DocketNumber: 2010-12966-AD
Citation Numbers: 2011 Ohio 3965
Judges: Borchert
Filed Date: 4/27/2011
Status: Precedential
Modified Date: 10/30/2014
[Cite as Siemens v. Ohio Dept. of Transp.,2011-Ohio-3965
.] Court of Claims of Ohio The Ohio Judicial Center 65 South Front Street, Third Floor Columbus, OH 43215 614.387.9800 or 1.800.824.8263 www.cco.state.oh.us KEVIN SIEMENS Plaintiff v. OHIO DEPT. OF TRANSPORTATION Defendant Case No. 2010-12966-AD Deputy Clerk Daniel R. Borchert MEMORANDUM DECISION {¶ 1} On October 1, 2010, at approximately 5:30 p.m., plaintiff, Kevin Siemens, was traveling north on Interstate 75 “south of highway 73 in a construction zone” in the far left lane when a “semi traveling in center lane struck a large piece of tire tread in the roadway” causing the object to be propelled into the path of the vehicle plaintiff was driving. The propelled object struck the front of plaintiff’s vehicle causing substantial body and structural damage to the vehicle. Plaintiff implied that the damage to the automobile was proximately caused by negligence on the part of defendant, Department of Transportation (ODOT), in failing to maintain the roadway free of hazardous debris conditions. Plaintiff filed this complaint seeking to recover $2,300.00, which represents $500.00 for his insurance coverage deductible, $300.00 for rental car expenses, and $1,500.00 for “[d]iminished value to the vehicle.” The filing fee was paid. {¶ 2} Defendant explained that the roadway area where plaintiff’s incident occurred was within the limits of a working construction project under the control of ODOT contractor, John R. Jurgensen Company (Jurgensen). Defendant related that the particular construction project “dealt with grading, draining, planning and pavement repair of I-75, interchange reconstruction of SR 122 and bridge replacements at several locations in Warren County.” According to defendant, the construction project limits “corresponds to state mileposts 32.10 to 40.50” on Interstate 75 and plaintiff’s damage incident occurred “near state milepost 38.45 which is within the project limits.” {¶ 3} Defendant asserted that this particular construction project was under the control of Jurgensen and consequently ODOT had no responsibility for any damage or mishap on the roadway within the construction project limits. Defendant argued that Jurgensen, by contractual agreement, was responsible for maintaining the roadway within the construction zone. Therefore, ODOT contended that Jurgensen is the proper party defendant in this action. Defendant implied that all duties such as the duty to inspect, the duty to warn, the duty to maintain, and the duty to repair defects were delegated when an independent contractor takes control over a particular section of roadway. Furthermore, defendant contended that plaintiff failed to introduce sufficient evidence to prove his damage was proximately caused by roadway conditions created by ODOT or its contractors. All construction work was to be performed in accordance with ODOT requirements and specifications and subject to ODOT approval. {¶ 4} For plaintiff to prevail on a claim of negligence, he must prove, by a preponderance of the evidence, that defendant owed him a duty, that it breached that duty, and that the breach proximately caused his injuries. Armstrong v. Best Buy Company, Inc.,99 Ohio St. 3d 79
,2003-Ohio-2573
,¶8 citing Menifee v. Ohio Welding Products, Inc. (1984),15 Ohio St. 3d 75
, 77, 15 OBR 179,472 N.E. 2d 707
. Plaintiff has the burden of proving, by a preponderance of the evidence, that he suffered a loss and that this loss was proximately caused by defendant’s negligence. Barnum v. Ohio State University (1977), 76-0368-AD. However, “[i]t is the duty of a party on whom the burden of proof rests to produce evidence which furnishes a reasonable basis for sustaining his claim. If the evidence so produced furnishes only a basis for a choice among different possibilities as to any issue in the case, he fails to sustain such burden.” Paragraph three of the syllabus in Steven v. Indus. Comm. (1945),145 Ohio St. 198
,30 O.O. 415
,61 N.E. 2d 198
, approved and followed. {¶ 5} Defendant has the duty to maintain its highways in a reasonably safe condition for the motoring public. Knickel v. Ohio Department of Transportation (1976),49 Ohio App. 2d 335
, 3 O.O. 3d 413,361 N.E. 2d 486
. However, defendant is not an insurer of the safety of its highways. See Kniskern v. Township of Somerford (1996),112 Ohio App. 3d 189
,678 N.E. 2d 273
; Rhodus v. Ohio Dept. of Transp. (1990),67 Ohio App. 3d 723
,588 N.E. 2d 864
. The duty of ODOT to maintain the roadway in a safe drivable condition is not delegable to an independent contractor involved in roadway construction. ODOT may bear liability for the negligent acts of an independent contractor charged with roadway construction. Cowell v. Ohio Department of Transportation, Ct. of Cl. No. 2003-09343-AD, jud,2004-Ohio-151
. Despite defendant’s contentions that ODOT did not owe any duty in regard to the construction project, defendant was charged with duties to inspect the construction site and correct any known deficiencies in connection with the particular construction work. See Roadway Express, Inc. v. Ohio Dept. of Transp. (June 28, 2001), Franklin App. 00AP-1119. {¶ 6} Alternatively, defendant denied that either ODOT or Jurgensen had any notice “of debris lying on I-75” prior to plaintiff’s property-damage event. Defendant pointed out ODOT records “indicate that one complaint was received at the Warren County Garage for I-75 regarding the construction on I-75 but not because of debris in the same location as [plaintiff’s] incident.” Defendant argued that plaintiff failed to produce any evidence to prove the damage-causing debris condition was attributable to any conduct on either the part of ODOT or Jurgensen. Defendant submitted a copy of an e-mail from Jurgensen representative Jodi Lantz, who reported Jurgensen “could not accept liability for [plaintiff’s] claim because we are not responsible for items thrown from the roadway. * * * traffic control crews monitor the project area twice a day and we do our best to remove any debris that is left on the roadway.” {¶ 7} In order to find liability for a damage claim occurring in a construction area, the court must look at the totality of the circumstances to determine whether ODOT acted in a manner to render the highway free from an unreasonable risk of harm for the traveling public. Feichtner v. Ohio Dept. of Transp. (1995),114 Ohio App. 3d 346
,683 N.E. 2d 112
. In fact, the duty to render the highway free from an unreasonable risk of harm is the precise duty owed by ODOT to the traveling public under both normal traffic and during highway construction projects. See e.g. White v. Ohio Dept. of Transp. (1990),56 Ohio St. 3d 39
, 42,564 N.E. 2d 462
. {¶ 8} Ordinarily to prove a breach of the duty to maintain the highways, plaintiff must prove, by a preponderance of the evidence, that defendant had actual or constructive notice of the precise condition or defect alleged to have caused the accident. McClellan v. ODOT (1986),34 Ohio App. 3d 247
,517 N.E. 2d 1388
. Defendant is only liable for roadway conditions of which it has notice, but fails to reasonably correct. Bussard v. Dept. of Transp. (1986),31 Ohio Misc. 2d 1
, 31 OBR 64,507 N.E. 2d 1179
. However, proof of notice of a dangerous condition is not necessary when defendant’s own agents actively cause such condition. Bello v. City of Cleveland (1922),106 Ohio St. 94
,138 N.E. 526
, at paragraph one of the syllabus; Sexton v. Ohio Department of Transportation (1996), 94-13861. There is no evidence to show that any construction activity caused the debris condition. {¶ 9} Generally, in order to recover in any suit involving injury proximately caused by roadway conditions including debris, plaintiff must prove that either: 1) defendant had actual or constructive notice of the debris and failed to respond in a reasonable time or responded in a negligent manner, or 2) that defendant, in a general sense, maintains its highways negligently. Denis v. Department of Transportation (1976), 75- 0287-AD. Plaintiff has not produced any evidence to indicate the length of time that the debris was present on the roadway prior to the incident forming the basis of this claim. No evidence has been submitted to show that defendant had actual notice of the debris. Additionally, the trier of fact is precluded from making an inference of defendant’s constructive notice, unless evidence is presented in respect to the time that the debris appeared on the roadway. Spires v. Ohio Highway Department (1988),61 Ohio Misc. 2d 262
,577 N.E. 2d 458
. There is no indication that defendant had constructive notice of the debris. {¶ 10} Plaintiff has not produced any evidence to infer that defendant, in a general sense, maintains its highways negligently or that defendant’s acts caused the defective condition. Herlihy v. Ohio Department of Transportation (1999), 99-07011-AD. Plaintiff has failed to prove that his damage was proximately caused by any negligent act or omission on the part of ODOT or its agents. See Wachs v. Dept. of Transp., Dist. 12, Ct. of Cl. No. 2005-09481-AD,2006-Ohio-7162
; Nicastro v. Ohio Dept. of Transp., Ct. of Cl. No. 2007-09323-AD,2008-Ohio-4190
. {¶ 11} Defendant has contended debris plaintiff’s car struck “was displaced by a third party and it was not a state truck.” Defendant has denied liability based on the particular premise it had no duty to control the conduct of a third person except in cases where a special relationship exists between defendant and either plaintiff or the person whose conduct needs to be controlled. Federal Steel & Wire Corp. v. Ruhlin Const. Co. (1989),45 Ohio St. 3d 171
,543 N.E. 2d 769
, Jordan v. Ohio Dept. of Transp., Dist. 8, Ct. of Cl. No. 2010-01336-AD,2010-Ohio-4583
. However, defendant may still bear liability if it can be established some act or omission on the part of ODOT was the proximate cause of plaintiff’s injury. No evidence has been presented to establish the damage claimed was proximately caused by any act or omission on the part of either ODOT or Jurgensen. Court of Claims of Ohio The Ohio Judicial Center 65 South Front Street, Third Floor Columbus, OH 43215 614.387.9800 or 1.800.824.8263 www.cco.state.oh.us KEVIN SIEMENS Plaintiff v. OHIO DEPT. OF TRANSPORTATION Defendant Case No. 2010-12966-AD Deputy Clerk Daniel R. Borchert ENTRY OF ADMINISTRATIVE DETERMINATION Having considered all the evidence in the claim file and, for the reasons set forth in the memorandum decision filed concurrently herewith, judgment is rendered in favor of defendant. Court costs are assessed against plaintiff. ________________________________ DANIEL R. BORCHERT Deputy Clerk Entry cc: Kevin Siemens Jerry Wray, Director 454 Christopher Drive Department of Transportation Centerville, Ohio 45458 1980 West Broad Street Columbus, Ohio 43223 SJM/laa 4/14 Filed 4/27/11 Sent to S.C. reporter 8/10/11