DocketNumber: No. 8426.
Citation Numbers: 144 P.2d 186, 115 Mont. 362, 1943 Mont. LEXIS 75
Judges: Adair, Morris, Johnson, Anderson, Erickson
Filed Date: 11/18/1943
Status: Precedential
Modified Date: 10/19/2024
Failure of the Lower Court to Rule upon Objections. The supreme court is not a trial court, but is a court of review. The party against whom the trial court rules is entitled to have that ruling reviewed by this court. But, if the lower court refuses to rule, then there is nothing to review, unless this court becomes a trial court and rules by conjecture and suspicion. The duties of the trial court should be performed by that court. When it errs in a ruling, it may then be set right by this court. When a trial court, as in this case, throughout a protracted trial, refuses to rule upon evidence offered by both parties, its refusal constitutes *Page 366 an abuse of judicial discretion which can only be remedied by a reversal of the judgment.
The practice followed by the trial court was condemned in 1933 (Gilcrest v. Bowen,
The Complaint Does Not State a Cause of Action. It nowhere alleges performance of the contract by either Coast Engineering Company or respondent up to the time of termination. If the action is properly brought upon the contract it was incumbent upon respondent to allege performance on the part of himself and Coast Engineering Company. (Sutton v. Lowry,
The complaint affirmatively alleges, and the lien affirmatively shows that on January 24th, 1941 the contract was terminated in accordance with its provisions. It is elementary that when a contract is terminated pursuant to its express terms it is at an end for all purposes as a binding obligation upon either party, *Page 367
and cannot thereafter be made the basis of an action. (Edwards
v. Muri,
Neither Coast Engineering Company nor respondent supplied or furnished the labor or materials going to make up the items in question in that they failed to pay for such labor or materials. Having failed to perform the contract in such respect, plaintiff cannot claim a lien against the property of appellants. (Cockrill v. Davie,
On November 20th, 1940 Coast Engineering Company assigned "all its right, title and interest to the said Lester L. Smith in and to any and all contracts heretofore made by the Coast Engineering Company, a corporation, covering the State of Montana." The assignment did not convey to Smith the amount earned by and due to Coast Engineering Company on November 20th, 1940 as alleged in the complaint. It merely operated as an assignment of moneys thereafter to be earned together with the burdens and obligations of the contract. (5 C.J. 947; 6 C.J.S. 1142.) The distinction between the assignment of a contract and of moneys due thereunder is well pointed out in the decisions cited under 5 C.J. 864, section 31. Assuming, however, that the assignment conveyed to plaintiff moneys due the Coast Engineering Company to November 20th, 1940, nevertheless, such assignment would not give respondent the right to claim a lien for such labor and material. In Mason v. Germaine,
We have here, a situation where a considerable amount, running into several hundred dollars, is not a lienable claim by respondent. What this amount is cannot be ascertained. The minimum would appear to be in the neighborhood of $750. The true amount is a matter of conjecture. Where the plaintiff's proof leaves the matter in such condition, there can be no lien. (McClain v. Hutton,
The evidence discloses that an undetermined amount of material included in respondent's lien was not actually used in the remodeling. Where it appears that non-lienable items are included in the claim of lien, they must be capable of being segregated and eliminated from the lien. If it is impossible from the evidence to do this, then the lien must fail. (CaliforniaPortland Cement Co. v. Wentworth Hotel Co.,
It seems to be likewise the general rule that a party seeking to have a judgment reversed on this ground must have protected his record in the lower court by requesting a ruling upon the objections or motion in addition to the mere making of it at the time the ruling is reserved. In this case, appellants made no such request at the conclusion of the case, took no exception to the court's failure to rule on the objections in its findings of fact and conclusions of law (although exceptions to such findings were filed by appellants), and now seek for the first time to raise the question in this court. If error was committed, such error could have been rectified if appellants had seen fit to mention it in their exceptions to the court's Findings of Fact and Conclusions of Law. This they did not do, and they consequently should now be precluded from raising the point.
In fairness, a litigant should not be allowed to make an objection, be fully cognizant of the fact that a ruling is reserved, and then sit back and gamble on a favorable decision in the case with the idea that an unfavorable decision can be reversed *Page 371
because of the reserved ruling. A litigant, to take advantage of the court's failure to rule, should be required to request a ruling. (64 C.J. 221; Ross v. Minnesota Mutual Life InsuranceCo.,
The complaint alleges that "plaintiff herein under the direction of defendants has carried on the work and furnished the materials for said remodeling, repairing and construction in accordance with the direction of said defendants;" and "plaintiff herein pursuant to the terms of said contract furnished work, labor, materials, and supervision of and for the construction, repairing and remodeling work done upon said premises." The contention of appellants is that it is a requirement that plaintiff allege performance on his part of the conditions of the contract, and that the terms "pursuant to the provisions of" and "in accordance with" are mere conclusions of law and have no force or effect. In the final analysis, we think, the rule requiring plaintiff to plead performance on his part has been fully complied with. After all, when the contract requires plaintiff to do certain things and plaintiff alleges that he did those things, naming them in accordance with the terms of the contract, he certainly satisfies every reasonable rule of pleading that could be required of him.
Appellants' contention on the matter of assignment is bottomed upon the fact that there was a formal assignment of the contract from the Coast Engineering Company to the Kraft *Page 372
Construction and Materials Company, and it is argued that respondent can have no lien for that part of the work done by the Coast Engineering Company, and that since such part of the work is not segregated from the balance, respondent is entitled to no lien at all. The evidence shows that there was no real change of contractors. Smith simply changed his name. Of course the contract, along with others, was formally assigned, but that proceeding was more of a formality than anything else, for Smith was doing the work both before and after the assignment. The question is not therefore really one of assignment but rather an inquiry as to whether or not the plaintiff may change his name and still have his lien. On this point see Simmons v.Webster,
Appellants argue that certain of the materials for which a lien was claimed were not actually used in the construction work. This is followed by the assertion that since the materials not used cannot be segregated from those used, plaintiff's entire claim of lien must fall. Here the plaintiff in good faith bought and paid for materials specially for defendant's home, delivered these materials on the premises (where they still are, Gunniss not having made any offer to return them) and was prevented from putting them into the building by the action of the owner himself, who does not in good faith seek to give them back, but seeks to retain them and avoid paying the whole claim by virtue of such retention. The true rule under the present circumstances is that where the contractor furnishes materials in good faith, he is not to be deprived of his lien merely because a small portion of the material did not get used. Particularly should this be true when it is the action of the owner that prevents use of the materials. (B.F. Salzer Lumber Co., v. Lindenmeier,
By said judgment the court decreed that defendants were indebted to the plaintiff Lester H. Smith, a building contractor, in the amount of $3,632.17, with interest, for the construction of improvements and additions to defendants' residence.
The residence occupied by Mr. and Mrs. Gunniss consisted of a two-room brick house with a small wooden lean-to addition. This lean-to was used as a kitchen and bath. With the view of enlarging their dwelling the Gunnisses commenced certain new construction around and adjacent to the two-room brick house, the latter remaining intact. Upon building the walls, laying a concrete floor and placing a roof on the new structure, work ceased. Shortly before November 2, 1940, Mr. and Mrs. Gunniss talked with the plaintiff Lester H. Smith, a building contractor, with reference to completing the construction theretofore begun. The plaintiff Smith and his foreman inspected the premises and talked further with Mr. and Mrs. Gunniss "as to their ideas on what they wanted done." The latter were quite indefinite as to just what was to be done and as to how they desired their house completed and the plaintiff Smith testified that he declined to set any definite amount or to enter into any fixed price contract for the job. Instead, the plaintiff Smith prepared and the defendants Gunniss, on November 2, 1940, executed a written agreement whereby the construction work was to be begun and the labor and materials therefor supplied by the contractor, at cost plus taxes and ten per cent. *Page 374
Five days after the above agreement was executed, the construction work commenced and continued until January 24, 1941. Mr. and Mrs. Gunniss observed the work as it progressed. A statement of the approximate amount owing the contractor Smith for labor, materials and supplies, which had been furnished for the home to January 22, 1941, was on that date furnished Mr. and Mrs. Gunniss at their request. Two days later the Gunnisses ordered Smith to cease all work on the dwelling, giving as their reason that they considered the cost was getting too high. Smith, as directed, stopped work and moved off the job on January 24, 1941. When the Gunnisses thus stopped the work, they had paid absolutely nothing for the labor, materials and supplies that had been furnished by Smith in remodeling their house. The contractor, Smith, asked Mr. Gunniss what he was going to do about compensating him and Mr. Gunniss replied that he was not going to pay Smith. A month passed, and having received no money from the Gunnisses, the contractor Smith on February 24, 1941, filed with the county clerk and recorder a duly verified notice and claim of lien against the Gunniss property in the amount of $3,753.91. Thereafter on March 17, 1941, the intervener Pinski Brothers, Inc., who had installed the plumbing and heating in the house, at the instance and request of the defendants, filed notice and claim of lien in the amount of $1,138.80 against the same property. The case was tried to the court without a jury and judgments were entered in favor of the plaintiff Smith and the intervener Pinski Brothers, Inc. No appeal has been taken from the judgment for the intervener and this appeal is only from the judgment rendered in favor of the plaintiff, Lester H. Smith.
Defendants assert that the complaint fails to state a cause of action in: (1) That this action is based upon a written contract upon which plaintiff seeks to recover for moneys due under its terms and that the complaint fails to allege performance of the contract on the part of plaintiff; (2) that the allegation that "plaintiff herein, under the direction of defendants, has *Page 375 carried on the work and furnished the materials for said remodeling, repairing and construction in accordance with the directions of the defendants" is a mere conclusion of law as are the allegations of paragraph V of the complaint which reads: "That subsequent to the 2nd day of November, 1940, and up to and including January 24, 1941, upon which date the same remodeling, repairing, and construction work was stopped by the order of defendants herein, plaintiff herein, pursuant to the terms of said contract, furnished work, labor, materials and supervion of and for the construction, repair and remodeling work done upon said premises, the total reasonable and agreed value of which amounts to the sum of Thirty-seven Hundred Fifty-three and 91/100 ($3,753.91) Dollars, an itemized statement of which appears more fully in the annexed copy of the lien filed herein marked Exhibit ``B' and for all purposes made a part of this complaint; that no part of said sum has ever been paid by defendants to this plaintiff though demand therefor has been frequently made, and the said sum and the whole thereof is now due, owing and unpaid from defendants to this plaintiff, together with interest thereon at the rate of six per cent. per annum from and after January 24, 1941;" and (3) that since the complaint alleges and the lien shows that on January 24, 1941, the contract was terminated in accordance with its provisions, there can be no cause of action on the contract and no lien based thereon. In none of these contentions is there any merit.
The plaintiff, Lester H. Smith, a builder, became entitled to a lien upon the Gunniss property for the work, labor and materials which he supplied thereon pursuant to section 8339, Revised Codes of Montana of 1935, which provides: "Every * * * foreman, * * * builder, * * * workman, laborer, and any other person, performing any work and labor upon, or furnishing any material, machinery or fixture for, any building, structure, * * * city or town lot, * * * or any improvements, upon complying with the provisions of this chapter for his work or labor done, or material, machinery or fixtures furnished, has a lien upon the *Page 376 property upon which the work or labor is done or material is furnished."
Within the statutory time allowed therefor, the plaintiff filed and perfected his lien as is provided for in section 8340, Revised Codes of Montana of 1935. Thereafter within the time and in the manner provided by statute, this action was commenced for the express purpose of foreclosing the mechanics' and materialmen's lien which plaintiff had theretofore perfected.
Under our statutes, the right of a mechanic or a materialman[1, 2] to a lien on property upon which he has supplied work, labor or materials is not dependent upon whether the contract with the owner of the property is written or oral or whether it is express or implied. (Black v. Appolonio, 1. Mont. 342, 346.) Our lien statutes are remedial. They are for the express purpose of providing for the payment of the claims of builders, mechanics and materialmen out of the property to which their work and material have contributed an increased value. For these reasons, this court has long been committed to the view that the lien statutes should be given full effect and that they should receive a liberal construction so that the objects and purposes of such statutes may be carried out. (Caird Engineering Works
v. Seven-up Gold Mining Co.,
The original agreement of November 2, 1940, provided that the[3] "contract shall be completed by, not later than, December 20, 1940." Subsequent to the commencement of the construction work, frequent changes were made by Mr. and Mrs. Gunniss in the construction plans and these changes so made by them occasioned considerable delay and necessitated considerable additional work, materials and expense. The plaintiff testified that he continued with the construction work on the Gunniss home subsequent to December 20, 1940, and up to January 24, 1941, with the consent of defendants and that at various times during such period defendants informed him what they desired done in connection with the work and that their orders were carried out and that the work continued under their direction up to January 24, 1941. Where owners thus permit the builder to continue with the work after the expiration of the time fixed in the contract for the completion thereof, such conduct on the part of the owners amounts to an election to go on with the contract rather than to forfeit it and, on the completion of the work, the owners are liable for the price. (Wortman v. Montana Cent. Ry. Co.,
The original agreement provided that the "contractor isn't to[4] receive any money until such time as said contract is terminated by the owner." The contract also contained the provision: "This contract may be terminated by the owner at any time that he may feel that the work is not properly progressing or that it is to his benefit to terminate said contract. * * * It is understood that all work shall be done in *Page 378 a workmanlike manner and that the owner upon completion will sign a Title One Federal Housing note in the amount due."
The defendants urge that under the above provisions payment was to be made to the contractor at such time as said contract is terminated by defendants by the signing of a Title One Federal Housing note in the amount due rather than in the payment ofmoney, and that since the complaint does not allege that the defendants refused to give the note required under the contract or that demand was made therefor the complaint fails to state a cause of action. This contention is without merit. (Van Stone v. Stillwell Bierce Mfg. Co., supra.)
By agreeing that "the contractor isn't to receive any money until such time as said contract is terminated by the owner," the parties most certainly did not intend that the contractor was never to receive any money for the cash outlay which he was to make in paying for the labor performed and the materials used in the improving of the Gunniss home. The above quoted provisions in the agreement are simply to the effect that pay day, for the contractor, arrives upon the happening of either of two contingencies, viz., (1) upon the completion of the contract, or (2) upon the sooner termination of the contract by the owners. According to the agreement, any time that the owners should decide that it was to their benefit to terminate the contract, they were privileged to end it. The owners knowingly accepted the benefits of the construction work which was in progress on their home from November 7, 1940, to January 24, 1941. They could have waited for the completion of the contract but instead they exercised their option to terminate the contract prior to its completion. When they exercised such option so given them by the agreement and terminated the contract, then and thereby themoney which the Gunnisses were owing to the contractor Smith for the labor, materials and supervision that he had supplied became due and payable. Payment is presumed to be made in money unless an intent to the contrary is shown. The provision for the signing of the Federal Housing note "upon completion" of the *Page 379 contract was simply the means agreed upon for the obtaining, by the owners, of the necessary money to finance and pay for the construction work so that "upon completion" the money would be available with which to pay the constractor what should then be due him. Mr. and Mrs. Gunniss were certainly not relieved, by such provision, from their obligation to pay the contractor themoney which was owing to him when they terminated their contract with him.
"One who prevents or makes impossible the performance or[5] happening of a condition precedent upon which his liability by the terms of a contract is made to depend cannot avail himself of its non-performance. In other words, he who prevents a thing from being done shall never be permitted to avail himself of the non-performance which he himself has occasioned." (12 Am. Jur., sec. 329, p. 885.)
"The abandonment of an improvement before the completion[6] thereof, by the owner of the premises, without fault on the part of the contractor, does not abrogate the right of the contractor, laborers, and material men to mechanics' liens for the value of the work done and the material furnished. In such case, the building or improvement is to be deemed completed, so far as the rights of persons to assert liens is concerned." (36 Am. Jur., sec. 35, p. 38.)
The allegations of the complaint above quoted are proper[7] averments under section 9170, Revised Codes, which provides: "In pleading the performance of conditions precedent in a contract, it is not necessary to state the facts showing such performance, but it may be stated generally that the party duly performed all the conditions on his part, and if such allegation be controverted, the party pleading must establish, on the trial, the fact showing such performance." Clearly, the complaint herein is sufficient to state a cause of action for the foreclosure of plaintiff's lien. (Doney v. Ellison,
On November 2, 1940, when the plaintiff Smith prepared and the[8, 9] defendants Gunniss signed the cost-plus agreement, Smith was then the manager at Great Falls for Coast Engineering Company, an Oregon corporation, which company was named in the agreement as the contractor. On November 20, 1940, being thirteen days after Smith had commenced the construction work on the Gunniss dwelling, the plaintiff Smith bought a considerable quantity of building material which Coast Engineering Company then had on hand and took over the performance of all that company's contracts covering the state of Montana. Coast Engineering Company on that date executed and delivered to the plaintiff Lester H. Smith a bill of sale covering such transfer to him of the materials and contracts, in consideration of the manager, Smith, releasing Coast Engineering Company from the payment of any reserve and salary due him as well as any other debts due by said corporation to Smith. Upon receiving such bill of sale, the plaintiff Smith advised the defendants Gunniss of his taking over of the said contracts of Coast Engineering Company and, with the defendants' consent, the plaintiff Smith continued the construction work on the Gunniss building under the name of Kraft Construction Materials Company, employing identically the same men on the job as were theretofore employed thereon. Defendants urge that Smith may only claim a lien for the labor and materials supplied from November 20, 1940, the date of the bill of sale to him, to January 24, 1941, when the contract was terminated. They further assert that because Smith included in his claim the sums which he had personally paid from his personal funds for labor and materials supplied during the first thirteen days when the contract stood in the name of Coast Engineering Company that thereby his entire lien is destroyed. The mere fact that a notice or claim of lien may include some items which are lienable and other items which are not or the fact that the claim may be made for a larger amount than the claimant shows himself entitled will not vitiate or destroy the lien for the amount actually due the claimant in *Page 381
the absence of a fraudulent intent in the filing of the lien. (Mason v. Germaine,
The instant case presents not merely one of assignment of the claim of a mechanic or materialman after the completion of the work and before the lien has been actually filed, but it presents a situation where the plaintiff Smith has entirely taken over the construction job which was commenced under his management and which continued to progress under his management with the knowledge and consent of the owners and under their direction. The plaintiff was on the job from the very beginning. It was Smith to whom Mr. and Mrs. Gunniss first talked with respect to the construction work which they desired done. He prepared the contract which the Gunnisses signed. He personally managed and supervised the work from the day it commenced on November 2, 1940, to the day the defendants terminated the contract on January 24, 1941. He took over from Coast Engineering Company the building materials and the uncompleted contracts covering the state of Montana. He contracted for and personally paid from his personal funds the various items of labor and materials, set forth in his claim for lien, that went into the construction work on the Gunniss property. Such bills were paid by Smith irrespective of whether the labor and materials had been charged to Coast Engineering Company or to Kraft Construction Materials Company. The Gunnisses, as owners of the property, consented that Smith be substituted as the original contractor and, with defendants' full assent and approval the work went forward under Smith's management. By this substitution of a new creditor (Smith) in place of the old creditor (Coast Engineering Company) with intent to transfer the rights of the old creditor (Coast Engineering Company) to the new one (Smith), a novation was made. (Sec. 7461, Rev. Codes). The Gunnisses may not, after so consenting to the new arrangement and after knowingly accepting the advantages and benefits thereof now, in defense *Page 382
of this action and to defeat the builder's lien, question the builder's right to include in his claim the labor and materials which he supplied on the Gunniss home during the first thirteen days that the construction work was in progress. As was said inPensacola R. Co. v. Schaffer,
Defendants assert that they are relieved from liability on[10] their contract because plaintiff failed to pay for the labor and materials supplied for the job by three materialmen, viz.: (1) St. Anthony and Dakota Lumber Company, $31.50 for a door; (2) Rowe Electric Company, $140 for wiring, fixtures and electrical work; and (3) the intervener Pinski Brothers, *Page 383 Inc., $1,138.80 for plumbing and heating. Had plaintiff paid the claim of Pinski Brothers, Inc., then he could have included same in his lien and suit herein and a separate judgment would not then have been entered for intervener as was done in the instant case. So with the other two claims — had plaintiff paid them, then he would have simply added the amounts of such payments to his own claim and lien plus ten per cent. for plaintiff's services and supervision. Since the plaintiff did not pay the three claims in question, the defendants are obligated to pay the materialmen the respective amounts thereof. No loss or prejudice to defendants results from plaintiff's[11] failure to pay the three claims. By terminating the contract before its completion, the defendants abandoned the improvements and same are deemed completed as far as concerns the right of the plaintiff builder to assert his lien under section 8339, Revised Codes. (36 Am. Jur., sec. 35, p. 38.) "If one party to a contract makes it impossible for the other party to perform the contract or delays the performance of it, the party who thus makes performance impossible on the part of the other, can not treat the default of the adversary party, which is thus caused, as discharging him from liability. The party who is prevented from performing further may recover damages for the breach of that contract, or compensation for what he has done without performing fully." (5 Page on The Law of Contracts, 2d Ed. sec. 2922, pp. 5152, 5153.)
Defendants complain that a lock, a door, ten sheets of[12] tempered board, twenty feet of beading and some neo-tyle were included in plaintiff's claim but that same were not actually used in the construction work. These matters were taken into account and considered by the trial court which allowed a deduction of $121.74 therefor before rendering judgment for plaintiff herein, hence again no prejudice resulted to defendants on this score.
Defendants contend that the provision in the contract "that[13] the owner upon completion will sign a Title One Federal Housing note in the amount due" fixes the maximum cost of *Page 384
the construction at $2,500 for the reason that $2,500 is the maximum amount of such a note under
During the trial both defendant and plaintiff made various[14] motions and interposed numerous objections to offered evidence upon which the trial court reserved its rulings. These rulings were still reserved and undisposed of when the trial ended. Defendants assign eight specifications of error upon the failure of the trial court to rule upon the motions and objections so made. While this court has heretofore criticized the practice of admitting evidence subject to the objection or on which the court reserves, but never makes, its ruling (Gilcrest
v. Bowen,
MR. CHIEF JUSTICE JOHNSON and ASSOCIATE JUSTICES ANDERSON and ERICKSON concur.
Lusk Lumber Co. v. Independent Producers Consolidated , 35 Wyo. 381 ( 1926 )
Van Stone v. Stillwell & Bierce Manufacturing Co. , 12 S. Ct. 181 ( 1891 )
Braden Co. v. Lancaster Lbr. Co. , 170 Okla. 30 ( 1934 )
Hind v. Oriental Products Co., Inc. , 195 Cal. 655 ( 1925 )
Union Supply Co. v. Morris , 220 Cal. 331 ( 1934 )
Langston v. Currie , 95 Mont. 57 ( 1933 )
Frisbee v. Coburn , 101 Mont. 58 ( 1935 )
Doney v. Ellison , 103 Mont. 591 ( 1937 )
De Bolt v. Farmers' Exchange Bank , 51 Okla. 12 ( 1915 )
Seaboard Surety Co. v. Standard Accident Insurance , 277 N.Y. 429 ( 1938 )
Ogden v. . Alexander , 140 N.Y. 356 ( 1893 )
Central Finance Corp. v. Brown , 175 Okla. 528 ( 1936 )
Chicago & Alton Railroad v. Union Rolling Mill Co. , 3 S. Ct. 594 ( 1884 )
Boone v. Maloney , 171 Okla. 454 ( 1935 )
Edwards v. Muri , 73 Mont. 339 ( 1925 )
Gilcrest v. Bowen , 95 Mont. 44 ( 1933 )
Caird Engineering Works v. Seven-Up Gold Mining Co., Inc. , 111 Mont. 471 ( 1940 )
Clark v. Brown , 141 Cal. 93 ( 1903 )
McClain v. Hutton , 131 Cal. 132 ( 1900 )
Pacific States Electric Co. v. United States Fidelity & ... , 109 Cal. App. 691 ( 1930 )
Eggers v. General Refrigeration Co. , 123 Mont. 205 ( 1949 )
Cole v. Hunt , 123 Mont. 256 ( 1949 )
Brown v. First Federal Sav. & L. Ass'n of Great Falls , 154 Mont. 79 ( 1969 )
Maxwell v. Anderson , 181 Mont. 215 ( 1979 )
Williams Bros. Construction v. Vaughn , 1981 Mont. LEXIS 763 ( 1981 )
Holland Constr. Co. v. Lampson ( 1974 )
Fausett v. Blanchard , 154 Mont. 301 ( 1969 )
Leigland v. McGaffick , 338 P.2d 1037 ( 1959 )
Puetz v. Carlson , 139 Mont. 373 ( 1961 )
Sherwood & Roberts, Inc. v. First Security Bank , 209 Mont. 402 ( 1984 )
Brunzell v. Lawyers Title Ins. Corp. , 101 Nev. 395 ( 1985 )
Gramm v. Insurance Unlimited , 141 Mont. 456 ( 1963 )
Durand v. Dowdall , 232 Mont. 347 ( 1988 )
Dck Worldwide Holdings Inc. v. CH SP Acquisition LLC , 380 Mont. 215 ( 2015 )