DocketNumber: Appeal, No. 987 C.D. 1977
Judges: Mencer, Rogers, Wilkinson
Filed Date: 7/12/1978
Status: Precedential
Modified Date: 10/18/2024
Opinion by
Petitioner seeks review of an adverse determination by the Board of Arbitration of Claims (Board) denying petitioner additional compensation in the amount of $72,722.82 under a highway construction contract with the Commonwealth of Pennsylvania, Department of Transportation (respondent). We affirm the determination of the Board.
On November 2,1972 petitioner executed a contract to perform all work in improving a section of Interstate 81 in Bast Pennsboro and Hampden Townships,
Petitioner appealed this determination to the Board. At a hearing held on July 27, 1976, Rimshaw
Petitioner contends the Board erred as a matter of law in finding that Item 213-0001 contained no ambiguity. It bases its allegation of ambiguity on two theories: (1) that Item 213-0001 does not specifically state that it does not apply to project areas inside a DER-established air basin; and (2) that the language of Item 213-0001 is unclear as to whether there must be an actual violation of the Air Pollution Control Act before alternative methods of burning may be employed and compensated for under the contract.
Although petitioner focuses on Item 213-0001 as the center of the controversy, it is axiomatic that where the court is called upon to determine the meaning of words in a written contract, its function is to give effect to the intention of the parties as ascertained from an examination of the entire instrument. Department of Transportation v. Acchioni and Canuso, Inc., 14 Pa. Commonwealth Ct. 596, 324 A.2d 828 (1974). When viewing the entire contract here in
To these general provisions, Item 213-0001 provided as follows:
DESCRIPTION — This work shall consist of disposing of burnable spoils by the use of an open pit incinerator, by removal, or other disposal methods approved by the engineer. This work shall not be performed unless prior approval is received from the Chief Highway Engineer and the Federal Highway Administration, if applicable.
. CONSTRUCTION REQUIREMENTS'
(a) General. Temporary air pollution control measures will be used whenever burning is prohibited as a result of a violation of the Air Pollution Control Act, approved January 8, 1960 or as amended.
BASIS OF PAYMENT — Temporary Project Air Pollution Control will be paid for as follows :
*521 l.(ib) In accordance with the procedure set forth in Section 109.04(d) for force-account work.
Viewing the contract as a whole and in conjunction with DEE regulations, it is apparent Section 201.3 of Form 408 was intended to give the bidder notice that his bid should conform with the type of burning and disposal permitted under the regulations. This interpretation was confirmed by testimony of petitioner’s witness that in prior contracts his bid was based on whether or not the project was located in an air basin because of the additional cost of ■ constructing an open'pit incinerator. The DEB regulations established pursuant to the Act clearly state that a contractor engaged in open air burning outside an air basin might violate the Act under certain conditions even using prior approved methods, but that he would always be in violation of the Act if he conducted open air burning inside an air basin. Compare 25 Pa. Code §129.14(b) with 25 Pa. Code §129.14(a). Thus, if Section 213-0001 were to apply to areas both in and out of air basins a contractor would always be entitled to additional compensation for work done inside an air basin. To reach such a conclusion would render the notice provision of Section 201.3 mere surplusage and the lump sum bidding procedure under Section 201.5 a vain act. Therefore, we find there is no inherent ambiguity in Item 213-0001 by reason of the failure of that provision to specify that it was not to apply to areas inside an air basin.
This construction of Item 213-0001 must also negate by implication petitioner’s second contention that subparagraph (a) of Item 213-0001 does not require that a contractor must actually be cited for a violation of the Act before alternative methods of burning will be authorized and compensated for.
One contracting with the Commonwealth often does so at great risk. Before submitting his bid a contractor should become aware of all contractual provisions and their ramifications. A failure to do so is often a prelude to disappointment or financial loss.
Accordingly, we will enter the following
Order
And Now, July 12, 1978, the order of the Board of Arbitration of Claims at Docket No. 396, dated April 13, 1977, is hereby affirmed.
Act of January 8, 1960, P.L. (1959) 2119, as amended, 35 P.S. §4005 (Act). Pursuant to this section, DER established the Harrisburg Air Basin in which East Pennsboro Township is included. See 25 Pa. Code §121.1. DER regulations further provide that open burning is prohibited absolutely in air basins, but permitted conditionally outside air basins unless the emissions interfere with or cause damage to health or property. See 25 Pa. Code §129.14.
It might he considered significant that petitioner’s only witness; Rimshaw, testified as to Kerndale’s interpretation of the contract, not petitioner’s.