inside the energized MCC. While attempting to tighten a bolt using both wrenches, one of the
    wrenches made contact with an energized component within the MCC, creating an arc fault. As a
    result, petitioner and a co-worker suffered serious electrical burns to their bodies.
    An MCC is a product customized to fit within a larger electrical distribution system in
    order to meet the electrical needs of the customer—in this case, Arch. Arch hired Robertson P &
    E, Inc. (“Robertson”), an electrical contractor, to design the electrical distribution system as part
    of an expansion project in May of 2005. As part of the project, Robertson ordered nine MCCs
    from WESCO International, Inc. (“Wesco”), a distributor of electrical products, for use at
    1
    Although Arch Coal, Inc. and Coal-Mac, Inc. d/b/a Phoenix Coal-Mac Mining, Inc.
    were also named as defendants below, they are not parties to the instant appeal; their status as
    defendants in this case is unclear from the appendix record.
    1
    various locations throughout Arch’s mine. Wesco then placed an order with Eaton to build the
    MCCs to the specifications provided by Robertson.
    The evidence below showed that Eaton manufactured the MCCs as ordered. Robertson
    specified seven of the nine MCCs to include a main breaker disconnect, which is a switch that
    provides means to disconnect power downstream of its location. The remaining two MCCs
    ordered by Robertson—including the MCC at issue—were specified with a main lug only
    connection, which allows the MCC to be integrated directly into the customer’s electrical
    distribution system. In order to de-energize this particular MCC, petitioner could have opened a
    Gang Operated Air Brake (“GOAB”), which is a switching mechanism designed to open (de­
    energize) a three-phase line with one mechanism. Alternatively, petitioner could have pulled the
    disconnect fuses on the incoming power lines to the MCC by using a “hot stick”(an insulated
    telescoping rod), thereby opening the circuits and de-energizing all components downstream of
    the fuse, including the MCC. Although petitioner was aware of these two separate means of de-
    energizing the MCC, he elected to begin working on the equipment while it was energized.
    It is undisputed that Arch required its employees to de-energize equipment before
    working on it to avoid electrical shock injury. In this case, petitioner knew the MCC at issue was
    energized before he began working on it and the record reveals that, on the day of the accident,
    when Arch’s lead electrician, Ronald Gannon, told petitioner to install a ground wire in the
    MCC, he also told him to de-energize the MCC before performing any work. Petitioner admitted
    being aware of the risks and hazards of working on energized equipment; that there were
    warning labels and instructions attached to the MCC at issue that advised employees of the
    dangers of working on energized equipment; and that he failed to read or heed the warning labels
    and instructions.
    Petitioner filed an amended complaint on May 9, 2012, in which he alleged that the MCC
    was inherently dangerous because it was designed and manufactured without a switch to de-
    energize the power circuits of the electrical equipment and without covers to protect users from
    contacting the internal energized buss bars (electrical conductors), and, as a result, Eaton was
    strictly liable for all of petitioner’s injuries and damages. The amended complaint further alleged
    that Eaton breached its duty to warn potential users, such as petitioner, of the dangers associated
    with the use of the MCC, including, but not limited to, failing to prominently affix proper
    warnings to the subject MCC to warn users that there was not a switch installed in the cabinet to
    de-energize the power circuits of the electrical equipment. Petitioner also alleged a breach of
    implied warranty claim.
    Discovery ensued and on November 21, 2014, Eaton filed a motion for summary
    judgment to which petitioner filed a response. A hearing on the motion was conducted on
    September 10, 2015. By order entered December 22, 2015, the circuit court granted the motion
    for summary judgment. This appeal followed.
    We review de novo petitioner’s appeal of the circuit court’s summary judgment order. “A
    circuit court’s entry of summary judgment is reviewed de novo.” Syl. Pt. 1, Painter v. Peavy, 
    192 W. Va. 189
    , 
    451 S.E.2d 755
    (1994). Our review is guided by the principle that
    2
    “‘[a] motion for summary judgment should be granted only when it is
    clear that there is no genuine issue of fact to be tried and inquiry concerning the
    facts is not desirable to clarify the application of the law.’ Syllabus Point 3, Aetna
    Casualty & Surety Co. v. Federal Insurance Co. of New York, 148 W.Va. 160,
    
    133 S.E.2d 770
    (1963).” Syllabus Point 1, Andrick v. Town of Buckhannon, 187
    W.Va. 706, 
    421 S.E.2d 247
    (1992).
    
    Painter, 192 W. Va. at 190
    , 451 S.E.2d at 756, syl. pt. 2. Furthermore,
    “[s]ummary judgment is appropriate where the record taken as a whole
    could not lead a rational trier of fact to find for the nonmoving party, such as
    where the nonmoving party has failed to make a sufficient showing on an
    essential element of the case that it has the burden to prove.” Syllabus point 4,
    Painter v. Peavy, 192 W.Va. 189, 
    451 S.E.2d 755
    (1994).
    Syl. Pt. 5, Toth v. Bd. of Parks & Recreation Comm’rs, 215 W.V a. 51, 
    593 S.E.2d 576
    (2003).
    In his first assignment of error, petitioner argues that the circuit court erred in failing to
    find that Eaton did not comply with its duty to construct an MCC unit with a shut-off switch as
    required by West Virginia regulations thereby making the unit unsafe for its intended use.
    Petitioner argues that, according to the report of its expert, Jack Spadaro, Eaton and the other
    named defendants below, Arch, Coal-Mac, Inc., and Phoenix Coal-Mac Mining, violated 56
    C.S.R. 3-37.5(b), which provides that “[e]lectric equipment shall be provided with devices that
    will permit the equipment to be deenergized quickly in the event of an emergency.”2 Mr.
    Spadaro’s report also identifies other rules, both state and federal, that, in his opinion, were
    violated by Eaton in connection with the incident,3 including West Virginia Code § 22A-2­
    40(17), which states that “[o]perators of coal mines in which electricity is used as a means of
    power shall comply with the following provisions: . . . . (17) All power circuits and electrical
    equipment shall be deenergized before work is done on such circuits and equipment except when
    necessary for trouble shooting or testing.”4
    We find no error. Eaton is a manufacturer of custom electrical distribution systems.
    Petitioner has failed to demonstrate, or, indeed, to otherwise argue, that the miners’ health,
    safety, and training rules cited in its expert’s report are applicable to Eaton. Having failed to
    show (or attempt to show) that these rules apply to Eaton and imposed upon it some sort of duty
    2
    Although petitioner argues that Mr. Spadaro also opined that the MCC unit at issue was
    required to be “equipped or designed in such a manner that it can be determined by visual
    observation that the circuit is deenergized when the switches are open[,]” under 56 C.S.R. 3­
    37.5(f), Mr. Spadaro’s report does not mention this regulation. The transcript of Mr. Spadaro’s
    deposition is not a part of the appendix record.
    3
    None of those regulations are discussed in petitioner’s brief.
    4
    It appears undisputed that petitioner was not “trouble shooting” or “testing” the
    equipment at the time the events herein transpired.
    3
    to manufacture the MCC at issue with components not included in the specifications identified
    by the electrical contractor for its customer, we find that petitioner has failed to establish that any
    genuine issue of material of fact exists on this issue and that summary judgment was properly
    granted.5
    In a related argument, petitioner argues that the circuit court erred in finding that the
    decision to include a main breaker disconnect or other shut-off switch within the electrical
    distribution system was within the exclusive control of Robertson and Arch, not Eaton. Petitioner
    argues that, in fact, the evidence showed that Robertson’s specifications for the MCC unit were
    “silent” with regard to whether a shut-off switch was requested and that, for this reason,
    summary judgment should not have been granted. Petitioner’s argument that the jury should have
    been permitted to decide whether Eaton was either solely responsible or concurrently negligent
    with Robertson and Arch for constructing the unit without a shut-off switch is based exclusively
    on petitioner’s supplemental answers to Eaton’s first request for admissions in which petitioner
    admitted that the specifications generated by Robertson and ordered by Arch for the MCC at
    issue “did not include specifications for a main breaker disconnect.”6 Petitioner argues that, thus,
    it was “Eaton’s sole independent decision to not include a shut off switch when the specifications
    were silent.”
    We find no error. The undisputed evidence before the circuit court was that Arch
    contracted with Robertson to design the electrical distribution system for a section of the mine;
    that Robertson selected the component parts to meet the electrical needs of the mine; that
    Robertson determined that the MCC at issue should not contain a main breaker disconnect; that
    Robertson determined that a main lug only connection was appropriate for this particular MCC
    because the MCC was to be directly incorporated into the electrical distribution at the mine; that
    Eaton did not inspect the mine before or after the MCC was installed by Robertson; and that
    Eaton did not conduct any maintenance work on the MCC at issue. Given this overwhelming
    evidence, petitioner is incorrect in his claim that it was Eaton that decided to not include a shut­
    off switch. To the contrary, the evidence shows that Eaton manufactured the MCCs exactly as
    designed and ordered by Robertson. Thus, we find that no genuine issue of material fact exists
    5
    We note that the circuit court also found—and petitioner does not dispute on appeal—that
    the inclusion of a main breaker disconnect switch within the MCC would not have
    terminated all incoming power and the Plaintiff, in order to de-energize all
    components of the MCC, would still have been required to utilize the two existing
    means to fully de-energize the equipment and avoid the electrical shock injury he
    sustained.
    (Emphasis added).
    6
    The circuit court concluded that Robertson and Arch’s “independent decisions not to
    include a main breaker disconnect or other such ‘more convenient’ switching mechanism would
    constitute an intervening cause if, indeed the failure to include such a switch can be considered
    the proximate cause of Plaintiff’s injury.”
    4
    and that summary judgment was properly granted.
    Next, we address petitioner’s argument that summary judgment was improperly granted
    with regard to petitioner’s claim that the MCC at issue was defective because Eaton designed
    and manufactured it “without proper warnings that there was not a switch installed in the cabinet
    to de-energize the power circuits of the electrical equipment.” This Court has held that, in strict
    liability cases, failure-to-warn claims arise “when a product may be safe as designed and
    manufactured, but which becomes defective because of the failure to warn of dangers which may
    be present when the product is used in a particular manner.” Syl. Pt. 2, in part, Ilosky v. Michelin
    Tire Corp., 
    172 W. Va. 435
    , 
    307 S.E.2d 603
    (1983). A failure-to-warn claim requires proof that
    the use of the product was foreseeable, that the product was defective due to a failure to warn,
    and that the failure to warn proximately caused the injury. 
    Id. at 442,
    307 S.E.2d at 610.
    Petitioner concedes that he was aware of the hazards associated with working on or near
    energized equipment; knew the MCC was energized when he began work on it the day of the
    accident; and failed to shut off the MCC unit by the two means available to him. However,
    petitioner argues that “the method[s] of turning off the unit w[ere] unreasonable” and that “a
    switch was not installed on the MCC unit;” thus, he contends, a jury should have been permitted
    to determine the comparative negligence of the parties. See Syl. Pt. 3, Bradley v. Appalachian
    Power Co., 
    163 W. Va. 332
    , 
    256 S.E.2d 879
    (1979) (holding that “[a] party is not barred from
    recovering damages in a tort action so long as his negligence or fault does not equal or exceed
    the combined negligence or fault of the other parties involved in the accident.”).
    We find no error. In addition to the fact that petitioner knew that the MCC unit at issue
    was energized before he began his work and that he elected to work on it without de-energizing
    it by either of the two means available, the undisputed evidence also shows that petitioner knew
    of the risks and hazards associated with working on energized equipment, was told by his
    supervisor to de-energize the MCC unit at issue before working on it, and knew there were
    warning labels and instructions attached to the subject MCC and an instruction manual advising
    of the dangers associated with working on energized equipment.
    This Court has held that
    [i]n a comparative negligence or causation action the issue of
    apportionment of negligence or causation is one for the jury or other trier of the
    facts, and only in the clearest of cases where the facts are undisputed and
    reasonable minds can draw but one inference from them should such issue be
    determined as a matter of law.
    Syl. Pt. 2, in part, Reager v. Anderson, 
    179 W. Va. 691
    , 
    371 S.E.2d 619
    (1988).
    In this case, we find that reasonable minds could draw but one inference from the
    undisputed facts— that the MCC at issue was not defective due to a failure to warn, and, even if
    any such defect existed, it was not the proximate cause of petitioner’s injuries. Though petitioner
    contends that the labels affixed to the MCC and the instruction manual provided by Eaton should
    have warned him that there was no main breaker disconnect incorporated within the MCC
    5
    structure, he admits that he failed to read the warnings and manuals that were in place at the time
    of the accident. Importantly, there is no evidence—and, indeed, petitioner does not claim—that
    he would have heeded or read additional warnings or that such additional warnings would have
    prevented the accident. Therefore, we conclude that the circuit court did not err in finding that no
    genuine issue of material fact exists on this issue.
    Finally, petitioner argues that the circuit court erred in granting summary judgment
    because the jury should have been permitted to consider that Robertson and Arch took remedial
    measures subsequent to petitioner’s injury by installing a shut-off switch on the MCC at issue.
    See W.Va. R. Evid. 407 (stating that “[w]hen measures are taken that would have made an earlier
    injury or harm less likely to occur, evidence of the subsequent measures is not admissible to
    prove: (1) negligence; (b) culpable conduct; (c) a defect in a product or its design; or (d) a need
    for a warning or instruction. But the court may admit this evidence for another purpose, such as
    impeachment or—if disputed—proving ownership, control, or the feasibility of precautionary
    measures.”). Importantly, although the evidence shows that, after petitioner’s accident, Arch and
    Robertson installed a shut-off switch between the MCC and the fuse disconnects—that is, they
    modified the electrical distribution system but not the MCC at issue—petitioner does not allege,
    nor does the evidence show, that Eaton took any measure that would have made petitioner’s
    injury less likely to have occurred. Furthermore, our review of the appendix record reveals that
    petitioner failed to raise this issue in his response to Eaton’s motion for summary judgment and
    that his meager argument on the issue at the summary judgment hearing failed to include any
    legal authority supporting his claim that an exception to Rule 407 applies to this case.
    This Court has repeatedly stated that “[o]ur general rule . . . is that when
    nonjurisdictional questions have not been decided at the trial court level and are then first raised
    before this Court, they will not be considered on appeal.” Whitlow v. Bd. of Educ. of Kanawha
    County, 
    190 W. Va. 223
    , 226, 
    438 S.E.2d 15
    , 18 (1993). We noted in Whitlow:
    The rationale behind this rule is that when an issue has not been raised below, the
    facts underlying that issue will not have been developed in such a way so that a
    disposition can be made on appeal. Moreover, we consider the element of
    fairness. When a case has proceeded to its ultimate resolution below, it is
    manifestly unfair for a party to raise new issues on appeal. Finally, there is also a
    need to have the issue refined, developed, and adjudicated by the trial court, so
    that we have the benefit of its 
    wisdom. 190 W. Va. at 226
    , 438 S.E.2d at 18. Therefore, we decline to address this assignment of error.
    For the foregoing reasons, we affirm.
    Affirmed.
    ISSUED: November 10, 2016
    6
    CONCURRED IN BY:
    Chief Justice Menis E. Ketchum
    Justice Brent D. Benjamin
    Justice Margaret L. Workman
    Justice Allen H. Loughry II
    DISSENTING:
    Justice Robin Jean Davis
    7