Supreme Court of Michigan.
*216 Keller & Katkowsky, P.C. by Lawrence S. Katkowsky, Southfield, for plaintiff.
Smith, Haughey, Rice & Roegge by Jon D. VanderPloeg and Craig R. Noland, Grand Rapids, for defendant.
MICHAEL F. CAVANAGH, Justice.
In this case, we granted leave to appeal to consider (1) whether the plaintiff's action is governed by the sixty-day notice provision of M.C.L. § 224.21; M.S.A. § 9.121 or the 120-day notice provision of M.C.L. § 691.1404; M.S.A. § 3.996(104), (2) whether our rule in Hobbs v. State Hwys. Dep't, 398 Mich. 90, 247 N.W.2d 754 (1976), requiring a showing of prejudice, should be overruled, and (3) if we reaffirm Hobbs, whether there has been a showing of prejudice in the instant case. We hold that the 120-day notice provision applies in an action for personal injuries against a county road commission. Further, we reaffirm our decision in Hobbs, wherein this Court held that, absent a showing of actual prejudice to the governmental agency, the notice provision is not a bar to the claim. Because the governmental agency has not shown prejudice from the plaintiff's failure to give notice within this period, we reverse the trial court's grant of summary disposition for the road commission, and remand the case for trial on the merits.
On June 12, 1988, plaintiff Billy D. Brown was riding his motorcycle through Filer City, Michigan, near Manistee when he lost control attempting to avert a pothole. He filed a complaint on June 11, 1990, against defendant Manistee County Road Commission, alleging that he sustained serious injuries.
Brown claimed that the defendant was negligent because it failed to maintain the surface of the road under its control. Sixty-one days after the accident occurred, the road commission resurfaced the road. However, there is no allegation that it knew about the accident when it resurfaced the road.
On September 5, 1991, the defendant moved for summary disposition pursuant to MCR 2.116(C)(7), claiming that the plaintiff failed to comply with the sixty-day notice requirement of M.C.L. § 224.21; M.S.A. § 9.121.[1] On November 5, 1991, the trial court held that the plaintiff was subject to the sixty-day notice provision, that the defendant was prejudiced by the plaintiff's failure to serve notice, and thus it granted the defendant's motion for summary disposition. The plaintiff appealed in the Court of Appeals, and the defendant cross-appealed the decision of the trial court with respect to which notice provision governed. The Court of Appeals affirmed the decision of the lower court. 204 Mich.App. 574, 516 N.W.2d 121 (1994). We granted leave to appeal,[2] and reverse the decision of the Court of Appeals.
We begin with the fundamental principle that governmental agencies are statutorily[3] immune from tort liability.[4] The Legislature has, however, provided exceptions to immunity, including liability for failure to properly maintain highways[5] and failure to *217 maintain county roads[6] in reasonable repair. As a condition of this particular waiver of immunity, qualified by Hobbs, the Legislature requires notice of the alleged injury and defect to be served on the appropriate governmental agency. However, the two potentially governing statutes in this case provide different notice periods. M.C.L. § 224.21; M.S.A. § 9.121, addressing county road commission liability, compels the injured party to file a notice of the claim with the clerk and the chairman of the board of county road commissioners within sixty days of the injury.[7] M.C.L. § 691.1404; M.S.A. § 3.996(104), addressing the identical liability for the state, its political subdivisions (including county road commissions),[8] and municipal corporations,[9] requires the injured party to file a notice of the claim with a governmental agency within 120 days of the injury.[10]
In the present case, the trial court denied the defendant's motion for summary disposition on the basis of plaintiff's failure to comply with the 120-day notice provision. It held that the county was not prejudiced by repavement of the road before the expiration of the notice provision.[11] However, if the sixty-day notice provision applies, the defendant may have been prejudiced because after the road was repaved, it was unable to photograph, examine or otherwise evaluate plaintiff's claim. We, therefore, must determine *218 with which notice provision the plaintiff was required to comply. In doing so, we remain loyal to this Court's recent commitment "to interpret the current immunity statute and its exceptions in a manner consistent with the intent of the Legislature." Scheurman v. Dep't of Transportation, 434 Mich. 619, 627, 456 N.W.2d 66 (1990).
We have previously discerned the legislative intent "to provide uniform liability and immunity to both state and local government agencies." Ross v. Consumers Power Co. (On Rehearing), 420 Mich. 567, 614, 363 N.W.2d 641 (1984). We, therefore, note that the distinct notice periods in the two statutes are suspect because it is clear that M.C.L. § 691.1404; M.S.A. § 3.996(104) and M.C.L. § 224.21; M.S.A. § 9.121 govern identical causes of action for defective road and highway maintenance. By providing different notice periods, the legislation divides injured persons into two classes: those injured on a defective road controlled by a county road commission and those injured on a defective road controlled by other governmental agencies. Accordingly, we must determine whether this distinction implicates the Equal Protection Clause.[12]
Unless the legislation creates a "classification scheme," or "impinges upon the exercise of a fundamental right," it is "accorded a presumption of constitutionality, and is reviewed by applying a rational basis standard."[13]Doe v. Dep't of Social Services, 439 Mich. 650, 662, 487 N.W.2d 166 (1992). This presumption requires the court to inquire whether "``any state of facts either known or which could reasonably be assumed affords support'" for the distinction between the notice provisions. Shavers v. Attorney General, 402 Mich. 554, 613-614, 267 N.W.2d 72 (1978).[14]
The only purpose that this Court has been able to posit for a notice requirement is to prevent prejudice to the governmental agency:
[A]ctual prejudice to the state due to lack of notice within 120 days is the only legitimate purpose we can posit for this notice provision.... [Hobbs, supra at 96, 247 N.W.2d 754.]
Notice provisions, therefore, permit a governmental agency to gather evidence quickly in order to evaluate a claim. In contravention of the stated purpose of the notice provision in Hobbs, defendant claims that another purpose for the notice provision is to enable the county to remedy any road defects and prevent future injury. A county cannot be prejudiced with respect to the injured party's claim, as required by Hobbs, to enforce the notice provision because of the possibility of a future injury. A future injury does not affect a governmental agency's ability to defend itself against the original claim.
The notice provision has the same purpose, therefore, irrespective of whether the action is brought against the state, a city, township, or county road commission. However, an injured person with a negligent highway cause of action against a "political subdivision" must comply with the 120-day notice provision in M.C.L. § 691.1404; M.S.A. § 3.996(104), whereas a person with an identical cause of action against a county road commission must comply with the sixty-day notice provision in M.C.L. § 224.21; M.S.A. § 9.121. Thus, a person injured in a county in which there is no county road commission would be required to file notice of the claim within 120 days, whereas an identical person injured in a county that has a county road commission would be required to provide notice *219 within sixty days to the county road commissioner.
Therefore, despite a presumption of constitutionality, we are unable to perceive a rational basis for the county road commission statute to mandate notice of a claim within sixty days. During oral argument, attorney for defendant asserted that one could only "surmise" that the distinction is justified by the county road commission's responsibility for "many miles of rural road." However, we believe that there are no "facts either known or which could reasonably be assumed" that indicate a road commission requires a shorter notice period merely because it is responsible for rural roads.[15]Shavers, supra at 613-614, 267 N.W.2d 72. This fact bears no relationship to the stated purpose of the notice provision. There may be no dispute that the governmental agencies under M.C.L. § 691.1401(e); M.S.A. § 3.996(101)(e) are likewise responsible for many miles of rural roads, highways, and streets. Accordingly, the distinct sixty-day notice provision required for claims against a county road commission is unconstitutional.
We must now determine whether the 120-day notice provision is reasonable. Carver v. McKernan, 390 Mich. 96, 211 N.W.2d 24 (1973). In Carver, the Court held that a notice provision with a legitimate purpose "does not necessarily violate the constitution." Id. at 100, 211 N.W.2d 24. The Court held, however, that "even though some notice requirement may be permitted, a particular provision may still be constitutionally deficient." Id. Upholding the six-month notice requirement of the accident claims act, M.C.L. § 257.1118; M.S.A. § 9.2818,[16] the Court also noted that a particular notice provision may be unreasonable if "the time specified in the notice [provision is] for an extremely short period...." Id.
We do not believe that a 120-day notice provision is unreasonably short. Both the six-month notice provision in Carver and the present 120-day notice provision provide a claimant sufficient time to serve the governmental agency with notice of an alleged injury and corresponding defect. Our decision is clearly supported by this Court's subsequent decision in Hobbs, supra, in which we upheld the exact 120-day notice requirement of M.C.L. § 691.1404; M.S.A. § 3.996(104). Accordingly, we would hold that the plaintiff's cause of action is subject to the 120-day notice provision.
We do not agree with the conclusion of the dissenting opinion that Hobbs should be overruled; rather, the doctrine of stare decisis mandates its reaffirmance.[17] Additionally, despite the Legislature's ability to change the statutory language or disapprove of this Court's interpretation of § 4, it has acquiesced in the Hobbs decision for nearly twenty years.
This Court has stated on many occasions that "``[u]nder the doctrine of stare decisis, principles of law deliberately examined and decided by a court of competent jurisdiction should not be lightly departed.'" Boyd v. W G Wade Shows, 443 Mich. 515, 525, n. 15, 505 N.W.2d 544 (1993), quoting People v. Jamieson, 436 Mich. 61, 79, 461 N.W.2d 884 (1990). Further, this Court has stated that it "will not overrule a decision deliberately made unless [it] is convinced not merely that the case was wrongly decided, but also that less injury would result from overruling than from following it." Boyd at 524, 505 N.W.2d 544 (citation omitted).
*220 Moreover, this Court has consistently opined that, absent the rarest circumstances, we should remain faithful to established precedent. We have stated:
"The rule of stare decisis establishes uniformity, certainty, and stability in the law.... Only in the rare case when it is clearly apparent that an error has been made, or changing conditions result in injustice by the application of an outmoded rule, should we deviate from following the established rule." [People v. Collins, 438 Mich. 8, 41-42, 475 N.W.2d 684 (1991) (Cavanagh, C.J., dissenting), quoting Parker v. Port Huron Hosp., 361 Mich. 1, 10, 105 N.W.2d 1 (1960).]
With these principles in mind, we do not believe that Hobbs should be overruled. When this Court decided Hobbs in 1976, it carefully examined the notice provision and the reasons justifying it. In that case, this Court deliberately decided that actual prejudice to the governmental agency resulting from lack of notice within 120 days was the only legitimate purpose it could posit for the notice provision. Further, this Court deliberately decided that, unless actual prejudice is shown, the plaintiff's claim is not barred by failure to give notice within the requisite period.
We are not convinced that Hobbs was wrongly decided. Further, we believe that more injury would result from overruling it than from following it. The rule in Hobbs has been an integral part of this state's governmental tort liability scheme for almost two decades. It should not be lightly discarded. Although the law of governmental tort liability in this state has changed over the years, the continued validity of the Hobbs rule will not result in injustice. Rather, a reaffirmance of the rule will maintain the uniformity, certainty, and stability in the law of this state.
Further, we emphasize that the Legislature has not changed the language of § 4 since Hobbs was decided.[18] For decades, this Court has recognized that stare decisis applies to decisions construing statutes, especially where the Legislature acquiesces in this Court's construction by its failure to change the language of the construed statute. See Boydat 525, 505 N.W.2d 544, citing Consumers Power Co. v. Muskegon Co., 346 Mich. 243, 78 N.W.2d 223 (1956). Further, this Court has stated:
"When, over a period of many years, the Legislature has acquiesced in this Court's construction of a statute, the judicial power to change that interpretation ought to be exercised with great restraint. On more than one occasion our Court has quoted with approval the statement that stare decisis ``is especially applicable where the construction placed on a statute by previous decisions has been long acquiesced in by the legislature, by its continued use or failure to change the language of the statute so construed, the power to change the law as interpreted being regarded, in such circumstances, as one to be exercised solely *221 by the legislature.'" [Boyd at 525-526, 505 N.W.2d 544, quoting Dean v. Chrysler Corp., 434 Mich. 655, 664, 455 N.W.2d 699 (1990), quoting Consumers Power Co. v. Muskegon Co. at 251, 78 N.W.2d 223, quoting 21 CJS, Courts, § 214, pp 388-390. See also In re Clayton Estate, 343 Mich. 101, 107, 72 N.W.2d 1 (1955).]
Because the Legislature has not reacted to this Court's interpretation of § 4 in the nearly twenty years since Hobbs was decided, we conclude that the Legislature has acquiesced in our interpretation of the statute. Smith v. Detroit, 388 Mich. 637, 650, 202 N.W.2d 300 (1972). Apparently, the Legislature has been content with the way this Court has interpreted § 4.[19]
We reverse the holding of the Court of Appeals that the sixty-day provision applies, and hold that the 120-day notice provision applies to lawsuits against a county road commission. Further, we hold that Hobbs is still good law. Finally, we hold that the defendant road commission has not established that it has suffered prejudice from the plaintiff's failure to serve notice within the 120-day period, because it repaved the road before the expiration of the notice period.
We remand for trial on the merits.
BRICKLEY, C.J., and LEVIN and MALLETT, JJ., concur with CAVANAGH, J.
WEAVER, J., not participating. RILEY, Justice (dissenting).
Although I agree with the majority's conclusion that plaintiff must comply with the 120-day notice requirement, I dissent because I would reject the requirement of prejudice engrafted upon the statutory notice provision by Hobbs v. Dep't of State Hwys., 398 Mich. 90, 247 N.W.2d 754 (1976). Accordingly, on the basis of the facts before the Court, I would hold that the statutory notice requirement bars plaintiff's cause of action. Although the Court of Appeals improperly concluded that the sixty-day notice provision governed, it properly upheld the trial court's grant of defendant's motion for summary disposition. Therefore, I would affirm the decision of the Court of Appeals on different grounds.
The statutory provision at issue in this case is straightforward, clear, and unambiguous. Nevertheless, this Court previously engrafted a requirement of prejudice upon it. The requirement has its origins in Reich v. State Hwy. Dep't, 386 Mich. 617, 194 N.W.2d 700 (1972), in which this Court, in acursory opinion, struck down the sixty-day notice requirement as violative of the Equal Protection Clauses of the state and federal constitutions. The Court reasoned that the notice requirement divided the natural class of victims of negligent tortfeasors into arbitrary subclasses: victims of governmental negligence who must meet the notice requirement and victims of private negligence who are not subject to the notice requirement.
However, in Carver, supra, the Court retreated from this position and held that notice provisions are not necessarily unconstitutional. The Court upheld the constitutionality of notice provisions in cases in which prejudice to the government for failure to give such notice could be demonstrated.
In the Court's subsequent decision in Hobbs, supra at 96, 247 N.W.2d 754, the Court upheld Carver and specifically required a showing of prejudice to the state before enforcement of the notice provision:
Because actual prejudice to the state due to lack of notice within 120 days is the only legitimate purpose we can posit for this notice provision, absent a showing of such prejudice the notice provision contained in M.C.L. § 691.1404; MSA 3.996(104) is not a bar to claims filed pursuant to M.C.L. § 691.1402; MSA 3.996(102). *222 This "constitutional" requirement engrafted by the Court is illusory. I note that "[w]hen scrutinizing economic and social legislation, this Court applies the rational basis standard of review." Downriver Plaza Group v. Southgate, 444 Mich. 656, 666, 513 N.W.2d 807 (1994). The only inquiry, then, is whether this social legislation creating a 120-day notice requirement has a rational basis.
This particular legislation passes the minimal rational basis test, and the Court in Hobbs was without authority to require a showing of prejudice in each and every case. Notice provisions rationally and reasonably provide the state with the opportunity to investigate and evaluate a claim. The mere fact that in some cases the legislation prevents prejudice to the government by itself is a rational basis. No further "constitutional" analysis is permitted. Certainly, if the Legislature may provide no recovery at all, it may place a condition on recovery, i.e., a reasonable notice provision.[1] The Court in Carver and Hobbs erred in that both failed to properly analyze this social legislation under the rational basis standard. Erroneously concluding that prejudice had to be shown in every case to preserve the legislation's constitutionality, the Court ignored the rational basis test and created the prejudice requirement.
The statute clearly survives rational basis scrutiny and, is constitutional. The statute, therefore, must be read and applied as written.[2] In contrast, this Court in Hobbs created a condition for the application of a notice requirement that is not supported by the language of the statute.
Hobbs is, therefore, in clear derogation of the fundamental precepts of statutory construction. I am unable to agree with this judicial intrusion into a legislative function.[3] As Justice Carr noted in Williams v. Detroit, 364 Mich. 231, 235, 111 N.W.2d 1 (1961):
The admission of the obvious fact that a change in the policy of governmental immunity from liability in cases of the nature here involved is within the scope of legislative authority carries with it the further admission that such action is not within the scope of judicial powers.
Although I agree with the result in Hobbs that notice provisions are constitutional, I cannot agree with its rationale. This conclusion remains loyal to our recent decision in Ross v. Consumers Power Co. (On Rehearing), 420 Mich. 567, 363 N.W.2d 641 (1984), where we stated that the grant of immunity "is expressed in the broadest possible language...." Id. at 618, 363 N.W.2d 641. The statutory exceptions, however, are "narrowly drawn." Id. Plaintiff in this case is only able to bring his court action because the Legislature created an exception to governmental immunity. The Legislature requires timely notice of such a claim as quid pro quo for its relinquishment of immunity. I would uphold this notice requirement as written by the Legislature.
The majority relies on legislative acquiescence to uphold the Hobbs prejudice requirement.[4] This argument is wholly without merit. In Hobbs, the Court upheld the constitutionality of the 120-day notice provision provided that prejudice be read into the statute. To overcome the previously adjudged *223 constitutional infirmities of notice requirements, the Hobbs Court simply held, albeit improperly, that actual prejudice to the state was the only legitimate purpose for the notice provision. Accordingly, the Court held that the requirement of prejudice saved the statute from constitutional infirmity. The Legislature, therefore, was without authority during the past twenty years to eliminate the prejudice requirement which the Hobbs Court engrafted upon the statute. The dissent's legislative acquiescence argument ignores the fundamental principle that "[c]onstruction of the constitution is the province of the courts and this Court's construction of a State constitutional provision is binding on all departments of government, including the legislature." Richardson v. Secretary of State, 381 Mich. 304, 309, 160 N.W.2d 883 (1968). Accordingly, principles of legislative acquiescence are not relevant to this case.[5]
While I agree that plaintiff's equal protection rights are violated by applying two distinct notice periods to the same cause of action for defective road and highway maintenance, I am not persuaded that the rule in Hobbs, requiring a showing of prejudice to the governmental agency, is supportable and would therefore overrule that decision. Proper application of the statute bars plaintiff's cause of action because he failed to provide the county road commission with notice of his claim within 120 days of his injury. Accordingly, the decision of the Court of Appeals should be affirmed on different grounds.
BOYLE, J., concurs with RILEY, J.
[1] On March 18, 1991, the trial court denied a previous defense motion for summary disposition on the basis of the plaintiff's failure to comply with the 120-day notice requirement. M.C.L. § 691.1404; M.S.A.§ 3.996(104).
[2] 449 Mich. 860, 535 N.W.2d 793 (1995).
[3] Common-law sovereign immunity was abrogated by statute. Pittman v. City of Taylor, 398 Mich. 41, 247 N.W.2d 512 (1976).
[4] Except as otherwise provided in this act, all governmental agencies shall be immune from tort liability in all cases wherein the government agency is engaged in the exercise of discharge of a governmental function. [M.C.L. § 691.1407(1); M.S.A. § 3.996(107)(1).]
For a review of sovereign immunity and its origins and development in this state, see Ross v. Consumers Power Co. (On Rehearing), 420 Mich. 567, 618, 363 N.W.2d 641 (1984).
[5] M.C.L. § 691.1402; M.S.A. § 3.996(102) provides in relevant part:
Each governmental agency having jurisdiction over any highway shall maintain the highway in reasonable repair so that it is reasonably safe and convenient for public travel. Any person sustaining bodily injury or damage to his or her property by reason of failure of any governmental agency to keep any highway under its jurisdiction in reasonable repair, and in condition reasonably safe and fit for travel, may recover the damages suffered by him or her from the governmental agency.... The duty of the state and the county road commissions to repair and maintain highways, and the liability therefor, shall extend only to the improved portion of the highway designed for vehicular travel and shall not include sidewalks, crosswalks, or any other installation outside of the improved portion of the highway designed for vehicular travel.
[6] M.C.L. § 224.21; M.S.A. § 9.121 specifically addresses the county road commission's liability and states in relevant part:
It is hereby made the duty of the counties to keep in reasonable repair, so that they shall be reasonably safe and convenient for public travel, all county roads, bridges and culverts that are within their jurisdiction and under their care and control and which are open to public travel.
[7] [N]o board of county road commissioners, subject to any liability under this section, shall be liable for damages sustained by any person upon any county road, either to his person or property, by reason of any defective county road, bridge or culvert under the jurisdiction of the board of county road commissioners, unless such person shall serve or cause to be served within 60 days after such injury shall have occurred, a notice in writing upon the clerk and upon the chairman of the board of county road commissioners of such board, which notice shall set forth substantially the time when and place where such injury took place, the manner in which it occurred, and the extent of such injuries as far as the same has become known, the names of the witnesses to said accident, if any, and that the person receiving such injury intends to hold such county liable for such damages as may have been sustained by him. It is the intention that the provisions of this section shall apply to all county roads whether such roads become county roads under chapter 4 of the general highway laws.... [Emphasis added.]
[8] "Political subdivision" means any municipal corporation, county, county road commission, township, charter township, school district, community college district, port district, or metropolitan district, transportation authority, or any combination thereof.... [M.C.L. § 691.1401(b); M.S.A. § 3.996(101)(b).]
On July 1, 1986, the Legislature amended this definition to include "county road commission." Actions against a county road commission would seemingly be within the statute's purview. Notwithstanding this amendment, a reference in M.C.L. § 691.1402; M.S.A. § 3.996(102) to M.C.L. § 224.21; M.S.A. § 9.121 for "liability, procedure and remedy as to county roads under the jurisdiction of a county road commission" remains. This language is clear and unambiguous, therefore, it is not susceptible to statutory construction: "When a statute is clear and unambiguous, judicial construction or interpretation is unnecessary and therefore, precluded." Lorencz v. Ford Motor Co., 439 Mich. 370, 376, 483 N.W.2d 844 (1992).
[9] "Municipal corporation" means any city, village, township or charter township, or any combination thereof, when acting jointly. [M.C.L. § 691.1401(a); M.S.A. § 3.996(101)(a).]
[10] As a condition to any recovery for injuries sustained by reason of any defective highway, the injured person, within 120 days from the time the injury occurred, except as otherwise provided in subsection (3) shall serve a notice on the governmental agency of the occurrence of the injury and the defect. The notice shall specify the exact location and nature of the defect, the injury sustained and the names of the witnesses known at the time by the claimant. [M.C.L. § 691.1404(1); M.S.A. § 3.996(104)(1).]
[11] Defendant essentially prejudiced itself by repaving, albeit unknowingly, before the expiration of the notice period in this particular case.
[12] This is not the same equal protection issue raised in Reich v. State Hwy. Dep't, 386 Mich. 617, 194 N.W.2d 700 (1972). In Reich, the Court held that the Equal Protection Clause was violated because notice requirements placed tortfeasors in two arbitrary classes: "private tortfeasors to whom no notice of claim is owed and governmental tortfeasors to whom notice is owed." Id. at 623, 194 N.W.2d 700. This Court is no longer persuaded that notice requirements are unconstitutional per se. Hobbs, supra.
[13] Social or economic legislation is generally subject to review under traditional equal protection tests, i.e., whether the legislation may be reasonably justified. People v. Perlos, 436 Mich. 305, 462 N.W.2d 310 (1990).
[14] Citing United States v. Carolene Products Co., 304 U.S. 144, 58 S.Ct. 778, 82 L.Ed. 1234 (1938).
[15] Moreover, this arbitrary distinction does not even apply to Wayne County.
[16] This rationale applies equally to claims brought pursuant to the governmental liability act. Hobbs, supra.
[17] In Boyd v. W G Wade Shows, 443 Mich. 515, 526, n. 16, 505 N.W.2d 544 (1993), this Court quoted with approval Burnet v. Coronado Oil & Gas Co., 285 U.S. 393, 406, 52 S.Ct. 443, 447, 76 L.Ed. 815 (1932) (Brandeis, J., dissenting), for the premise:
"Stare decisis is usually the wise policy, because in most matters it is more important that the applicable rule of law be settled than that it be settled right.... This is commonly true even where the error is a matter of serious concern, provided correction can be had by legislation."
[18] In Carver v. McKernan, 390 Mich. 96, 211 N.W.2d 24 (1973), this Court held that notice provisions are not necessarily unconstitutional. The provision may be constitutional if there is a legitimate purpose for it, and if the time specified is not an unreasonably short period. It was in Carver that we recognized that a governmental agency could be prejudiced by a plaintiff's failure to give notice. We held that the governmental agency must have the opportunity to show prejudice, and, if prejudice is shown, the claim will be barred.
When Hobbs was decided three years later we held:
The rationale of Carver is equally applicable to cases brought under the governmental liability act. Because actual prejudice to the state due to lack of notice within 120 days is the only legitimate purpose we can posit for this notice provision, absent a showing of such prejudice the notice provision contained in M.C.L. § 691.1404; M.S.A. § 3.996(104) is not a bar to claims filed pursuant to M.C.L. § 691.1402; M.S.A. § 3.996(102). [Id. at 96, 211 N.W.2d 24.]
The difficulty we experienced in Hobbs was that we could not posit another purpose for the notice provision other than to prevent prejudice to the state. If the Legislature was not happy with our presumption, it could have responded in some fashion to the Hobbs decision. It could have further articulated the notice provision's purpose and possibly have created a presumption of prejudice to the governmental agency from the plaintiffs' failure to give notice within 120 days. However, not only has the Legislature not attempted to revise the statute to respond to Hobbs, it also has not even criticized Hobbs in later legislative enactments or amendments in the almost twenty years since it was decided.
[19] As this Court stated in Sheppard v. Michigan Nat'l Bank, 348 Mich. 577, 631-632, 83 N.W.2d 614 (1957), citing Twork v. Munising Paper Co., 275 Mich. 174, 178, 266 N.W. 311 (1936):
When the Supreme Court has placed an interpretation on a statute over a considerable period of years it may indulge in the judicial assumption that the legislature has been content with that interpretation because of its failure to exercise its independent prerogative to restate the provision.
[1] As noted by Justice Coleman in her dissent in Hobbs, unlike private tortfeasors, the state must consent to be sued. She noted that the Legislature placed conditions on its surrendering of a portion of its immunity, i.e., the claim must be brought in the Court of Claims, there is a two-year statute of limitations for injuries resulting from a defective highway, and the governmental agency must be notified of the claim within 120 days of its occurrence.
[2] "If the language used is clear and the meaning of the words chosen is unambiguous, a common-sense reading of the provision will suffice, and no interpretation is necessary." Karl v. Bryant Air Conditioning, 416 Mich. 558, 567, 331 N.W.2d 456 (1982) (citations omitted). The fundamental principles of statutory construction were best summarized in Grand Traverse Co. v. State of Michigan, 450 Mich. 457, 464, 538 N.W.2d 1 (1995): "[O]ur duty is to give effect to the intent of the Legislature as expressed by the plain meaning of the statute."
[3] Justice Coleman aptly noted that "the law does not permit amendment of legislation by court edict." Kerkstra v. Highway Dep't, 398 Mich. 103, 109, 247 N.W.2d 759 (1976) (Coleman, J., dissenting).
[4] The majority also relies in large part on principles of stare decisis. As this Court previously stated in Wilson v. Doehler-Jarvis, 358 Mich. 510, 514, 100 N.W.2d 226 (1960):
Notwithstanding appellant's quoted understanding of the oft-discussed doctrine of stare decisis, this Court will not close its eyes to a possible error it may have committed in the past. We do not believe that the doctrine of stare decisis means that this Court and the evolution of the law should be controlled by the "dead hand from the past."
Nor do we believe that this Court must perpetuate error simply because it may have reached a wrong result in one of its earlier decisions.
Having concluded that this Court failed to apply the proper constitutional scrutiny, i.e., rational basis, and improperly engrafted a prejudice requirement, stare decisis is not a credible basis to perpetuate this error.
[5] As Justice Cavanagh noted in People v. Bullock, 440 Mich. 15, 27, 485 N.W.2d 866 (1992), "this Court alone is the ultimate authority with regard to the meaning and application of Michigan law."
In Re Certified Questions , 416 Mich. 558 ( 1982 )
Scheurman v. Department of Transportation , 434 Mich. 619 ( 1990 )
Reich v. State Highway Department , 386 Mich. 617 ( 1972 )
Boyd v. W G Wade Shows , 443 Mich. 515 ( 1993 )
In Re Clayton Estate , 343 Mich. 101 ( 1955 )
People v. Perlos , 436 Mich. 305 ( 1990 )
Williams v. City of Detroit , 364 Mich. 231 ( 1961 )
Sheppard v. Michigan National Bank , 348 Mich. 577 ( 1957 )
Smith v. City of Detroit Swarthout , 388 Mich. 637 ( 1972 )
Pittman v. City of Taylor , 398 Mich. 41 ( 1976 )
Hobbs v. Department of State Highways , 398 Mich. 90 ( 1976 )
Ross v. Consumers Power Co. , 420 Mich. 567 ( 1985 )
Wilson v. Doehler-Jarvis Division of National Lead Co. , 358 Mich. 510 ( 1960 )
Twork v. Munising Paper Co. , 275 Mich. 174 ( 1936 )
People v. Collins , 438 Mich. 8 ( 1991 )
Brown v. Manistee County Road Commission , 204 Mich. App. 574 ( 1994 )
Downriver Plaza Group v. Southgate , 444 Mich. 656 ( 1994 )
Consumers Power Co. v. County of Muskegon , 346 Mich. 243 ( 1956 )
Carver v. McKernan , 390 Mich. 96 ( 1973 )
Moss v. Bierl , 134 F. App'x 806 ( 2005 )
20221122_C359999_35_359999.Opn.Pdf ( 2022 )
Beasley v. State , 483 Mich. 1025 ( 2009 )
Lamp v. Reynolds , 249 Mich. App. 591 ( 2002 )
Ward v. Michigan State University , 287 Mich. App. 76 ( 2010 )
Paige v. City of Sterling Heights , 476 Mich. 495 ( 2006 )
Karaczewski v. Farbman Stein & Co. , 478 Mich. 28 ( 2007 )
Trent v. Suburban Mobility Authority for Regional ... , 252 Mich. App. 247 ( 2002 )
Neal v. Oakwood Hospital Corp. , 226 Mich. App. 701 ( 1998 )
Rowland v. Washtenaw County Road Commission , 477 Mich. 197 ( 2007 )
Ells v. EATON COUNTY ROAD COM'N , 739 N.W.2d 87 ( 2007 )
Esselman v. GARDEN CITY HOSP. , 780 N.W.2d 781 ( 2010 )
ANGLERS OF AuSABLE v. DEPT. OF ENVTL. QLTY. , 777 N.W.2d 407 ( 2010 )
Colaianni v. Stuart Frankel Dev. Corp. , 485 Mich. 1070 ( 2010 )
Blohm v. EMMET CTY. RD. COMM'RS , 223 Mich. App. 383 ( 1997 )
Glancy v. City of Roseville , 457 Mich. 580 ( 1998 )
Rowland v. WASHTENAW COUNTY ROAD COMMISSION , 474 Mich. 1099 ( 2006 )
Mason v. CASS CTY. BD., RD. COMM'RS , 221 Mich. App. 1 ( 1997 )
Robertson v. DaimlerChrysler Corp. , 465 Mich. 732 ( 2002 )