DocketNumber: File 7102
Judges: Ntjessle, Burke, Grimson, Christianson, Morris
Filed Date: 4/6/1950
Status: Precedential
Modified Date: 11/11/2024
This action was brought by the plaintiff to 'recover damages from the defendant Bailway Company on account of negligence on the part of the defendant in the damming and diversion of the Cannonball Biver and' in the construction and maintenance of the' diversion channel, dikes, and embankments erected and used in such damming and diversion.
The record discloses the following - facts: In March, 1943, plaintiff was a tenant in possession of a farm in the valley of the Cannonball River, a tributary of the Missouri. He lived there with his family. The valley, of varying width, descends from west to east through a rough terrain. The channel of the river is tortuous. To the northwest of the plaintiff’s farm it curves to the south, thence easterly through the farm south of his buildings, thence north again • east of the buildings, thus forming a loop. In 1909 the defendant built a line of railroad up the valley. The grade for the roadbed was raised above the valley floor about four feet. It crossed the Cannonball northeast of the plaintiff’s buildings and passing about 1,000 feet north of the buildings again crossed the river northwest of them. Both of' these crossings were overfills in the channel. Therefore, it became necessary to change the course of the river. Accordingly, the defendant cut a new channel north of and parallel with its roadbed across the peninsula formed by the loop. To divert the stream into the channel thus cut an earthen dam was constructed 200 feet north of the west crossing of the river. About 200 feet west of this crossing there- was a depression or draw parallel with the channel. The grade was built through and over this draw and two cement culverts each 36 inches in diameter were laid under the grade to take care of such water as might run down the draw from the north. Likewise, under the fill in the channel on the east sid.e of the loop two cement culverts each 30 inches in diameter were -laid to convey back into the stream such water as might accumulate in the abandoned portion of the channel. Thus under the same head of water the 36 inch culverts had more than two-fifths greater capacity than the 30 inch. ■ The diversion channel was 75 feet wide at the bottom and ten feet in
In February, 1943, the weather turned warm. The snow melted and the Cannonball ran bank full. Then abruptly the temperature fell and the river froze over. With the cold weather the Bow decreased and ice ten to fourteen inches thick was left in the riverbed and hanging on the banks. On March 14, a storm began. This lasted for nearly four days, with high winds and a heavy fall of wet snow that drifted greatly. On March 22, the temperature rose and the snow melted rapidly. All the streams were in flood. On the 25th the river was running more than bank full. An ice gorge formed a mile and a quarter below the plaintiff’s farm. The water backed up in the valley, immediately above the gorge so that it was nearly a mile in width. Upstream from the diversion dam and railway embankment the valley was flooded and became an ice-filled lake several hundred acres in extent. Water poured through the culverts west of the dam. Water also flowed in through ravines from the south. Thus the land within the loop flooded. It rose so high that it submerged the plaintiff’s barnyard.
On the morning of the 25th, Carl Haff, one of the plaintiff’s neighbors, came to the bank across the river south of the buildings. The plaintiff was away but his wife and children were at home. Haff shouted to the family that the situation was dangerous and that they should leave. At that time the water-had not reached the house but the barnyard was submerged and he could see cattle standing in the water with only their heads visible. That afternoon the family walked from the house to the railroad track, thence along the track to the east side of' the loop. There they were met by Haff who took them to his home where they remained that night. The next morning they returned to the farm walking in on the track. In the afternoon
At some time during the night of the 26th the railroad grade 'west of the dam was washed out as was the fill in the channel there and the west one-half or two-thirds of the diversion dam. The fill in the channel on the' east side of the loop also was ■washed out, together with 320 feet of the railroad grade. And the water had risen so high that it reached and flooded the ■plaintiff’s house. The facts set forth above are undisputed.
The defendant called as witnesses the section foreman and ■several members of his crew whose duty it was to patrol and look after that portion of its roadbed and track with which we .are here concerned. These witnesses testified that on the morning of March 25th they patrolled the track as usual. At that time the water west of the loop and north of the track was nearly up to the top of the grade. It was spouting through the 36 inch ■culverts under such pressure that it kicked the water below back some 20 to 40 feet. Some of these witnesses also testified that the water was spouting through the 30 inch culverts under the fill on the east side of the loop in- the- same manner. There is no direct denial of this latter testimony. These witnesses testified that the water was higher on the north side of the track than it was on the south side, but it does not appear whether this was the case only on the west side of the loop or at any or all other points along the diversion channel. On the other hand, the defendant’s witness, Haff, testified, that on the afternoon of the 25th at the east crossing of the river the water was a foot higher south of the track than it was north of the track and that on the 26th it was two feet higher south than it was north of the track. Manifestly, if Haff was right, the water could not have been spouting through the culverts there. On the morning of the 26th the section crew again patrolled the track and at that time
Defendant’s division engineer testified that about two months after the flood he, with a number of assistants, surveyors, and others, using instruments made measurements of the diversion channel and of that portion of the abandoned channel south of the railroad track. His testimony is that the narrowest part of the abandoned channel was 70 feet wide and 10 feet deep and that the diversion channel was straight, 10 feet deep and-75 feet wide, with a uniform grade down from west to east. There is no testimony, however, as to the grade of the latter or as to the difference in elevation,' though it must have been appreciable, between, the bottom of the diversion channel at the point of diversion and’the bottom of that channel where it joined the original channel on the east. Neither does it appear whether the bottom of the diversion channel at the points of its beginning and ending was of the'same elevation as the bottom of the original channel of the river at those points. The elevation of the top of the fill over the channel on the west side of the loop was not shown, nor was that of the top of the fill over the channel on the east side of the loop.
The plaintiff testified that the diversion channel was 70 feet wide and 10 feet deep and that the abandoned channel was 350 feet in width from top bank to top bank. But it is uncertain as to what he meant by “top bank to top bank”. His son-in-law was also called as a witness for the plaintiff. His testimony was in accord with that of the plaintiff as to the width of the abandoned channel but not as to the width or depth of the diversion channel in that he said it was 15 feet wide and 8 feet deep. Neither of these witnesses had ever measured either of the channels and gave only-their estimates as to the widths and depths thereof. Both of them testified that the culverts on both sides of the loop were filled with dirt and debris in the fall and winter of 1942-43. This was denied by the foreman and other members-of the section crew.
The defendant’s engineer further testified that using instru
There is no evidence in the record showing the width of the valley at either end of the loop or as to the extent or elevation of the flood plain — that is the part of the floor of the valley subject to overflow in times of ordinary flood — nor does it appear how wide the valley was, measured from north to south across the portion occupied by the plaintiff’s buildings. Nor are there any profiles in evidence showing the relative elevations of the bed of the river; the artificial channel; the dam; the railroad grade; or of the floor of the valley. It is undisputed, however, that the plaintiff’s- barn was about 200 feet north of the abandoned channel and that the house and other buildings were on somewhat higher ground about 200 feet further from the channel. The elevation of the barn and other buildings above the bed of the channel is not shown. Neither does it appear whether there was a series of rises from the north bank of the original channel to the high ground north of the diversion channel or whether there was a general uniform slope. Nor does it appear how far it was from the diversion channel to the north side of the valley.
Numerous witnesses were called by the defendant who testified as to the character and severity of the storm which began on March 14, and to the extent of the flood that followed after the snow had -melted. These witnesses testified that never before had they seen so great a flood. Some had lived near and observed the river thereabouts for 40 years or more. One of them testified that there had been other floods but the water in the instant flood was two to four feet higher than any other he had known of. The foundation under his house had been undermined by this flood — something that had never before happened. Whether this was before or after the 26th does not appear. He lived down the valley from the plaintiff. Another of the de
There is no question but that the plaintiff suffered serious damage by reason of the flood. The greater part of this damage was incurred prior to March 26th and before the grade, the fills, and a portion of the diversion dam were washed away. The damage incurred after the 26th was relatively small.
The allegations of the plaintiff’s complaint on which he predicates his claim of negligence are to say the least, nebulous and most inartificially drawn. In paragraph three thereof he alleges: “. . . that prior to-the construction of said railroad, the natural course of the Cannon Ball River on said land and adjacent thereto, was a loop to the south; that the said defendant in its construction of its said road changed the course of said Cannon Ball River by shutting off the flow of the waters of' the Cannon Ball River in said loop to the south and digging a new ditch and causing said River to flow north of its said railroad, thereby causing the Cannon Ball River to continue to flow north of the railroad instead of going under the road and going into said loop and going under the road again where said loop turns to the north under said railroad; that the defendant in the construction of the new course of the Cannon Ball River as aforesaid, and in preventing the waters to follow its natural course around said loop did negligently and carelessly construct the same, among other things in this: that in the first place the defendant should not have changed the course of said Cannon Ball River; that it should have .permitted said Cannon Ball River to flow in its natural course; Second, that in its attempt to blockade the flow of the waters of the Cannon Ball River in its natural course through said loop as aforementioned the defendant did the work in a careless and negligent manner; that it constructed and maintained an- inadequate levee and dam across said Cannon Ball River at both places where the natural bed stream goes under the railroad tracks at said place through
And in paragraph four he further alleges: “That on or about the 26th day of March, 1943, the River in said artificial river bed, so constructed by the defendant as aforesaid, plugged up and that said defective levee and dam in the west end of said loop as aforementioned, gave away thereby permitting the waters of the Cannon Ball River to flow in a torrent flood through the old river bed and up against the levee built by the defendant across the east end of the loop as aforementioned, which caused the waters of the Cannon Ball River to rise and flood the plaintiff’s premises with approximately twelve (12) feet of water, or more, . . . that in addition thereto, the defendant carelessly and negligently did permit said dam and levee on the west end of said loop to become deteriorated and defective' and failed to properly maintain and keep same up; that the defendant carelessly and negligently permitted said artificial river bed to become defective; that the defendant’s carelessness and negligence as aforesaid continued up to the time of said flood aforementioned;
The defendant answering denied any negligence and alleged that the channel diversion, dikes, and embankments, were designed and constructed pursuant to proper engineering standards to take care of all normal waters and all flood waters reasonably foreseeable; that such channel, dikes, and embankments were properly cared for and maintained and had carried off all the waters of the river for a period of over 30 years; that the flood was unprecedented and unforeseeable; that the waters did not reach greater heights than they would have reached had the river remained in its natural state and regardless of the channel change the same flood and damage would have occurred.
The defendant predicates this appeal on the grounds that the evidence is not sufficient either to warrant the answer returned to the special interrogatory or to support the verdict; that the court erred in denying defendant’s motions for directed verdict and for judgment notwithstanding the, verdict, and in numerous rulings on matters of law during the course of the trial; that the coixrt erred in his instructions to the jury; and that counsel for the plaintiff resorted to improper and prejudicial practices during the trial of the case and in argument to the jury.
There is- no question hut that the plaintiff suffered serious damage by reason of the high waters in the Cannonball on March 25th and 26th, 1943. The vital question of fact is as to whether this damage was incurred as a proximate effect of negligence on the part of the defendant in the construction and maintenance of the diversion channel and of- the dikes, and embankments on which its track was laid. The defendant’s contentions as to that question are, as stated in its motions for directed verdict and for judgment notwithstanding the verdict, that “There is no testimony showing any negligence on the part of the defendant proximately causing the plaintiff’s loss; secondly, the undisputed testimony shows that regardless of the channel change the same flooding and damage would have occurred; third, the undisputed testimony shows that the flood here involved was of such unprecedented occurrence that it could not have been foreseen by men of ordinary experience and prudence.”
When the case was submitted the court at the request of the defendant directed the jury in addition to returning a general verdict to answer the special interrogatory: “Was the flood that occurred on or about March 26th, 1943, in the valley of the Cannon Ball River in the vicinity of and on the land occupied by the plaintiff an extraordinary and unprecedented flood?”
In Soules v. Northern Pacific Railway Company, supra, this court held as stated in the syllabus, that “Extraordinary or unprecedented floods are floods which are of such unusual occurrence that they could not have been foreseen by men of ordinary experience and prudence.” And the court in its instructions to the jury in the instant case so charged.
The defendant herein contends that it did so construct the diversion dam, channel, and other works as to take care of the normal flow of the river and of any ordinary flood, and that the flood here under consideration was so extraordinary and unprecedented, that it could not have been anticipated and on this account alone the damage resulted. Relying on this as a de
The undisputed testimony is that the waters of this flood were greater in volume and rose higher than in any that had ever before occurred within the recollection or knowledge of any of the witnesses, some of whom had lived in the vicinity and had observed and known the Cannonball River for 40 or more years. And the published report of the United States Weather Bureau offered by the defendant and received in evidence tends to corroborate this testimony. But this report also shows that floods on the Cannonball and other 'streams tributary to the Missouri River in this area were not unusual, particularly at the time of the spring run-off, and ice jams or gorges were often formed. And one of the defendant’s witnesses testified that-a few years prior to the instant flood there was another almost as great as this one.
In passing upon the question of whether a flood is extraordinary and unprecedented it is proper and necessary to consider the topography of the area traversed and drained by the flooded stream; the climatic conditions ordinarily prevailing there; whether the stream is subject to ice jams during the spring run-off; the character of tributary streams as to their volume and velocity; the laws of hydraulics known to the ordinary man; the extent of the drainage area; the existence or non-existence of conditions tending to retard the flow of the water therein; and whether there have been other floods and the frequency and magnitude thereof. If all the attendant conditions and circum
It does not follow as a matter of course that because the jury found the flood was not extraordinary and unprecedented on that account alone the defendant is liable for any damage the plaintiff may have suffered. In order that the plaintiff recover it is necessary that the defendant be found to have been negligent and that such negligence was the proximate cause of. the damage.
We have set out a lengthy summation of the evidence. The diversion channel was 4200 feet in length. The jury could properly find from the evidence that the difference between the level of the water at the west end of the diversion channel and of the level at the east end was seven feet, and consequently, that the diversion channel was not capable of carrying off the waters of the river at the stage the flood had reached on the 25th and 26th. This finding would amount to a finding of negligence in the construction and maintenance of the diversion channel.
We have quoted the allegations of the plaintiff’s complaint on which he predicated his charges of negligence. Considered in the light most favorable to the plaintiff we think that a charge of negligence may be spelled out of these allegations, not only on account of the construction and maintenance of the diversion channel as above set forth, but also on account of the construction and maintenance of the dikes and embankments erected by the defendant.
The proofs disclose that under the fill and embankment at the east crossing of the river there were two cement culverts each 30 inches in diameter and under the fill and embankment where the latter crossed the depression west of the river there were two
There is no question but that the abandoned ■ channel and the whole of the valley south of the railroad were filled with water to such an extent that the barnyard of the plaintiff was inundated. There is some evidence that water from melting snow flowed into this valley through ravines from the south. And defendant’s witnesses testified that water from the flood plain west of the loop spouted through the 36 inch culverts in tremendous volume. Simple arithmetic demonstrates that the water that poured into the basin through the 36 inch culverts was two-fifths more than the 30 inch culverts down stream under the fill on the east side of the loop would carry. However, it is immaterial whence the water came. The 30 inch culverts, evidently put under the fill for the purpose of draining the basin, were insufficient and the jury on that account was warranted in finding that the defendant was negligent in the construction of the embankment.
.. Summarized, the evidence warranted the jury in finding: That the defendant built a railroad up the valley. The grade or embankment for the roadbed built four feet above the valley floor, made two crossings of the river overfills in the channel about
The defendant predicates error on certain rulings on matters of evidence. It contends that evidence as to the culverts was inadmissible since it was not responsive to any issue made by the pleadings. What we have already said as to the matter of the culverts disposes of this particular assignment.
Defendant also contends that the court erred in overruling objections to the admission of testimony of the plaintiff’s witnesses as to the depth ahcl width of the original channel and of the diversion channel. The reason assigned for the objections was that no foundation had been laid for the admission of this testimony, since the witnesses had made no .measurements and could give only their estimates. They, however, testified that
Defendant assigns error on account of misconduct of counsel for the plaintiff during the course of the trial. The grounds for this assignment are that in the cross-examination of defendant’s witnesses the insinuating character of counsel’s questions and his exclamations 'when the witnesses answered them were intended to and did prejudice the jury. ' There was ground for defendant’s taking exception to the conduct of counsel. But although it was improper we are unable to say that it was so prejudicial as to warrant the granting of a new trial.
In the course of his argument counsel for the plaintiff told the jury that the special interrogatory was submitted to the jury for the purpose of misleading them. Counsel for the defendant objected to this statement and moved for a continuance because of it. The court sustained the objection and stated that the argument was improper. He also admonished the jury to disregard the statement but denied the motion to continue. There was no error in so doing. Thereafter, counsel for the plaintiff commented not oiily on the facts on which the answer to the interrogatory would be based but also as to the legal effect of that answer, saying that if it were in the affirmative the plaintiff “would be left out in the cold.” Defendant objected to-this statement insisting that plaintiff had no right to argue as to the effect of the answer and moved that a mistrial be declared and the case continued over.
The function of the jury was to answer the interrogatory according as they might find -the facts to be regardless-of its effect. Plaintiff concedes that it is reversible error to comment on the effect of their .special findings when the jury is required to return a special verdict pursuant to the provisions of Section 28-1502, RC 1943. See Morrison v. Lee, 13 ND 591, 102 NW 223. But he insists that this rule does not apply to special interrogatories submitted pursuant to the provisions of Section 28-1503, RC 1943. This latter section provides that the general verdict which the jury in such ease is also required to return must be
Error is also assigned on account of certain portions of the instructions given by the court. Defendant complains that the court charged the jury that if after considering all of the evidence they should find the defendant was negligent in and about the construction and maintenance of the diversion channel, dikes, and embankments they should return a verdict for the plaintiff but that they were not told in said instruction that before they could so return their verdict they must also find that this negligence was the proximate cause of the damage that resulted. An examination of the whole charge, however, discloses that the court did in two instances elsewhere charge the jury that before they could return a verdict for the plaintiff they must find the negligence of the defendant' was the proximate cause of the damage. While these latter portions' of. the instructions did-not immediately follow the portion of which the defendant complains, reading the charge as a whole and considering all
There are other portions of the instructions which the defendant challenges. However, examined in the light of the view we have taken of the instant case they are without merit and deserve no consideration here.
Judgment affirmed.