DocketNumber: Docket No. 63774
Citation Numbers: 126 Mich. App. 770
Judges: Burns, MacKenzie, Quinnell
Filed Date: 7/6/1983
Status: Precedential
Modified Date: 10/18/2024
Defendant Bruce Moore appeals the trial court’s order enjoining him to remove improvements to his driveway which obstruct his neighbor’s adjacent easement. Defendant seeks reversal of the trial court’s order denying his request for a writ of mandamus against the Ottawa County Road Commission.
In 1965, plaintiff Warren Warber and his wife purchased several lots in Spring Lake Township, Ottawa County. Adjoining plaintiff’s lots is an unnamed easement, approximately 20 feet wide, which plaintiff has used for several years to gain access to one of his lots which abuts Spring Lake. Plaintiff acquired an undivided one-seventh interest in this easement when he purchased the lots. Others have occasionally used the easement.
Intersecting the easement and adjacent to plaintiff’s lots was an unimproved "two-track” right-of-way called Bayou Lane, which had been dedicated as a public road when the plat was recorded in 1923. The two-track feature of Bayou Lane is evidence that it had been used at least occasionally over the years. The intersection of plaintiff’s easement and Bayou Lane is the focal point of this case.
In 1976, defendant Bruce Moore and his wife purchased the lakefront lots on the other side of the easement. Defendant built a lakefront residence, relying on Bayou Lane as the sole means of access to the residence. When Moore bought his lot, the only evidence of use along plaintiff’s 20-foot easement was a small path along its southern edge. At the center of the easement, at the intersection of the easement and Bayou Lane, there was a relatively deep gully or ravine which rendered Bayou Lane impassable and hazardous as a means of access to defendant’s residence during the winter months.
Moore proceeded to add several feet of gravel to fill the ravine at the intersection of Bayou Lane and the easement. The result was that the grade along the east 28 feet of the easement was increased from about 14% to about 28%. Bayou Lane’s grade was reduced appreciably, and the road became sufficiently passable to enable Moore to use it regularly as an access to his residence.
Plaintiff filed this action to have Moore remove the improvement. No other neighbors who had previously used the easement joined in this action.
Trial was held May 2, 1978. The trial court found that defendant’s actions materially changed the grade of Bayou Lane and that this change effectively prevented plaintiff’s reasonable access between Bayou Lane and the easement for the passage of vehicles, equipment and boats. The trial court held that defendant had unlawfully changed the grade of a public road, an act which only the commission had authority to do. The trial court proposed that the commission become involved in fashioning a remedy, suggesting that if the means proposed by the commission were not agreeable to the parties, then the trial court would direct the action to be taken.
It became apparent by March 31, 1980, that the
Following hearings at which a commission engineer testified, the trial court concluded that no feasible compromise or alternative had been presented and ordered defendant to restore Bayou Lane to its original grade. Judgment was entered April 20, 1981.
Defendant moved for a new trial and alleged that the trial court failed to address his petition for mandamus. On February 3, 1982, the trial court issued its final opinion in this matter, ruling that the establishment of a grade for Bayou Lane was "discretionary in nature” and not subject to mandamus.
This case presents the unusual question of whether a party who has made an improvement to a public roadway in reliance upon a permit secured in good faith from a county road commission may subsequently be enjoined to remove that improvement where (1) the commission’s engineers acknowledged that an improvement was necessary to eliminate a safety hazard inherent in the original condition of the roadway, (2) the commission’s permit failed to formally establish a grade for the improved roadway, and (3) the grade of the improvement has the effect of blocking an abutting easement owner’s access to the roadway. Underlying this dispute is the more fundamental question of whether, under the circumstances, the commission can be compelled by a writ of mandamus to establish at least some grade for the roadway.
We note at the outset that mandamus is available only where there is a legal duty incumbent upon a public agency, the person seeking manda
Both the trial court and the commission have relied heavily on Bd of County Road Comm’rs of Oakland County, supra, for the proposition that, because the commission’s decision whether or not to set a grade for a public highway is "discretionary” in nature, mandamus is inappropriate. We believe that such reliance is misplaced. That case rejected an attempt to require the State Highway Commission to complete the construction of Northwestern Highway in Oakland County — a project which the State Highway Commission had undertaken pursuant to a contract executed by the parties to that case. There, the party seeking mandamus sought to require the State Highway Commission and its officers not only to exercise its discretion, but to do so in a particular way (namely, completing the project even though funds for construction had run out due to cost overruns). This Court held that mandamus should be unavailable for three reasons. First, this Court observed that the State Highway Commission had no clear legal duty to exercise its discretion in a particular way. Second, the Court stated that mandamus should not be available to compel public officers to perform a duty assumed by contract. Finally, the Court found mandamus inappropriate anyway because an alternative remedy was available, i.e., a suit for specific performance of the parties’ contract governing the Northwestern Highway project. 79 Mich App 507-509, 512.
Contrast the present case, where defendant has merely asked the trial court to require some exer
While neither plaintiff nor the commission cite any case authority for the proposition, we will assume arguendo that the establishment of a particular grade on a public highway is a discretionary act not subject to a writ of mandamus. However, although "[t]he opening up of new streets and highways is a matter which is generally left to the discretion and judgment of the proper officials, * * * mandamus will issue to compel the public authorities to proceed to exercise the discretion vested in them [even though] it will not be granted to control or alter their decision in the matter * * 52 Am Jur 2d, § 221, pp 549-550. (Emphasis added; footnotes omitted.) See also 52 Am Jur 2d, § 77, pp 398-399, which states the following established principle:
"A public officer is in duty bound to exercise the judgment or discretion which is reposed in him by law. If he fails or refuses to do so, and does not act upon the subject or pass upon the question on which such judgment or discretion is to be exercised, then the writ of mandamus may be used to enforce obedience to the law. In other words, when in matters involving discretion*778 the respondent refuses to act at all, mandamus may issue to move him to action and to exercise his discretion in the matter. * * * The relator in such cases merely asks that the respondent make a decision one way or the other. He does not seek to use the writ to compel or control a decision in any particular way * * (Emphasis added; footnotes omitted.)
No party here points to any Michigan cases adopting the foregoing principle and no cases applying this principle have been decided under GCR 1963, 710.1(1) or GCR 1963, 714, governing the issuance of writs of mandamus. However, we find no reason to question the applicability of the foregoing principle in cases such as the present one where the public agency involved (the highway commission) has issued a permit for an improvement to a public roadway, thereby asserting its jurisdiction over that roadway, yet flatly refuses to exercise its discretion regarding at least one crucial aspect of the improvement to the roadway, namely, the establishment of the grade which would result from the improvement and which would render the improvement safe and appropriate.
The commission has undertaken a duty to exercise its discretion in the instant case by taking steps which not only acknowledge its jurisdiction over Bayou Lane but also express its willingness to supervise defendant’s improvement. These steps included the issuance of a permit, the submission of a report to the trial court acknowledging the need for defendant’s improvement in order to render Bayou Lane safe and passable, and submission of testimony describing the commission’s report to the trial court as a "recommendation” that defendant’s improvement be left unchanged and that additional work be done on the area to restore plaintiffs access from his easement. This
We further find that defendant Moore has no alternative remedies available. This is not a situation like that in Bd of County Road Comm’rs of Oakland County, supra, where the party seeking mandamus had a cognizable alternative remedy at law such as an action on a contract. In the proceedings before the trial court, the commission acknowledged the necessity of Moore’s improvement and that Bayou Lane’s original condition presented a hazard.
Furthermore, the commission’s assertion that Moore has failed to exhaust administrative proceedings under MCL 41.271; MSA 9.571 is without merit in light of the fact that Moore has already applied for a permit to improve Bayou Lane and the commission has granted the application. Thus, Moore is without any alternative remedy at law or in equity which would bar his request for mandamus. Thus, the trial court erred in failing to issue
The trial court should not have ordered defendant Moore to remove the improvement to Bayou Lane absent a determination by the commission as to the proper grade for that roadway. On remand, the trial court shall issue a writ of mandamus requiring the commission to determine the proper grade for Bayou Lane. The trial court’s remedy in the present action may then be based upon its undisputed finding that the improvement interfered with plaintiff’s legitimate use of the adjoining easement, consistent with the commission’s determination of the proper grade for Bayou Lane.
Reversed and remanded. No costs, a public question.