DocketNumber: 81-1945
Judges: Blackmun, Brennan, Burger, Marshall, Powell, White
Filed Date: 4/20/1983
Status: Precedential
Modified Date: 10/19/2024
delivered the opinion of the Court.
The turning of swords into plowshares has symbolized the transformation of atomic power into a source of energy in
This case emerges from the intersection of the Federal Government’s efforts to ensure that nuclear power is safe with the exercise of the historic state authority over the generation and sale of electricity. At issue is whether provisions in the 1976 amendments to California’s Warren-Alquist Act, Cal. Pub. Res. Code Ann. §§25524.1(b) and 25524.2 (West 1977), which condition the construction of nuclear plants on findings by the State Energy Resources Conservation and Development Commission that adequate storage facilities and means of disposal are available for nuclear waste,
I — I
A nuclear reactor must be periodically refueled and the “spent fuel” removed. This spent fuel is intensely radioactive and must be carefully stored. The general practice is to store the fuel in a water-filled pool at the reactor site. For many years, it was assumed that this fuel would be reprocessed; accordingly, the storage pools were designed as short-term holding facilities with limited storage capacities. As expectations for reprocessing remained unfulfilled, the spent fuel accumulated in the storage pools, creating the risk that nuclear reactors would have to be shut down. This could occur if there were insufficient room in the pool to store spent fuel and also if there were not enough space to hold the entire fuel core when certain inspections or emergencies required unloading of the reactor. In recent years, the problem has taken on. special urgency. Some 8,000 metric tons of spent nuclear fuel have already accumulated, and it is projected that by the year 2000 there will be some 72,000 metric tons of spent fuel.
The California laws, at issue here are responses to these concerns. In 1974, California adopted the Warren-Alquist State Energy Resources Conservation and Development Act, Cal. Pub. Res. Code Ann. §25000-25986 (West 1977 and Supp. 1983). The Act requires that a utility seeking to build in California any electric power generating plant, including a nuclear powerplant, must apply for certification to the State Energy Resources Conservation and Development Commission (Energy Commission).
Two sections of these amendments are before us. Section 25524.1(b) provides that before additional nuclear plants may be built, the Energy Commission must determine on a case-by-case basis that there will be “adequate capacity” for storage of a plant’s spent fuel rods “at the time such nuclear facility requires such . . . storage.” The law also requires that each utility provide continuous, on-site, “full core reserve storage capacity” in order to permit storage of the entire re
Section 25524.2 deals with the long-term solution to nuclear wastes. This section imposes a moratorium on the certification of new nuclear plants until the Energy Commission “finds that there has been developed and that the United States through its authorized agency has approved and there exists a demonstrated technology or means for the disposal of high-level nuclear waste.” “Disposal” is defined as a “method for the permanent and terminal disposition of high-level nuclear waste . . . .” §§ 25524.2(a), (c). Such a finding must be reported to the state legislature, which may nullify it.
In 1978, petitioners Pacific Gas & Electric Co. and Southern California Edison Co. filed this action in the United States District Court, requesting a declaration thsjit numerous provisions of the Warren-Alquist Act, including the two sections challenged here, are invalid under the Supremacy Clause because they are pre-empted by the Atomic Energy Act. The District Court held that petitioners had standing to challenge §§25524.1(b) and 25524.2,
We granted certiorari limited to the questions of whether §§25524.1(b) and 25524.2 are ripe for judicial review, and whether they are pre-empted by the Atomic Energy Act. 457 U. S. 1132 (1982).
II
We agree that the- challenge to § 25524.2 is ripe for judicial review, but that the questions concerning §25524.1(b) are not. The basic rationale of the ripeness doctrine “is to prevent the courts, through avoidance of premature adjudication, from entangling themselves in abstract disagreements over administrative policies, and also to protect the agencies from judicial interference until an administrative decision has been formalized and its effects felt in a concrete way by the challenging parties.” Abbott Laboratories v. Gardner, 387
Both of these factors counsel in favor of finding the challenge to the waste disposal regulations in §25524.2 ripe for adjudication. The question of pre-emption is predominantly legal, and although it would be useful to have the benefit of California’s interpretation of what constitutes a demonstrated technology or means for the disposal of high-level nuclear waste, resolution of the pre-emption issue need not await that development. Moreover, postponement of decision would likely work substantial hardship on the utilities. As the Court of Appeals cogently reasoned, for the utilities to proceed in hopes that, when the time for certification came, either the required findings would be made or the law would be struck down, requires the expenditures of millions of dollars over a number of years, without any certainty of recovery if certification were denied.
III
It is well established that within constitutional limits Congress may pre-empt state authority by so stating in express terms. Jones v. Rath Packing Co., 430 U. S. 519, 525 (1977). Absent explicit pre-emptive language, Congress’ in
Petitioners, the United States, and supporting amici, present three major lines of argument as to why § 25524.2 is pre-empted. First, they submit that the statute — because it regulates construction of nuclear plants and because it is allegedly predicated on safety concerns — ignores the division between federal and state authority created by the Atomic Energy Act, and falls within the field that the Federal Government has preserved for its own exclusive control. Second, the statute, and the judgments that underlie it, conflict with decisions concerning the nuclear waste disposal issue made by Congress and the Nuclear Regulatory Commission. Third, the California statute frustrates the federal goal of developing nuclear technology as a source of energy. We consider each of these contentions in turn.
Even a brief perusal of the Atomic Energy Act reveals that, despite its comprehensiveness, it does not at any point expressly require the States to construct or authorize nuclear powerplants or prohibit the States from deciding, as an absolute or conditional matter, not to permit the construction of any further reactors. Instead, petitioners argue that the Act is intended to preserve the Federal Government as the sole regulator of all matters nuclear, and that § 25524.2 falls within the scope of this impliedly pre-empted field. But as we view the issue, Congress, in passing the 1954 Act and in subsequently amending it, intended that the Federal Government should regulate the radiological safety aspects involved in the construction and operation of a nuclear plant, but that the States retain their traditional responsibility in the field of regulating electrical utilities for determining questions of need, reliability, cost, and other related state concerns.
Need for new power facilities, their economic feasibility, and rates and services, are areas that have been characteristically governed by the States. Justice Brandéis once observed that the “franchise to operate a public utility ... is a special privilege which . . „ may be granted or withheld at the pleasure of the State.” Frost v. Corporation Comm’n, 278 U. S. 515, 534 (1929) (dissenting opinion). “The nature of government regulation of private utilities is such that a utility may frequently be required by the state. regulatory scheme to obtain approval for practices a business regulated in less detail would be free to institute without any approval from a regulatory body.” Jackson v. Metropolitan Edison Co., 419 U. S. 345, 357 (1974). See Central Hudson Gas & Electric Corp. v. Public Service Comm’n of New York, 447 U. S. 557, 569 (1980) (“The State’s concern that rates be fair and efficient represents a clear and substantial governmental interest”). With the exception of the broad authority of the
The Atomic Energy Act must be read, however, against another background. Enrico Fermi demonstrated the first nuclear reactor in 1942, and Congress authorized civilian application of atomic power in 1946, Atomic Energy Act of 1946, see Act of Aug. 1, 1946, 60 Stat. 755, at which time the Atomic Energy Commission (AEC) was created. Until 1954, however, the use, control, and ownership of nuclear technology remained a federal monopoly. The Atomic Energy Act of 1954, Act of Aug. 30, 1954, 68 Stat. 919, as
The Commission, however, was not given authority over the generation of electricity itself, or over the economic question whether a particular plant should be built. We observed in Vermont Yankee, supra, at 550, that “[t]he Commission’s prime area of concern in the licensing context, . . . is national security, public health, and safety.” See also Power Reactor Development Co. v. Electrical Workers, 367 U. S. 396, 415 (1961) (utility’s investment not to be considered by Commission in its licensing decisions). The Nuclear Regulatory Commission (NRC), which now exercises the AEC’s regulatory authority, does not purport to exercise its authority based on economic considerations, 10 CFR § 8.4 (1982), and has recently repealed its regulations concerning the financial qualifications and capabilities of a utility proposing to construct and operate a nuclear powerplant. 47 Fed. Reg. 13751 (1982). In its notice of rule repeal, the NRC stated that utility financial qualifications are only of concern to the NRC if related to the public health and safety.
“Nothing in this chapter shall be construed to affect the authority or regulations of any Federal, State or local agency with respect to the generation, sale, or transmission of electric power produced through the use of nuclear facilities licensed by the Commission . . .
The legislative Reports accompanying this provision do little more than restate the statutory language, S. Rep. No. 1699, 83d Cong., 2d Sess., 31 (1954); H. R. Rep. No. 2181, supra, at 31, but statements on the floor of Congress confirm that while the safety of nuclear technology was the exclusive business of the Federal Government, state power over the production of electricity was not otherwise displaced.
The 1959 amendments reinforced this fundamental division of authority. In 1959, Congress amended the Atomic Energy Act in order to “clarify the respective responsibilities
“[T]he Commission shall retain authority and responsibility with respect to regulation of—
“(1) the construction and operation of any production or utilization facility;
“(4) the disposal of such . . . byproduct, source, or special nuclear material as the Commission determines . . . should, because of the hazards or potential hazards thereof, not be so disposed of without a license from the Commission.”
Although the authority reserved by § 274(c) was exclusively for the Commission to exercise, see S. Rep. No. 870, supra, at 8, 9; H. R. Rep. No. 1125, 86th Cong., 1st Sess., 8, 9 (1959), Congress made clear that the section was not intended to cut back on pre-existing state authority outside the
“Nothing in this section shall be construed to affect the authority of any State or local agency to regulate activities for purposes other than protection against radiation hazards.”
Section 274(k), by itself, limits only the pre-emptive effect of “this section,” that is, §274, and does not represent an affirmative grant of power to the States. But Congress, by permitting regulation “for purposes other than protection against radiation hazards” underscored the distinction drawn in 1954 between the spheres of activity left respectively to the Federal Government and the States.
This regulatory structure has remained unchanged, for our purposes, until 1965, when the following proviso was added to §271:
“Provided, that this section shall not be deemed to confer upon any Federal, State or local agency any authority to regulate, control, or restrict any activities of the Commission.”
The accompanying Report by the Joint Committee on Atomic Energy makes clear that the amendment was not intended to detract from state authority over energy facilities.
This account indicates that from the passage of the Atomic Energy Act in 1954, through several revisions, and to the present day, Congress has preserved the dual regulation of
The above is not particularly controversial. But deciding how §25524.2 is to be construed and classified is a more difficult proposition. At the outset, we emphasize that the statute does not seek to regulate the construction or operation of a nuclear powerplant. It would clearly be impermissible for California to attempt to do so, for such regulation, even if enacted out of nonsafety concerns, would nevertheless directly conflict with the NRC’s exclusive authority over plant construction and operation. Respondents appear to concede as much. Respondents do broadly argue, however, that although safety regulation of nuclear plants by States is forbidden, a State may completely prohibit new construction until its safety concerns are satisfied by the Federal Government. We reject this line of reasoning. State safety regulation is not pre-empted only when it conflicts with federal law. Rather, the Federal Government has occupied the entire field of nuclear safety concerns, except the limited powers expressly ceded to the States,
That being the case, it is necessary to determine whether there is a nonsafety rationale for § 25524.2. California has maintained, and the Court of Appeals agreed, that § 25524.2 was aimed at economic problems, not radiation hazards. The California Assembly Committee on Resources, Land Use, and Energy, which proposed a package of bills including §25524.2, reported that the waste disposal problem was “largely economic or the result of poor planning, not safety related.” Reassessment of Nuclear Energy in California: A Policy Analysis of Proposition 15 and its Alternatives, p. 18 (1976) (Reassessment Report) (emphasis in original). The Committee explained that the lack of a federally approved method of waste disposal created a “clog” in the nuclear fuel cycle. Storage space was limited while more nuclear wastes were continuously produced. Without a permanent means of disposal, the nuclear waste problem could become critical,
The Court of Appeals adopted this reading of §25524.2. Relying on the Reassessment Report, the court concluded:
“[S]ection 25524.2 is directed towards purposes other than protection against radiation hazards. While Proposition 15 would have required California to judge the safety of a proposed method of waste disposal, section 25524.2 leaves that judgment to the federal government. California is concerned not with the adequacy of the method, but rather with its existence.” 659 F. 2d, at 925.
Our general practice is to place considerable confidence in the interpretations of state law reached by the federal courts of appeals. Cf. Mills v. Rogers, 457 U. S. 291, 306 (1982); Bishop v. Wood, 426 U. S. 341, 346 (1976). Petitioners and amici nevertheless attempt to upset this interpretation in a number of ways. First, they maintain that § 25524.2 evinces no concern with the economics of nuclear power. The statute states that the “development” and “existence” of a permanent disposal technology approved by federal authorities will lift the moratorium; the statute does not provide for considering the economic costs of the technology selected. This view of the statute is overly myopic. Once a technology is selected and demonstrated, the utilities and the California Public Utilities Commission would be able to estimate costs; such cost estimates cannot be made until the Federal Government has settled upon the method of long-term waste disposal. Moreover, once a satisfactory disposal technology is found and demonstrated, fears of having to close down operating reactors should largely evaporate.
Third, petitioners note that there already is a body, the California Public Utilities Commission, which is authorized to determine on economic grounds whether a nuclear power-plant should be constructed.
Fourth, petitioners note that Proposition 15, the initiative out of which §25524.2 arose, and companion provisions in California’s so-called nuclear laws, are more clearly written with safety purposes in mind.
Although these specific indicia of California’s intent in enacting §25524.2 are subject to varying interpretation, there are two further reasons why we should not become embroiled in attempting to ascertain California’s true motive. First, inquiry into legislative motive is often an unsatisfactory venture. United States v. O’Brien, 391 U. S. 367, 383 (1968). What motivates one legislator to vote for a statute is not necessarily what motivates scores of others to enact it. Second, it would be particularly pointless for us to engage in such inquiry here when it is clear that the States have been allowed to retain authority over the need for electrical generating facilities easily sufficient to permit a State so inclined to halt the construction of new nuclear plants by refusing on economic grounds to issue- certificates of public convenience in individual proceedings. In these circumstances, it should be up to Congress to determine whether a State has misused the authority left in its hands.
Therefore, we accept California’s avowed economic purpose as the rationale for enacting §25524.2. Accordingly, the statute lies outside the occupied field of nuclear safety regulation.
Petitioners’ second major argument concerns federal regulation aimed at the nuclear waste disposal problem itself. It is contended that § 25524.2 conflicts with federal regulation of nuclear waste disposal, with the NRC’s decision that it is permissible to continue to license reactors, notwithstanding uncertainty surrounding the waste disposal problem, and with Congress’ recent passage of legislation directed at that problem.
Pursuant to its authority under the Act, 42 U. S. C. §§ 2071-2075, 2111-2114 (1976 ed. and Supp. V), the AEC, and later the NRC, promulgated extensive and detailed regulations concerning the operation of nuclear facilities and the handling of nuclear materials. The following provisions are relevant to the spent fuel and waste disposal issues in this case. To receive an NRC operating license, one must submit a safety analysis report, which includes a “radioactive waste handling syste[m].” 10 CFR § 50.34(b)(2)(i), (ii) (1982). See also 10 CFR § 150.15(a)(1)(i) (1982). The regulations specify general design criteria and control requirements for fuel storage and handling and radioactive waste to be stored at the reactor site. 10 CFR pt. 50, App. A, Criteria 60-64, p. 412 (1982). In addition, the NRC has promulgated detailed regulations governing storage and disposal away from the reactor. 10 CFR pt. 72 (1982). NRC has also promulgated procedural requirements covering license applications for disposal of high-level radioactive waste in geologic repositories. 10 CFR pt. 60 (1982).
Congress gave the Department of Energy the responsibility for “the establishment of temporary and permanent facilities for storage, management, and ultimate disposal of nuclear wastes.” 42 U. S. C. §7133(a)(8)(C) (1976 ed.,
The NRC’s imprimatur, however, indicates only that it is safe to proceed with such plants, not that it is economically wise to do so.
Nor has California sought through §25524.2 to impose its own standards on nuclear waste disposal. The statute accepts that it is the federal responsibility to develop and license such technology. As there is no attempt on California’s part to enter this field, one which is occupied by the Federal Government, we do not find §25524.2 pre-empted any more by the NRC’s obligations in the waste disposal field than by its licensing power over the plants themselves.
After this case was decided by the Court of Appeals, a new piece was added to the regulatory puzzle. In its closing week, the 97th Congress passed the Nuclear Waste Policy Act of 1982, Pub. L. 97-425, 96 Stat. 2201, a complex bill providing for a multifaceted attack on the problem. Inter alia, the bill authorizes repositories for disposal of high-level radioactive waste and spent nuclear fuel, provides for licensing and expansion of interim storage, authorizes research and development, and provides a scheme for financing. While the passage of this new legislation may convince state authorities that there is now a sufficient federal commitment to fuel storage and waste disposal that licensing of nuclear reactors may resume, and, indeed, this seems to be one of the purposes of the Act,
c
Finally, it is strongly contended that §25524.2 frustrates the Atomic Energy Act’s purpose to develop the commercial use of nuclear power. It is well established that state law is pre-empted if it “stands as an obstacle to the accomplishment and execution of the full purposes and objectives of Con
There is little doubt that a primary purpose of the Atomic Energy Act was, and continues to be, the promotion of nuclear power. The Act itself states that it is a program “to encourage widespread participation in the development and utilization of atomic energy for peaceful purposes to the maximum extent consistent with the common defense and security and with the health and safety of the public.” 42 U. S. C. § 2013(d). The House and Senate Reports confirmed that it was “a major policy goal of the United States” that the involvement - of private industry would “speed the further development of the peaceful uses of atomic energy.” H. R. Rep. No. 883, 89th Cong., 1st Sess., 4 (1965); H. R. Rep. No. 2181, 83d Cong., 2d Sess., 9 (1954); S. Rep. No. 1699, 83d Cong., 2d Sess., 9 (1954). The same purpose is manifest in the passage of the Price-Anderson Act, 42 U. S. C. § 2210, which limits private liability from a nuclear accident. The Act was passed “[i]n order to protect the public and to encourage the development of the atomic energy industry . . . .” 42 U. S. C. §2012(i). Duke Power Co. v. Carolina Environmental Study Group, Inc., 438 U. S., at 63-67.
The Court of Appeals’ suggestion that legislation since 1974 has indicated a “change in congressional outlook” is unconvincing. The court observed that Congress reorganized the Atomic Energy Commission in 1974 by dividing the promotional and safety responsibilities of the AEC, giving the former to the Energy Research and Development Administration (ERDA)
The Court of Appeals is right, however, that the promotion of nuclear power is not to be accomplished “at all costs.” The elaborate licensing and safety provisions and the continued preservation of state regulation in traditional areas belie that. Moreover, Congress has allowed the States to determine — as a matter of economics — whether a nuclear plant vis-a-vis a fossil fuel plant should be built. The decision of California to exercise that authority does not, in itself, constitute a basis for pre-emption.
IV
The judgment of the Court of Appeals is
Affirmed.
See U. S. Congress, Office of Technology Assessment, Managing Commercial High-Level Radioactive Waste 9 (Apr. 1982) (hereafter OTA Study).
“For the past several years the Department of Energy or one of its predecessors has been warning the Congress almost annually of the imminent closure of a number of nuclear power reactors as a result of the lack of available capacity to store the spent nuclear fuel.... No reactor has yet shut down for these reasons, largely because utilities have expanded their storage capacity.” H. R. Rep. No. 97-785, pt. 1, p. 47 (1982); the Office of Technology Assessment’s analysis found that “reactors are running out of storage space, and some may have to shut down by the mid-1990’s unless more storage space is made available on a timely basis.” OTA Study, at 27. See also Affidavit of Terry R. Lash (staff scientist for Natural Re
See H. R. Rep. No. 97-785, supra, at 46. “Waste disposal, at the present stage of technological development, refers to the storage of the very long lived and highly radioactive waste products until they detoxify sufficiently that they no longer present an environmental hazard. There are presently no physical or chemical steps which render this waste less toxic, other than simply the passage of time.” Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U. S. 519, 528, n. 6 (1978).
See generally Nuclear Fuel Cycle Committee, California Energy Commission, Status of Nuclear Fuel Reprocessing, Spent Fuel Storage and
High-Level Waste Disposal, Draft Report (1978) (App. 173-373); Report to the President by the Interagency Review Group on Nuclear Waste Management 37, 47, 61 (1979).
Committee on Nuclear and Alternative Energy Systems, National Research Council, National Academy of Sciences, Energy in Transition 1985-2010, pp. 314-316 (1979). See also Yellin, High Technology and the Courts, 94 Harv. L. Rev. 489, 534 (1981).
The uncertainty is reflected in the fact that since 1979 the Nuclear Regulatory Commission has been engaged in a proceeding to reassess the evidentiary basis for its position that safety considerations will not be compromised by continuing federal licensing while a waste disposal method is being developed. 44 Fed. Reg. 61373 (1979); see Minnesota v. NRC, 195 U. S. App. D. C. 234, 241, 602 F. 2d 412, 419 (1979). Moreover, the ultimate solution to the waste disposal problem may entail significant expenditures, affecting the economic attractiveness of the nuclear option.
The applicant must first file a notice of intention to file an application for certification, after which the Commission conducts a review process for not more than 12 months. If the notice of intention is approved, the applicant must then file an application for certification, after which the Commission conducts a further review process not to exceed 18 months. Unless certification is granted, the proposed plant cannot be constructed; if certification is granted the Commission is authorized to make certain specifications for construction of the plant and is directed to monitor the construction process.
After transmission of a Commission finding to the legislature, the certification of nuclear powerplants continues to be prohibited until 100 legislative days have elapsed without disaffirmance of the findings by either house of the legislature, or, if the findings have been disaffirmed but are then re-adhered to by the Energy Commission, if the legislature fails to void the renewed findings by statute within 100 legislative days after their retransmittal by the Commission.
The District Court found that §§ 25524.1 and 25524.2, coupled with the Energy Commission’s failure to make the required findings, made further investment by petitioners in nuclear plants “an unreasonable risk.” The court also found that if those sections and other provisions were held invalid, petitioners would reactivate plans for further nuclear plant development. 489 F. Supp., at 700-701.
The court also held unripe challenges to various certification provisions, Cal. Pub. Res. Code Ann. §§25500, 25502, 25504, 25511, 25512, 25514, 25516, 25517, 25519, 25520, 25523, 25532 (West 1977 and Supp. 1983), requirements that utilities acquire surrounding development rights, § 25528 (West Supp. 1983), and the reprocessing provisions of § 25524.1(a). The requirement that a utility propose at least three alternative sites, § 25503, was held ripe for review and not pre-empted by the Atomic Energy Act for reasons similar to those applied to § 25524.2. 659 F. 2d, at 915-918.
Section 271, 68 Stat. 960, as amended and as set forth in 42 U. S. C. § 2018, provides:
“Nothing in this chapter shall be construed to affect the authority or regulations of any Federal, State or local agency with respect to the generation, sale, or transmission of electric power produced through the use of nuclear facilities licensed by the Commission: Provided, That this section shall not be deemed to confer upon any Federal, State or local agency any authority to regulate, control, or restrict any activities of the Commission.”
Section 274(k), 73 Stat. 691, 42 U. S. C. §2021(k), provides:
“Nothing in this section shall be construed to affect the authority of any State or local agency to regulate activities for purposes other than protection against radiation hazards.”
The role of these provisions in the federal regulatory structure is discussed infra, at 208-211.
In the same appeal, the Ninth Circuit consolidated and decided a related challenge to §25524.2 brought by a nuclear engineer hired to work on a proposed nuclear plant who subsequently lost his job when the project was abandoned. The District Court had held that the engineer had standing to challenge the waste disposal law and that the law was preempted by the Atomic Energy Act. Pacific Legal Foundation v. State Energy Resources Comm’n, 472 F. Supp. 191 (SD Cal. 1979). The Court of Appeals disagreed with the District Court’s standing analysis and reversed. 659 F. 2d, at 911-914. We denied certiorari. 457 U. S. 1133 (1982).
Pacific Gas & Electric, for example, had spent at least $10 million before even filing a notice of intention to file an application for certification. Opinion at 489 F. Supp. 699 (ED Cal. 1980) (Finding of Fact No. 15, App. to Pet. for Cert. 72).
Finding of Fact No. 13, id., at 71.
Respondents also contend that the waste disposal provision question is not ripe for review because even if the law is invalid, petitioners’ injury— being prevented as a practical matter from building new nuclear power-plants — will not be fully redressed inasmuch as other sections of the Warren-Alquist Act, not before the Court, also prevent such construction. Respondents also suggest that this lack of redressability rises to the level of an Art. Ill concern. Both arguments are predicated entirely upon a statement in petitioners’ reply brief in support of the petition for certiorari that “unless and until the California certification system statutes are reviewed and at least largely invalidated/petitioners will not again undertake to build nuclear power plants in California.” Reply Brief for Petitioners 6. Respondents attempt to draw entirely too much from this statement. The California certification provisions do not impose a moratorium on new construction; in the main, they require that information be gathered on a variety of issues and be considered by the Energy Commission. Cal. Pub. Res. Code Ann. §§ 25500, 25502, 25504, 25511, 25512, 25514, 25516, 25517, 25519, 25520, 25523,25532 (West 1977 and Supp. 1983). It is unreasonable to presume that these informational requirements will exert the same chilling effect on new construction as would a moratorium. The Ninth Circuit concurs:
“[A] delay in adjudication will not cause any undue hardship for the parties. The certification scheme, in general, does not have an ‘immediate and substantial impact’ on the utilities. Gardner v. Toilet Goods Association, 387 U. S. 167, 171 . . . (1967); neither [Pacific Gas & Electric] nor [Southern California Edison] has a notice of intention or application for certification pending, and the threat that procedural burdens might someday be imposed or that certification might someday be denied for failure to meet Energy Commission standards is remote at best.” 659 F. 2d, at 916 (footnote omitted).
Respondents’ “fears” that petitioners will not seek to pursue the nuclear option, notwithstanding a favorable decision in this litigation, appear greatly exaggerated.
The Court of Appeals noted that the draft report by the State Energy Commission’s Nuclear Fuel Cycle Committee, which recommended requiring all nuclear plants to provide a specified amount of storage space, see Nuclear Fuel Cycle Committee, supra n. 4, at 113, does not necessarily render the provision ripe. The Committee report is only an indication of the views of two of five members of the Energy Commission in 1978. Not only may views change in the future, but the report itself cautions that it does not represent final agency action. Indeed, the full Commission’s decision on January 25, 1978, did not adopt this report or the Committee’s recommendations regarding on-site storage. Finally, the recently enacted Nuclear Waste Policy Act of 1982, Pub. L. 97-425, 96 Stat. 2201, 42 U. S. C. § 10101 et seq. (1982 ed.), authorizes the NRC to license technology for the on-site storage of spent fuel, § 133, and directs the Secretary of Energy to provide up to 1,900 metric tons of capacity for the storage of spent fuel, § 135; these provisions might influence the State Commission’s ultimate findings.
As early as 1920, many States had adopted legislation empowering utility commissions to regulate electric utilities. See Jones, Origins of the Certificate of Public Convenience and Necessity: Developments in the States, 1870-1920, 79 Colum. L. Rev. 426, 454-455 (1979). Today, every State has a regulatory body with authority for assuring adequate electric service at reasonable rates. House Committee on Interstate and Foreign Commerce, The Electric Utility Sector: Concepts, Practices, and Problems, 95th Cong., 1st Sess., 12 (Comm. Print 1977). For a description of the regulatory framework in effect in the States, see American Bar Association, Special Committee on Energy Law, The Need for Power and the Choice of Technologies: State Decisions on Electric Power Facilities (1981).
See also NRC Atomic Safety and Licensing Appeal Board, Consolidated Edison Co. of N. Y., Inc., 7 N. R. C. 31, 34 (1978): “States ... re
100 Cong. Rec. 12015, 12197-12202 (1954) (remarks of Sen. Hickenlooper); id., at 10559 (statements of AEC Chairman Strauss). Particularly instructive is an exchange on the House floor between Representatives Yates and Cole. Representative Yates inquired if the bill imposed the duty upon the Commission “to determine whether the public convenience and necessity require certain commercial institutions to be licensed to construct reactors for the production of power for civilian purposes?” Representative Cole responded that there was no such imposition to grant licenses based upon public convenience and necessity. “That,” he said, “is regulated by existing Federal and State authorities. We do not touch that in any respect.” Id., at 11689.
Authority could be shifted to the States for control over byproduct and source material, and over special nuclear material “in quantities not sufficient to form a critical mass.” California has signed a §274 agreement. Cal. Health & Safety Code Ann. §§25875-25876 (West 1967).
In addition to § 274(k), § 274(l), 42 U. S. C. § 2021(l), created an advisory role for the States respecting activities exclusively within the NRC’s jurisdiction, and § 274(g), 21 U. S. C. § 2021(g), directs the Commission to cooperate with the States even in the formulation of standards for regulation against radiation hazards.
“Because of these unique provisions in the act pertaining to AEC’s licensing and regulation of persons operating reactors which could be used to produce electricity, there was some feeling of uneasiness among the drafters of the legislation over the effect of the new law upon other agencies— Federal, State, and local — having jurisdiction over the generation, sale, and transmission of electric power. It was recognized by the drafters that the authority of these other agencies with respect to the generation, sale, and transmission of electric power produced through the use of nuclear facilities was not affected by this new law; and that the AEC’s regulatory
“The amendment of this section effected by this bill is intended as a clarification of the meaning of section 271 as originally enacted.” Id., at 10.
While expressions of a subsequent Congress generally are not thought particularly useful in ascertaining the intent of an earlier Congress, Senator Hickenlooper, the sponsor of the 1965 amendment, was an important figure in the drafting of the 1954 Act. Senator Pastore, also involved in the writing of the 1954 Act, elaborated:
“We were conscious that it was not desired that the AEC should engage in the business of regulating electricity as such. . . . We were trying to keep the AEC out of the business of regulating electricity. That is what gave birth to section 271. We provided that nothing in the act would affect the local supervising authority’s right to control the manufacture of electricity generated by nuclear facilities.” 111 Cong. Rec. 19832 (1965).
Our summary affirmance in Northern States Power Co. v. Minnesota, 447 F. 2d 1143 (CA8 1971), summarily aff’d, 405 U. S. 1035 (1972), is fully consistent with this reading of the division of regulatory authority. Minnesota’s effort to regulate radioactive waste discharges from nuclear plants fell squarely within the field of safety regulation reserved for federal regulation. The invalidation of this regulation in Northern States requires no retraction of the state authority preserved in §§ 271 and 274 of the Act. And, as with all summary affirmances, our action “is not to be read as an adoption of the reasoning supporting the judgment under review.” Zobel v. Williams, 457 U. S. 55, 64, n. 13 (1982); Mandel v. Bradley, 432 U. S. 173, 176 (1977) (per curiam).
In addition to the opportunity to enter into agreements with the NRC under § 274(c), Congress has specifically authorized the States to regulate
Cal. Pub. Util. Code Ann. § 1001 (West 1975 and Supp. 1983).
The 1976 amendments to the Warren-Alquist Act were passed as an alternative to Proposition 15, an initiative submitted to California’s voters in June 1976. (By their terms, these provisions would not have become operative if Proposition 15 had been adopted. Cal. Pub. Res. Code Ann. §25524.2, Historical Note (West 1977). The proposition was rejected.) Like § 25524.2, Proposition 15, among other things, barred the construction of new nuclear powerplants unless a permanent method of waste disposal was developed, though Proposition 15 gave as the reason for its concern the threat of harm to “the land or the people of . . . California.” Similarly, Cal. Pub. Res. Code Ann. § 25524.3(b) (West Supp. 1982) requires the State Energy Commission to undertake a study of underground placement and berm containment of nuclear reactors, to determine whether such construction techniques are necessary for “enhancing the public health and safety . . . .”
Petitioners correctly cite Perez v. Campbell, 402 U. S. 637, 651 (1971), for the proposition that state law may not frustrate the operation of federal law simply because the state legislature in passing its law had some purpose in mind other than one of frustration. In Perez, however, unlike this ease, there was an actual conflict between state and federal law. Perez involved an Arizona law that required uninsured motorists who had not satisfied judgments against them or had failed to pay settlements after accidents to prove their financial responsibility before the State would license them to drive again. The Arizona law, contrary to the Federal Bankruptcy Act, specified that this obligation would not be discharged in bankruptcy. We held the state law pre-empted, despite the fact that its purpose was to deter irresponsible driving rather than to aid in the collection
The Natural Resources Defense Council’s petition with the NRC claimed that the Atomic Energy Act required the agency to consider the safety aspects of off-site waste disposal in determining whether to license reactors. The NRC denied the petition, stating that it had to examine only on-site safety risks in its licensing decisions. 42 Fed. Reg. 34391 (1977). The NRC was not asked to consider whether nuclear reactors were sufficiently reliable investments in light of the unresolved waste disposal question, and the NRC did not address this issue. Nor was the issue raised in the review of the NRC’s decision in Natural Resources Defense Council, Inc. v. NRC, 582 F. 2d 166 (CA2 1978). As the Court of Appeals stated, “the issue ... is whether NRC, prior to granting nuclear power reactor operating licenses, is required by the public health and safety requirement of the [Atomic Energy Act] to make a determination . . . that high-level radioactive wastes can be permanently disposed of safely.” Id., at 170 (emphasis deleted).
Similarly, the NRC’s proceeding addressing the extent to which assessments of waste disposal technology should be factored into NRC reactor licensing does not address the economic ramifications of the issue. This matter has been the subject of prolonged litigation, and is presently pending before the Court. See Natural Resources Defense Council, Inc. v. NRC, 178 U. S. App. D. C. 336, 547 F. 2d 633 (1976), rev’d sub nom. Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U. S. 519 (1978), on remand, 222 U. S. App. D. C. 9, 685 F. 2d 459 (1982), cert. granted sub nom. Baltimore Gas & Electric Co. v. Natural Resources Defense Council, Inc., 459 U. S. 1034 (1982).
The Act itself, § 111(b), 42 U. S. C. § 10131(b) (1982 ed.), enumerates the following purposes:
“(1) to establish a schedule for the siting, construction, and operation of repositories that will provide a reasonable assurance that the public and the environment will be adequately protected from the hazards posed by high-level radioactive waste and . . . spent nuclear fuel. . . ;
“(2) to establish the Federal responsibility, and a definite Federal policy, for the disposal of such waste and spent fuel.” 96 Stat. 2207.
See also H. R. Rep. No. 97-785, pt. 2, pp. 59-60 (1982) (purpose of Act to provide “reasonable assurance that safe waste disposal methods will be
In 1977, ERDA’s functions were transferred to the Department of Energy. 91 Stat. 577, 42 U. S. C. § 7151(a) (1976 ed., Supp. V).
The Senate bill had included language prohibiting the ERDA from “giving unwarranted priority to any single energy source” out of concern that the ERDA “may give an unwarranted priority to development of nuclear power to the detriment of competing energy technologies.” S. Rep. No. 93-980, p. 27 (1974). The House bill expressed no concern about giving “unwarranted priority” to nuclear power. H. R. Rep. No. 93-707 (1973). The bill reported by the Conference Committee, and subsequently enacted, did not contain the Senate’s prohibitory language, but instead stated that all technologies were to be promoted. H. R. Conf. Rep. No. 93-1445, p. 25 (1974).
We recently rejected a similar claim that congressional policy to favor the use of coal as a fuel source pre-empted state legislation that may have
Our resolution of this case is not controlled by First Iowa Hydro-Electric Cooperative v. FPC, 328 U. S. 152 (1946). In First Iowa, this Court held that compliance with requirements for a state permit under Iowa law was not necessary in order to secure a federal license for a hydroelectric project. Allowing the States to veto federal decisions could “destroy the effectiveness of the Federal Act. It would subordinate to the control of the State the ‘comprehensive’ planning which the Act provides shall depend upon the judgment of [the Federal Government].” Id., at 164. In the same manner, requiring compliance with state requirements would have reduced the project to a size that the Federal Power Commission had determined was inadequate, and compliance with state engineering requirements could handicap the financial success of the project. The Atomic Energy Act does not give the NRC comprehensive planning responsibility. Moreover, § 25524.2 does not interfere with the type of plant that could be constructed. State regulations which affected the construction and operation of federally approved nuclear powerplants would pose a different ease.