DocketNumber: C.A. No. PB 02-1019 C.A. No. PB 02-2778
Judges: SILVERSTEIN, J.
Filed Date: 4/23/2003
Status: Precedential
Modified Date: 7/6/2016
In accordance with G.L. 1956 §§
Less than 120 days later, on or about February 25, 2002, and pursuant to G.L. 1956 §§
In the meantime, Respondent Robert Rossi also contracted with Petitioner Gem Plumbing and Heating (Gem) to provide the materials and labor required to install water and sewer lines in connection with the construction of the office building. On January 28, 2002, Attorney Robert Levine, on behalf of Gem, recorded a notice of intention to claim a mechanics' lien. One hundred twenty (120) days later, on May 28, 2002, Gem filed a petition to enforce mechanics' lien and a notice of lis pendens. The amount claimed in Gem's petition for unpaid labor and materials is $ 35,500.00.
On June 3, 2002, in response to both Sells/Greene and Gem's petitions to enforce, Respondents paid into the registry of the court two sums of money. First, in connection with the Sells/Greene petition, Respondents paid an amount of $130,404.66 (equaling the total amount of the notice of intention plus $596.88 in costs). Next, in connection with the Gem petition, Respondents paid an amount of $35,860.00 (equaling the total amount of the notice of intention plus $360.00 in costs).
Pursuant to G.L. 1956 §
Various pleadings and motions have subsequently been filed by all parties. The motion of consequence, as it pertains to this Decision, is the challenge to the constitutionality of the Mechanics' Liens statute, raised by Respondents in their memorandum in support of motion to dismiss petition and release funds from the registry of the court, filed on August 29, 2002. In accordance with Super. R.Civ.P. 24(d), Respondents served the Attorney General with a copy of the proceeding. This matter came to be heard on two occasions. Initially, this Court heard limited argument on September 27, 2002, at which time the Attorney General declined to intervene. Subsequent to this hearing, an order entered on October 23, 2002, inviting the Attorney General and any party to file amicus curiae briefs. Additionally, this Court ordered that notice be given to the major building and construction trade associations for the purpose of advising them of this Court's invitation to file amicus curiae briefs. Finally, this order provided that this matter be scheduled for further hearing. Amicus briefs were subsequently filed by the Attorney General and various building and construction trade associations.
On January 2, 2003, a stipulation was filed by Petitioner Sells/Greene, Petitioner Gem Plumbing and Heating, and Respondents Robert and Linda Rossi, agreeing that the two separate matters may be consolidated for the purpose of resolving the issue of the constitutionality of the Mechanics' Lien Statute.
On February 6, 2003, this Court heard argument in full on the constitutional challenge, and opposition thereto. The central argument of the Respondents is that the Mechanics' Lien statute, G.L. 1956 §§
Petitioners, on the other hand, advance a number of arguments in support of the constitutionality of the Mechanics' Liens statute. Generally, Petitioners aver that the property right affected is a very narrow one, that the level of governmental involvement is low, and that the protections in place are sufficient. The argument of the Attorney General mirrors that of the Petitioners, and asserts specifically that the filing of a mechanics' lien does not constitute a significant deprivation of a property interest and thus due process does not attach. In the alternative, the Attorney General contends that even if due process does attach, the statute provides sufficient safeguards. Arguments contained within the amicus curiae briefs echo the same notes in their support of the constitutionality of the statute. Accordingly, Petitioners, the Attorney General, and parties filing amicus briefs, all urge this Court to deny the motion to dismiss and the motion to release funds posed by the Respondents, and to find that the Mechanics' Liens statute is not unconstitutional.
"Whenever any building, canal, turnpike, railroad, or other improvement shall be constructed, erected, altered, or repaired by oral or written contract with or at the oral or written request of the owner, the owner being at the time the owner of the land on which the improvement is located, or by the husband of such owner with the consent of his wife, the building, canal, turnpike, railroad, or other improvement, together with the land, is hereby made liable and shall stand subject to liens for all the work done by any person in the construction, erection, alteration, or reparation of such building, canal, turnpike, railroad, or other improvement, and for the materials used in the construction, erection, alteration, or reparation thereof, which have been furnished by any person."
The statute for mechanics' liens must be strictly construed as it is in derogation of the common law. Rhode Island Marble Tile Co. v.Spear,
"Notice of intention to claim lien. — (a) . . . the person shall, before or within one hundred and twenty (120) days after the doing of such work or the furnishing of such materials, mail . . . a notice of intention . . . to do work or furnish material, or both, together with a statement that the person so mailing may within one hundred and twenty (120) days after the doing of the work or the furnishing of the materials, file a copy of such notice of intention in the records of land evidence in the city or town in which the land generally described in such notice of intention is located and a further statement that the mailing of the notice of intention and the filing of the copy will perfect a lien of the person so mailing against the land under and subject to the provisions of this chapter, to the owner of record of the land at the time of the mailing, or, in the case of a lien against the interest of any lessee or tenant, to the lessee or tenant . . . ."
G.L. 1956 §
Should a dispute subsequently arise as to payment, or should any person performing work or providing materials as described in G.L. 1956 §
"Petition to enforce lien- Lis pendens notice.— (a) . . . the person [claiming a lien] shall file a petition to enforce the lien . . . in the superior court for the county in which is situated the land upon which the building, canal, turnpike, railroad, or other improvement is being or has been constructed, erected, altered, or repaired . . . and . . . such person shall also file in the records of land evidence in the city or town in which the land is located a notice of lis pendens . . . the petition to be filed on the same day as the notice of lis pendens, or within seven (7) days thereafter, and both the petition and the notice of lis pendens to be filed within one hundred twenty (120) days of the date of the recording of the notice of intention . . . ."
G.L. 1956 §
Absent in this statutory scheme is any provision for a hearing either before or immediately after the filing of the lien. Rather, the property owner who wishes to remove the lien is given the option of either filing a bond or depositing sufficient cash to cover the amount of the lien with the superior court. G.L 1956 §
"Dismissal of petition, notice of lien, and release of lien upon deposit in court.— At any time after the recording of a notice of intention or after the filing of a petition to enforce a lien . . . the owner . . . of the land described in the notice or petition may pay into the registry of the court in the county in which the land is located cash equal to the total amount of the notice of intention and the accounts and demands of all persons claiming liens therein . . . including costs of the lien holder, or may, in lieu of cash, deposit in the registry of the court the bond of a surety company . . . in the total amount running to all persons claiming liens . . . and on proper payment or deposit and on motion of the owner . . . any justice of the superior court shall enter ex parte an order discharging the notice of intention and lis pendens and dismissing the cause as to the owner . . . ."
G.L 1956 §
Considering the various sections of the Mechanics' Lien statute together, one reality emerges. According to the language of G.L 1956 §
The year 1969 marks the inception of the evolution. In that year the United States Supreme Court struck down a Wisconsin statute that permitted a creditor to effect prejudgment garnishment of wages without notice and prior hearing to the wage earner. Sniadach v. Family FinanceCorp. of Bay View,
While Sniadach may have been an obvious decision for the Court, since it concerned a family being deprived of wages, a more difficult and perhaps more significant case confronted the Court three years later. In 1972, the United States Supreme Court struck down Florida and Pennsylvania prejudgment replevin statutes that permitted vendors to have goods seized through ex parte application to a court clerk and the posting of a bond. Fuentes v. Shevin,
"The constitutional right to be heard is a basic aspect of the duty of government to follow a fair process of decisionmaking when it acts to deprive a person of his possessions. The purpose of this requirement is not only to ensure abstract fair play to the individual. Its purpose, more particularly, is to protect his use and possession of property from arbitrary encroachment — to minimize substantively unfair or mistaken deprivations of property, a danger that is especially great when the State seizes goods simply upon the application of and for the benefit of a private party. So viewed, the prohibition against the deprivation of property without due process of law reflects the high value, embedded in our constitutional and political history, that we place on a person's right to enjoy what is his, free of governmental interference."
Id. at 80-81. The Fuentes Court was particularly concerned with the necessity to provide an opportunity for a hearing at a ``meaningful time.'Id. at 80. As the Court articulated rather simply, "If the right to notice and a hearing is to serve its full purpose, then, it is clear that it must be granted at a time when the deprivation can still be prevented." Id. at 81. In Fuentes, the Petitioners seeking to enforce the statute endeavored to support its constitutionality by relying on the purported ``safeguards' in the statutes. Id. at 83. Specifically, the statutes require that a party seeking a writ must first post a bond, allege conclusorily that he is entitled to specific goods, and open himself up to possible liability in damages if he is wrong. Id. Rejecting that proposition, the Court pointed out that those requirements "test no more than the strength of the applicant's own belief in his rights. Since his private gain is at stake, the danger is all too great that his confidence in his cause will be misplaced . . . . Because of the understandable, self-interested fallibility of litigants, a court does not decide a dispute until it has had an opportunity to hear both sides."Id. In sum, the Fuentes Court concluded that the bond requirement is no replacement for the right to a prior hearing. Id.
In response to the landmark ruling in Fuentes, the United States District Court for the District of Rhode Island (District Court) summarily declared the Rhode Island prejudgment attachment procedure pursuant to G.L. 1956 §
The response to McClellan by the Rhode Island court system was swift. That same year, the Rhode Island Superior Court adopted, with the approval of the Rhode Island Supreme Court, an amendment to Rule 4(j) of the Superior Court Rules of Civil Procedure. The result was that the amended "Rule 4(j) placed a greater burden on a party seeking to attach property. The moving party must demonstrate at a hearing that the party has a likelihood of success on the merits. In addition, the moving party must demonstrate the need for security." Martin v. Lincoln Bar, Inc.,
"Attachment and Trustee Process.
(3) Same: Issuance. The writ of attachment may be procured in blank from the clerk, shall be filled out by the plaintiff's attorney as provided in paragraph (2) of this subdivision, and shall be submitted to the court with a motion for its issuance. The motion shall be granted only upon a showing that there is a probability of a judgment being rendered in favor of the plaintiff and that there is a need for furnishing the plaintiff security in the amount sought for satisfaction of such judgment, together with interests and costs. A motion hereunder shall not be granted ex parte. Security may be required in connection with issuance of any writ of attachment. A surety upon a bond or undertaking hereunder shall be subject to the provisions of Rule 65(c)."5
Super. R.Civ.P. 4(j).
The following year, in order to correct the constitutional violations that moved the McClellan Court to strike down the pre-judgment attachment procedures, the Rhode Island General Assembly amended the attachment statute, G.L. 1956 §
"At the time of the commencement of the action, or at any time thereafter, a plaintiff must file a motion in said court for authority to attach said defendant's assets including his personal or real estate, and the said motion must state the day, time and place of hearing and a copy must be served by the process server on the defendant or be leaving it at his last and usual place of abode with some person there at least five (5) days before the fixed date of hearing."6
G.L. 1956 §
The next year, in 1974, the United States Supreme Court again dealt with a challenge to an alleged violation of due process in the interference with property rights without proper hearing. Mitchell v.W.T. Grant Co.,
Soon thereafter, in 1975, the United States Supreme Court expounded further on its decision in Mitchell, emphasizing again the safeguards inMitchell that satisfied due process. North Georgia Finishing, Inc., v.Di-Chem, Inc.
During the 1970's, while the United States Supreme Court was repeatedly addressing due process challenges to property interests that had been seized or sequestered, courts around the country were addressing due process challenges to property interests subject to mechanics' liens. In dealing with these challenges, courts were divided as to whether or not the taking by a mechanics' lien is a significant property interest in violation of the Fourteenth Amendment. Several courts found that there was, in fact, a significant property interest. See RoundhouseConstruction Corporation v. Telesco Masons Supplies Company, Inc.,
In 1991, the United States Supreme Court addressed the issue concerning "unseized" property, announcing that the property interests that attachment affects are significant, and "even the temporary or partial impairments to property rights that attachments, liens, and similar encumbrances entail are sufficient to merit due process protection."Connecticut v. Doehr,
"Our summary affirmance in Speilman-Fond (citation omitted) does not control. In Speilman-Fond, the District Court held that the filing of a mechanics' lien did not amount to the taking of a significant property interest. (citation omitted) A summary disposition does not enjoy the full precedential value of a case argued on the merits and disposed of by a written opinion. (citation omitted) The facts of Speilman-Fond presented an alternative basis for affirmance in any event. Unlike the case before us, the mechanics' lien statute in Speilman-Fond required the creditor to have a pre-existing interest in the property at issue. 379 F. Supp. at 997. As we explain below, a heightened plaintiff interest in certain circumstances can provide a ground for upholding procedures that are otherwise suspect." (citation omitted)
Id. Having found that a significant property interest was at issue, theDoehr Court went on to decide that the risk of deprivation that the State permits is too great. Id. "The potential for unwarranted attachment in these situations is self-evident and too great to satisfy the requirements of due process absent any countervailing consideration."Id. at 14. Furthermore, the Court concluded that "absent such allegations [of an attempt to transfer or encumber real estate] . . . the plaintiff's interest in attaching the property does not justify the burdening of Doehr's ownership rights without a hearing to determine the likelihood of recovery." Id. at 16.
Later that same year, the Court of Appeals for the First Circuit paid homage to the holding in Doehr, and struck down a statutory lien imposed by the Environmental Protection Agency pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Reardonv. U.S,
"[t]he District Court, relying primarily on Speilman-Fond (citation omitted) found that the filing of a federal lien under42 U.S.C. § 9607 (l) did not amount to a deprivation of a significant property interest; thus, the court did not reach the second step of the analysis. However, a Supreme Court case decided after the district court had issued its decision . . . has clarified the law in this area considerably, and has precluded continued reliance on the Court's summary affirmance in Speilman-Fond."
Id.
Most recently, in 1994, the Rhode Island Supreme Court struck down a section of the Rhode Island statute dealing with writs of attachment.Shawmut Bank of Rhode Island v. Costello,
Against the backdrop of this evolving status of lien law, the Respondents in the instant matter urge this Court to find that the Rhode Island Mechanics' Lien statute is violative of due process and therefore unconstitutional.
The Petitioners, on the other hand, argue that the mechanics lien does not deprive a person of a significant property interest. In support of this position, the Attorney General advances an argument relying primarily on cases that preceded the holding in Doehr. In particular, the Attorney General asks this Court to rely on Speilman-Fond, which failed to find a significant property interest implicated by a mechanics' lien statute. In addition, the Attorney General asks this Court to rely on an Indiana Court of Appeals case which was decided four years after Doehr.Haimbaugh Landscaping, Inc. v. Jegen,
This Court finds that post-Doehr, there is no longer any valid argument that a mechanics' lien does not implicate a significant property interest. To begin with, this Court finds that reliance on Speilman-Fond
is misplaced. As the Court of Appeals in Reardon warned, Doehr has "precluded continued reliance on the Court's summary affirmance inSpeilman-Fond." Reardon v. U.S.,
On the contrary, the United States Supreme Court, in its thorough analysis of the due process challenge to the attachment procedure inDoehr, concluded that interferences with property interests, including "liens" implicate a significant property interest. Connecticut v. Doehr,
"first, consideration of the private interest that will be affected by the prejudgment measure; second, an examination of the risk of erroneous deprivation through the procedures under attack and the probable value of additional or alternative safeguards; and third, in contrast to Matthews, principal attention to the interest of the party seeking the prejudgment remedy, with, nonetheless, due regard for any ancillary interest the government may have in providing the procedure or forgoing the added burden of providing greater protections."
Connecticut v. Doehr,
As to the first prong of the test, the Respondents aver that the private interest affected by a mechanics' lien is the right to utilize the financial benefits of owning real estate. Moreover, the Respondents explain, a mechanics' lien deprives a property owner from the opportunity to take economic advantage of the equity in a property. The Respondents also specify that in the instant matter, the private interest affected is the money currently in the registry of the court.
The Petitioners, on the other hand, contend that because the owner of the property remains in full possession of the subject property, that the property right affected is a very narrow one. In fact, argue the Petitioners, the private interest at stake must be minimal, since there is no physical deprivation of property. The Attorney General shares the view of the Petitioners that the affected private interest is minimal, supporting his position with the previous argument that the interest is not "significant" in the context of a due process challenge.
Taking into consideration the principles articulated in holding that a mechanics' lien implicates a significant property interest; this Court finds that the private interest affected by the mechanics' lien is likewise of considerable importance. Under the Mechanics' Liens statute, upon the recording of a notice of intention, the owner of the subject property suffers both immediate as well as potential consequences. First, the landowner is immediately deprived of clear title to land. In addition, the owner's credit rating is likely to be tainted. Moreover, an existing mortgage could technically be in default in the event of an insecurity clause. Furthermore, should the property owner endeavor to sell or otherwise alienate the property, for example, by obtaining (further) financing secured by a mortgage or an additional mortgage, such owner may find this task difficult, or indeed impossible, with a lien against the subject property. Finally, with all of these consequences looming, the property owner may elect to rid the property of the lien. Unfortunately for the property owner, before this feat may be accomplished, the Mechanics' Liens statute works another deprivation. To free the property from a mechanic's lien, the property owner must either purchase and file a bond or deposit sufficient cash to cover the amount of the lien with the registry of the court, as was done in the case at bar. Accordingly, this Court finds that the private interest implicated by the mechanics' lien is of tremendous significance. Moreover, this Court rejects the argument advanced by the Petitioners which suggests that in order for a private interest to be significant, that property must be seized. The United States Supreme Court rejected that argument in 1991 inDoehr, and this Court likewise finds no merit in the argument twelve years later.
As to the second prong of the Matthews test, the Respondents argue that the risk of erroneous deprivation under the Mechanics' Liens statute is high. In support of this assertion, the Respondents point out that the person or entity claiming a lien is under no requirement to at least show a reasonable likelihood that the underlying debt is due or valid. In fact, the Respondents contend, the only threshold fact required to impose the lien is that work, services or material were supplied. Further, the Respondents maintain that under the existing infirm statutory procedure, no judicial determination must be made at the outset concerning these threshold facts. Finally, argue the Respondents, under the statute, there is no right to any pre- or post-deprivation hearing to determine the validity and enforceability of the underlying debt. Therefore, urge the Respondents, not only is the risk of error high, but there are no corrective mechanisms available to the property owner.
The Petitioners, on the other hand, contend that the risk of an erroneous deprivation is substantially limited by the statutory requirement of the statement under oath. The Petitioners contend that the penalties of perjury prevent the danger of any false or incorrect statement being offered in support of a mechanics' lien. Likewise, the Attorney General pays great heed to the purported safeguards in the statute. For example, the Attorney General suggests that the mere fact that in order to perfect a mechanics' lien, the claimant must file a notice within 120 days of performing the work constitutes a safeguard. In addition, the Attorney General suggests the option of the property owner to purchase a bond or deposit sufficient cash into the registry of the court as a surefire safeguard. Finally, and most importantly according to the Attorney General, the statute provides that the respondent "may contest the right of the petitioner . . . claiming the lien." (Attorney General's Amicus Curiae Mem. of Law at 17).
This Court finds that the risk of erroneous deprivation permitted by the Mechanics' Liens statute is substantial. To begin with, the statute allows any person seeking to perfect a lien, to record a notice of intention containing a sworn statement of the amount allegedly owed. Under the statute, the "due process" afforded the property owner consists of no more than the recording of the sworn statement. Once the notice has been recorded, the lien is perfected and the negative repercussions to the property owner begin to flow. These repercussions flow regardless of the truth, accuracy or validity of the claimed amounts due under the lien. These repercussions flow before any judicial determination has been made as to the validity of the lien. In fact, these repercussions flow before any judge of any court has ever seen the notice of intention. And, most significantly, these repercussions flow before the property owner has any opportunity whatsoever to challenge the truth, accuracy, or validity of the amounts claimed under the lien. Instead, the property owner must suffer the consequences based on a claimant's bald assertions until the property owner either makes the payment in full, purchases a bond, deposits sufficient cash to cover the claim in the registry of the court, or hires an attorney to contest the claim at some later, unspecified time. In fact, from the time that a notice of intention is recorded, a person seeking to enforce a lien has a statutorily-granted 120 day period within which a petition to enforce must be filed. Thus, a potential claimant may wait four months from the time of recording the notice of intention before an enforcement action is commenced. But the wait for the property owner seeking to contest the lien is not over even at this point. Rather, it is up to the property owner to file an objection to the enforcement action with the court and to seek a hearing date at some point thereon. The statute does not provide for any immediate hearing, nor does the statute provide for any time period within which a hearing must take place. In the meantime, the untested lien remains on the owner's property. Until one of these further deprivations is elected, the property owner suffers from all of the financial problems associated with property subject to a lien.
This Court finds that the "safeguards" held up by the Petitioners as a bulwark against any potential injustice range from mere formality to further injury to the property owner. First, the notion that the penalty of perjury is any safeguard to a disputed money claim fails to persuade this Court. The suggestion that because the singular document required to be filed must be sworn will somehow prevent any deliberate or innocent errors is beyond credulity. Furthermore, the argument that an additional safeguard lies in the provision that the respondent may contest any claim is also without merit. When this opportunity arises is not made clear by the statute. However, what is clear is that any such opportunity comesafter the imposition of the lien. In the meantime, the property owner is deprived of all that is associated with clear title to her property. Moreover, this opportunity must be initiated by the property owner. The statute does not provide for any immediate post-deprivation hearing. Consequently, any such "safeguards" are too little and too late to satisfy the requirements of due process.
In striking down the attachment statute, the Rhode Island Supreme Court concluded, "Section
The final prong of the Matthews test requires this Court to examine the interest of the private party in the ex parte procedure, together with the government's interest in forgoing the added burden of requiring greater protections. The Respondents argue that the cost or burden to government in providing the property owner an opportunity to be heard is outweighed by the benefits that are required under the Fourteenth Amendment.
The Petitioners, on the other hand, argue that a requirement that a formal hearing be held in superior court before a mechanics' lien could issue would place an undue burden on the courts of the state. Concerned about potentially "tying up substantial Court time and resources," the Petitioners paint a picture of untold numbers of builders and contractors banging on the courthouse doors. (Pet.'s Mem. of Law at 9). The Petitioners also suggest that any judicial inquiry at such a proposed initial hearing would not be any more "in depth" than that contemplated by the statute. (Pet.'s Mem. of Law at 9). The Attorney General, in his argument, focuses primarily on the interest of the lien holder to secure payment for his labor and materials.
This Court finds that the Mechanics' Liens statute is so lacking in minimal constitutional protections that the potential governmental burden that an additional procedural requirement would entail is far outweighed by the benefits incident to the fundamental principles of due process. This Court also finds that while a potential claimant certainly has an interest in getting paid; that claimant, like all others, can suffer through the constitutionally-required exercise of a hearing prior to depriving the property owner of the process which is due.
Prevailing counsel shall present an appropriate order and judgment reflecting the foregoing, which, inter alia, should include a stay of the effect of the judgment for 30 days. Said order and judgment to be presented to the Court not later than April 30, 2003.
Spielman-Fond, Inc. v. Hanson's, Inc. , 379 F. Supp. 997 ( 1973 )
Art Metal Construction Co. v. Knight , 56 R.I. 228 ( 1936 )
Sniadach v. Family Finance Corp. of Bay View , 89 S. Ct. 1820 ( 1969 )
Connecticut v. Doehr , 111 S. Ct. 2105 ( 1991 )
Barry Properties v. Fick Bros. Roofing Co. , 277 Md. 15 ( 1976 )
Cook v. Carlson , 364 F. Supp. 24 ( 1973 )
Roofing Concepts, Inc. v. Barry , 1989 R.I. LEXIS 112 ( 1989 )
Power v. City of Providence , 1990 R.I. LEXIS 170 ( 1990 )
Paul D. Reardon and John E. Reardon v. United States of ... , 947 F.2d 1509 ( 1991 )
Rhode Island Marble & Tile Co. v. Spear , 49 R.I. 441 ( 1928 )
Haimbaugh Landscaping, Inc. v. Jegen , 1995 Ind. App. LEXIS 734 ( 1995 )
Mathews v. Eldridge , 96 S. Ct. 893 ( 1976 )
RHODE ISLAND INSURERS'INSOLVENCY FUND v. Leviton ... , 1998 R.I. LEXIS 261 ( 1998 )
Burrillville Racing Ass'n v. State , 118 R.I. 154 ( 1977 )
McClellan v. Commercial Credit Corp. , 350 F. Supp. 1013 ( 1972 )
Fuentes v. Shevin , 92 S. Ct. 1983 ( 1972 )
Peralta v. Heights Medical Center, Inc. , 108 S. Ct. 896 ( 1988 )
Martin v. Lincoln Bar, Inc. , 1993 R.I. LEXIS 93 ( 1993 )
Shawmut Bank of Rhode Island v. Costello , 1994 R.I. LEXIS 185 ( 1994 )