These actions against the railroad were brought by two employees of the Cayuga Foundation Corporation, a general contractor engaged by the state to construct a portion of the Connecticut Turnpike adjacent to the Burr Road Bridge, which crosses over the main line of the railroad in Bridgeport. The actions arise out of an accident which occurred on November 6, 1957, while the named plaintiffs, in the course of their employment by Cayuga to pave the turnpike at or near its approach to the bridge, were holding, guiding or steadying a piece of road-building equipment known as a "fine-grader," which at the moment was hoisted off the roadway and was in the process of being moved by a metal cable suspended from the boom of a crane mounted on a truck. While plaintiffs were thus in contact with the fine-grader and walking or standing on the surface of the highway, the boom of the crane came into contact with a signal wire of the railroad which was suspended from towers and crossed over the highway at a height of fifty-four feet above the surface of the highway at the point of contact. The wire carried 11,000 volts, and the charge of electricity transmitted through the crane boom, cable and fine-grader to the two plaintiffs gave them severe electric shocks and *Page 166 burns and caused them serious, painful and disabling personal injuries.
The two cases were tried together, commencing on February 14, 1963, before a jury of twelve with two alternates, both of whom were called upon during the next three weeks of trial to replace ailing jurors. On March 8, owing to personal problems arising among the remaining jurors, the choice was presented of either declaring a mistrial or proceeding with the trial to the court without a jury. Upon stipulation of counsel, the latter alternative was adopted and the trial continued before the court to its conclusion.
Out of the many pages of testimony and numerous exhibits, one conclusion seems utterly inescapable. That conclusion is that a direct proximate cause of the plaintiff's injuries was the negligence of their employer, Cayuga. It was Cayuga who, under both its contract with the state and the contract between the state and railroad, had the responsibility of making arrangements with the railroad to shut off the power when necessary "to facilitate the contractor's operations," and whose employees failed to make such a request on this occasion, although several of them, including a foreman, the crane operator, and the driver of the crane, to say nothing of the two plaintiffs themselves, apparently knew that the crane was going to operate in the vicinity of the wire in question. The crane operator, who had operated his crane over this bridge with equipment suspended from the boom on previous occasions, and who knew or certainly should have known of the presence of the high-tension wires over the bridge, was the one who operated the crane in such a manner as to bring its boom into contact with the wire fifty-four feet above the highway, and that despite a five- by eight-inch sign, bolted to the *Page 167 outside of the crane directly in front of the operator, on which appeared, in red letters on a white background, the words: "This machine not to be operated within 6 feet of power line." How his operation of the crane under the circumstances could be considered other than grossly negligent is difficult to see.
Since the claims of the plaintiffs against Cayuga are governed by the Workmen's Compensation Act, Cayuga's liability to them is not an issue here. However, the part played by its negligence in causing this accident narrows the issues before the court to these: (1) Was the railroad negligent with respect to either (a) its design, installation or location of the wire in question, or (b) the arrangements it made for the protection of those who it should reasonably anticipate might come in contact with it? (2) Was such negligence on the part of the railroad — if any existed, either concurrent with or independent of the negligence of Cayuga — a proximate cause of plaintiffs' injuries? (3) Did any contributory negligence on the part of plaintiffs proximately cause their injuries?
Considering the first category of the first issue, the court cannot find from the evidence that there was any negligence on the part of the railroad with respect to the design, installation or location of the wire in question. There was no evidence that the design of the supporting towers or details of construction or installation were improper, or faulty, except that concerning plaintiffs' claims that the wire should have been located elsewhere — either underneath, or at a greater height above the highway — or that it should have been insulated or shielded in some manner from persons or objects which might come into contact with it at the height of fifty-four feet above the highway. In this connection, *Page 168 plaintiffs introduced into evidence Public Utilities Docket No. 5700, being "Electric Rules, Regulations, Standards and Specifications," calling particular attention to § 60, to the general effect that every utility (including, by admission of defendant, railroads) must use all possible care to protect the public, employees and others from the dangers of electric wires maintained by them. This would be the approximate standard under our common law anyhow, and there is nothing specific in this document, with special reference to §§ 165-168 inclusive, regulating the height of wires above roadways, either under normal conditions of use or during construction.
The electrical engineer called by plaintiffs as their expert expressed the opinion, in response to a hypothetical question, that the installation was not in conformity with good practice, but his reasons were not convincing to the court — nor were his qualifications with respect to experience with railroad transmission lines particularly impressive. Generally speaking, his testimony was that the wire should have been higher above the highway, or under the Burr Road Bridge, underground or encased in armor, or de-energized at the time in question. His testimony was contradicted in almost every respect by J. C. Hitt, an electrical engineer with extensive experience in the design and construction of high-tension transmission lines, who was called by the defendant. According to him, the design and installation of transmission towers and lines at the crossing in question were in conformity with the best practices in use at the time; the installation met or exceeded the safety requirements of the national electrical safety code, one universally recognized and accepted in the electrical industry; it would be impractical to install the wires higher or to cross the highway at any other location; *Page 169 it would be far less satisfactory and far less safe to have them suspended under the bridge or placed underground. At the conclusion of Hitt's testimony, it was stipulated by counsel, in the interests of saving time, that Harry F. Brown, also called by defendant as an expert, would corroborate Hitt's testimony and expressed opinions in every respect and also that his qualifications as an expert in the field of electrical transmission were unquestioned. In this connection, also, is to be considered defendant's exhibit 13, the national electrical safety code, highly regarded as a standard of practice and procedure by all of the experts, including one called by plaintiffs.
Although from all of the evidence the court cannot find negligence on the part of the railroad with respect to the design, installation or location of the wire, there still remains for consideration the question whether, under the circumstances existing at the time, the railroad should have taken further additional precautions for the protection of those who it should reasonably anticipate might come into contact with the wire, located where it was. It is unquestionably true, as was so ardently stressed by plaintiffs' counsel throughout the trial and in their brief, that the highway at the time and place in question was not completed and that a different standard of care was involved than in the case of a completed highway with no work crews in the vicinity of the wire crossing.
The conclusion of the court with respect to the design, installation and location of the wire is unchanged, even taking into account the circumstances existing at the time, and the only remaining evidence of negligence on the part of the railroad boils down to that of its failure to de-energize the wires across Burr Road Bridge at the time of the *Page 170 accident. As previously pointed out, it was the contractual duty of Cayuga to request the railroad to de-energize its wires when specific circumstances so required. The contract clearly established the procedure to be followed at any time that the employees of Cayuga, in the course of their work, were likely to be in danger of contact with high-tension wires maintained by the railroad. This procedure, according to the evidence, had been habitually and regularly followed throughout the construction of the Burr Street Bridge and adjacent sections of the highway.
The "groundman" for the railroad at Burr Road Bridge on the day of the accident testified that when he reported for work on the morning of the accident at about 7 o'clock, he had first checked with the Cayuga supervisor as to where the men would be working; that he had been advised they would be working under the bridge and not above; that early that morning, about 7:30, he had, at the request of a Cayuga employee, ordered and obtained de-energization of all four wires under the bridge, where men were painting; that he received no request to de-energize the wires over the bridge; that he was himself working under the bridge and did not know there was a crane on or near the bridge until after the accident happened. At this time, the basic structure of the bridge had been completed and workmen were engaged primarily in working below the bridge, painting, or on the surface or ramps, more than fifty feet below the overhead wires.
A Cayuga operator of a crane with an even longer boom than the one involved here testified that he had carried machinery with his crane across the same bridge a number of times during the weeks preceding the accident without contacting the overhead *Page 171 wires. Actually, there was no more reason for the railroad to anticipate that a crane with an elevated boom would hit that wire on that date than that it would be struck by a low-flying helicopter from the nearby Sikorsky plant or touched by a boy flying a kite attached to a metal wire instead of a string.
The Connecticut decision most nearly in point on this phase of the case is Hassett v. Palmer,
Plaintiffs, in their brief, refer to the lower court decision in the Hassett case, in which error was *Page 172
found, and also to Reboni v. Case Bros., Inc.,
Although it is not strictly necessary for the court to continue with a consideration of the two remaining issues, it must observe, briefly, that even if some negligence had been found on the part of the railroad, through its failure, for any reason at all, to de-energize the wire, such negligence would not have been, under the circumstances, a proximate cause of the accident, since the negligence of Cayuga employees other than those charged with the responsibility of requesting de-energizing clearly intervened and was the direct proximate cause — notably the conduct of those operating the crane. See, on this point, Miner v. McNamara,
In view of the foregoing conclusions, it is not necessary to consider the question of contributory negligence on the part of the plaintiffs.
The issues are found for the defendant to the extent hereinabove set forth, and judgment may enter in favor of the defendant in each case without costs.
Since the intervening complaints of Cayuga Foundation Corporation filed in these actions are based on its right to recover either all or part of any damages awarded to plaintiffs Diggs and Arrigone as reimbursement for sums of money it has paid or become obligated to pay to them under the Workmen's Compensation Act, the judgments for defendant in each case are dispositive of these claims also.