This is a suit by the assignee of an option to purchase certain land in the City of Titusville, Brevard County, Florida. The plaintiff complains that the defendant, under the option language and other related documents, represented that the land in question was riparian land when its was not. Plaintiff claims that he suffered damages to the extent of $34,689.00 because the land was not riparian land. Belief on account of the defendant’s breach of contract is premised upon our general Tucker Act jurisdiction, 28 U.S.C. § 1491 (1970). The case is before this court on cross-motions for summary judg
There is no genuine issue as to any material fact. On May 29, 1987, a joint venture composed of J. L. Williams, B. J. iChafin, and James C. Hadsell granted the Postmaster General of the United States an option to purchase certain land in Titusville, Florida,
On May '3,1968, the Post Office Department issued an “Advertisement for Bids to Lease Construction” covering the Titusville land; and at approximately the same time, the plaintiff was furnished with a site plan, dated April '3,1968, for construction of the Post Office building. The option was assigned by the Post Office Department to the plaintiff on June 30, 1968. By letter of July 11, 1968, the plaintiff exercised his right to purchase and directed the joint venture to proceed with the fill.
'By an “Amendment To Option To Purchase Land,” dated January 15, 1968, the option was amended to provide that
* * * the work described in the letter dated November 6,1961, from Tom Ellis, Incorporated, agent for the [joint venturers], will be commenced promptly after exercise of the option and will be satisfactorily completed within ninety (90) days after the exercise of the said option, and, further, that the Closing for the property will take place within ten (10) days after such satisfactory completion of the work.
Thus, the plaintiff had notice of the November 6,1967, letter from the joint venture to the Post Office Department, wherein the joint venture agreed to do as follows:
3. The Joint Venturers and/or their assigns will fill and bulkhead in accordance with Corps of Engineer guidelines and will protect the entire site from encroachment by water and that the property line running east to west on the south side of the lot and on the north side will be protected by bulkhead or properly stabilized fill protected by a main bulkhead line at the rwer frontage rwnnmg both north and south from owr property. [Emphasis supplied.]
The work described in this letter was part of the option and, in fact, the closing was not to occur until after the work was completed.
Enclosed with the said letter of November 6, 1967, was a copy of the United States Army Corps of Engineers dredge and fill permit dated April 29, 1966, authorizing the joint venture
* * * to construct a bulkhead, and to dredge and fill, the dredged material to be deposited shoreward of the bulkhead, in Indian River, westerly shore, at your property located about midway between Jackson and Harrison Streets, about 2.2 miles south of State Road 402 Causeway, Titusville, Florida, in accordance with plans attached hereto.
We find additional confirmation for this view in plaintiff’s letter to the joint venture dated July 11, 1968. In relevant part, this letter states:
* * * Consider this your notice that the option is exercised and understand that the work under the option is to be completed within the next ninety (90) days.
❖ * ❖ * *
I would like to be informed as to what schedule you have in doing the fill work as outlined in the drawings and option and the contemplated completion of same. [Emphasis supplied.]
Plaintiff having taken the assignment of the option with actual knowledge of these facts or having documents from which he should have known such facts cannot be heard to complain.
Plaintiff relies heavily on the site plan, dated April 3,1968,
In accordance with option to the Post Office Department, dated May 29, 1967, and subsequent correspondence, including uorps of Engineers requirements, dated April W,1966, optionors are required to construct a hulh-Tiead and to dredge and fill portions of the property located in the Indian River. * * * [Emphasis supplied.]
While it is true that the building site plan indicated the need for warning lamps on the eastern border of the optioned property, it is necessary to keep in mind that the site plan was dated April 3, 1968, while the dredging was not done until June or July, 1968. The Post Office Department was merely prudent to require the navigational lamps. If the joint venture’s remaining parcel of 250 feet x 162 feet were to remain submerged, the lamps would be needed. Much the same may be said with respect to the said building site plan’s depicting of the Indian River as immediately adjacent to the rear boundary of the option land. At the time of the preparation of the site plan, the Post Office Department could only be sure of one fact, that all the land covered by the option would be filled.
Plaintiff also seeks to make much of paragraph 12 of the option, a letter dated 'September 2,1967, to the Government from the joint venture which states, in relevant part:
With reference to the May 29, 1967, Option to Purchase Land U.S. Government, please be advised that the property will be filled and you will be given all usable land. * * *
Logically construed, this language simply means that all site property would be filled. Thus, all the option property would be usable. There is no statement at all with regard to whether the submerged property between the option property and the bulkhead line would be filled.
For the foregoing reasons we grant the defendant’s motion for summary judgment. Plaintiff’s motion for summary judgment is denied. The petition is hereby dismissed.
The Government also makes the jurisdictional argument that if the plaintiff has a claim against anyone, it is against the joint venturers. When a party raises a jurisdictional argument, we are not required to decide whether or not we have jurisdiction if the case is submitted on cross-motions for summary judgment and we can see from the record that the claim is without substance on the merits. Monett v. United States, 190 Ct. Cl. 1, 419 F. 2d 434 (1969), cert. denied, 400 U.S. 846 (1970).
The description of the land, as set forth in the option, is as follows :
SOUTH DESCRIPTION
Commence at the N.W. Corner of Section 15, Township 22 South, Range 35 East, Brevard County, Florida; thence run N89°41'37"E along the North line of said Section 15, a distance of 3,990.97 feet more or less to a point on the Easterly right of way line of U.S. Highway No. 1, (STATE ■ROAD No. 5) ; thence Southeasterly along said Easterly R/W line, a distance of 536.8 feet more or less to an intersection point with the South property line of Lot 4, Block A, as recorded in “BOXES SUBDIVISION,” [Plat Book 2, Page 40 of the Public Records of Brevard County, Florida; ■thence run >S88°55'38''E along said South property line and the extension of said line, 512.54 Feet to a point in the Indian River, said point being 500 Feet by right angle measurement from the afore mentioned Easterly R/W line of u.'S. Highway No. 1, said point being the POINT OF BEGINNING; thence reverse the previous bearing and run N88°55'3-8"W, 512.54 feet back to the Easterly R/W of said U.S. Highway No. 1; thence Northerly along said R/W line 250.00 feet; thence S8S°55'38"E and parallel with the said South propert (sic) line of Lot 4, 512.54 feet more or less to a point 500 feet, by right angle measurement from the said Easterly R/W line of U.S. Highway No. 1; thence run Southeasterly, parallel with said Easterly R/W line, 250 feet more or less to the POINT OF BEGINNING.
order #3024 /s/ Tom C. Grusbnmeyer
Tom C. Grusenmeyer
Reg. Fla. Land Surveyor #1542
The plaintiff subsequently completed the construction and the Government, on June 2, 1969, leased the premises, for a period of 15 years with the option periodically to renew for SO additional years.
under the laws of Florida, bulkhead lines have much significance in transactions involving riverfront properties in that there is a mandatory recording statute with relation to established and approved bulkhead lines. 12 F.S.A. § 253.122 (1972-73 Supplement) provides as follows :
§ 253.122 Power to fix bulkheads
*****
(5) Upon the establishment and approval of any bulkhead line or lines in the manner herein provided for, a drawing showing the location of such bulkhead line or lines shall be promptly filed in the public records of the county where the same may be located and recorded in the book of plats of said county. * * *
We observe that the same bulkhead line shown on the dredge and fill map attached to the dredge and fill permit of April 29, 1961, reproduced earlier in this opinion, is referred to in the warranty deed of September 25, 1968, from the joint venturers to the plaintiff, indicating the east end of a drainage easement as follows:
* * * to the intersection with the City of Titusville Bulkhead line as recorded in B. H. Boole 1, at pages SS thru 37, of the Public Records of Brevard County, Florida; * * *, (Emphasis supplied.]