Appeal from an order of the Supreme Court, Erie County
It is hereby ordered that said appeal be and the same hereby is unanimously dismissed without costs.
Memorandum: In appeal No. 1, Niagara Frontier Transportation Authority (defendant) contends that Supreme Court erred in granting that part of plaintiffs motion seeking partial summary judgment on liability against it with respect to Labor Law §§ 200 and 241 (6) and, in appeal No. 3, defendant contends that the court erred in adhering to its prior decision after granting that part of defendants’ subsequent motion seeking leave to reargue. We note at the outset that defendant’s appeal from the order in appeal No. 1 must be dismissed (see Loafin’ Tree Rest. v Pardi [appeal No. 1], 162 AD2d 985 [1990]). We agree with defendant, however, that plaintiff is not entitled to partial summary judgment on liability against it with respect to Labor Law §§ 200 and 241 (6), and we therefore modify the order in appeal No. 3 accordingly.
Plaintiff, an employee of a subcontractor hired by defendant DiPizio Construction Co. (DiPizio) to conduct pressurized air tests in underground storm sewer pipes, was injured when an inflatable plug blew out of one of the pipes. It is undisputed that the contract between defendant and DiPizio required that any inflatable plug be braced before a pressurized air test was conducted and that the instant plug was not braced. Even assuming, arguendo, that plaintiff established that defendant exercised supervision and control over the work of plaintiffs employer, we conclude that defendant raised an issue of fact whether it exercised the requisite supervision or control over the pressurized air tests. Thus, plaintiff is not entitled to partial summary judgment on liability against defendant with respect to Labor Law § 200. Defendant’s engineer spent approximately one hour per day at the construction site, and defendant contracted with third-party defendant, TVGA Engineering, Surveying, EC. (TVGA), to oversee and monitor the construction project. “Where the alleged defect or dangerous condition arises from the contractor’s methods and the owner exercises no supervisory control over the operation, no liability attaches to the owner under . . . Labor Law § 200” (Comes v New York State Elec. & Gas Corp., 82 NY2d 876, 877 [1993]; see Gielow v Rosa Coplon Home, 251 AD2d 970, 972-973 [1998], lv dismissed and denied 92 NY2d 1042 [1999], rearg denied 93 NY2d 889 [1999]).
We further agree with defendant that the court erred in grant
With respect to appeal No. 2, we conclude that the court properly granted the motion of TVGA seeking summary judgment dismissing the third-party complaint. The contract between TVGA and defendant provided that TVGA would defend and indemnify defendant for injuries in the event of TVGA’s negligence. TVGA established as a matter of law that it was not negligent and thus has no duty to defend or indemnify defendant, and defendant failed to raise an issue of fact (see Colyer v K Mart Corp., 273 AD2d 809, 809-810 [2000]). Present—Pigott, Jr., P.J., Hurlbutt, Scudder, Gorski and Hayes, JJ.