In New York v. EPA, 413 F.3d 3 (D.C.Cir.2005) (“New York I”), the court addressed the first of two rules promulgated by the Environmental Protection Agency providing ways for stationary sources of air pollution to avoid triggering New Source Review (“NSR”). The court upheld in part and vacated in part the first rule. Id. at 10-11. We now address the second rule, the Equipment Replacement Provision (“ERP”), which amends the Routine Maintenance, Repair, and Replacement Exclusion (“RMRR”) from NSR requirements. Under section 111(a)(4) of the Clean Air Act, 42 U.S.C. § 7411(a)(4), sources that undergo “any physical change” that increases emissions are required to undergo the NSR permitting process. See also id. §§ 7501(4), 7479(2)(C)(cross-referencing id. § 7411(a)(4)). The exclusion has historically provided that routine maintenance, repair, and replacement do not constitute changes triggering NSR. The ERP both defined and expanded that exclusion. EPA explained:
[The] rule states categorically that the replacement of components with identical or functionally equivalent components that do not exceed 20% of the replacement value of the process unit and does not change its basic design parameters is not a change and is within the RMRR exclusion.
Equipment Replacement Provision of the Routine Maintenance, Repair and Replacement Exclusion, 68 Fed.Reg. 61,248, 61,270 (Oct. 27, 2003) (“Final Rule”); see also 70 Fed.Reg. 33,838 (June 10, 2005)(“Recon-sideration”). Hence, the ERP would allow sources to avoid NSR when replacing equipment under the twenty-percent cap notwithstanding a resulting increase in emissions. The court stayed the effective date of the ERP on December 24, 2003. We now vacate the ERP because it is contrary to the plain language of section 111(a)(4) of the Act.
The Clean Air Act requires new and modified sources of pollution to undergo NSR, a permitting process that imposes specific pollution control requirements depending upon the geographic location of the source.
The term “modification” means any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.
42 U.S.C. § 7411(a)(4) (emphasis added). Since the inception of NSR, RMRR has been excluded from the definition of “modification.” See 39 Fed.Reg. 42,510, 42,514 (Dec. 5, 1974); 43 Fed.Reg. 26,388, 26,403-04 (June 19, 1978). Heretofore, EPA applied the RMRR exclusion through “a case-by-case determination by weighing the nature, extent, purpose, frequency, and cost of the work as well as other factors to
The government and environmental petitioners contend that the ERP is contrary to the plain text of the Act because the statutory definition of “modification” applies unambiguously to any physical change that increases emissions, necessarily including the emission-increasing equipment replacements excused from NSR by the rule. They maintain that the word “any,” when given its natural meaning, requires that the phrase “physical change” be read broadly, such that EPA’s attempt to read “physical change” narrowly would relegate the word “any” to an insignificant role.
In evaluating the petitioners’ contention, we proceed under the familiar two-part test of Chevron, U.S.A., Inc. v. Natural Resources Defense Council, Inc., 467 U.S. 837, 104 S.Ct. 2778, 81 L.Ed.2d 694 (1984). If “Congress has directly spoken to the precise question at issue ... that is the end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress.” Id. at 842-43, 104 S.Ct. 2778. Only if the statute is silent or ambiguous do we defer to the agency’s interpretation, asking “whether [it] is based on a permissible construction of the statute.” Id. at 843, 104 S.Ct. 2778. “If a court, employing traditional tools of statutory construction, ascertains that Congress had an intention on the precise question at issue, that intention is the law and must be given effect.” Id. at 843 n. 9, 104 S.Ct. 2778.
The petitioners and EPA agree that the phrase “physical change” is susceptible to multiple meanings, each citing dictionary definitions. However, “the sort of ambiguity giving rise to Chevron deference ‘is a creature not of definitional possibilities, but of statutory context.’ ” American Bar Ass’n v. FTC, 430 F.3d 457, 469 (D.C.Cir.2005) (quoting Brown v. Gardner, 513 U.S. 115, 118, 115 S.Ct. 552, 130 L.Ed.2d 462 (1994)); see California Indep. Sys. Operator Corp. v. FERC, 372 F.3d 395, 400 (D.C.Cir.2004); Cincinnati Ins. Co. v. Flanders Elec. Motor Serv., Inc., 40 F.3d 146, 152 (7th Cir.1994). As the parties point out, the ordinary meaning of “physical change” includes activities that
The parties’ essential disagreement, then, centers on the effect of Congress’s decision in defining “modification” to insert the word “any” before “physical change.” According to the petitioners, the word “any” means that the phrase “physical change” covers any activity at a source that could be considered a physical change that increases emissions. According to EPA, “any” does nothing to resolve ambiguity in the phrase it modifies. EPA maintains that because “physical change” is “susceptible to multiple meanings,” id. at 61,271, “identifying activities that are ‘changes’ for NSR purposes ... requires an exercise of Agency expertise,” “the classic situation in which an agency is accorded deference under Chevron,” id. at 61,272. Under this approach, once EPA has identified an activity as a “physical change,” the word “any” requires that the activity be subject to NSR. We conclude that the differences between the parties’ interpretations of the role of the word “any” are resolved by recognizing that “[r]ead naturally, the word ‘any’ has an expansive meaning, that is, ‘one or some indiscriminately of whatever kind,’ ” United States v. Gonzales, 520 U.S. 1, 5, 117 S.Ct. 1032, 137 L.Ed.2d 132 (1997), and that courts must give effect to each word of a statute, see, e.g., TRW, Inc. v. Andrews, 534 U.S. 19, 31, 122 S.Ct. 441, 151 L.Ed.2d 339 (2001). Because Congress used the word “any,” EPA must apply NSR whenever a source conducts an emission-increasing activity that fits within one of the ordinary meanings of “physical change.”
In a series of cases, the Supreme Court has drawn upon the word “any” to give the word it modifies an “expansive meaning” when there is “no reason to contravene the clause’s obvious meaning.” Norfolk S. Rwy. Co. v. Kirby, 543 U.S. 14, 31-32, 125 S.Ct. 385, 160 L.Ed.2d 283 (2004); see also Dep’t of Hous. and Urban Dev. v. Rucker, 535 U.S. 125, 130-31, 122 S.Ct. 1230, 152 L.Ed.2d 258 (2002); Gonzales, 520 U.S. at 5, 117 S.Ct. 1032. Indeed, the Court has read the word “any” to signal expansive reach when construing the Clean Air Act. In Harrison v. PPG Industries, Inc., 446 U.S. 578, 100 S.Ct. 1889, 64 L.Ed.2d 525 (1980), the Court resolved a jurisdictional dispute under section 307(b)(1) by interpreting the phrase “any other final action,” which the Court “discern[ed to have] no uncertainty.” Id. at 588, 100 S.Ct. 1889. The Court never suggested that the term “final action” was itself devoid of multiple meanings depending on the context, but rather stated that when Congress amended the Act in 1977, “it expanded its ambit to include not simply ‘other final action,’ but rather ‘any other final action.’ ” Id. at 589, 100 S.Ct. 1889. “[I]n the absence of legislative history to the contrary,” the Court held that the statutory phrase “must be construed to mean exactly what it says, namely, any other final action.” Id.
Although EPA is correct that the meaning of “any” can differ depending upon the statutory setting, see Nixon v. Missouri Mun. League, 541 U.S. 125, 132, 124 S.Ct. 1555, 158 L.Ed.2d 291 (2004), the context
Even without specific reliance on the effect of “any,” this court has construed the definition of “modification” broadly. In Alabama Power, the court explained that “the term ‘modification’ [in section 111(a)(4) ] is nowhere limited to physical changes exceeding a certain magnitude.” 636 F.2d at 400. Although the legislative history indicated that one Senator intended the term to apply only to “major expansion program[s],” id. at 400 n. 47, the court observed that “the language of the statute clearly did not enact such limit into law,” id. at 400. The court further observed that “[ijmplementation of the statute’s definition of ‘modification’ will undoubtedly prove inconvenient and costly to affected industries; but the clear language of the statute unavoidably imposes these costs except for de minimis increases.” Id. More recently, in Netv York I, the court looked to the plain meaning of section 111(a)(4) and the absence of contrary legislative history in holding that even pollution control projects constituted “physical changes.” New York I, 413 F.3d at 40-42. Likewise, the Seventh Circuit concluded in WEPCo that the purposes of the 1977 amendments to the Act required an expansive reading of the plain language of section 111(a)(4). See WEPCo, 893 F.2d at 908-10.
EPA’s attempt to avoid the persuasive force of these decisions and to find ambiguity in the phrase “any physical change” fails for a variety of reasons. Even assuming that the decisions construing section 111(a)(4) are not “judicial precedent holding that the statute unambiguously forecloses the agency’s interpretation,” Nat’l Cable & Telecomms. Ass’n v. Brand X Internet Servs., - U.S. -, -, 125 S.Ct. 2688, 2700, 162 L.Ed.2d 820 (2005), Brand X, on which EPA principally relies, does not drain those decisions of all precedential value. The fact that previous judicial interpretations of section 111(a)(4) have all reached the conclusion that the text must be read broadly supports the petitioner’s argument at Chevron step one, particularly because those decisions — both before and after Chevron — used language indicating the text was “clear” and “plain.” See New York I, 413 F.3d at 40; WEPCo, 893 F.2d at 907; Alabama Power, 636 F.2d at 400.
Even in the absence of such precedent, EPA’s approach to interpreting “physical change,” as well as a similar approach by
In contrast, the petitioners’ approach, by adopting an expansive reading of the phrase “any physical change,” gives natural effect to all the words used by Congress and reflects both their common meanings and Congress’s purpose in enacting the 1970 and 1977 amendments. See New York I, 413 F.3d at 11-13; WEPCo, 893 F.2d at 909. To improve pollution control programs in a manner consistent with the balance struck by Congress in 1977 between “the economic interest in permitting capital improvements to continue and the environmental interest in improving air quality,” Chevron, 467 U.S. at 851, 104 S.Ct. 2778, Congress defined the phrase “physical change” in terms of increases in emissions. After using the word “any” to indicate that “physical change” covered all such activities, and was not left to agency interpretation, Congress limited the scope of “any physical change” to changes that “increase!] the amount of any air pollutant emitted by such source or which result! ] in the emission of any air pollutant not previously emitted.” 42 U.S.C. § 7411(a)(4). Thus, only physical changes that do not result in emission increases are excused from NSR. Because Congress expressly included one limitation, the court must presume that Congress acted “intentionally and purposely,” Barnhart v. Sigmon Coal Co., 534 U.S. 438, 452, 122 S.Ct. 941, 151 L.Ed.2d 908 (2002) (quoting Russello v. United States, 464 U.S. 16, 23, 104 S.Ct. 296, 78 L.Ed.2d 17 (1983)), when it did not include others. Cf. New York I, 413 F.3d at 39. So construed, each word in the phrase “any physical change” has a meaning consonant with congressional intent and the scope of the definitional phrase is limited only by Congress’s determination that such changes be linked to emission increases.
The expansiveness of the petitioners’ approach does not leave the definition of “any physical change” without limits. The
The fact that EPA, through the RMRR exclusion, has historically interpreted “any physical change” to exclude changes of trivial regulatory concern on a de minimis rationale, see Alabama Power, 636 F.2d at 360-61, does not demonstrate that the meaning of “physical change” is ambiguous. Rather, it reflects an agency’s inherent power to overlook “trifling matters,” id. at 360, a “principle [that] is a cousin of the doctrine that, notwithstanding the ‘plain meaning’ of a statute, a court must look beyond the words to the purpose of the act where its literal terms lead to ‘absurd or futile results,’ ” id. at 360 n. 89 (citations omitted). As the Supreme Court has instructed, “the venerable maxim de minimis non curat lex (‘the law cares not for trifles’) is part of the established background of legal principles against which all enactments are adopted, and which all enactments (absent contrary indication) are deemed to accept.” Wisconsin Dep’t of Revenue v. William Wrigley, Jr., Co., 505 U.S. 214, 231, 112 S.Ct. 2447, 120 L.Ed.2d 174 (1992). Reliance on the de minimis doctrine invokes congressional intent that agencies diverge from the plain meaning of a statute only so far as is necessary to avoid its futile application. Thus, the court in Alabama Power acknowledged that “EPA does have discretion, in administering the statute’s ‘modification’ provision, to exempt from PSD review some emission increases on grounds of de minimis or administrative necessity.” 636 F.2d at 400. As applied, the court explained that de minimis standards served to alleviate “severe” administrative and economic burdens by lifting requirements on “minuscule” emission increases. See id. at 405. While the court today expresses no opinion regarding EPA’s application of the de minimis exception, given the limits on the scope of the de minimis doctrine, see Shays, 414 F.3d at 113-14, EPA appropriately has not attempted to justify the ERP as an exercise of de minimis discretion. As EPA has disclaimed the assertion that its prior expansive interpretations of “any physical change” were “absurd or futile,” 70 Fed.Reg. at 33,842, it is in no position to claim that the ERP is necessary to avoid absurdity.
EPA’s remaining arguments also fail to demonstrate that the phrase “any physical change” is ambiguous. The fact that the court concluded that the word “increases” in section 111(a)(4) is ambiguous, see New York I, 413 F.3d at 23, does not suggest that the phrase “any physical change” is also ambiguous; unlike the latter, the former is unaccompanied by a qualifier signaling Congress’s intent. Congress’s use of the word “increases” necessitated further definition regarding rate and mea
“Therefore, for EPA to avoid a literal interpretation at Chevron step one, it must show either that, as a matter of historical fact, Congress did not mean what it appears to have said, or that, as a matter of logic and statutory structure, it almost surely could not have meant it.” Engine Mfrs. Ass’n v. EPA, 88 F.3d 1075, 1089 (D.C.Cir.1996). The discussion in New York I, 413 F.3d at 12-13, and WEPCo, 893 F.2d at 909 (quoting H.R. Rep. No. 95-294, at 211, (1977), as reprinted in 1977 U.S.C.C.A.N. 1077, 1290), of Congress’s basic goals in enacting the 1977 amendments — to intensify the war against air pollution, to establish a permit program that struck a balance between economic and environmental interests, and to stimulate technology to control pollution — demonstrate the futility of EPA’s endeavor. EPA cannot show that historical fact prevents a broad reading of “any physical change” inasmuch as EPA for decades has interpreted that phrase to mean “virtually all changes, even trivial ones, ... generally interpreting] the [RMRR] exclusion as being limited to de minimis circumstances.” 68 Fed.Reg. at 61,272.
As for logic, EPA cannot show any incoherence in Congress requiring NSR for equipment replacements that increase emissions while allowing replacements that do not increase emissions to avoid NSR. EPA acknowledges the reasonableness of its past expansive interpretation of “any physical change.” See id.; 70 Fed Reg. at 33,842; Respondent’s Br. at 29. To the extent that EPA relies on the argument that allowing ERP projects has the potential to lower overall emissions through increased efficiency even if emissions increase at a source, the court in New York 1 rejected EPA’s similar argument in support of an exemption from NSR for pollution control projects. The court stated that “Congress could reasonably conclude, for example, that tradeoffs between pollutants are difficult to measure, and thus any significant increase in emissions of any pollutant should be subject to NSR.” New York I, 413 F.3d at 41. Absent a showing that the policy demanded by the text borders on the irrational, EPA may not “avoid the Congressional intent clearly expressed in the- text simply by asserting that its preferred approach would be better policy.” Engine Mfrs., 88 F.3d at 1089.
Likewise, EPA offers no reason to conclude that the structure of the Act supports the conclusion that “any physical change” does not mean what it says. EPA does not address the Act’s structure except in defending the reasonableness of the ERP as a policy choice. In that context, EPA points to the Act’s “many other
Accordingly, we hold that the ERP violates section 111(a)(4) 'of the Clean Air Act in two respects. First, Congress’s use of the word “any” in defining a “modification” means that all types of “physical changes” are covered. Although the phrase “physical change” is susceptible to multiple meanings, the word “any” makes clear that activities within each of the common meanings of the phrase are subject to NSR when the activity results in an emission increase. As Congress limited the broad meaning of “any physical change,” directing that only changes that increase emissions will trigger NSR, no other limitation (other than to avoid absurd results) can be implied. The definition of “modification,” therefore, does not include only physical changes that are costly or major. Second, Congress defined “modification” in terms of emission increases, but the ERP would allow equipment replacements resulting in non-de minimis emission increases to avoid NSR. Therefore, because it violates the Act, we vacate the ERP.
. NSR consists of two programs: prevention of significant deterioration ("PSD”) and non-attainment NSR. See New York I, 413 F.3d at 11-14. New and modified sources in attainment areas, i.e., where air quality standards have been met, and in unclassifiable areas are required to follow PSD rules, which means they must obtain a preconstruction permit, prove that the construction will not cause violations of certain air quality standards, and show that their operations are in compliance with the Best Available Control Technology (“BACT”) requirements. See 42 U.S.C. § 7475. In nonattainment areas, i.e., where air quality standards have not been met, new and modified sources are required to obtain preconstruction permits, to offset emissions increases with emissions reductions from other sources in the area, and to install "lowest achievable emissions rate” technology ("LAER"). See id. § 7503.
. The ERP provides:
Without regard to other considerations, routine maintenance, repair and replacement includes, but is not limited to, the replacement of any component of a process unit with an identical or functionally equivalent components), and maintenance and repair activities that are part of the replacement activity, provided that all of the requirements in paragraphs (cc)(l) through (cc)(3)of this section are met.
40 C.F.R. § 52.2 l(cc). Paragraph (cc)(l) establishes that the fixed capital cost of the replacement component cannot exceed twenty percent of the replacement value of the process unit. Paragraph (cc)(2) states that • the replacement cannot change the basic design parameters of the process unit. Paragraph (cc)(3) requires that the replacement activity not cause the process unit to exceed any independent, legally enforceable emission limitation. The ERP also amends 40 C.F.R. §§ 51.165, 51.166, and 52.24, but given the similarity of the sections, the court will follow the practice of the parties in citing only section 52.21.
. See TVA v. Hill, 437 U.S. 153, 173 n. 18, 98 S.Ct. 2279, 57 L.Ed.2d 117 (1978) (quoting Through the Looking Glass, in The Complete Works Of Lewis Carroll 196 (1939)).
. The court has no occasion to decide whether part replacements or repairs necessarily constitute a "modification” under the definition taken as a whole.