DocketNumber: 20110083
Citation Numbers: 2011 ND 206, 806 N.W.2d 172, 2011 N.D. LEXIS 206, 2011 WL 5009548
Judges: Vande Walle, Crothers, Sandstrom, Maring, Lee, Kapsner
Filed Date: 10/20/2011
Status: Precedential
Modified Date: 10/18/2024
[¶ 1] Alvin Peterson appealed and the State Engineer, Todd Sando, cross-appeal
I
[¶ 2] Peterson owns land in Walsh County, which, along with other land in the area, contains a slough in a closed basin. Sometime before 1973, Peterson dug a ditch to drain the slough. In 1973, the United States Department of Interior, Fish and Wildlife Service (“USFWS”), the holder of wetland conservation easement for the slough, required Peterson to restore the drained wetland by constructing a ditch plug to maintain the slough at a minimum of 1543.0 feet mean sea level.
[¶ 3] In August 2009, Peterson’s neighbor filed a complaint with the State Engineer under N.D.C.C. § 61-16.1-53.1, alleging an unauthorized dam existed on Peterson’s land. The neighbor claimed Peterson had raised the height of the ditch plug above the slough’s natural overflow elevation, which resulted in the im-poundment of additional water in the slough without necessary water or construction permits under N.D.C.C. §§ 61-04-02 and 61-16.1-38.
[¶ 4] Laura Ackerman, a water resource engineer with the State Water Commission, investigated the ditch plug and the area impounding the slough. According to Ackerman’s December 2009 interoffice report, there had been a history of problems with the ditch plug since 1973, including a 1996 complaint that the ditch plug was impounding additional water in two sections of land and damaging a township road between those sections. Acker-man’s report stated a 1996 field inspection revealed two ditch plugs in the area, and one of the plugs was “obviously higher than what the topography would indicate to be the natural outlet elevation.” Her report explained that the Walsh County Water Resource Board had obtained an injunction to lower that ditch plug one foot to save the township road and an agreement was entered to construct the top of the plug at 1543.0 feet mean sea level. Ackerman’s report also described a 1998 complaint about the ditch plug and investigation, which determined that from one half to one foot of fill had been placed on top of the berm and resulted in an injunction to lower the plug to 1543.0 feet mean sea level. Ackerman’s report further detailed complaints about the ditch plug from 2007 through 2009 and attempts to resolve those complaints. Ackerman’s report identified a man-made rock ridge at the ditch plug which was higher than the surrounding topography. Based on her investigation and available information, Ackerman concluded the natural overflow elevation of Peterson’s land was 1543.0 feet mean sea level and the overflow elevation of the raised ditch plug was 1543.9 feet mean sea level. Ackerman concluded Peterson’s land impounded more than fifty acre-feet of water above its natural overflow elevation without water or construction permits required by N.D.C.C. §§ 61-04-02 and 61-16.1-38. She recommended that the State Engineer order Peterson to lower the ditch plug to 1543.0 feet mean sea level.
[¶ 6] On appeal to the district court, the court affirmed the State Engineer’s order requiring Peterson to maintain the dam at 1543.5 feet mean sea level, but reversed the part of the order requiring Peterson to dig a drainage ditch to maintain the slough at that level. The court also awarded the State Engineer “costs as allowed by law,” and the State caused a judgment to be entered which “awarded [the State Engineer] costs as allowed by law” without any delineation of costs.
II
[¶ 7] When a decision of an administrative agency is appealed from the district court to this Court, we review the agency’s decision and the record compiled before the agency. Reinholdt v. North Dakota Dep’t of Human Servs., 2009 ND 17, ¶ 10, 760 N.W.2d 101; Rennich v. North Dakota Dep’t of Human Servs., 2008 ND 171, ¶ 10, 756 N.W.2d 182. Courts exercise a limited review in appeals from administrative agency decisions under the Administrative Agencies Practice Act, N.D.C.C. ch. 28-32. Rennich, at ¶ 10. Under N.D.C.C. § 28-32-49, our standard of review of an agency’s decision is the same as the standard applied by the district court under N.D.C.C. § 28-32-46. Rennich, at ¶ 10. We will not reverse an agency’s decision unless:
1. The order is not in accordance with the law.
2. The order is in violation of the constitutional rights of the appellant.
3. The provisions of this chapter have not been complied with in the proceedings before the agency.
4. The rules or procedure of the agency have not afforded the appellant a fair hearing.
5. The findings of fact made by the agency are not supported by a preponderance of the evidence.
6. The conclusions of law and order of the agency are not supported by its findings of fact.
7. The findings of fact made by the agency do not sufficiently address the evidence presented to the agency by the appellant.
8. The conclusions of law and order of the agency do not sufficiently explain the agency’s rationale for not adopting any contrary recommendations by a hearing officer or an administrative law judge.
N.D.C.C. § 28-32-46.
[¶ 8] In determining whether an agency’s findings of fact are supported by a preponderance of the evidence, we do not make independent findings of fact or substitute our judgment for that of the agency; rather, we determine only whether a reasoning mind reasonably could have determined the agency’s factual conclusions were proved by the weight of the
Ill
[¶ 9] In its cross-appeal, the State Engineer argues the district court erred in not affirming the State Engineer’s order on the ground of judicial estoppel. The State Engineer argues Peterson has taken inconsistent positions in the State Water Commission’s petition to the State Engineer to review the ALJ’s recommendation and in his appeal to the district court. The State Engineer claims Peterson supported the ALJ’s recommendation to maintain the slough at 1543.5 feet mean sea level in the State Water Commission’s petition to the State Engineer to review the ALJ’s recommendation and argues Peterson received exactly the outcome he requested in that proceeding. The State Engineer claims Peterson is judicially es-topped from seeking different relief in his appeal to the district court, or this Court.
[¶ 10] “Judicial estoppel prohibits a party from assuming inconsistent or contradictory positions during the course of litigation.” BTA Oil Producers v. MDU Res. Group, Inc., 2002 ND 55, ¶ 14, 642 N.W.2d 873. In BTA, at ¶ 14 (quoting 28 Am.Jur.2d Estoppel and Waiver § 74 (2000) (footnotes omitted)), we explained the underlying rationale for judicial estop-pel:
The fundamental concept of judicial estoppel is that a party in a judicial proceeding is barred from denying or contradicting sworn statements made therein. Judicial estoppel is a judge-made doctrine that seeks to prevent a litigant from asserting a position inconsistent, conflicts with, or is contrary to one that she has previously asserted in the same or in a previous proceeding; it is designed to prevent litigants and their counsel from playing fast and loose with the courts, and to protect the integrity of the judicial process. Judicial estoppel doctrine is equitable and is intended to protect the courts from being manipulated by chameleonic litigants who seek to prevail, twice, on opposite theories. The purpose of the doctrine of judicial es-toppel is to reduce fraud in the legal process by forcing a modicum of consistency on the repeating litigant.
The doctrine applies only where a party’s subsequent position is totally inconsistent with its original position, and does not apply where distinct or different issues or facts are involved.
[¶ 11] In Dunn v. North Dakota Dep’t of Transp., 2010 ND 41, ¶ 10, 779 N.W.2d 628, we recognized we had “consistently assumed, without deciding, the doctrine of judicial estoppel applies in North Dakota.” In Dunn, at ¶ 10, we said that in several cases, we had declined to apply judicial estoppel because a party’s subsequent position was not entirely inconsistent with that party’s original position. See DeMers v. DeMers, 2006 ND 142, ¶¶ 18-19, 717 N.W.2d 545; Ingebretson v. Ingebretson, 2005 ND 41, ¶¶ 16-18, 693 N.W.2d 1; Meide v. Stenehjem ex rel. State, 2002 ND 128, ¶¶ 13-15, 649 N.W.2d 532; BTA, 2002 ND 55, ¶¶ 13-18, 642 N.W.2d 873. In Dunn, at ¶ 11, however, we concluded a litigant was judicially estopped from taking inconsistent and contrary legal positions in a separate application for a writ of mandamus and in a subsequent appeal to this Court.
[¶ 12] Here, the district court decided Peterson’s position in his appeal to that court was not entirely inconsistent
[¶ 13] We conclude Peterson has not taken entirely inconsistent positions in the administrative process and his appeal to the district court. We therefore conclude his appeal is not barred by judicial estop-pel.
IV
[¶ 14] Peterson argues the ALJ abused its discretion in admitting into evidence a June 17, 2009 letter from the Natural Resources Conservation Service to the Walsh County Water Resource District to establish that the natural elevation of his land near the slough was 1543.0 feet mean sea level for purposes of calculating whether he had constructed or maintained a dam that impounded more water than authorized by N.D.C.C. §§ 61-04-02 and 61-16.1-38. Peterson claims the letter constitutes double hearsay, because it contains facts taken from the Natural Resources Conservation Service’s 1997 “trip report” to his land, including the following statements:
3. Current elevation of ditch plug is 1542.7 MSL.
4. The ditch plug is located in the correct location.
5. Elevation of plug needed to satisfy USFWS and protect the township road between sections 22 and 23 is 1543.0.
6. Historic wetland boundary based on soil investigation is 1543.2 (historic level of saturation).
7. Historic level of ponded water is 1541.9.
8. A 1937 black and white photo indicates wet conditions existed just downstream of the dike — indicating that during high runoff periods the entire natural drainage area can be covered with standing and running water depending on the elevation of the water. The entirety of the soil, topography and hydrology (includes*179 photograph) data does not support the claim that a natural berm existed at an elevation of 1543.9 prior to manipulations.
9. [Natural Resources Conservation Service] considers the basin restored at an elevation of 1543.0.
[¶ 15] Peterson argues the statements in the letter are “classic” hearsay and the letter was improperly admitted into evidence by the ALJ under N.D.R.Ev. 703, which deals with the bases of opinion testimony by experts and provides:
The facts or data in the particular case upon which an expert bases an opinion or inference may be those perceived by or made known to the expert at or before the hearing. If of a type reasonably relied upon by experts in the particular field in forming opinions or inferences upon the subject, the facts or data need not be admissible in evidence in order for the opinion or inference to be admitted. Facts or data that are otherwise inadmissible shall not be disclosed to the jury by the proponent of the opinion or inference unless the court determines that their probative value in assisting the jury to evaluate the expert’s opinion substantially outweighs their prejudicial effect.
[¶ 16] Under N.D.C.C. § 28-32-24(1), the admissibility of evidence in an adjudicative proceeding before an administrative agency is governed by the North Dakota Rules of Evidence. We review a hearing officer’s evidentiary rulings under the abuse-of-discretion standard. Knudson v. Director, N.D. Dep’t of Transp., 530 N.W.2d 313, 316-17 (N.D.1995). An abuse of discretion occurs when a decision is arbitrary, unreasonable, or capricious, or not the product of a rational mental process, or a misapplication or misinterpretation of the law. See Davis v. Killu, 2006 ND 32, ¶ 6, 710 N.W.2d 118; Knudson, at 316.
[¶ 17] We have “recognized that an expert witness ‘should be permitted to describe otherwise inadmissable hearsay relied upon in order to give the basis for the opinion.’ ” Davis, 2006 ND 32, ¶ 10, 710 N.W.2d 118 (quoting State v. Messner, 1998 ND 151, ¶ 26, 583 N.W.2d 109). However, we have also explained that experts do not have “free reign to act as a mouthpiece for inadmissible hearsay evidence,” and there “is often a fine line between an expert merely relating inadmissible hearsay and an expert giving testimony about inadmissible facts or data upon which the expert’s opinion is based.” Davis, at ¶¶ 10, 12. In Davis, at ¶ 11, we said N.D.R.Ev. 703 had not yet been amended to track a 2000 amendment to F.R.Ev. 703, which incorporated the balancing test of F.R.Ev. 403 for determining admissibility of otherwise inadmissable facts or data for an opinion under F.R.Ev. 703. Rule 703, N.D.R.Ev., was amended, effective March 1, 2007, to provide that “[f]acts or data that are otherwise inadmissible shall not be disclosed to the jury by the proponent of the opinion or inference unless the court determines that their probative value in assisting the jury to evaluate the expert’s opinion substantially outweighs their prejudicial effect.”
[¶ 18] We have also recognized that N.D.R.Ev. 702 “ ‘envisions generous allowance of the use of expert testimony if [proffered] witnesses are shown to have some degree of expertise in the field in which they are to testify.’ ” Langness v. Fencil Urethane Sys., Inc., 2003 ND 132, ¶ 8, 667 N.W.2d 596 (quoting Anderson v. A.P.I. Co., 1997 ND 6, ¶ 9, 559 N.W.2d 204). A witness’s qualifications may be established by knowledge, skill, experience, or education, if the witness’s knowledge, training, education, and experience
[¶ 19] Here, the ALJ admitted the 2009 letter from the Natural Resources Conservation Service to the Walsh County Water Resource District after hearing the parties’ argument under N.D.R.Ev. 703. The information in the 2009 letter is the type of information that Ackerman could rely on in forming her opinion about the natural elevation of the area for purposes of her job as an engineer with regulatory responsibilities for permits and complaints about dams. Ackerman’s opinion was expressed in her testimony and in her December 2009 interoffice memorandum to the State Engineer, which was also admitted into evidence at the administrative hearing. Under N.D.R.Ev. 703, the ALJ had discretion to admit “facts or data” that may be otherwise inadmissa-ble to evaluate Ackerman’s opinion. We conclude the ALJ’s decision to allow the admission of the letter into evidence at the administrative hearing was not arbitrary, capricious, or unreasonable, or a misapplication or misinterpretation of the law and was the product of a rational mental process. We therefore conclude the ALJ did not abuse its discretion in admitting the letter into evidence.
[¶ 20] Peterson nevertheless asserts the evidence was insufficient to establish the natural elevation of the area and claims the natural elevation of the area is 1543.9 feet mean sea level. It is unlikely the historic natural elevation could ever by proven with the certain preciseness Peterson appears to demand. Peterson’s arguments generally attack the weight to be given to the various items of evidence about the natural elevation of the land and the slough. We decline Peterson’s invitation to reweigh that evidence, and although each piece of evidence, by itself, may not have been sufficient to establish the natural elevation of the land, we conclude the cumulative effect of the evidence in the record is such that a reasoning mind could reasonably conclude the natural elevation of the land in the area was 1543.0 feet mean sea level. We also conclude a reasoning mind could conclude Peterson’s land impounded sufficient water to require water or construction permits under N.D.C.C. §§ 61-04-02 and 61-16.1-38. We conclude the State Engineer’s findings about the natural elevation of the land in the area and the amount of water impounded are supported by a preponderance of the evidence, and we therefore affirm the State Engineer’s finding about an unauthorized dam on Peterson’s land.
[¶ 21] Peterson also argues the State Engineer lacks authority to require him to dig a drainage ditch on his property to drain the slough to 1543.5 feet mean sea level. The State Engineer has authority under N.D.C.C. § 61-03-21.2 to order a person to modify an unauthorized dam. Because Peterson’s land impounded sufficient water to require permits under N.D.C.C. §§ 61-04-02 and 61-16.1-38 and no permits had been procured, the State Engineer, as part of its authority to order a person to modify an unauthorized dam, had authority to require Peterson to construct a ditch to drain the slough to 1543.5 feet mean sea level at the site of the unauthorized dam. We reverse the district court judgment to the extent the court concluded the State Engineer lacked authority to require Peterson to construct a ditch to drain the slough to 1543.5 feet mean sea level, and we affirm the State Engineer’s order in its entirety.
V
[¶ 22] Peterson argues the district court abused its discretion in awarding the State Engineer costs. The State
[¶ 23] The district court’s decision on costs is a boilerplate, conclusory statement awarding the State Engineer “costs as allowed by law,” and the State thereafter caused entry of a judgment that “awarded [the State Engineer] costs as allowed by law” without any delineation of those costs, or discussion of whether costs are allowed in the district court acting as an appellate court. We have a strong and longstanding policy against piecemeal appeals. See, e.g., Investors Title Ins. Co. v. Herzig, 2010 ND 138, ¶ 24, 785 N.W.2d 863. The State Engineer failed to take steps to delineate or include any specific costs in the judgment it caused to be entered. Under our jurisprudence disfavoring piecemeal appeals, we conclude the State Engineer’s failure to include any further delineation for costs in the final judgment constitutes a waiver of any costs it may have been entitled to in a proceeding before a district court acting as an appellate court in an administrative proceeding. We decline the State Engineer’s request to remand for a determination of the costs, if any, to which it may be entitled.
VI
[¶ 24] We affirm the judgment in part and reverse in part, and we affirm the State Engineer’s order.