Judges: Turner
Filed Date: 2/28/1913
Status: Precedential
Modified Date: 11/9/2024
Opinion of the Court by
Affirming.
This is an equitable action by the City of Louisville against appellee, L. R. Figg Company, and its surety, W. H. Bowser, wherein judgment is sought against them on a guaranty executed in 1910.
It is, in form, an agreed case submitted to the court under section 637 of the Civil Code, it being agreed in the petition that should the court he of opinion that it is the duty of appellees under their guaranty to remedy Ithe admitted defects in the work which they did unde» contract with the city, they will proceed to do so under the supervision and direction of the Board of Public Works and pay the costs-of the action; but thalt if 'it should he determined that appellees were not- required to remedy the defects in said work, the action should he dismissed at the costs of the city.
In 1910 the parties entered into a written contract for ithe reconstruction of Seventh street in the City of Louisville between Walnut and Chestnut streets, with vitrified ¡brick; carefully prepared specifications as ifco the material
“The party of the second part hereby guarantees the work done under this contract, and the materials used in the construction of the same, are free from defects or flaws, and this guarantee is for a term of five years from and after the acceptance of the work by the Board of Public Works. It is hereby especially agreed, and understood that this guarantee shall not include any repairs made necessary by any cause or causes other than defective work or materials in the construction of the improvement. ’ ’
All parties agree that the street so reconstructed by appellees is now in a dilapidated and defective condition and badly in need of repair or reconstruction;' it is admitted by appellant that the bricks, cement and sand used in the work were up to the specifications.
It is the contention of the city that the defective condition grows out of bad workmanship or imperfect preparation of materials on the part of appellee; while it i-s the contention of appellee that the defective condition grows out of the manner in which they were required by the specifications to do the work. The only direct evidence in the record as to whether these' specifications were strictly followed is given by L. B. Figg; and while it appears throughout the record that numerous inspectors and representatives of the city including the City Engineer and Assistant City Engineer carefully supervised and looked over the work, some of them being present ait all times, no one of them is introduced as a witness, except the City Engineer himself, who of course was only present for a short time each day while the work was in progress, and who testifies to no single fact which -came under his personal observation showing that the .specifications were not strictly adhered to.
‘Many expert witnesses were introduced iby both sides, some of them learned and experienced as to the construction of vitrified streets, and as anight be expected, their evidence, based upon hypothetical questions, is in- some respects very conflicting.
Most of the expert testimony of the city was directed at proving that the cement grout or filler which was required to be used after the bricks were laid, was not properly mixed or applied as required by-, the specifications;
The preparation and manner of applying this grout filler were prescribed in minute detail in the specifications, and appellees’ evidence shows strict compliance therewith; the City Engineer himself, who was present part of the time when the same was being prepared and applied, says that i't was done in accordance with the specifications while he was present. The burden of the city’s complaint is that this grout or filler was not prepared or applied in such manner as to fill the cracks between the bricks down deep enough; but that by reason of its imperfect preparation or application, in many places it only went down one-quarter or one-half inch from the top of the bricks, and did not therefore, after it was set, make a strong or solid monolithic mass, whereas, if it had been properly prepared and applied, it would have gone down in between the bricks to the bottom, or near the bottom, and would in that way after being set, have composed a solid and practically indestructable street.
It is true that many of the bricks taken from the street disclosed that this grout or filler only went down a short distance between them, but appellees' contend that that condition did not grow out of the manner in which the grout was prepared or applied’ but grew out of the fact that under the specifications after the brick were laid on a loose layer of sand two inches thick, they were required to be "rolled in such manner, and to such extent, and with such weight, as to force the sand up between the cracks in the bricks and for that reason the grout could descend only until it met the sand.
In support of this view they refer to section nine of the specifications', which is as follows, to-wit:
“After 'the blocks in the pavement are inspected and surface is- swept clean of spawls, the pavement shall be well rolled with a five (5) ton steam roller in the following manner: The blocks next the curb shall be tamped with a band wood tamper to the proper gutter grade. The rolling .shall then commence near the curb at a very slow pace and continue back and forth until the center of the pavement is reached, then begun a't the opposite curb*544 and repeated in the same manner to. 'the center of the carriage-way. After this first passage of the roller the pace may be quickened and the rolling continued until each block is firmly imbedded in the sand cushion. The roller shall then be .started at the end of the block and the pavement rolled transversely at an angle of-forty-five (45°) degrees to the curb; then the rolling shall be repeated in like manner in the opposite direction. Before this transverse rolling takes place all broken or injured blocks .shall be taken up and replaced with perfect ones.”
It is altogether reasonable that with this enormous weight rolling over and over the bricks after they were laid on the cushion 'of loose sand, that the pressure would cause the sand to come up between the cracks in the bricks some considerable distance.
The evidence discloses that some time after the completion o.f this work when vehicles would pass, along the street, there would be a rumbling sound as if they were passing over a cistern or cavity of .some kind, thereby tending to -show that the expansion had caused the bricks to buckle or raise from the concrete foundation, and that heavy traffic over it while in that condition would break and shatter the bricks; this was clearly one of, if not the' chief cause of the imperfect condition of the street. The evidence is ample that this is a natural result where no provision is made for .such expansion and contraction.
The specifications provided for expansion cushions on each side of the street next to the curbs, and prescribed its composition and dimensions; but no provision is made whatever for an expansion cushion lengthwise of the street, and the witness, L. B. Figg, states that on many occasions during the progress of the work, he notified the City Engineer and the city officials that there ought to be expansion cushions every fifty or seventy-five feet lengthwise of the whole work which was 744 feet long.
It is in evidence that the temperature in the City of Louisville varies 120 or 130 degrees at different times of the year, and it is perfectly manifest from a commonsense view that these extremes of temperature should in some way be provided for in the construction of such work.
The chancellor below evidently from his opinion in
Judgment affirmed.