DocketNumber: No. 75655.
Citation Numbers: 757 N.E.2d 50, 143 Ohio App. 3d 13
Judges: Karpinski, McMonagle, Corrigan
Filed Date: 8/13/2001
Status: Precedential
Modified Date: 10/19/2024
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *Page 15
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *Page 16
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *Page 17
At the time of the bidding, various utility lines were located near the existing bridge: Cleveland Public Power (CPP) maintained electric power lines beneath the bridge, and other utilities maintained power, telephone, and other utility lines on the north and south sides. The Notice to Bidders provided by Cleveland specifically informed them that the Project was required to comply with certain safety regulations, including O.A.C. Section 4121:1-3-07, which governs the operation of cranes in close proximity to power lines. (Id. at Para. 6.)
In June 1991, after reviewing the site and the work to be performed, Industrial Construction Co., Inc. (ICC), an independent contractor, submitted a bid to perform the Project. Cleveland accepted ICC's bid and agreed to pay *Page 18 $519,247.40 to obtain a finished product: namely, the replacement of the bridge, as well as liability insurance coverage for the Project. Cleveland retained no control over the independent contractor's conduct of the work, and there has never been any allegation that it did.
On August 23, 1991, the parties entered into an extensive Contract and Specifications for the Project, which incorporated, inter alia, the above ordinances and Notice to Bidders. In addition to other specific terms governing the work, the Contract and Specifications advised ICC of its responsibility for Project safety,2 its responsibility to safeguard adjacent property in general and utilities in particular,3 and its responsibility to comply with Workers' Compensation Laws4 and to be fully insured.5
To satisfy its insurance obligations, ICC obtained Commercial General Liability (CGL) policy No. ASR124769 from the Commercial Union Insurance Companies, issued by American Employers' Insurance Company (Commercial Union). The CGL policy contained several endorsements to expand coverage, including an endorsement to name Cleveland as an additional insured as well as an employers liability stop-gap endorsement to extend coverage for claims by ICC's employees.6
Paragraph B-8 governed ICC's responsibility for construction filed from adjacent areas, and B-92 established ICC's responsibility for the equipment and methods used to complete the Project. See C.C.O. Sections 185.23 and 185.24, respectively.
The central issue in the case at bar is whether Cleveland qualified as an insured within the scope of this coverage. The policy introduction provides: The word ``insured' means any person or organization qualifying as such under WHO IS AN INSURED (SECTION II). SECTION II of the CGL policy defines who qualifies as an insured for purposes of coverage. ICC was the organization listed in the Declarations as the named insured under Section II.1.c. *Page 19 Section II of the policy was amended, however, by endorsement to include additional insureds.
The ADDITIONAL INSURED OWNERS, LESSEES OR CONTRACTORS (FORM B) endorsement used in this case provides as follows:
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, butonly with respect to liability arising out of ``your work' for that insured by or for you. (Emphasis added.)
The City of Cleveland, among others, was listed as an additional insured in the SCHEDULE under the Name of Person or Organization as follows:
The City of Cleveland — Re: replacement and reconstruction of Washington Ave Division of Purchases and Supplies Bridge for Dept. Of Public Service Room 128, City Hall Cleveland, Ohio 44144
A central issue is whether the claims against Cleveland arose out of ICC's work on the Project.7
On August 29, 1991, the parties discussed relocating the utilities surrounding the existing bridge and decided to suspend the CPP electric power lines from utility poles on the north side of the bridge where other utilities were located. John Shkil, ICC's project manager, declined CPP's offer to move the power lines to the south side of the bridge. CPP did not respond to ICC's offer to dig a trench for the lines on the north side of the bridge. From approximately October 11 through November 8, 1991, CPP moved the power lines from below the bridge to utility poles on the north side of the bridge.
ICC thereafter demolished the existing bridge without incident and rented an uninsulated forty-ton Grove crane from Construction Supplies, Inc. (Construction Supplies). To operate the crane, James Kerr, ICC's general supervisor, who was working on his first bridge construction project, hired Richard Bowman. Bowman, however, was not licensed to operate the crane selected by ICC. On December 2, 1991, the crane arrived on the site, and ICC placed it at the south end of the bridge. Work reconstructing the south bridge abutment was completed without incident. On December 17, 1991, after approximately two weeks on site, ICC moved the crane *Page 20 to the north side of the bridge when no one from Cleveland was present. At no time did ICC request Cleveland take any action concerning CPP's electrical wires after it moved the crane.
Richard Klein was ICC's job superintendent in charge of safety on the worksite. Although Klein knew applicable safety regulations required the crane to be at least ten feet from the power lines, on December 30, 1991 he directed the boom of the crane to be placed within approximately two to three feet of CPP's power lines. Having returned from lunch after drinking alcohol, Bowman, the unlicensed crane operator, operated the crane in this location. There is no evidence that Cleveland had knowledge of this dangerous situation, let alone participated in it.
Plaintiffs Michael Stickovich and David Straight, carpenters assigned by ICC to work on the Project, were guiding a steel form into place to prepare for pouring concrete on the north bridge abutment when the crane came into contact with the power line. Both of them received bodily injuries and recovered workers' compensation payments after asserting the injuries arose out of and in the course of their employment by ICC on the Project.
Stickovich also filed an application with the Ohio Industrial Commission for an additional award against ICC for violation of specific safety requirements on the Project (VSSR claim). To recover such a VSSR award, an injured worker must show that his employer violated an authoritative safety requirement and that such violation was the proximate cause of his injuries.
In his VSSR application, Stickovich alleged eight violations by ICC of O.A.C. Section 4121:1-3-07, governing Cranes, Hoists, and Derricks. Four of his claims related to operating the boom of the crane within close proximity — less than ten feet — of overhead electrical lines. Cleveland had specifically notified ICC in its Notice to Bidders before it commenced any work on the Project that these precise safety requirements would be enforced. (Id. at Para. 6.)
Stickovich recovered on his VSSR claim against ICC by showing that ICC's violation of the O.A.C. safety regulations was the proximate cause of his injury. Neither he nor Straight, however, subsequently filed against ICC an intentional tort claim asserting that their injuries were substantially certain to occur from its conduct on the Project.
Instead, on March 12, 1993, Stickovich and Straight filed the case at bar against Cleveland, the crane manufacturer (Grove), and the crane lessor, Construction Supplies. They alleged Cleveland improperly maintained the stationary wires and that the manufacturer improperly produced and the lessor improperly leased a defective uninsulated crane to ICC without providing adequate warnings to avoid contact with electrical power lines. Cleveland requested that Commercial Union *Page 21 provide a defense and liability coverage for it as an additional insured under ICC's CGL policy. Commercial Union refused.
Cleveland, represented by its law department, filed an answer to the complaint as well as a third-party complaint against ICC and CGL insurer Commercial Union. Cleveland's July 12, 1993 complaint alleged, inter alia, that ICC was negligent. Cleveland also sought a declaratory judgment against Commercial Union; it specifically requested a defense of the claims against Cleveland as well as coverage for any liability imposed against it. (Third-Party Complaint, Count 1 Breach of Contract, and Count 2 Declaratory Judgment.)
Numerous other claims and cross-claims were subsequently filed by the parties. For example, crane lessor Construction Supplies also alleged that ICC was negligent. Commercial Union filed an answer to Cleveland's complaint and denied liability, but notably did not specifically raise the affirmative defense that the coverage of its own CGL policy was contrary to statute or public policy as required by Civ.R 8(C).
On September 12, 1995, more than two years later, Cleveland filed a motion for summary judgment on its claims against Commercial Union. By this time discovery during the course of the litigation revealed evidence to support claims against ICC, which evidence raised the potential for vicarious liability of others. Commercial Union opposed Cleveland's motion and filed its own cross-motion for summary judgment. The trial court granted Cleveland's motion for summary judgment against Commercial Union and denied Commercial Union's cross-motion. In granting summary judgment, the trial court held that Commercial Union had a duty to defend and was conditionally liable for any judgment against Cleveland depending on the verdict and evidence presented at trial.
On March 29, 1996, more than three years after the action was originally filed, counsel retained by Commercial Union filed an appearance on behalf of Cleveland. Commercial Union was reluctant to defend Cleveland, however, and repeatedly sought to relitigate the coverage issues. A successor trial judge denied its requests to reconsider the coverage rulings. Commercial Union ultimately controlled the defense and exercised its exclusive right to settle the matter.8
Although no findings were made concerning the workers' claims or damages, against Cleveland or any of the other parties, Commercial Union agreed to pay Stickovich and Straight $1.3 million to dismiss their complaint. Also surrendered without adjudication were Cleveland's defenses. ICC was found liable to Construction Supplies for damage to its crane. All remaining claims were ultimately resolved or dismissed. *Page 22
Commercial Union now appeals from the trial court's order granting Cleveland's motion for summary judgment and denying its cross-motion for summary judgment. Commercial Union argues that its own CGL liability insurance coverage is void and against public policy and contends that the trial court erroneously construed it to provide coverage for negligence of Cleveland, the additional insured.
Commercial Union raises the following sole assignment of error:
THE TRIAL COURT IMPROPERLY DETERMINED THAT THE ADDITIONAL INSURED CLAUSE IN THE CONTRACTOR'S GENERAL COMMERCIAL LIABILITY INSURANCE POLICY PROVIDED COVERAGE FOR THE ADDITIONAL INSURED'S OWN NEGLIGENCE. THUS, THE TRIAL COURT'S GRANTING OF SUMMARY JUDGMENT IN FAVOR OF THIRD-PARTY PLAINTIFF-APPELLEE [CITY OF CLEVELAND] REQUIRES REVERSAL.
This assignment lacks merit.
Commercial Union disputes its duty to defend or pay its settlement and seeks an order from this court that it recover these costs. Commercial Union argues it had no duty because Cleveland does not qualify under the CGL policy as an additional insured under the following endorsement:
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule [Cleveland], but only with respect to liability arising out of your work for that insured by or for you. (Emphasis added.)
It argues that the trial court improperly determined that the additional insured endorsement covered Cleveland's own negligence in violation of R.C.
Standard principles governing insurance law and motions for summary judgment warrant affirming the trial court's judgment. Summary judgment is warranted when, after viewing the evidence in the light most favorable to the non-moving party, there is no genuine issue of material fact, reasonable minds can come to but one conclusion, and the moving party is entitled to judgment as a matter of law. Civ.R. 56(C). After reviewing the record in accordance with this standard, we conclude the trial court properly granted Cleveland's motion and properly denied Commercial Union's cross-motion for summary judgment.
This court recently held that this precise defense was waived under these circumstances in Blount v. Digital Equipment Corp. (Feb. 3, 2000), Cuyahoga App. No. 75298, unreported, stating as follows:
We also reject Net-Tech's argument that the indemnification agreement violates R.C.
2305.31 . A defense alleging the illegality of a contract is an affirmative defense. Countrymark Coop. v. Smith (1997),124 Ohio App. 3d 159 ,164 ,705 N.E.2d 738 , citing McCabe/Marra Co. v. City of Dover (1995),100 Ohio App. 3d 139 ,652 N.E.2d 236 , appeal dismissed,72 Ohio St. 3d 1529 ,649 N.E.2d 839 ; Arthur Young Co. v. Kelly (1993),88 Ohio App. 3d 343 ,623 N.E.2d 1303 , cause dismissed,67 Ohio St. 3d 1462 ,619 N.E.2d 697 . As such, it must be raised in a responsive pleading or it is deemed waived. McCabe/Marra Co. v. City of Dover (1995),100 Ohio App. 3d 139 ,147 ,652 N.E.2d 236 . Net-Tech did not raise the issue of the illegality of the indemnification agreement and, therefore, has waived this issue.
As in Blount, Commercial Union's Answer to Cleveland's Third-Party Complaint in the case at bar did not raise the affirmative defense of illegality, did not mention R.C.
The public works contract and liability insurance agreements in the case at bar were authorized by the Ohio Constitution, Cleveland's Charter, and the Ohio Revised Code.10 *Page 24 Cleveland Ordinance No. 993-90 specifically authorized and directed the City to enter into the challenged public works contracts, which incorporated the challenged substantive terms from Chapter 185 of Cleveland's codified ordinances.
Liability insurance was compulsory both by law, C.C.O. 185.26, and by contract. Paragraph B-18 of the Contract and Specifications specifically required ICC to obtain the insurance coverage involved in the case at bar:
PUBLIC LIABILITY, PROPERTY DAMAGE AND AUTOMOBILE INSURANCE
a. The Contractor [ICC] shall take out and maintain during the life of this contract such public liability and property damage insurance, wherein the City of Cleveland is named as an additional insured, as shall protect himself, the City of Cleveland and any subcontractor performing work covered by this contract from claims for damage for personal injury, including accidental death, as well as from claims for property damages which may arise from operations under this contract, whether such operations be by himself or by any subcontractor or by anyone directly or indirectly employed by either of them. An exact copy of such policy or policies shall be deposited with the City of Cleveland before the commencement of any work under the contract. * * *
Liability insurance was compulsory precisely to protect the public from liability and to provide a fund for anyone injured in connection with the Project.
Any doubt concerning the governing public policy in this context is dispelled by R.C.
*Page 25(A)(1) A political subdivision may use public funds to secure insurance with respect to its and its employees' potential liability in damages in civil actions for injury, death, or loss to persons or property allegedly caused by an act or omission of the political subdivision or any of its employees in connection with a governmental or proprietary function. The insurance may be at the limits, for the circumstances, and subject to the terms and conditions, that are determined by the political subdivision in its discretion. * * * (Emphasis added.)
Enacted after R.C.
In a free and democratic society, freedom of contract is the general rule; public policy limits are the exception. The doctrine does not grant courts a roving commission to police the terms of agreements and must be cautiously applied lest the exception swallow the rule. The Ohio Supreme Court has repeatedly admonished the courts against the loose application of public policy to invalidate agreements, even in the context of ordinary contracts between private parties not authorized by specific legislation as in the case at bar:
When judges come to apply the doctrine, they must take care not to infringe on the rights of the parties to make contracts which are not clearly opposed to some principle or policy of law.
Lamont Bldg. Co. v. Court (1946),
As a general rule, neither indemnity agreements nor liability insurance contracts are against public policy. See e.g., Glaspell v. Ohio Edison Co. (1987),
Rather than simply invoking the nebulous catch phrase of public policy as Commercial Union requests, it is our duty to carefully review and apply the statute as written by the General Assembly. Careful review of the language used by the General Assembly reveals that R.C.
R.C.
A covenant, promise, agreement, or understanding in, or in connection with or collateral to, a contract or agreement relative to the design, planning, construction, alteration, repair, or maintenance of a building, structure, highway, road, appurtenance, and appliance, including moving, demolition, and excavating connected therewith, pursuant to which contract or agreement the promisee, or its independent contractors, agents or employees has hired the promisor to perform work, purporting to indemnify the promisee, its independent contractors, agents, employees, or indemnities against liability for damages arising out of bodily injury to persons or damage to property initiated or proximately caused by or resulting from the negligence of the promisee, its independent contractors, agents, employees, or indemnities is against public policy and is void. Nothing in this section shall prohibit any person from purchasing insurance from an insurance company authorized to do business in the state of Ohio for his own protection or from purchasing a construction bond.
(Emphasis added.)
The language, structure, and purpose of R.C.
R.C.
A commercial liability insurance policy is not a construction indemnity agreement within the scope of R.C.
The business of insurance is different from other risk allocation contracts. E.g., Griffin Systems, Inc. v. Ohio Dept. of Ins. (1991),
As a matter of common understanding, usage, and legal definition, an insurance contract denotes a policy issued by an authorized and licensed insurance company whose primary business it is to assume specific risks of loss of members of the public at large in consideration of the payment of a premium. There are, *Page 28 however, other risk-shifting agreements which are not insurance contracts. These include the customary private indemnity agreement where affording the indemnity is not the primary business of the indemnitor and is not subject to governmental regulation but is merely ancillary to and in furtherance of some other independent transactional relationship between the indemnitor and the indemnitee. The indemnity is, thus, not the essence of the agreement creating the transactional relationship but is only one of its negotiated terms.
Id. at 354-355.
The case at bar involves an insurance contract, not a construction indemnity agreement.
Commercial Union and the dissent fail to distinguish the construction indemnity agreement from the liability insurance contract in the case at bar. It is well established that under indemnity agreements, before being reimbursed by the indemnitor, the indemnitee must pay a final judgment against him in favor of the injured party. See e.g., State Auto Mut. Ins. Co. v. Columbus Motor Express (1933), 15 Ohio Law. Abs. 747, 748. In the context of liability insurance, however, the insurer becomes liable upon the loss and directly pays the injured party rather than reimbursing its insured.
With these distinctions in mind, a review of the express terms of R.C.
R.C.
The General Assembly understood this distinction, and courts have recognized these principles in this precise context when considering public policy under R.C.
Judicially announced principles of public policy generally forbid a party from shifting the risk of loss by insurance when its wrongdoing is deliberate and is reflected in policy terms such as accident, or occurrence. There is no claim (or evidence) that Cleveland deliberately injured ICC's employees, and there is less reason to believe that a public agency might indulge in moral hazard because of liability insurance. *Page 30
Cases citing R.C.
The Ohio Supreme Court has never applied R.C.
For a period of more than twenty years after the passage of R.C.
Since Zavarella was issued, the case has had a checkered history: To date, two cases have cited it in split opinions with dissents, and a federal magistrate *Page 31
declined to follow it because of its failure to distinguish liability from indemnity. As noted above, however, the Sixth Circuit, holding that the federal court should abstain from the dispute, vacated the magistrate's opinion and left the disagreement for the Ohio state courts to resolve. The Zavarella opinion is more opaque than the language of R.C.
Although Zavarella and the case at bar appear superficially similar to the extent that both cases involve insurance coverage disputes after an injury on a construction site, the two cases differ markedly. Zavarella arose in a different procedural setting, with different substantive facts, and different contract language. In addition to the substantive facts, at least four significant differences are manifest.
First, unlike the case at bar, the insurer issuing the additional insured endorsement in Zavarella apparently raised and, therefore, did not waive, the affirmative defense that coverage under its own liability insurance contract violated public policy.15 Second, Zavarella did not involve a public works bridge project a project authorized by the Ohio Constitution and Revised Code, as well as the Cleveland Charter and ordinances and a project that did not even fall within the scope of R.C.
As an alternative ground for summary judgment, Buckeye [on behalf of the additional insured] argued that American [the insurer issuing the additional insured endorsement] breached its duty to defend. It did not separately set forth this issue as a separate argument in its merit brief, so we consider that issue *Page 32 waived on appeal. Hawley v. Ritley (1988),35 Ohio St. 3d 157 ,159 ,519 N.E.2d 390 ,392-393 .
Id. at 152 n. 1.
In addition to these basic differences, the underlying facts of Zavarella are also readily distinguishable from the case at bar. In Zavarella, a subcontractor's employee was injured in a fall, the circumstances of which were not described. He obtained workers' compensation benefits and lost by directed verdict on his intentional tort claim against Zavarella, the subcontractor and his employer, because there were no facts to support his intentional tort claim. The employee thereafter sued the project general contractor, Snavely, who was named as an additional insured under the subcontractor's insurance policy.
The subcontractor's insurer refused to defend the claim, so the general contractor's own insurer defended and settled it. The general contractor's insurer thereafter sued the subcontractor's insurer to recover the amount of its settlement and defense costs, which were covered by its own insurance policy. Unlike the case at bar, the general contractor's insurer did not raise a claim that the subcontractor's insurer breached its duty to defend and the subcontractor's insurer raised the affirmative defense that coverage under its policy would be tantamount to indemnification. Id. at 150.
Kendall, however, held that an indemnity agreement between two private parties in a contract to dismantle a factory was barred by R.C.
R.C.2305.31 prohibits indemnity agreements, in the construction-related contracts described therein, whereby the promisor agrees to indemnify the promisee for damages caused by or resulting from the negligence of the promisee, regardless of whether such negligence is sole or concurrent. (Emphasis added.)
Id. at syllabus paragraph one. As noted above, however, because Zavarella and the case at bar involve liability insurance, a commercial liability insurer, rather than the contractor (that *Page 33 is, the promisor), agrees to pay the injured party, rather than indemnify the promisee. Zavarella's misapplication of Kendall requires confusing different contracts, different parties, and different duties.
To reach the result advocated by Commercial Union and the dissent requires an increasingly loose use of the term indemnity. Contrary to Zavarella, R.C.
It would go far beyond Zavarella to hold that the promisor indemnifies the promisee by naming the promisee as an additional insured. It is a fiction to suggest that a contractor indemnifies the property owner by naming it as an additional insured on a liability insurance policy. The commercial liability insurer has a separate and independent duty under the insurance contract on which the owner is named as an additional insured, but the contractor does not either (1) enter into an indemnity agreement or (2) agree to indemnify the owner under the insurance contract simply by requesting that it be named as an insured on a liability insurance policy.
To the contrary, the record in the case at bar shows that ICC was found by the Industrial Commission to have violated specific safety regulations in O.A.C. 4121:1-3-07, which prohibited it from operating the crane as it did in close proximity to overhead electric wires. Not only does directing the operation of an uninsulated crane by an unlicensed operator who had been drinking alcohol in violation of these regulations create a substantial certainty of injury, but the VSSR award was made precisely because such violation by ICC was the proximate cause of the employee's injury. See e.g., State ex rel. Newman v. Industrial Comm'n (1997),
The insurance contract in the case at bar defines coverage in terms of causation and grants coverage with respect to liability arising out of ``[ICC's] work.' Zavarella asserted that, under the unique circumstances of that case,17 there were no ambiguities regarding the additional insured's own negligence or proximate cause. Because it stated no facts concerning how the injury occurred, unlike virtually every other case applying R.C.
By its own terms, R.C.
The Ohio Supreme Court has recently recognized the distinction between construction indemnity agreements and insurance contracts, a distinction which Zavarella failed to make by misapplying Kendall. Kemmeter v. McDaniel Backhoe Serv. (2000),
Moreover, even in the context of indemnity agreements, Kemmeter held that indemnity agreements in favor of the general contractor are not barred if the accident arose out of activities under the contractual control of the subcontractor. Id. at 413. To the extent that Kemmeter applies beyond its own terms to liability insurance contracts, as distinguished from such construction indemnity agreements, it supports the result reached by the trial court. The record in the case at bar shows that *Page 35 the workers' injuries arose out of ICC's selection, staffing, and operation of the crane, which activities were under its exclusive contractual control.18
Finally, Kemmeter also expressly recognized that the mere assertion of a negligence claim is not sufficient to preclude coverage. Even if a construction indemnity agreement facially violated R.C.
In the case at bar, Cleveland contracted for a completed product, namely, the bridge. ICC was an independent contractor free to select the tools and methods to complete its task. Cleveland did not control or specify the manner of performance by ICC or its employees. Cleveland did not control ICC's selection of an uninsulated crane, did not control ICC's selection of an unlicensed operator, did not control ICC's location of the crane, and did not control ICC's operation of the crane in knowing violation of safety regulations. See Cleveland Codified Ordinance Sections 185.23, 185.24, and 185.25; Contract Paragraphs B-8, B-9, B-10, and C-5.
Before the project began, Cleveland gave ICC notice that ICC had to comply with O.A.C. 4121:1-3-07. (Notice to Bidders Para. 6.) ICC selected the crane, used it without incident, and moved the crane when no one from Cleveland was on the site. ICC did not request that Cleveland do anything to the wires after moving the crane. ICC directed its unlicensed crane operator after he had been drinking alcohol at lunch to operate the crane in violation of the O.A.C. safety regulations. There is no evidence that Cleveland had knowledge of this dangerous situation, let alone participated in it. ICC's operation of the crane in violation of these regulations was already determined to be the proximate cause of one employee's injury in the context of his VSSR claim against ICC. In short, the workers' injuries arose from ICC's operation of the crane on the project.
We are required to construe and apply the terms of the liability insurance contract in light of the pleadings and evidence in this case. The liability insurance contract, through the additional insured endorsement, provides coverage for liability arising out of your [ICC's] work. Commercial Union did not draft the endorsement to contain any express exclusion or limitation for allegations of negligence made against the additional insured. It contends nevertheless that the liability insurance contract should be construed as if it contained such an exclusion or limitation because it would otherwise violate public policy. *Page 36
Even if Commercial Union had properly raised this affirmative defense, however, it did not satisfy its burden of proving that liability insurance coverage violated public policy in the case at bar. For the reasons set forth above, Commercial Union has not shown that liability insurance coverage violates public policy even if it were construed to cover Cleveland's alleged negligence. Liability insurance contracts routinely provide coverage for an insured's own negligence. Moreover, even if coverage were limited to exclude Cleveland's own negligence, Commercial Union has not shown the trial court construed its endorsement to provide coverage for actionable negligence by Cleveland, which caused the workers' injuries.
Simply stated, an allegation of negligence against an additional insured in a complaint does not categorically preclude an insurer's duty to defend or pay under a liability insurance contract. Unlike the above cases recognizing coverage, Zavarella did not even cite the allegations in the complaint for which coverage was sought. For example, Lewis v. Ohio Edison, supra, involved both an insurance policy and an indemnity agreement, both of which were found to be enforceable despite R.C.
The Fourth District Court of Appeals construed a similar CGL additional insured endorsement to provide coverage for claims against a public agency for its own alleged negligence in Washington Cty. A. M. Assoc. dba Washington Cty. Fair v. T.H.E. Insurance Co. (Dec. 22, 1992), Washington App. Nos. 92CA4 and 92CA13, unreported. Washington County Fair (WCF) contracted with an independent contractor to provide a Fourth of July fireworks display. A child was injured the day after the show when an unexploded firework he picked up from the ground detonated in his hand. Alleging negligence, the child sued WCF and the contractor.
The additional insured endorsement issued by T.H.E. Insurance Company provided coverage to WCF only as respects accidents arising out of the business operations of the primary insurer. There was some evidence that the public authority was responsible for clean up of the site after the show. The policy defined the contractor's work to include work or operations performed by you or on your behalf as in the case at bar. Contrary to Commercial Union's argument, the trial court's conclusion that the liability insurer had a duty to defend WCF and pay damages was affirmed on appeal. Id. at 4; accord, e.g., McIntosh v. Scottsdale Ins. Co. (10th Cir. 1993),
Commercial Union's additional insured endorsement in the case at bar provides coverage with respect to liability arising out of ``your [ICC's] work' for that insured [Cleveland] by or for you. Inter alia, the injured worker's complaint herein alleged:
4. On December 30, 1991, the plaintiffs, Michael Stickovich and David Straight, were employed by Industrial Construction, Inc. [ICC] on a job site at the Washington Street bridge in Cleveland, Ohio. The plaintiffs were assigned to rebuild the bridge pursuant to a contract with the City of Cleveland. * * *5. Said crane was designed, manufactured and sold by defendant Grove North America. Said crane was leased to Industrial Construction Co., Inc. [ICC] by defendant Construction Supplies.
6. During the course of guiding the metal form being lowered by the crane, the plaintiffs were severely burned by electrocution as a result of an electrical event occurring between a portion of the crane and the high voltage wires owned and maintained by defendant City of Cleveland.
Although the complaint also contained an allegation that Cleveland was negligent, id. at para. 7, the quoted allegations in other paragraphs of the complaint reveal that the claims arose out of ICC's work on the project.
The term arising out of in a liability insurance policy affords very broad coverage. This court has held that arising out of means flowing from or having its origin in. E.g., Nationwide Mut. Fire Ins. Co. v. Turner (1986),
Where the insurer's duty to defend is not apparent from the pleadings in the action against the insured, but the allegations do state a claim which is potentially or arguably within the policy coverage, or there is some doubt as to whether a theory of recovery within the policy coverage has been pleaded, the insurer must accept the defense of the claim.
Id. at syllabus.
Under the circumstances, the claims by the workers, crane manufacturer, and lessor in the case at bar were sufficient, or at least sufficiently ambiguous, to require a defense. Lewis quoted Willoughby at length concerning the insurer's duty to defend claims against a utility by a contractor's employee injured by electricity adjacent to a worksite while he was performing the work as in the case at bar:
The Ohio Supreme Court went on to say, at pages 179-180:
* * * For instance, in Allen v. Standard Oil Co. (1982),2 Ohio St. 3d 122 , this court held that, in the context of an indemnification agreement, the duty to defend could attach at some later stage in the litigation despite the fact that the pleadings did not conclusively establish the duty.The rationale for the rule was stated in Milliken, supra (Millken v. Fidelity Cas. Co. of N.Y. [C.A. 10, 1964],
338 F.2d 35 ), at page 40, as follows:The reason for this rule is that `` * * * under the Federal Rules of Civil Procedure the dimensions of a lawsuit are not determined by the pleadings because the pleadings are not a rigid and unchangeable blueprint of the rights of the parties. * * *'
Further, in Solo Cup Co. v. Federal Ins. Co. (C.A.7, 1980),
619 F.2d 1178 , the court stated at 1185:``* * * especially since the advent of notice pleading, in a case where there is some doubt as to whether a theory of recovery within the policy coverage has been pleaded in the underlying complaint, the insurer must defend, and its defense obligations will continue until such time as the claim against the insured is confined to a recovery that the policy does not cover.' See, also, Hagen Supply Corp. v. Iowa National Mut. Ins. Co. (C.A.8, 1964),
331 F.2d 199 ,204 .Like the federal system, Ohio has embraced notice pleading through adoption of the Ohio Rules of Civil Procedure. See Civ.R. 8(A) and (E). No longer must a complaint set forth specific factual allegations. All that Civ.R. 8(A) requires is ``* * * (1) a short and plain statement of the claim showing the pleader is entitled *Page 39 to relief, and (2) a demand for judgment for the relief to which he deems himself entitled. * * *'
In addition, no longer is a trial strictly limited to the issues raised in the pleadings. See Civ.R. 15(B).
It follows that the pleadings alone may not provide sufficient factual information to determine whether the insurer has an obligation to defend the insured. It remains true that where the pleadings unequivocally bring the action within the coverage afforded by the policy, the duty to defend will attach. Motorists Mut., supra (Motorists Mut. v. Trainor [1973],
33 Ohio St. 2d 41 ); State Farm Fire Cas. Co. v. Pildner (1974),40 Ohio St. 2d 101 [69 O.O.2d 509]. However, where the insurer's duty to defend is not apparent from the pleadings in the case against the insured, but the pleadings do state a claim which is potentially or arguably within the policy coverage, or there is some doubt as to whether a theory of recovery within the policy coverage has been pleaded, the insurer must accept the defense of the claim. Thus, the ``scope of the allegations' may encompass matters well outside the four corners of the pleadings. (Emphasis and inserts added.)Appellee Buckeye Union cites Wedge Products Inc. v. Hartford Equity Sales Co. (1987),
31 Ohio St. 3d 65 , for the proposition that an insurer is not obligated to defend or indemnify an insured when there is no possibility of coverage under the applicable policy of insurance. However, the facts herein are very complex and it is not so clear that there is no possibility of coverage.
Id. at pp. 3-4.
The Lewis Court thereafter declined to invalidate the parties' indemnification agreement or the conditional duty to pay damages under the liability insurance policy, and the Ohio Supreme Court denied further review. Lewis v. Ohio Edison Co. (1991),
These are standard principles governing the duty to defend determined by summary judgment in insurance coverage declaratory judgment actions. The allegations and liability coverage provisions do not unambiguously show there was no coverage in the case at bar. Under the circumstances, the two successive trial judges did not err by finding a duty to defend.
In granting summary judgment, the trial court held that Commercial Union had a duty to defend and was conditionally liable for any judgment depending on the verdict and evidence presented at trial. The duty to defend a claim is distinct from the duty to pay that claim and does not mean that the insurer has a duty to pay if the facts subsequently show there is no coverage or liability of its insured.
Instead of proceeding to the scheduled bench trial, when the matter could be determined once and for all, however, Commercial Union exercised its exclusive contractual right to control and settle the litigation on the eve of trial without proof of the workers' claims or damages against any of the parties. Under the circumstances, after thoroughly reviewing the record, we find that (1) Commercial Union did not satisfy its burden of proving its affirmative defense that its insurance contract violated public policy, and (2) the record does not show that its settlement was outside the scope of its liability insurance coverage or improperly covered injury or damages proximately caused by actionable negligence of Cleveland.
Commercial Union has not shown that public policy precludes either liability on its settlement or liability insurance coverage in the case at bar. As noted above, the public works contracts were authorized by the Ohio Constitution, Cleveland Charter, the Ohio Revised Code, and Cleveland ordinances. R.C.
Even if the trial court construed the additional insured endorsement to cover Cleveland's own negligence as Commercial Union argues, it has shown no error. Public policy does not prohibit a public agency from obtaining liability insurance to protect the public on public works projects. Ohio courts have held insurers liable for settlements when they raise unfounded public policy arguments to avoid coverage, for example, in cases involving employers liability endorsements covering substantial certainty intentional torts as the case at bar. E.g., Presrite Corp. v. Commercial Union Ins. Co. (1996),
Finally, even if Commercial Union were correct that coverage of liability for negligence by Cleveland were against public policy, it has not shown that the trial court applied its insurance contract to cover damages proximately caused by actionable negligence of Cleveland. The injured workers did not prosecute their claims or damages against Cleveland or the other parties. They dismissed their complaint against Cleveland without any finding or stipulation of liability or negligence by Cleveland. It is not clear who, if anyone, was liable, negligent, or proximately caused any injury or damage they may have suffered. The settlement relieved them of their burden of proving negligence, proximate cause, and damages concerning any party. Construction Supplies alleged negligence by ICC and ultimately recovered for damage to its crane. By agreeing to pay the workers to dismiss their complaint without proof Commercial Union prevented any finding against its named insured, ICC, which would have triggered coverage under the policy.19
The settlement also compromised without adjudication all Cleveland's defenses, including: (1) that Cleveland was protected by sovereign immunity for emergency bridge repairs, upon which the City prevailed by summary judgment before the first trial judge; (2) that ICC committed an intentional tort and proximately caused the employees' injury, as found to support the VSSR award; (3) that the crane manufacturer and/or lessor's conduct in providing an uninsulated crane without adequate warning was tortious and proximately caused any injury; and *Page 42 (4) that Cleveland was not negligent and did not proximately cause any injury or damages.
By settling without proceeding to the bench trial, Commercial Union seeks to enhance its opportunity to contest coverage without regard to the facts of the underlying case supporting either the claims or defenses. Nothing in Zavarella supports this conclusion. The unique facts of Zavarella revealed to a legal certainty that no recovery could be made under the CGL policy. Because the injured employee had exhausted (and lost) all his legal claims against his employer (the subcontractor and named insured) and because no other party raised tort claims against it, no further liability could arise from its work within the meaning of the endorsement. As a result, the only possible liability that could arise in the case was against the general contractor (the additional insured) for its own negligence.
As noted above, the case at bar is readily distinguishable. The workers did not exhaust (or lose) their claims against ICC, their employer and the named insured, and other claims were pending against it. Moreover, Cleveland raised defenses of sovereign immunity, ICC's VSSR violation, and the responsibility of other parties, which were not involved in Zavarella. Unlike in Zavarella, because legal recourse against ICC existed and the additional insured's defenses were supported, we cannot say as a matter of law that any liability did not arise out of ICC's work. To the contrary, ICC was already found to have violated several specific safety requirements by operating the crane boom within two to three feet of overhead electrical wires in violation of published regulations. And such violation was also found to have been the proximate cause of Stickovich's injury. State ex rel. Newman v. Industrial Comm'n, supra.
Commercial Union has not shown that the trial court improperly applied the additional insured endorsement to cover Cleveland for its own negligence in violation of R.C.
ICC selected the crane and located it on the site. The record unambiguously shows that ICC never requested Cleveland do anything to the electrical wires thereafter. ICC moved the crane when no one from Cleveland was on site, and did not request any change to the wires after it decided to operate the crane in close proximity to them. ICC thereafter directed its unlicensed crane operator, who had been drinking alcohol at lunch, to operate it in violation of safety regulations. There is *Page 43 no evidence that Cleveland had knowledge of this situation, let alone participated in it. In short, the allegations of Cleveland's own negligence were essentially its failure to prevent the negligence of others.
Unlike Commercial Union, we cannot assume that the trial court construed the insurance contract to cover actionable negligence of Cleveland. Cleveland argued it was immune from claims of liability arising from its own conduct in the case at bar under R.C. Chapter 2744, because the case involved discretionary acts in carrying out the governmental function of bridge repair to which no exception applied. Regardless of any immunity, however, there is existing caselaw involving claims by employees of independent contractors against both public and private property owners and utilities that would have supported its non-liability on the claims against it under the circumstances of this case. See Betzman v. Navistar Int'l Transp. (1991),
Accordingly, Commercial Union's sole assignment of error is overruled.
It is ordered that appellee recover of appellant its costs herein taxed.
The court finds there were reasonable grounds for this appeal.
It is ordered that a special mandate issue out of this court directing the Cuyahoga County Court of Common Pleas to carry this judgment into execution.
A certified copy of this entry shall constitute the mandate pursuant to Rule 27 of the Rules of Appellate Procedure.
TIMOTHY E. McMONAGLE, J., CONCURS; MICHAEL J. CORRIGAN, J., DISSENTS (See Dissenting Opinion).
_________________________________ DIANE KARPINSKI, PRESIDING JUDGE:
I. The Insuring Agreement of SECTION 1 — COVERAGE A — is deleted and replaced by the following Insuring Agreement:
1. Insuring Agreement.
a. We will pay those sums that the insured becomes legally obligated to pay as damages because of bodily injury to an employee of yours arising out of and in the course of his or her employment by you in a state indicated in the schedule. * * *
The accompanying SCHEDULE specifically lists Ohio as a covered State.
SECTION V — DEFINITIONS
"* * *
"15. ``Your work' means:
"a. Work or operations performed by you or on your behalf; and"b. Materials, parts or equipment furnished in connection with such work or operations.
"``Your work' includes:
"a. Warranties or representations made at any time with respect to fitness, quality, durability, performance or use of ``your work'; and"b. The providing of or failure to provide warnings or instructions."
We hold that the additional insured agreement does not violate public policy, but that the express language of the policy does not afford coverage under the circumstances.
Scott E. McIntosh and Steven R. McIntosh v. Scottsdale ... , 992 F.2d 251 ( 1993 )
kenneth-p-milliken-kenneth-p-milliken-and-sylvia-milliken-blair , 338 F.2d 35 ( 1964 )
Arthur Young & Co. v. Kelly , 88 Ohio App. 3d 343 ( 1993 )
Hagen Supply Corporation, a Minnesota Corporation v. Iowa ... , 331 F.2d 199 ( 1964 )
SOLO CUP COMPANY, Plaintiff-Appellant, v. FEDERAL INSURANCE ... , 619 F.2d 1178 ( 1980 )
McCabe/Marra Co. v. City of Dover , 100 Ohio App. 3d 139 ( 1995 )