— In two actions to recover damages for wrongful death which are to be jointly tried, the defendants Samuel and Adrianne Millman (hereinafter the Millmans) appeal from an order of the Supreme Court, Rockland County (Kelly, J.), dated June 18, 1987, which denied their motion for summary judgment dismissing the complaint in action No. 1 as against them and the complaint in action No. 2 as against Samuel Millman.
Ordered that the order is modified by deleting the provisions denying those branches of the Millmans’ motion which were to dismiss (1) the demands for punitive damages against them in action No. 1 and against Samuel Millman in action No. 2, and (2) those causes of action in the complaints which seek to recover damages against them for alleged violations of the Workers’ Compensation Law, the Education Law and the Occupational Safety and Health Act and substituting therefor provisions granting those branches of the motion; as so modified, the order is affirmed, without costs or disbursements.
The instant action arises out of an accident which occurred in July 1983 at the Millmans’ residence in Pomona, New York. The Millmans were in the process of having an in-ground pool installed in their backyard when two of the employees of the general contractor involved in the construction were accidentally killed by falling debris from a backyard
The record establishes that in June 1983 the Millmans consulted with the defendants Larry Rowe and Robert Schanzer, doing business as Leisure Pool Service regarding the installation of the in-ground pool in their backyard. Given the undersized nature of the Millmans’ lot, the existence of a large tree in the middle of the yard and a concrete patio extending from the rear of the house, Schanzer recommended that an octagonal-shaped pool be constructed. Although the parties discussed the possibility of removing the tree, Mr. Millman allegedly decided not to have the tree taken down. As a result, the parties agreed to the installation of a 23-foot octagonal pool which would not necessitate the removal of either the tree or the patio. By contract dated July 3, 1983, the parties agreed to the terms of the construction. The contract provided that Schanzer & Rowe, doing business as Leisure Pool Service would "furnish all materials and perform all labor necessary to complete” the work.
The excavation work on the Millmans’ pool began on or about July 7, 1983, and continued for about three days. At that time, neither the Millmans nor Schanzer had applied for a building permit. During one of the parties’ preliminary discussions, Schanzer apparently told Mr. Millman that while a building permit is usually needed for the installation of a pool, the pool could be completed before the permit was obtained. Schanzer, however, did not advise the Millmans as to whether a permit should be obtained, although he did know that a permit was required.
On July 12, one of the Millmans’ neighbors informed the local building inspector of the construction on the Millmans’ property. That same day, the building inspector visited the Millmans’ property and upon observing the work, advised Mr. Millman that he was required to have a building permit. The building inspector also indicated that the pool as planned did not conform with the local sideline requirements.
Mr. Millman advised Schanzer of his discussions with the building inspector and they then considered possible alternatives for constructing the pool so as to satisfy the sideline requirements. In order to maintain the presence of the tree in
The following day, July 13, Mrs. Millman and Schanzer went to the local building department. At that time, the building inspector personally informed Schanzer of the sideline requirements. On July 14, Mr. Millman visited the building department to file the building permit application and pay the requisite fee. Significantly, the application filed by Mr. Millman states that the builder and supervisor of the construction were the owners of the premises, namely the Mill-mans.
A factual dispute exists as to what instructions, if any, the building inspector gave to Mr. Millman on July 12 and 14 regarding the continuance of the construction of the pool without a building permit. Initially, during his examination before trial, Mr. Millman claimed that at no time prior to the issuance of the building permit did the building inspector discuss the issue of whether the construction could continue. However, in his affidavit in support of the motion for summary judgment Mr. Millman stated that prior to the issuance of the building permit, the building inspector advised him that the excavation could continue without a permit. In contrast, the building inspector, in a memorandum dated July 12, 1983, noted that on that date, following the inspection of the premises, he told Mr. Millman to stop the work and obtain a building permit. Similarly, in a subsequent affidavit, the building inspector stated that on July 12th, he ordered all work on the pool to cease until a building permit was issued. The building inspector also noted that when the application was filed by Mr. Millman there was no mention of the removal of a portion of the backyard patio or excavation of the area adjacent thereto.
The excavation work of the backyard resumed on July 15, 1983, even though no building permit had been issued. The general contractor determined that the backyard patio, which was a concrete slab approximately six inches thick, would be removed by digging under the patio and then hammering off pieces of the slab. The Millmans left for work on the morning of July 15th prior to the commencement of the excavation and returned home at approximately 3:30 p.m. When Mr. Millman walked to the backyard, he observed the workers digging and
The plaintiffs’ claims against the Millmans are essentially premised on allegations that the Millmans participated in the direction and control of the construction and excavation on their property and as such violated various statutory provisions including Labor Law § 240 (1) and § 241 (6), which set forth requirements for conducting construction and excavation work. In addition, the plaintiffs claim, inter alia, that the Millmans violated the provisions of Labor Law § 200, which requires that an owner provide a safe place to work for the employees of a general contractor working on his or her premises.
Following service of their answer, the Millmans moved for summary judgment dismissing the complaint in both actions on the basis that they did not "direct or control” the construction or excavation of the pool and thus were excluded from liability under Labor Law § 240 (1) and § 241 (6). Additionally, the Millmans argued that they cannot be held liable for a breach of their statutory duty under Labor Law § 200 because the accident was caused not by a failure to provide a safe work place but rather by hazards which were inherent in the work which the contractor chose to perform.
The Supreme Court denied the Millmans’ motion on the basis that a triable issue of fact exists as to whether the Millmans directed or controlled the installation of the pool and the excavation work. Additionally, the court determined that triable issues of fact exist on the issue of whether the Millmans breached their statutory duty under Labor Law § 200 and whether the breach, if any, was a proximate cause of the accident. We agree and, accordingly, affirm that part of the Supreme Court’s order.
Labor Law § 240 sets forth certain standards which must be adhered to by general contractors and owners in conducting construction and excavation work and imposes absolute liability for injuries which occur as a result of a deviation from those standards. This liability is wholly independent of the owner’s actual supervision or control of the work place (Haimes v New York Tel. Co., 46 NY2d 132; Picciotto v Molloy Coll., 129 AD2d 619). Moreover, Labor Law § 241 (6) imposes a nondelegable duty of insuring that the area where the work is
In the situation at bar, we agree with the Supreme Court’s determination that, at the very least, an issue of fact exists as to whether the Millmans retained the requisite degree of direction and control over the installation of their in-ground pool to impose liability under Labor Law § 240 (1) and § 241 (6). The facts establish that the Millmans exercised considerable supervision over the construction of the pool. For example, the Millmans were involved in the decisions regarding the location, the shape and the size of the pool as well as the consideration of alternative methods of construction in order to comply with the applicable sideline requirements (see, Gallo v Supermarkets Gen. Corp., supra; cf., Schwartz v Foley, 142 AD2d 635). In fact, when Mr. Millman arrived home on the afternoon of July 12, he requested that the panels which had been placed in the excavated area be rearranged because he believed that they did not comply with the sideline restrictions. Additionally, it is significant to note that in filling out the building permit application, Mr. Millman indicated that the owner of the premises was the builder and supervisor of the construction. Clearly, these facts raise an issue as to whether the Millmans had sufficient direction and control over the construction so as to warrant the imposition of liability under Labor Law § 240 (1) and § 241 (6).
We further find that an issue of fact exists as to whether the Millmans breached their statutory duty of providing a safe work place for the workers on their premises under Labor Law § 200. This section represents a "codification of the common-law duty which the owner and the general contractor owed to workmen to exercise reasonable care to render safe the places of work provided by them, together with the ways and approaches thereto (see Rusin v Jackson Hgts. Shopping Center, 27 NY2d 103; Lagzdins v United Welfare Fund-Security Div. Marriott Corp., 77 AD2d 585, 586; Moore v Suburban Fuel Oil Serv., 22 AD2d 827 [affd 16 NY2d 647])” (Copertino v Ward, 100 AD2d 565, 567). This duty of the owner, however, does not extend to injuries arising from a defect in the contractor’s own plant, tools and methods or through the negligent acts of the contractor occurring as a detail of the work (Persichilli v Triborough Bridge & Tunnel Auth., 16 NY2d 136, 145; Kajowski v Irvico Realty Corp., 37 AD2d 991, lv denied 30 NY2d 481).
In the situation at bar, it is clear that the method which the general contractor chose to excavate the area near the rear concrete patio was a proximate cause of the accident and the Millmans’ liability under Labor Law § 200 did not extend to the general contractor’s negligence (see, Persichilli v Triborough Bridge & Tunnel Auth., supra). However, the record also
We do find, however, that the plaintiffs’ claims against the Millmans which are predicated on alleged violations of the Workers’ Compensation Law § 11, the Occupational Safety and Health Act (29 USC § 654) and Education Law § 3215 (1) should be dismissed since the decedents were not employees of the Millmans but rather were hired directly by the general contractor. Additionally, the plaintiffs’ demands for punitive and exemplary damages against the Millmans should be dismissed since there is no evidence in the record to support the conclusion that the Millmans’ actions constituted "gross recklessness or intentional, wanton or malicious conduct” warranting the imposition of punitive damages (Gravitt v Newman, 114 AD2d 1000, 1002). Mollen, P. J., Kunzeman and Rubin, JJ., concur.